CEMAT Q and A - 04SEP20.pdf

PDF 103 KB Posted

Attached to
Carrier Engineering Maintenance Assist Team (CEMAT) Federal contract opportunity
Solicitation number
N0002419R4304
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains questions and answers related to a Request for Proposals issued by the Naval Sea Systems Command for Carrier Engineering Maintenance Assist Team and Surface Engineering Maintenance Assist Team services. The solicitation seeks proposals for an Indefinite Delivery/Indefinite Quantity contract with a period of performance of five years to provide professional systems and equipment maintenance support onboard U.S. Navy vessels located around the world, including Norfolk, Newport News, Portsmouth, San Diego, Bremerton, Everett, and Yokosuka, Japan. The questions and answers provide clarification on requirements for facility descriptions, manpower charts, and labor categories in proposals, as well as granting an extension of the proposal due date to September 21, 2020. Pricing will be on a cost-plus-fixed-fee basis using pre-established composite rates for orders under the IDIQ contract.

View the file

Other files for this federal contract opportunity

Other files attached to Carrier Engineering Maintenance Assist Team (CEMAT), newest first.
File Type Posted
N00024-19-R-4304-0004.pdf PDF
N00024-19-R-4304-0004 Conformed.pdf PDF
N00024-19-R-4304-0003 Conformed.pdf PDF
N00024-19-R-4304-0003.pdf PDF
CEMAT Q and A - 27AUG20.pdf PDF
N00024-19-R-4304-0002 Conformed.pdf PDF
CEMAT Q and A - 14AUG20.pdf PDF
N00024-19-R-4304-0002.pdf PDF
N00024-19-R-4304-0001 Conformed.pdf PDF
CEMAT SEMAT Q and A - 11AUG20.pdf PDF
N00024-19-R-4304-0001.pdf PDF
J-1 TAM.pdf PDF
EXHIBIT A-DD 1423 GLOSSARY.pdf PDF
J-12 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-10NW.pdf PDF
J-7 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-05NW.pdf PDF
J-23 Attachment Key Personnel List.pdf PDF
J-17 042-007 Security Requirements for Work Within Norfolk Naval Shipyard.pdf PDF
J-24 Non-Key Reference Guide.pdf PDF
J-4 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-03NW.pdf PDF
N00024-19-R-4304 RFP - CEMAT SEMAT.pdf PDF
J-5 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-04NW.pdf PDF
J-14 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-12NW.pdf PDF
J-8 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-06NW.pdf PDF
EXHIBIT A-CEMAT CDRLs 6.16.2020 signed.pdf PDF
J-25 DD 254.pdf PDF
J-3 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-02NW.pdf PDF
J-21 NAVSEA INST 5100.3E.pdf PDF
L-2 RIS Past Performance Questionnaire (PPQ) CEMAT.docx DOCX document
J-19 042-037 General Requirements for Work Within Naval Station Norfolk.pdf PDF
L-3 Cost Proposal Format CEMAT.xlsx XLSX spreadsheet
J-20 077-001 Hazardous Waste Produced on Naval Vessels.pdf PDF
J-10 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-08NW.pdf PDF
J-13 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-11NW.pdf PDF
J-2 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-01NW.pdf PDF
J-9 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-07NW.pdf PDF
J-6 FY20 099-05PH MISC.pdf PDF
J-11 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-09NW.pdf PDF
L-1 Bidder Question Submittal Form CEMAT.xlsx XLSX spreadsheet
J-16 042-006 General Occupational Safety Health and Environment (OSHE) Requirements for Work Within Norfolk Naval Shipyard.pdf PDF
J-22 Contractor Badging and Access Requirements Solicitation (HL).pdf PDF
J-18 042-010 Nuclear Powered Ships-Nuclear Support Ships.pdf PDF
J-15 042-005 NNSY Work Authorization Form (WAF) Requirements.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-19-R-4304 CEMAT/SEMAT 04 SEP 2020

Question Number:

Question Source: (RFP Section, Attachment #, etc.)

Page Number and Paragraph Header from Source:

Question: Answer:

1 Section L, Factor 3 ‐ Resource Capabilities Page 133 Will the Government consider excluding the Staffing Plan (without cost) in the Excel file format from the page count for Factor 3 – Resource Capabilities?

Previously addressed in AMEND 0003, pg 118, 3.2.

2 Sec. L

p. 132, Factor 3 Resource Capability

Instruction; p. 26‐ 27 4.1 Facility Location & 4.2 Facility Function

Factor 3 Reference #1 requires a description of “the total facility resources available to the organization”. Will the Government please confirm that only the facilities required by the SOW are to be described?

Yes. Facility Location requirements are described in Section C, SOW 4.1 of the RFP.

Offerors must address facility requirements listed on pg. 27.

Factor 3 Reference #2 requires a description of “production and administrative facilities”; however, SOW 4.2 identifies only “administrative and supervisory management functions” at these locations.

Additionally, the hours allocated to contractor site performance in Table 17A indicate minimal hours for personnel other than administrative and management personnel at these locations.

3a Will the Government please clarify that there is no requirement for production support at contractor facilities, and adjust Section L Factor 3?

Offerors shall review Sect. C, SOW 4.0, Facility Requirements as addressed in the RFP.

No adjustment to Section L is required.

3b If maintaining this requirement, will the Government please clarify what production support is required for all offerors to respond?

See above response.

4 Sec. L

p. 132, Factor 3 Resource Capabilities Instruction,

p. 137, CLIN 0001 Labor Mix Discussion

Factor 3 Reference #3 requires manpower charts that includes “the ratio of mechanic/journeymen to unskilled labor/helpers”; however, there are no labor categories provided in Table 17A that align to these two labor classifications. Will the Government remove this requirement from the RFP?

Yes. Reference #3 has been removed and the numbering was updated. See AMEND 0004.

Factor 3 Reference #4 requires availability “manpower charts displaying total shipyard and subcontractor workload [to] provide a plan to accommodate any peaks or valleys in workload.” The SOW provides only a broad description of the work to be performed, and leaves the level of detail necessary to develop availability man‐loading charts to future task orders.

5a

Will the Government remove the requirement to provide these man‐loading charts from Section L Factor 3?

Yes. Reference #4 has been removed and the numbering was updated. See AMEND 0004.

5b If maintaining this requirement, will the Government please provide the availability work package information necessary to develop them?

N/A

6a

Factor 3 Reference #4 requires availability “manpower charts displaying total shipyard and subcontractor workload [to] provide a plan to accommodate any peaks or valleys in workload.” SOW

1.2.3 provides a list of 70 systems, but indicates this is not an all‐inclusive list. Will the Government please clarify that for purposes of the manpower charts all systems included on this list requiring CEMAT/SEMAT material condition assessment in each availability and no additional systems?

Addressed above.

6b

Will the Government please clarify that for purposes of the manpower charts all systems included on this list requiring CEMAT/SEMAT material condition assessment in each availability and no additional systems?

N/A

6c Will the Government please clarify what basis should be used to estimate the associated production work?

N/A

Sec. L

p. 132, Factor 3 Resource Capabilities Instructions;

p. 27, 4.2 Facility Function;

p. 137, CLIN 0001 Labor Mix Discussion

Sec. L

p. 132 Factor 3 Resource Capability

Instructions;

p.12‐28, Section

C

Sec. L

p. 132, Factor 3 Resource Capability Instructions p.12‐14 1.2.3

Task Break Down

Source Selection Information‐ See FAR 2.101 and 3.104 1 of 3

Number:

Question Source: (RFP Section, Attachment #, etc.)

Page Number and Paragraph Header from Source:

Question: Answer:

RFP, J26 & J27, CEMAT Industry Day Q&A

Document

p. 132 Factor 3 Resource Capabilities Instructions;

Attachments J26 & J27

It was briefed by the Government at the CEMAT/SEMAT Industry Day that on the East Coast CEMAT is used primarily in support of Continuous Maintenance Availabilities (CMAVs) which are not included in the availability schedules provided as Attachment J26 and J27, which are used to form the basis of the Overall Resource Plan required in the proposal. Will the Government please clarify what portion of the effort is expected to be in support of CNO Availabilities and Fleet Availabilities respectively, for the purpose of constructing the availability Manpower charts required in the Overall Resource Plan?

See above response.

8 Sec. L

p. 132, Factor 3 Resource Capabilities

Instruction; p.

137 CLIN 0001

Labor Mix Discussion

Factor 3 Reference #5 requires a craft/trade staffing plan, however there is no craft/trade labor in the labor categories provided in Table 17A. Will the Government please remove the requirement for a craft/trade staffing plan?

The word "craft/trade" has been removed per AMEND 0004. Staffing plan is still required. Please note that Ref. #5 is now #3 after the edits referenced above.

9 RFP SF‐33 Block #9

Considering the significant impact of pending information and answers to be provided by the Government for Offerors to respond to the solicitation requirements, would the Government please grant a three week extentsion for proposals to be submitted on October 2, 2020?

The Government is extending the due date for proposals from Sept. 11 to Sept. 21, 2020. See AMEND 0004. The Q&A period is NOT extended.

10 Sec. L p 119 Physical

Format

Will the Government please confirm if Tables submitted in the proposal are to be considered Diagrams and follow the same font criteria as noted in Section L?

Yes, type no smaller than 8‐point font size and 1 inch margins.

11 Sec. L p 119 Physical

Format

Will the Government please confirm if Tables are not considered diagrams, if Offerors may use Times New Roman 10pt font?

See above response.

Based on the Government’s desire to control contract cost by requesting fixed indirect rates for the contract duration:

12a Will the Government please change CLIN 0001 to a Time and Materials (T&M) by Labor Category type

CLIN?

No.

12b Will the Government please change CLIN 0001 to a Fixed Labor Rate type CLIN by Labor Category? No.

13 RFP

Amendment 3 as posted to beta.SAM.gov

The AUG. 27, 2020 "Description" in the beta.SAM.gov posting of Amendment 3 stated: "Questions and Answers and a corresponding amendment (0003) have been posted. Any questions still pending responses and necessary amendments will be posted as soon as possible." Does NAVEA anticipate issuing further Amendments to the Solicitation?

Yes. See AMEND 0004.

14 Sec. B, Sec. L Pg. 7, Note B and Pg. 137, 4.4.1.5

The government has specified (pg. 137) that a single, composite rate is to be bid for each year, and that, "The composite rate will be used for all orders issued under the IDIQ." The RFP also states that , under Note B (pg. 7), "Each order placed will use the contract composite rate established for that ordering period.", but that, "During Execution, the Contractor shall bill actual costs under CLIN 0001."

Could the government please clarify the use of the composite rate, both during ordering and performance, as well as confirm that actual cost and billing during performance will be CPFF and that the composite rate would not effect accumulation of costs and/or billing under the contract.

This is LOE. Yearly pre‐established composite rate multiplied by estimate of hours will provide final total dollars applicable to the delivery order. Actual cost plus fixed fee are paid.

15 RFP General

Respectfully request a two (2) week extension to the current due date and time of 11 SEP 2020 @ 1600 to 25 SEP 2020 @ 1600. Particularly at this time of the Government fiscal year, the fact that some contractors' Questions have only recently been answered and that the Government has noted that there is additional Q&A to come (both of which could significantly impact proposal development), it will be a challenge to prepare a fully compliant and competitive response by 11 SEP 2020.

An extension is being granted through 21 SEP 2020. See AMEND 0004.

Sec. B p 2, Section B Supplies or Services and Prices, Labor Support;

p. 137 4.4.2 Detailed Cost Data for CPFF CLINs 0001, 0002, and 0003

Source Selection Information‐ See FAR 2.101 and 3.104 2 of 3

Number:

Question Source: (RFP Section, Attachment #, etc.)

Page Number and Paragraph Header from Source:

Question: Answer:

16 Section L Page 139

Is the Offeror allowed to propose additional labor categories as long as the Offeror remains within the grand total number of hours provided by the government in the solicitation? If so, would the government please revise Section L of the RFP accordingly?

Yes. This was answered in Q&As previously posted.

17 Sec. L

p. 145, L‐215‐ H007

SUBMISSION OF

QUESTIONS BY

OFFERORS —

ALTERNATE I

(NAVSEA) (FEB

2020)

Due to the impact of the responses and amendments for outstanding questions, there was a previous question submitted requesting a three week extension for proposals to be due October 2, 2020. Since the Government's responses to outstanding questions and the associated amendments may have need for further clarification, will the Government please extend the deadline for receipt of questions by three weeks to 12 PM ET on September 18, 2020?

See AMEND 0004 and prior Q&A response.

Source Selection Information‐ See FAR 2.101 and 3.104 3 of 3