This local standard item and related federal contract opportunity outline requirements for engineering maintenance support services on Navy aircraft carriers and surface vessels. The indefinite delivery, indefinite quantity contract will have a five year ordering period and seek cost plus fixed fee pricing. The Naval Sea Systems Command will award the contract to provide Carrier Engineering Maintenance Assist Team and Surface Engineering Maintenance Assist Team services globally, with major locations including Norfolk, Newport News, Portsmouth, San Diego, Bremerton, Everett, and Yokosuka. The services will support repairs and training for ship's force equipment operators and maintenance technicians. Responders should contact the identified point of contact for attachments containing further details.

View the file

Other files

File Type Posted
N00024-19-R-4304-0004 Conformed.pdf PDF
CEMAT Q and A - 04SEP20.pdf PDF
N00024-19-R-4304-0004.pdf PDF
CEMAT Q and A - 27AUG20.pdf PDF
N00024-19-R-4304-0003 Conformed.pdf PDF
N00024-19-R-4304-0003.pdf PDF
N00024-19-R-4304-0002 Conformed.pdf PDF
N00024-19-R-4304-0002.pdf PDF
CEMAT Q and A - 14AUG20.pdf PDF
N00024-19-R-4304-0001 Conformed.pdf PDF
N00024-19-R-4304-0001.pdf PDF
CEMAT SEMAT Q and A - 11AUG20.pdf PDF
J-22 Contractor Badging and Access Requirements Solicitation (HL).pdf PDF
J-13 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-11NW.pdf PDF
EXHIBIT A-DD 1423 GLOSSARY.pdf PDF
J-17 042-007 Security Requirements for Work Within Norfolk Naval Shipyard.pdf PDF
J-14 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-12NW.pdf PDF
J-5 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-04NW.pdf PDF
J-8 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-06NW.pdf PDF
J-24 Non-Key Reference Guide.pdf PDF
J-25 DD 254.pdf PDF
J-15 042-005 NNSY Work Authorization Form (WAF) Requirements.pdf PDF
J-16 042-006 General Occupational Safety Health and Environment (OSHE) Requirements for Work Within Norfolk Naval Shipyard.pdf PDF
J-2 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-01NW.pdf PDF
J-11 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-09NW.pdf PDF
J-12 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-10NW.pdf PDF
N00024-19-R-4304 RFP - CEMAT SEMAT.pdf PDF
J-1 TAM.pdf PDF
J-7 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-05NW.pdf PDF
EXHIBIT A-CEMAT CDRLs 6.16.2020 signed.pdf PDF
J-18 042-010 Nuclear Powered Ships-Nuclear Support Ships.pdf PDF
J-6 FY20 099-05PH MISC.pdf PDF
J-9 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-07NW.pdf PDF
J-4 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-03NW.pdf PDF
J-23 Attachment Key Personnel List.pdf PDF
L-1 Bidder Question Submittal Form CEMAT.xlsx XLSX spreadsheet
J-19 042-037 General Requirements for Work Within Naval Station Norfolk.pdf PDF
J-10 FY20 CHG-1 NWRMC LOCAL STANDARD ITEM 099-08NW.pdf PDF
J-21 NAVSEA INST 5100.3E.pdf PDF
L-2 RIS Past Performance Questionnaire (PPQ) CEMAT.docx DOCX document
L-3 Cost Proposal Format CEMAT.xlsx XLSX spreadsheet
J-20 077-001 Hazardous Waste Produced on Naval Vessels.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 of 3 ITEM NO: 099-02NW

FY-2020

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

NWRMC

LOCAL STANDARD ITEM

ITEM NO: 099-02NW

DATE: 01 JUL 2016

CATEGORY: I

1. SCOPE:

1.1 Title: General Contractor Environmental Protection Requirements for Bremerton Naval Complex (BNC); accomplish

1.2 Location of Work:

1.2.1 None

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 None

3. REQUIREMENTS:

3.1 Accomplish Environmental Duties, Responsibility, and Liability as follows:

3.1.1 Comply with Local, State, and Federal environmental

regulations and environmental requirements per the Job Order during performance of this contract.

3.1.2 Ensure subcontractors understand and comply with Local, State, and Federal environmental regulations and environmental requirements of the Job Order applicable to their work under this contract.

3.1.3 Minimize pollution or waste generation at the source.

3.1.4 Notify the SUPERVISOR immediately if the situation is an immediate threat to human health or the environment.

3.1.4.1 Call the Regional Dispatch Center at 911 on a PSNS & IMF telephone or (360) 476-3333 on an outside line or cellular phone.

3.1.5 Failure to comply with or repeated violations of environmental protection requirements can result in the violator(s) losing access to the BNC or the operation being suspended until the contractor can demonstrate appropriate corrective action has been completed.

3.1.6 Comply with regulatory notices or orders, including payment of any fines attributable to the contractor’s conduct, regardless of whether or not the contractor is the named recipient of the notice, order, or fine. The Government shall not incur additional cost to the contract due to contractor violation of environmental protection requirements.

3.2 Schedule and facilitate a meeting with PSNS and IMF project team to discuss and validate compliance with the requirements of the Job Order including site Specific Government requirements, 5 days prior to availability start date.

2 of 3 ITEM NO: 099-02NW

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative,

3.3 Accomplish Personnel Assignments as follows:

3.3.1 Ensure all personnel are sufficiently trained to understand and comply with the environmental requirements applicable to their work assignment.

3.3.2 Designate a qualified Environmental Coordinator to ensure environmental compliance for the duration of the contract. The coordinator’s duties are to:

3.3.2.1 Know federal, state and Local Environmental Protection regulations.

3.3.2.2 Know the environmental protection requirements of the Job Order.

3.3.2.3 Conduct frequent inspections of work and storage areas for cleanliness, appropriate waste, material management, air, and water pollution controls.

3.3.2.4 Ensure complete and accurate records and documentation of environmental performance are being maintained.

3.3.2.5 Be the primary point of contact for Investigation and resolution of environmental compliance issues, including those involving subcontractors.

3.3.3 Demonstrate qualification of the Environmental Coordinator by providing evidence of one or more of the following, in precedence order:

3.3.3.1 Completion of specialized training in environmental

regulations and requirements applicable to this contract per paragraph 3.4.

3.3.3.2 Documented experience in performing the duties of

paragraph 3.3.2.

3.3.4 Designate a hazardous waste (HW) accumulation area operator (AAO) when the contractor expects to generate and accumulate HW. The duties of the AAO are to control and manage the contractor accumulation area.

3.4 Accomplish Environmental Training as follows:

3.4.1 Provide documentation of training upon request by the

SUPERVISOR.

3.4.2 Ensure all their personnel working at the BNC, their

supervisors, and their subcontractors are aware of the facility-specific environmental requirements specified in the Job Order applicable to their work under this contract.

3.4.3 The contractor’s or subcontractors designated Hazardous Waste Accumulation Area Operator must successfully complete the HW and Polychlorinated Biphenyls (PCB) Management Branch (Code 106.33) contractor training course prior to generation of waste. The Code

106.33 site specific training course is provided monthly and is paid (instructor’s fee only) for by the Government.

3 of 3 ITEM NO: 099-02NW

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative,

3.4.3.1 Schedule HW49 training via the SUPERVISOR.

3.5 Accomplish Contact with Regulatory Agencies as follows:

3.5.1 All contacts with environmental regulatory agencies shall be coordinated in advance with Code 106.13 via the SUPERVISOR.

3.5.2 Records required to be maintained on site shall be made available to government or regulatory inspectors at the time of inspection. Other documents requested by a regulatory agency must be turned over to the SUPERVISOR within 24 hours of the request. Code 106 and the SUPERVISOR will review and forward document(s) to the requesting agency.

3.5.3 Provide the SUPERVISOR copies of correspondence or a summary of verbal communication, related to this contract, between the contractor and the regulatory agency within 24 hours.

4. NOTES:

4.1 Local Standard Item Requirements apply to Prime Contractors and their subcontractors.

4.2 BNC includes Puget Sound Naval Shipyard & Intermediate Maintenance Facility PSNS&IMF Bremerton site and Naval Base Kitsap (NBK) at Bremerton.

4.3 The SUPERVISOR will consult with PSNS & IMF, Code 106 for clarification of any requirements specified in this local standard item.