N00024-17-R-4312 A0002
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment to Solicitation N00024-17-R-4312 is to: 1) Provide answ ers to bidder's questions as Enclosure 1; 2) Revise Section E to add clause title to HQ E-1-0006; 3) Revise Section L to make an update to the Staff ing Plan instructions. Accordingly, the Solicitation is hereby amended as follow s:
1. CONTRACT ID CODE PAGE OF PAGES
S 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Dec-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002417R4312
X 9B. DATED (SEE ITEM 11)
21-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Dec-2017
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002417R4312
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SECTION E - INSPECTION AND ACCEPTANCE
The following have been modified:
HQ E-1-0006 INSPECTION AND ACCEPTANCE OF PTD
Item(s) 0013 - The Government may accept, conditionally accept, or reject the Provisioning Technical Documentation (PTD) within sixty days after its delivery, or as specified on the applicable CDRL(s). A notice of conditional acceptance shall state any corrective action required by the Contractor. If PTD is rejected, the Contractor may be required, at the option of the Government, to correct any or all of the PTD. The Contractor shall at no additional cost to the Government make any necessary changes, modifications or corrections to the PTD. The Government shall take action on the corrected PTD within the time limit specified above. Government action under this requirement shall not affect or limit any other rights it may have under this contract.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L: INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
Change to Section L – Page 138/159
From:
The Government will evaluate the labor mix according to the Offeror’s specific technical approach, but Offerors that deviate from this historical production labor mix bear the burden of demonstrating that their labor mix will meet the Government’s requirements and is consistent with their proposed technical approach.
HISTORICAL PRODUCTION LABOR MIX
CRAFT/TRADE PERCENTAGE OF TOTAL LABOR MIX
Execution/Integration/Quality Assurance 10%
Advanced Planning 60% Engineering Support 10% Logistics/Purchasing 20%
The proposed Staffing Plan must be consistent with the Offeror’s technical approach, as described in Volume I, Evaluation Factor II. This plan shall also be clearly traceable to the Cost Volume (Volume II).
To:
N0002417R4312
The Government will evaluate the labor mix according to the Offeror’s specific technical approach, but Offerors that deviate from this historical production labor mix bear the burden of demonstrating that their labor mix will meet the Government’s requirements and is consistent with their proposed technical approach.
HISTORICAL PRODUCTION LABOR MIX
CRAFT/TRADE PERCENTAGE OF TOTAL LABOR MIX
Execution/Integration/Quality Assurance 10%
Advanced Planning 60% Engineering Support 10% Logistics/Purchasing 20%
The proposed Staffing Plan must be consistent with the Offeror’s technical approach, as described in Volume I, Evaluation Factor II. This plan shall also be clearly traceable to the Cost Volume (Volume II). The Staffing Plan will not count toward the total page count limitation provided in Section L Paragraph 3.1 and may be included as a separate attachment on the CD-ROMs provided in response to this solicitation.