This document is a Government Responses to Industry Questions document for the C-40A Contractor Logistics Support (CLS) solicitation, numbered N0001925R0003. The document contains detailed responses to 125 industry questions covering various aspects of the proposed IDIQ contract, including technical requirements, performance work statement (PWS) clarifications, past performance submission guidelines, and administrative details.
Key highlights include the government extending the proposal submission deadline to 12 May 2025, clarifying requirements for commercial parts pools, depot maintenance procedures for aircraft components like landing gear and airstairs, and addressing questions about pricing, shipping, and maintenance processes. The solicitation seeks a single contractor to provide comprehensive logistics support for 17 US Navy and 2 US Marine Corps C-40A aircraft, with responses addressing technical, operational, and administrative nuances of the proposed contract. The government will procure initial parts for upgrades, new capabilities, and changes, with the contractor responsible for subsequent replacements and maintenance under specific contract line item numbers (CLINs).
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Set # 3 (Formal RFP) 17 April 2025
Government Responses to Industry Questions N0001925R0003 Enclosure (1)
Industry Feedback Worksheet
1 A: Gen. Info General
In the Final RFP release, there were duplicated files for most of the attachments/documents. Please explain the difference in the two versions. Can the Contractor assume that the attachments with the " _1" (underscore numeral 1) take precedence and are so numbered so that they represent the FINAL RFP?
Although only the most recent documents appear within the formal RFP link, the Solicitation module automatically downloads both versions (draft and final) of documents when "download all documents" is selected. There is not currently a means for the Government to remedy this. However, the Contractor may download documents individually to ensure the most current version is used. Additionally, the Government will be posting an amended RFP package and will re-post all documents designating them as "Final" at the end of the titles.
2 A: Gen. Info N/A Is Appendix K included in the Final RFP Release? No. Appendix (K) has been removed and a Section H clause included in the contract instead.
3 L: B-3 N/A Vol 3 Technical instructions require the contract to include Features and Benefits Attachment L3 in this volume. Is the Features and Benefits Table (Table T-1 excel) included in the Technical Volume allowed page count of 40 pages?
Table T-1 is not included in the suggested page count.
4 L: B-4 N/A The Section L instructions for Volume 4 Past Performance does not specify how many PP Contract citations are allowed for this volume, and specifically for the Prime entity and the significant subcontractors. Can the Government please specify how may PP citations are allowed?
The Government is not limiting the number of contract references the Contractor may submit. The Contractor may submit any contract references that meet the definitions set forth in the solicitation.
5 L: B-4 N/A Can the contractor include subcontractor or teammate Past Performance Contracts as Relevant References in the PP Volume from Joint Venture/Principal Subcontractor Companies for P2 Entities as identified in Table CA-2 Workshare?
Yes. However, the relevant contract references shall align with the roles and responsibilities for the respective entity and shall be numbered in accordance with Attachment L-1, Tab CA-3. Definitions of Very Relevant and Somewhat Relevant have been updated to clarify.
6 L: B-3 N/A Instructions for Vol 3 Technical Section 3.1.2 require the contractor to provide Letters of Intent (LOI) and Letters of Agreement (LOA) for commercial parts and material at each MOB. Are these LOIs/LOAs included in the Technical Volume page count?
No, LOIs and LOAs are not included in the Technical Volume Page count.
7 L: B-3 N/A
Section L Instructions for Vol 3 Technical (page 108) Table T-2 Cross Reference Matrix has some duplications in the column for the PWS references. For instance, Both Section L paragraphs 3.1 and 3.2 show PWS paragraph 9.0. Similarly, Section 3.2 has a reference to PWS Paragraphs 8.0 and 9.0 which are not directly related to Commercial Line Maintenance and Ground Operating Procedures. Should the PWS references for Section 3.2 actually be 7.0, 7.2, 7.6 and 11.0 as reflected in the instruction narrative?
Table T-2 Cross Reference Matrix has been updated with applicable PWS paragraphs. Please see latest Solicitation Amendment for final updates.
8 L: B-3 20 Is PWS Paragraph 20.0 (as a reference) missing in the Table T-2 Cross Reference Matrix for the Technical Volume in Section L? Table T-2 Cross Reference Matrix has been updated with applicable PWS paragraphs. Please see the latest Solicitation Amendment for final updates.
9 L: B-3 General Can the Government confirm that Contractor's Proposal must address only the PWS items in the Table T-2 Cross Reference Matrix to be compliant?
Table T-2 lists the minimum requirements to be addressed in the proposal. The Contractor may elect to provide additional information related to other PWS requirements.
10 N/A 3 Paragraph 1.3 in the PWS lists the CLS tasks to be performed. In the Final RFP release, the task for "On-wing Engine Repair" was added.
Can the Government specify what specific engine repair services are included under "On-wing Engine Repair"
The Contractor shall provide Depot-Level engine support for repairs that can be made on wing. For example, Non-Destructive Testing (NDT) after a Foreign Object Damage (FOD) incident. This includes any repair that can be completed without the engine being removed, both at the Contractor's depot facility and in the field by a depot field team.
11 N/A 3 PWS Paragraph 3.4.1.1 Government Property (GP) in the PWS states that GP Inventory shall be dispositioned under the appropriate repair process. Can the Government provide that appropriate disposition detail?
PWS Paragraph 3.4.1.1 has been updated to read "A part removed from the aircraft and replaced with an item from the GP inventory shall be repaired or replaced under CLIN 0014, Government Property Replenishment."
12 N/A 3 Paragraph 3.8 Program Cybersecurity Implementation Plan in the PWS specifies that a Systems Security or Cybersecurity Engineer mus tbe dedicated to the program. Can the Government confirm that the intent is to include this position in the proposed headcount?
The Contractor is required to assign those duties to a specific person with the necessary credentials. The Government does not dictate a headcount.
13 N/A 3 PWS Paragraph 3.14.2.7 Readiness Teleconferences states : "The Contractor shall attend and participate in Readiness teleconferences....Heads Up Display (HUD)". Is the reference to HUD a typo or is this a separate teleconference the contractor must attend?
This is not a typo and is a separate teleconference that will require Contractor participation.
14 N/A 7
Can the government explain this note in the PWS which states: "NOTE: The term “NMCS/NMCM” is the DoN equivalent of the industry term “AOG”."
Contractor Comment: Aircraft on Ground (AOG) and the terms NMCS/NMCM are not typically the same definition.
The Note is intended for general context. The metrics are listed in Attachment 1, Appendix I. If Offerors have specific questions about the metrics, please identify.
For the purposes of this contract, NMCS/NMCM is equivalent to industry term AOG. NMCM/NMCS are terms used in the Naval Aviation Maintenance Program and translate to the aircraft being not mission capable for either maintenance or supply.
15 N/A 28 PWS Paragraph 28 Over-and-Above Work includes a reference to "Section H of the base IDIQ Contract" . Which contract is referred to?
Is this reference an error?
The PWS references the awarded IDIQ contract which is derived from Sections A-K of this solicitation (N0001925R0003). Section H contains clauses pertaining to Over-and-Above Procedures.
16 N/A 13
Section 13 - O&A clarification. When does this CLIN get exercised? What conditions need to be met for O&A to begin? What is considered unforseeable?
O&A efforts are those that arise during performance of a task order, not included in the awarded scope, and required in order to satisfactorily complete the requirement.
An "unforeseeable" effort would be one that is not related to the scope of the effort and could not have been anticipated.
Note that, pursuant to the PWS, some task orders may not qualify for O&A work unless a PoP extension is warranted and approved.
17 B: CLINs 12
Section 12.12 calls out "…associated repairs and requested service actions." Does this refer to the Scope of the card, or does this apply to any discrepancies found during the C Check inspection? I.E. Discrepancies found that will incude Engineering Evaluation, parts manufacturing, etc? Will these be charged to the FFP C-Check CLIN or to the O&A CLIN?
The FFP of C-Checks shall be for the labor performed during the time period specified in the PWS and can be proposed utilizing the historical data provided in the Technical Library. The depot time requirement includes all changes from the baseline task card list, discrepancy repairs, Service Actions, and O-Level Work Requests.
When the Contractor identifies a repair requiring Engineering Evaluation, Parts Manufacturing, etc, that may not be completed within the Turn Around Time, the Contractor may submit an OAWR form in accordance with the O&A clause.
18 B: CLINs General PWS__2025_03_14__Clean calls out "Appendix K" throughout the document, but on page 55, Appendix K has been removed. Is there a reason?
Appendix (K) has been removed and a H-Clause is utilized in its place.
The PWS has been updated to correct the references inadvertantly missed.
19 L: B-1 N/A Section L Paragraph B-1.3, Item 7 (page 106) addressing Model Contract Documents, looks out of place? Can the government confirm that a Written Plan for "Section J, Attachment 1 Performance Work Statement " for the IDIQ contract is a requirement for this sumbittal?
The plan created in accordance with the provision at DFARS 252.237-7024 will become a contract attachment and therefore is submitted as part of the proposal. In times of crisis, the plan would be implemented.
20 L: A-1 N/A Section L Paragraph A.2.1.6 (Page 102-103) Table G-1, Identifies the Offeror File Naming and Proposal Structure. Can the government please confirm that for Annex B and Annex D, Offerors should submit both a PDF copy and a Word copy of the each Annex?
The Government has updated Section L to specify that Annex B and Annex D shall be submitted as pdf documents. However, all documents submitted shall be fully searchable. Please see Table G-1 in the most recent Solicitation Amendment for final updates.
21 L: A-1 N/A
Section L Paragraph A. 4.0 (Page 103). 4.0 Proposal Packaging and Early Submission, states submission requirements. Can the Government confirm that the request to submit one electronic copy of Volume 1 Contract Administration, Tables CA-1, CA-2 and CA-3, Volume 4 Past Performance, Table PP-1 and Annex A, for all contract references, 14 calendar days prior to the submission date/time specified on Standard Form 1449 (Block 8), is optional and that a final submission later on the 28 April 2025 due date would be compliant?
Although optional, early submission of the CA-2 and CA-3 Tables is highly encouraged as the Government intends to begin the Past Performance data collection process as soon as possible. However, submission by the deadline is acceptable.
22 L: B-1 N/A Section L Paragraph B-1.4.1 Authorization Letters (Pages 110-111) has requirements for the "Release of Adverse Past Performance Authorization Letter(s)". Can the Government please confirm that “Release of Adverse Past Performance Authorization Letter(s)” are required for both JV members and subcontractors, if using their past performance?
Yes. Past Performance Authorization Letters are required for JV Members and Subcontractors.
Question/Comment Government ResponseNo.
Solicitation
Section
PWS
Section
Att.
App.
CDRL
Government Responses to Industry Questions N0001925R0003 Enclosure (1)
Industry Feedback Worksheet
Question/Comment Government ResponseNo.
Solicitation
Section
PWS
Section
Att.
App.
CDRL
23 L: B-3 3.4.1 In reference to PWS 3.4.1 Commercial Parts Pool, will the government please provide a list of the "Component parts" of end items listed in Appendix (B), High Value Asset (HVA) Spares [that] are subject to commercial parts pool requirements?
Any HVA component that is considered a Line Replaceble Unit (e.g., engine fan blade, APU starter generator, Aft Air Stair hydraulic pump, etc.) is subject to commercial parts pool requirements. The Government will not provide a list of HVA component parts.
24 N/A 3.1
PWS 3.1 states: "... the Contractor shall comply with 14 CFR Part 43 to keep the aircraft within FAA Type Design by meeting the intent of 14 CFR Part 121 Subparts L and V for maintenance, preventative maintenance, alterations, and associated aircraft and engine records." Also PWS 3.4 states: "The Contractor’s maintenance practices and parts management activities shall be performed in support of ETOPS-180 requirements. ETOPS-180 requires the C- 40A maintenance program to follow FAA directives, including 14 CFR Part 121, Appendix P."
QUESTION: Will the goverrnment confirm a 14 CFR PART 121 Certificate Holder is not required for the offeror (i.e or to be on the offeror's team) to comply with the PWS maintenance / maintenance practices requirements?
PMA-207 is not requiring the Contractor to hold a 121 certificate. However, the Contractor must comply with the PWS requirements.
25 N/A N/A Is Attachment (1), Appendix (J) intentionally not included in the RFP release? No. Attachment (1), Appendix (J) was inadvertantly excluded from the most recent posting. The posting was updated to add this document on 27 March 2025.
26 B: CLINs 3
Given the requirements of CLIN 0013 for consumables, expendables, repairables, and shipping for all sites, and that we cannot control the usage at those sites except the two with CMS, we request the the CLIN be provided as a Government plug number and changed to a Cost Reimbursable CLIN. The government can audit specific high cost purchases under the CLIN as desired to ensure the contractor is obtaining a competitive rate for a part, material, repair, or priority shipping.
Given the Commercial nature of the contract, per FAR 12.207, the Government is prohibited from utilizing cost reimbursable CLINs.
27 B: CLINs 9 See above See Above 28 B: CLINs 10 See above See Above 29 B: CLINs 12 See above See Above 30 B: CLINs 31 See above See Above
31 B: CLINs 3 Similar question for CLIN 0014 as its use of Government Owned parts/materials cannot be controlled except at the two CMS sites. We request CLIN 0014 be provided as a Government plug number and be changed to a cost reimburasable CLIN.
Given the Commercial nature of the contract, per FAR 12.207, the Government is prohibited from utilizing cost reimbursable CLINs.
32 N/A 1
Paragraphs 1.5.1 & 1.5.2 list the basic configuration differences between the USN & USMC aircraft. Can the Navy provide the approved configuration data for all aircraft in the fleet?
No, the Navy cannot provide the configuration data for all aircraft in the Fleet.
The requirement is to provide parts for the 737-700C, to encompass any configuration of the aircraft. There are configuration differences from USN aircraft to USN aircraft and between USN and USMC C-40A from the time of production. Following contract award, the Boeing IPC will list the configurations for each aircraft's effectivity.
33 2
Para 2.0 notes that the "Contractor shall comply with the versions in effect at the time the work is performed." Changes to the documents are unknown at time of bid. How will changes that impact labor or materials required to perform maintenance tasks be accounted for?
The Contractor bears the risk of changes to material due to changes in requirements documents listed in PWS Section 2.0. Material is accounted for in CLINs 0013 and 0014, in accordance with PWS Sections 9.0 and 10.0 respectively.
In accordance with PWS Paragraph 9.2, "The Government will procure initial parts required for discretionary upgrades, new capabilities, increased quantities, or unforced changes utilizing either CLIN 0037, Spare Parts Procurement or CLIN 0044, Service Action Material, but the Contractor shall subsequently replace those items under this CLIN 0013, Support Material Replacement requirement."
If a change to a document results in an extension to the period of performance, the Government will provide funding for additional labor under the appropriate CLIN.
34 3.10 Paragraph 3.10 states that the government is responsible for building and ground maintenance. In the event the government is unable to do so, can the contractor be reimbursed expenses needed to make spaces habitable (portable air conditioning, portable sanitary facilities, temporary wide area connections, etc.)? If yes, under what CLIN?
This Contract does not provide reimbursement for building or ground maintenance. PMA-207 will coordinate with MOB facilities to address any building or ground maintenance issues, including temporary mitigations.
35 3.10
Paragraph 3.10 does not say the government will provide OOMA terminals or access to OOMA. Please clarify if they will be provided, the number provided per site, will the terminals be hard wired or Wi-Fi capable? Will the government provide portable OOMA terminals for CLM sites?
OOMA access is provided in accordance with PWS Paragraph 6.4.1. The Government provides internet services for OOMA but not WiFi.
Terminals are currently hard wired. OOMA terminals and access will be provided to CLM sites. Furthermore, OOMA terminals and access are not provided as GFP under this contract but are provided and maintained by the Fleet, therefore, the number provided per site is unknown.
36 3.4.1
PWS Paragraph 3.4.1. How should offerors plan for part requirements that are not carried in commercial parts pools, such as COMBI components or interior components unique to the Navy and Marine C-40A configurations (Microwave Ovens, Seats, pallet components, Stowage Bins and Stowage Bin Parts, Fire retardant overhead liners, Cargo Doors, Tire and Wheel Assemblies, galleys, lavatories)?
The Contractor is responsible for part requirements under CLINs 0013 and 0014. In accordance with PWS Paragraph 6.2.3, the Offeror shall document DMSMS Risks in CDRL A00D, including mitigations. PMA-207 will analyze the available data, market research. and potential alternatives before determining the appropriate action.
37 3.9.5 Disposal of Government Property: Will the Government accept a scrap certification from a commercial repair vendor? For Appendices (B), (D), and (E), the Offeror shall follow the procedures outlined in PWS Paragraph 3.9.5.
For Appendices (C), (F), and (G), the Government will accept a scrap certification from a commercial repair vendor.
38 3.14.2.6 Service Action Review Board: Will Action Items from the meeting be provided to Contractors? Yes. NAVAIR dispositions for each Service Action reviewed during that time period will be provided to the CLS provider at the SARB meeting.
39 6.2.3 Para 6.2.3 notes that parts will be deemed DMSMS by the Government. Under what definition or requirements will the Government utilize to determine parts DMSMS?
Parts that are considered DMSMS by the Contractor will be verified by the Government through the OEM.
40 6.3
Para 6.3, Can the Navy provide historical usage data for hazmat items per site? Historical usage data is not applicable to the updated approach.
PWS Paragraph 6.3 has been revised to read, "The Squadrons will use the Base Consolidated Hazardous Material Reutilization and Inventory Management Program (CHRIMP) to procure HAZMAT. At the request of the Squadron, the Contractor shall use CLIN 0036, Beyond Fair Wear and Tear (BFWT) Material to procure HAZMAT not available via CHRIMP used to perform aircraft maintenance.
HAZMAT specific to aircraft operation (oil, hydraulic fluid, fuel, nitrogen, and oxygen) will be procured by the Government. The Contractor shall be responsible for HAZMAT at depot locations (excluding fuel for FCF)."
41 6.3 Para 6.3, notes that hazmat specific to aircraft operations (oil, Skydrol, fuel, nitrogen, and oxygen) will be procured by the Government".
Is Skydrol inclusive of all hydraulic fluids?
PWS paragraph 6.3 has been updated to remove the reference to Skydrol and replace with the term "hydraulic fluid".
42 6.3 Para 6.3, notes that hazmat specific to aircraft operations (oil, Skydrol, fuel, nitrogen, and oxygen) will be procured by the Government.
Fuel may be utilized in aircraft maintenance for example, engine runs. Will the Government be providing fuel for these efforts?
The Government provides fuel for line maintenance activities at the Squadron and for FCFs at any location.
Government Responses to Industry Questions N0001925R0003 Enclosure (1)
Industry Feedback Worksheet
Question/Comment Government ResponseNo.
Solicitation
Section
PWS
Section
Att.
App.
CDRL
43 6.3
Para 6.3, Can the Government provide each MOB Locations AULs? The Government will not provide Authorized Usage Lists (AULs).
However, the requirement in PWS Paragraph 6.3 has been updated to read "The Squadrons will use the Base Consolidated Hazardous Material Reutilization and Inventory Management Program (CHRIMP) to procure HAZMAT. At the request of the Squadron, the Contractor shall procure HAZMAT not available via CHRIMP used to perform aircraft maintenance under CLIN 0036, Beyond Fair Wear and Tear (BFWT) Material. HAZMAT specific to aircraft operation (oil, hydraulic fluid, fuel, nitrogen, and oxygen) will be procured by the Government. The Contractor shall be responsible for HAZMAT at depot locations (excluding fuel for FCF)."
44 6.4.1 Paragraph 6.4.1 indicates that the government will provide OOMA equipment, but that is not reflected in Paragraph 3.10. Please clarify if OOMA equipment, and configuration of that equipment will be provided, and in what quantities at both CLS and CLM sites
The Government will provide NMCI terminals with OOMA access already established at the MOBs. The Government is responsible for the configuration. Quantities are determined by the squadron to maintain OPTEMPO.
45 6.5.1 Para 6.5.1 states "The Contractor shall be responsible for delivery of parts into foreign countries". Please confirm that items that require Export Licenses are excluded as those items can only be shipped to locations identified on the licenses.
No items are excluded. In accordance with PWS Paragraph 3.4.2, the Contractor is required to obtain necessary export and import licenses to ship anywhere in the world.
46 7 Para 7.0 Note, states the "Contractor is responsible for the movement of tools, equipment, and personnel between the alt sites." Are contractor vehicles allowed on the flightline? If not, will the Government provide transportation between bases?
Yes, the Contractor will have flightline access. However, flightline access is under the cognizance of the specific base. In the event that the base does not allow flightline access, the Government will provide transportation.
47 7.6 Para 7.6, Are Contractors responsible for pricing in travel for AOG events that are less than 3 working days in CLIN 0010 and 0011? Yes. PWS Paragraph 7.6 has been updated to read, "From each CLM site, the Contractor shall support AOG events at any location by providing personnel for up to 3 working days and shall dispatch the team within 24 hours of notification from the site TPOC."
48 7.6 Para 7.6.7, states "Contractor shall re-inspect any transient/away from home-base maintenance actions that were preformed while the aircraft was away". Can the Government define "re-inspect"?
The Contractor is to reassure the quality of the task performed. The PWS has been updated to read "...Contractor shall perform a Quality Assurance inspection of any transient/away from home-base maintenance actions that were performed while the aircraft was away from its assigned MOB."
49 7.6 Para 7.6.7 states "On a non-interference basis to MOB assigned aircraft, when a C-40A transient aircraft is at a MOB at which CLM is provided". Who determines what is considered a "non-interference basis" and what criteria are used?
Non-interference will be determined by the TPOC with input from the Contractor site lead. The criteria used to determine non-interference will be the mission capable performance metrics.
50 8
Paragraph 8.0 states that the contractor will be responsible for shipping costs associated with transfer of GP for use. How will costs be covered if the government directs the transfer of SE to a non-CLM squadron? Would this include the transfer of Tow Tractors, Tugs or other large SE?
The shipping costs for PSE shall be covered under CLIN 0013, Support Material Replacement. In the event that shipping of Common Support Equipment (CSE) is required, CLIN 0038, Government Directed Shipping, will be utilized.
PWS Section 8.0 has been updated to state "The Contractor shall be responsible for shipping costs associated with PSE located at VR-51 and VMR-1 to and from any location when transferred for use under CLIN 0013, Support Material Replacement."
51 8.1
Paragraph 8.1 states that the contractor shall coordinate all SE mods or configuration changes with PMA 207 to ensure SE is updated and maintained to latest NAVAIR specified configuration. Could NAVAIR please provide the current specified configuration (including SB compliance) & condition for all SE at the sites?
For those items not fully updated, are upgrade/modification costs reimbursable?
The current configurations are reflected by the part numbers listed in Appendices (D) and (E). These appendices do not include service bulletin compliance as that information is not available. Parts for upgrades and modifications will be provided via the SARB process and CLM labor is covered under CLINs 0010 and 0011.
52 8.4
Para 8.4 notes "if the equipment is determined to be BER by the Government, the Contractor shall inform PMA-207". When a unit is determined to be BER, who is responsible for the cost of replacement?
In accordance with PWS Paragraph 8.3, "The Contractor shall procure or replace end items listed in Appendices (D) Peculiar Support Equipment (PSE) and (E) Common Support Equipment (CSE) located at any MOB site via separate order utilizing CLIN 0036, Beyond Fair Wear and Tear Material, CLIN 0037, Spare Parts Procurement, CLIN 0044, Service Action Material, or CLIN 0049, Over-and-Above (O&A) Material and CLIN 0038, Government Directed Shipping."
53 9.2.1
Does this include overseas shipments? If so, can the Navy provide an estimate of overseas HVA shipments? Yes. The Contractor shall ship HVAs for use worldwide.
Historical data on the shipment of HVAs is not available as items transferred for use do not require a contractual actions. In accordance with Paragraph 1.5 "In addition to the seven MOBs, the DoN operates C-40A aircraft out of foreign detachment sites identified in Table 1-2 at all times and requires support as specified elsewhere in this PWS"
54 9.2.5 Para 9.2.5, states that "military-unique parts are not subject to the commercial parts pool requirement". If the military unique parts are not subject to the commercial parts pool, how will costs associated with the repair or replacement be accounted for?
These costs are included in the FFPs of CLINs 0013 and 0014, but the Contractor is not required to utilize a Commercial Parts Pool.
55 9.2.5 PWS Para 9.2.5, If the COMBI items are not military-unique parts and are unique to the 737-700C aircraft and associated STCs, who owns the STC for the Combi materials?
The Boeing Company owns the USN COMBI STC. AAR Government Services, Inc. owns the USMC COMBI STC. The Government is the owner and operator of the aircraft and holds the rights and privileges associated with those functions.
56 9.4
Are the Preferred PN’s, listed in App J, currently installed throughout the fleet?
If not, can the Navy provide what PN's are installed throughout the fleet?
Who would be responsible for the cost of upgrade/modification/replacement when non-preferred parts are removed and provided as a "one-for-one" exchange?
Yes, the Preferred Parts are partially installed throughout the fleet in accordance with the IPC (i.e., multiple configurations allowed).
The Navy cannot provide what specific part numbers are installed throughout the Fleet.
The Contractor is responsible for the cost of the upgrade/modification/replacement when non-preferred parts are removed and preferred parts are provided.
57 10.1
Para 10.1 states "The Contractor shall procure additional GP inventory utilizing CLIN 0037, Spare Part Procurement, but shall subsequently replenish those items under this CLIN 0014, Government Property Replenishment requirement. Additional quantities do not warrant a price adjustment." How should Contractors account for the replenishment/maintenance of new material that will be added to the inventory later in the contract? This would drive a cost adjustment .
Procurement of additional spares will not increase usage on the aircraft. The Government will simply have a higher quantity available for usage. As a result, there would be no cost impact going forward and therefore increases to the FFP of CLINs 0013 or 0014 are not warranted.
58 11 Para 11.0 notes that "labor at detachment sites shall be included in the FFP of the Commercial Line Maintenance Labor CLINs". How will be overtime labor while on detachment be accounted for?
Payment for overtime shall be the Contractor's responsibility regardless of personnel location. When on detachment, personnel shall be compensated in the same manner as when working at the assigned MOB.
59 12.1 Para 12.1: states that "Provider shall remove the existing and replace with a serviceable set of Forward Airstairs every six years". Can the Government please confirm a serviceable set would be any RFI unit?
The Government confirms that the replacement unit must be a serviceable unit that is certified by FAA Form 8130-3.
60 12.1 Para 12.1 Note states that DOW Aero is the OEM for the Forward Airstairs. The OEM is actually Monogram Systems/SAFRAN. PWS Paragraph 12.1 has been revised to remove the last sentence referencing the OEM.
61 12.1.3 Para 12.1.3 states that Depot TAT terminates upon a successful FCF by the Government. Can the Government please confirm that delays beyond the Contractor's control for the start of the FCF will allow for a shift in the TAT?
Excusable delays consistent with the clause at FAR 52.249-14 may justify a PoP extension.
62 12.1.4 Para 12.1.4, will the total Depot TAT be adjusted for work scope additions to the C-Check after execution of order? PoP extensions will be considered on a case-by-case basis and will depend on cause and extent of work required.
63 12.4
Para 12.4, notes "No additional maintenance actions shall be completed without KO Approval". If the KO approves the additional work, how will be funding for these discrepancies be managed?
The FFP of C-Checks shall be for the labor performed during the time period specified in the PWS and can be proposed utilizing the historical data provided in the Technical Library. The depot time requirement includes all changes from the baseline task card list, discrepancy repairs, Service Actions, and O-Level Work Requests.
When the Contractor or Government identifies additional work that may not be completed within the Turn Around Time, the Contractor may submit an OAWR form in accordance with the O&A clause.
Government Responses to Industry Questions N0001925R0003 Enclosure (1)
Industry Feedback Worksheet
Question/Comment Government ResponseNo.
Solicitation
Section
PWS
Section
Att.
App.
CDRL
64 12.1 Para 12.10, states that "Labor required to complete additional FCFs that are necessary because of issues unrelated to the C- Check shall be included in the C-Check FFP price". If the effort is unrelated to the C-Check, shouldn't the work scope be captured as an O&A?
It depends; C-Check pricing is inclusive of all labor performed during the TAT regardless of tasking. However, when the Contractor or Government identifies additional work that may not be completed within the Turn Around Time, the Contractor may submit an OAWR form in accordance with the O&A clause.
65 12.11 Paragraph 12.11 states that the IDIQ FFP includes the Baseline C-check task cards, any additional task cards and O level maintenance tasks required. Can the Government provide the additional task cards and specify the O level maintenance tasks required in order to bid into the FFP during the base IDIQ contract RFP?
The Government has provided historical data on the number of additional SAs, O-level actions, and task card changes. The Government is unable to provide all possible task cards.
66 12.6 In the event an aircraft is delivered for depot induction with with extraneous materials/equipment on board outside of the designated configuration of the aircraft. Who is responsible for removing or storing said equipment?
The Contractor would be responsible for removing and storing the equipment.
67 12.12.1
Para 12.12.1 notes that there may be additions or deletions to the baseline C-Check task cards. Can the Government please advise how the additions or deletions will be accounted for at time of task order?
The FFP of C-Checks shall be for the labor performed during the time period specified in the PWS and can be proposed utilizing the historical data provided in the Technical Library. The depot time requirement includes all additions or deletions from the baseline task card list, discrepancy repairs, Service Actions, and O-Level Work Requests.
This is similar to the CLM method of pricing - non-task-dependent labor for a period of time, but in the case of C-Checks, with more spcecifics. Based on experience and expertise, an Offeror should be able to determine the length of time and personnel required for each phase (debrief/inventory, open aircraft, inspect, SAs/TCs/Other, close aircraft, quality, FCF, etc) in order to develop a FFP.
68 12.12.2
Para 12.12.2, notes that that if the Contractor identifies O&A tasking that would require additional labor will be negotiated IAW the applicable clauses. Can the Government confirm that material associated with O&A task will be managed the same as labor?
Over-and-Above Labor is applicable to C-Checks only where a PoP extension is warranted. Over-and-Above material is only material beyond that included in the FFP of CLINs 0013 and 0014, and therefore only applicable under very limited circumstances.
PWS Paragraph 12.12.2 has been revised to read, "If the Contractor identifies O&A tasking that would require additional material not within the scope of CLIN 0013, Support Material Replacement, or CLIN 0014, Government Property Replenishment, the Contractor may submit an OAWR in accordance with the applicable clauses" and removes the inadvertent reference to labor in this paragraph.
PWS Paragraph 28.2 has been revised to remove the first sentence.
69 17
If new parts are introduced to the fleet, is the Navy procuring enough spares to maintain the fleet for the remainder of the contract? If not, how does the contractor adjust their CLIN 0013 & 0014 pricing to account for the new requirement?
Generally, the Government does not procure spare parts that are available from a Commercial Parts Pool to maintain the fleet. In accordance with PWS Paragraph 9.2, "The Government will procure initial parts required for discretionary upgrades, new capabilities, increased quantities, or unforced changes utilizing either CLIN 0044, Service Action Material, or CLIN 0037, Spare Parts Procurement, but the Contractor shall subsequently replace those items under this CLIN 0013, Support Material Replacement requirement."
Parts would then be exchanged via Commercial Parts Pool.
PWS Paragraph 9.2.5 has been revised to add, "When the Government procures unique items, versions of which are not currently installed on the aircraft, each replacement will be procured utilizing CLIN 0036, Beyond Fair Wear and Tear Material. The FFPs of CLINs 0013 and 0014 will not be adjusted to account for future usage."
70 19 Para 19.0 states that "The Contractor shall provide all labor, parts, and material to comply with the APU Heavy Maintenance (AHM) in accordance with the OEM (Honeywell) build specification and the schedule established in the PMIC". Can the Government please advise how O&A's outside the AHM work scope IAW OEM build specifications will be managed?
When appropriate, the Contractor may submit for Government consideration an OAWR for the delta cost of work scope of the APU Heavy Maintenance required to meet the OEM build specifications. PWS Section 19.0 has been updated to remove the word "schedule" and replace with "interval".
71 19 Will Contractors be responsible for the replacement of the LLPs? If so, can the times/cycles remaining on all APU’s and associated LLPs be provided?
Yes. The Government has provided in the Technical Library, a document containing information on APU hours and cycles ("Engine & APU - Hours & Cycles").
72 21 Para 21.0 states "The total TAT shall not exceed 75 calendar days." Per the OEM, the standard TAT for Aft Airstairs is 15-16 weeks (105- 112 days). Based on this information the government prescribed 75-day TAT is not achievable. Will the government consider adjusting the AFT Airstair allowable TAT?
If an Offeror is able to provide documentation prior to or with its proposal submission from the vendor showing that the specified TAT is not achievable, the Government will adjust the TAT prior to IDIQ contract award.
73 22
Para 22.0 states that Main landing gear shall be overhauled in accordance with 737-SL-32-165 including the OEM specs listed in the Service Letter. The Discussion section of the Service Letter recommends the removal and restoration of a number of components. Can the Government please confirm that the recommended items regardless of test or inspection results shall be overhauled/replaced?
Yes. Pursuant to PWS Section 22.0, the overhaul includes "...all recommended actions identified in Boeing Service Letter 737-SL-32-165 and the OEM specifications listed therein."
74 22
Are all installed LG’s/spares the “preferred spare” or a PN interchangeable with the preferred PN? If not, what PN’s are installed?
Who is responsible for paying to have the units brought to “preferred PN” configuration?
The Long Range Plan identifies the PN installed on each aircraft and provides the Main LG Overhaul schedule.
PWS Section 22.0 has been updated to read, "The Contractor shall utilize the D741-70003 Long Range Plan for LG overhaul schedule and configuration requirements. The Main LG shall be configured for installation on the aircraft from which the next Main LG scheduled for overhaul is removed pursuant to Boeing Drawing 161A0002. If a part requires replacement, the Contractor shall use the parts identified as “preferred spares” in the 737NG and 737MAX Main Landing Gear Component Interchangeability List, in Boeing Drawing 161A0002. The Contractor shall overhaul the Main LG as a set (left and right) and accomplish all “SUGGESTED OPERATOR ACTION” identified in Boeing Service Letter 737-SL-32-165 at a FAA FAR Title 14 CFR Part 145 repair station. The total TAT shall not exceed 120 calendar days. Upon completion of the Main LG Overhaul, the Contractor shall produce and submit a Depot Completion Report in accordance with CDRL A00F, Depot Completion Report. Shipping shall be included in the FFP."
The Contractor is responsible for bringing each Main LG to the preferred PN configuration under the FFP of CLIN 0042.
75 22
Para 22.0 states "The Contractor shall utilize the PMICs for Main LG overhaul schedule". Can the Government provide the times & cycles for all installed gear? The PMIC does not allow the ability to plan future removals?
PWS Section 22.0 has been revised to reference the Long Range Plan rather than the PMIC.
The times and cycles data is irrelevant. The Boeing document, D741-70003 Long Range Plan, provided in the Technical Library contains the schedule of removals.
76 23
Para 23.0 states that Nose landing gear shall be overhauled in accordance with 737-SL-32-165 including the OEM specs listed in the Service Letter. The Discussion section of the Service Letter recommends the removal and restoration of a number of components. Can the Government please confirm that the recommended items, regardless of test or inspection results, shall be overhauled/replaced?
Yes. Regardless of test or inspection results, the Government requires the recommended items to be removed and restored in accordance with the Service Letter.
77 23
Para 23.0 states "The Contractor shall utilize the PMICs for Main LG overhaul schedule". Can the Government provide the times & cycles for all installed gear? The PMIC does not allow the ability to plan future removals?
PWS Section 23.0 has been revised to reference the Long Range Plan rather than the PMIC.
The times and cycles data is irrelevant. The Boeing document, D741-70003 Long Range Plan, provided in the Technical Library contains the schedule of removals.
Government Responses to Industry Questions N0001925R0003 Enclosure (1)
Industry Feedback Worksheet
Question/Comment Government ResponseNo.
Solicitation
Section
PWS
Section
Att.
App.
CDRL
78 23
Are all installed LG’s/spares the “preferred spare” or a PN interchangeable with the preferred PN? If not, what PN’s are installed?
Are Contractor's responsible for paying to have the units brought to “preferred PN” configuration?
The Long Range Plan identifies the PN installed on each aircraft and provides the Nose LG overhaul schedule.
PWS Section 23.0 has been updated to read "The Contractor shall utilize the D741-70003 Long Range Plan for LG overhaul schedule and configuration requirements. The Nose LG shall be configured for installation on the aircraft from which the next Nose LG scheduled for overhaul is removed pursuant to Boeing Drawing 162A0002. If a part requires replacement, the Contractor shall use the parts identified as “preferred spares” in the 737NG/MAX Nose Landing Gear and Tail Skid Component Interchangeability List, in Boeing Drawing 162A0002.
The Contractor shall overhaul the Nose LG and accomplish all “SUGGESTED OPERATOR ACTION“ identified in Boeing Service Letter 737-SL- 32-165 at a FAA FAR Title 14 CFR Part 145 repair station. The total TAT shall not exceed 120 calendar days. Upon completion of the Nose LG Overhaul, the Contractor shall produce and submit a Depot Completion Report in accordance with CDRL A00F, Depot Completion Report. Shipping shall be included in the FFP."
The Contractor is responsible for bringing each Nose LG to the preferred PN configuration under the FFP of CLIN 0043.
79 31
The government notes contractors may provide temporary monthly expedited shipping. Can the government please define quantity of items impacted and the maximum duration of this requirement? How should the contractor determine which parts covered under CLINS 0013 & 0014 are covered under this requirement?
This CLIN applies to any part that impacts mission capability.
This CLIN will be exercised on a monthly basis dependent on operational reqirements.
This premium will be paid in addition to CLINs 0013 and 0014 shipping requirements in order to meet the more stringent performance metrics.
80 A: Gen. Info
In Table G-1, NAVAIR has identified three documents for Volume 2 Pre-Requisities. Is it the Government's intent to receive the Part-145 Certification and Data files in one combined file as well as two separate individual files for each respective pre-req? (RFP page 102 of 164).
The Government has updated Section L, Table G-1 and the Offeror shall submit one combined file Vol 2 PreReq#.docx.
81 A: Gen. Info There is a newer revision to the PMIC available. Will the government provide the latest revision as an update to the technical library or shall offerors use the version provided in the solicitation?
Yes, the Government will provide the most recent revisions of the PMIC and ULSS with the final solicitation amendment.
82 8
Paragraph 8.1 states "the contractor will operate as a contractor work center assigned to, and integrated into, the operating squadron".
Is the offeror to assume that contractor personnel would be operating in accordance with government approved Ground Operating Procedures compliant with the NAMP and not under the direct supervision of the government? Will equipment status be tracked in OOMA or on the contractor system? Will the workcenter be subject to the squadron QA procedures?
Yes. Contractor personnel shall operate in accordance with GOPs compliant with the NAMP and not under supervision of the Government.
The system used for tracking the status of SE is at the Contractor's discretion. In order to meet the spirit of the NAMP, OOMA is suggested for those SE items with established baselines.
No. The workcenter will not be subject to squadron QA procedures.
83 N/A Att. L-6 The 'Instructions' tab lists CY5 End Date as 9/30/2030, which reflects a 9 month PoP. However, the 'EST QTY' tab has 12 months for CY5 on several CLINs. Can the Government advise if CY5 is a 9 month PoP or a 12 month PoP?
Attachment L-6 has been updated to reflect 12 months with the Phase-In period aligning to the start of Contract Year 1. Please see the most recent version of the Solicitation.
84 3
PWS 3.4.1.2 states "The item removed from an aircraft shall be returned to the commercial parts pool". There are certain parts the commercial providers will not accept back in their parts pool given the military traceability. Can the Government provide clarity on their intent here and offer guidance on what Offeror's should do in the event a parts pool provider refuses to accept a part with military trace?
Conversely, will the Government consider updating the language to something such as "The item removed from an aircraft shuld be returned to the commercial parts pool in any case where a parts pool provider will accept the part"?
Items that are eligible for commercial parts pool do not have any military trace. PWS Paragraph 3.4.1.2 applies only to items that are eligble for the commercial parts pool.
85 3
PWS 3.4.1 indicates "all repairables in support of the DoN C-40A program" with the exception of HVA's and military unique items must be in a parts pool. Will the Government clarify what "all" these parts mean, what global locations are to house such parts and to what service/availability level they should be provided? Commercial parts pool providers require a part number specific list of items and an availability rate. Without providing either, it is unclear how Offerors are to deliver the same level of service that can be adequately evaluated.
"All" means all parts that can be replaced via a commercial parts pool. The Government does not intend to store any commercial parts pool items.
Market research has not shown a comprehensive part lists to be the only method of pricing a parts pool.
86 N/A Can the bidder use 11" x 17"sized pages for graphics, figures or tables? Yes, so long as the font is no smaller than 10-point font and enough detail is provided to understand the information.
87 B: B-3
In Attachment L_4_Vol 4_PPCD, tab “Table PP-1” states to provide:
”PWS/SOW paragraphs from contract reference associated with performance in the following three areas: 1) Performing simultaneous depot level maintenance for two aircraft in the Design group of “C” through “E” as defined by the International Civil Aviation Organization (ICAO) Classification Group; 2) Performing Heavy Check maintenance on aircraft in Design group “C” through “E” ; and 3)Annual contract or order value of at least $1M per year.”
Question: Will the USG please confirm “Performing non-standard repairs on Design group “C” and “D” aircraft” should be added to this list, as this is also a relevancy evaluation requirement per RFP Section M.III.F.
The Government has updated Attachment L-4 Block 14 to encompass all levels of relevancy.
In Attachment L_4_Vol 4_PPCD, tab “Table PP-1” states to provide:
”PWS/SOW paragraphs from contract reference associated with performance in the following areas:
- Performing simultaneous depot level maintenance for two (2) aircraft in the Design group of “C” through “E” as defined by the International Civil Aviation Organization (ICAO) Classification Group.
- Performing Heavy Check maintenance on aircraft in Design group “C” through “E”
- Annual contract or order value of at least $1M per year.”
Will the USG please confirm “Performing non-standard repairs on Design group “C” and “D” aircraft” should be added to this list, as this is also a relevancy evaluation requirement per RFP Section M.III.F.
Duplicate question of #88 above.
89 M: III-F Att. L-1 Respectfully, will the USG please provide a 2-week extension to the current 28 April proposal due date due to unforeseen delays with major subcontractor not being able to execute Boeing NDA in timely manner to access C-40 Proprietary Tech Library? Offeror also needs additional proposal preparation time, after the USG answers all industry feedback questions.
The Government has extended the submission deadline to 12 May 2025.
90 B: B-5 9 PWS App. B
In regards to Amendment 0001, the new Att 1 Apendix (J) Preferred Parts List is different from the Draft RFP Appendix (J) file. The A0001 descript states there two (2) new parts that are 'blue highlighted'. However, there is not any 'blue highlighted parts' anywhere on the document as stated in A0001 description. Please confirm this App (J) parts list is the correct list to be used for the bid.
The Government confirms that the version in the updated posting does include two additional parts (two Static Inverters) with blue text that can be found on the last two rows of the table. Please ensure the most recent version is being downloaded from PIEE.
91 B: CLINs 9 PWS App. B Is paint price included in even C-Checks No. CLIN 0047 will be included in the task order when strip and paint is required.
Government Responses to Industry Questions N0001925R0003 Enclosure (1)
Industry Feedback Worksheet
Question/Comment Government ResponseNo.
Solicitation
Section
PWS
Section
Att.
App.
CDRL
92 B: B-2 5
Please clarify whether a one-for-one exchange is for same PN. If the CPP will only allow a swap for the same PN, how is the Contractor supposed to account for obsolescense or other PN changes?
The "one-for-one" exchange is not limited to the same PN. The "one-for-one" exchange refers to a non-RFI part that is removed from the aircraft being exchanged for a RFI part to be installed on the aircraft or placed in the Government's GP spares inventory.
CLINs 0013 and 0014 cover all items discussed therein. These CLINs are not solely related to any exchange program.
The PWS identifies circumstances in which the exchanged PNs differ from one another (e.g., items on the Preferred Parts List, obsolete parts, etc.)
93 N/A Within the contract clause 252.237-7023 it states that the Continuation of Essential Contractor Services is to be written to the PWS dated 3 February 2025.