Answers to Industry Questions

View the file

Other files

File Type Posted
N00019-15-R-0106_Amendment_0004.docx DOCX document
Q A_Posted_on_FBO_2015-10-19.xlsx XLSX spreadsheet
Q A_Posted_on_FBO_2015-10-15.xlsx XLSX spreadsheet
L-8_Vol_4_Price_Matrix_(revised_2015-09-30).xls XLS spreadsheet
N00019-15-R-0106_Amendment_0003.docx DOCX document
Q A_Posted_on_FBO_2015-10-09.xlsx XLSX spreadsheet
Q A_Posted_on_FBO_2015-09-30.xlsx XLSX spreadsheet
N00019-15-R-0106_Amendment_0002.docx DOCX document
N00019-15-R-0106_Amendment_0001.docx DOCX document
Q A_Posted_on_FBO_2015-09-24.xlsx XLSX spreadsheet
Q A_Posted_on_FBO_2015-09-21.xlsx XLSX spreadsheet
L-8_Vol_4_Price_Matrix.xls XLS spreadsheet
L-5_Vol_3_Tech_Exp.xls XLS spreadsheet
Attach_4a_-_WD_2012-0058_R3.txt TXT text file
L-7_Vol_3_Tech_SB_Goals.xls XLS spreadsheet
L-6_Vol_3_Tech_MP_Chart.xls XLS spreadsheet
L-1_Vol_1_ES_Tables.xls XLS spreadsheet
L-8_Vol_4_Price_Matrix.xls XLS spreadsheet
L-3_Vol_2_PP-1_Con_Data.xls XLS spreadsheet
Attach_1_Appendix_H__Performance_Metrics_(2015-06-05).doc DOC document
RFP_(2015-08-14).docx DOCX document
Attach_4d_-_WD-05-2104.txt TXT text file
Attach_4a_-_WD-12-0058-R1.txt TXT text file
Attach_1_Appendix_B__Commercial_Derivative_Aircraft_Airworthiness_(2015-08-13).doc DOC document
Attach_4e_-_WD-05-2058.txt TXT text file
Attach_4f_-_WD-05-2394.txt TXT text file
Attach_4b_CBA_Redacted.pdf PDF
Att_1_-_PWS_(2015-08-10).doc DOC document
Attach_4c_-_WD-05-2234.txt TXT text file
Q A_Posted_on_FBO_2015-08-05.xlsx XLSX spreadsheet
NA-01-C35CAA-1.pdf PDF
UC-35_Parts_List_1_Jun_2014_-_31_Aug_2014rev1.pdf PDF
UC-35_Aircraft_Top_10_Degraders.xlsx XLSX spreadsheet
DOD_4145.26-M.pdf PDF
UC-35_Parts_List_1_Mar_2015_-_31_May_2015rev1.pdf PDF
UC-35_Technical_Library_Table_of_Content_150722.docx DOCX document
UC-35_Aircraft_Historical_Flt_Hrs_and_MC_rates.xlsx XLSX spreadsheet
UC-35_Aircraft_and_Engine_Depot_Schedule_FY16-FY18.xlsx XLSX spreadsheet
UC-35_Parts_List_1_Dec_2014-28_Feb_2015rev1.pdf PDF
COMNAVAIRFORINST_4790.2_NAMP_Chapter_11_15_May12.pdf PDF
DoD_Joint_Travel_Regulations.pdf PDF
DCMA-INST-8210-1C.pdf PDF
NAVAIR_01-1A-509-1.pdf PDF
MCO_8023.3B.pdf PDF
UC-35_Parts_List_1_Sep_2014-30_Nov_2014rev1.pdf PDF
DoD_4160.21-M.pdf PDF
DoD_8570.01-M.pdf PDF
C-26_UC-35_pre-solic_brief_25June2015.pptx PPTX presentation
Pre-Solicitation_Conf_Attendee_List.xlsx XLSX spreadsheet
Attach_1_Appendix_H__Performance_Metrics_(2015-06-05).doc DOC document
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Posted FBO - 7-29-15 N00019-15-R-0106 UC-35 Contractor Logistics Support (CLS) Draft RFP Questions and Answers

#DocumentQuestion from IndustryAnswers
1RFP and PWS

RFP p. 62, Section B,

Pricing Notes B-5 & B-6Since this is a small business set aside, does the Government plan to make this a CAS covered contract?This will not be a CAS covered contract. Pricing notes B-5 and B-6 will be revised accordingly.
2RFP and PWS

RFP p. 118, Section I,

Clause 52.244-2 SubcontractsIf CAS does not apply to this contract, will the Government remove this clause or make changes?Clause 52.244-2 will be removed in the final RFP.
3RFP and PWS

RFP p. 113, Section I,

Clause 252.244-7001 Contractor Purchasing System AdministrationThe DCMA Guidebook states the following, "...if the contractor's sales to the Government (excluding competitively awarded FFP contracts, competitively awarded FP with EPA contracts, and FAR Part 12 sales of commercial items pursuant to Reference (h)) are expected to exceed $25 million during the next 12 months, the ACO shall perform a review to determine if a CPSR is needed. " Does the Government expect the contractor to have an approved purchasing system or a CPSR prior to contract award and does the Government expect yearly sales above $25M?An approved CPSR is not a requirement for award of the contract. The Government does not expect yearly sales above $25M; see RFP Section B for yearly estimates for the requirement.
4RFP Att. 2 DD254
Section 11Does the Government require a non-possessing facility clear contractor to have a possessing facility clearance at the secret level prior to contract award?

Company X currently has a facility clearance that is for a non-possessing facility of classified information. This means that all Key Management Personnel and the required employee have clearances at the secret level in order to perform maintenance on the aircraft within a classified area or have discussions with the customer on classified equipment without maintaining, storing, distributing, and classifying any classified documents within the company. The DD254 issued with the draft solicitation requires the storing of classified materials as one example. Does the Government require the bidder to already possess a facility clearance for possessing classified materials from another contract they may have before contract award. The process for changing to a possessing facility requires increased requirements on the contractor. PWS Para 3.8 has been revised to state the highest level of security for this contract is FOUO/Sensitive Unclassified information. The DD254 has been removed due to the performance of this requirement being unclassified.

5RFP Appendix B
TrainingUnder the current contract, do any personnel performing aircraft and engine maintenance without an A&P license? If so, will they be grandfathered into the new contract or does the awarded contractor need to replace these mechanics?PWS 3.2- Paragraph states all personnel performing maintenance on Aircraft and Maintenance shall have a certified and current Airframe and Powerplant (A&P) License.
6RFP Appendix B
RepairsDoes the Government accept Parts Manufacturer Approvals (PMA) materials for the aircraft as long as it has a 8130-3 tag?PWS 6.1- paragraph states yes, refurbished parts are accepted as long as they contain FAA 8130 tag.
7RFP and PWS

PWS Section 3.3.2

RFP, p. 108, Section H, Clause 5252.245-9520The S, O, and A states that only Cessna requires an ACA. The PWS indicates Cessna and Pratt & Whitney. Which is correct?Pratt and Whitney will be added to Section H, Clause 5252.245-9520 of the final RFP.
8PWS
Section 4.10This paragraph indicates the parts required to have an export license within 30 days after contract award. Is it correct to assume all other parts required for Futenma, Japan and Doha are classified as "No License Required" based on the EAR?PWS 4.10- only the items listed in this section are ITAR controlled items.
9PWS
Section 12.3The Government states that the contractor shall provide loaner engines instead of rental engines. Does the Government consider them to be one in the same? Or does the Government expect the contractor to enter into a engine loaner agreement?PWS 12.3- Yes, the term loaner and rental engines are the same. As a performance-based requirement, the Government will not direct the Contractor on specifically how to meet the requirement.
10PWS
Section 1.2Does the Government have any plans to deactivate any BSOs within the POP for this contract?No known requirements at this time.
11PWS
Section 3.6Para 3.6 states "The Contractor's Quality Assurance Program shall be part of the Contractor's Parts 135 and 145 operations, as applicable". Does this statement require the prime Contractor to have either a Part 135 or Part 145 certificate or both?PWS 3.6- The Contractor is required to have a Part 145 Repair Station certificate. The PWS will be revised with applicable changes to correct.
12PWS
Section 3.8Par 3.8 states there is no classified material requirement within the scope of the contract. The DD254 requires the contractor to fabricate, modify, or store classified hardware. Please clarify.See final RFP. PWS Para 3.8 is correct. The PWS has been revised and the DD254 has been removed due to the performance of this requirement being unclassified.
13PWSDoes the Government planned or have scheduled any Aircraft Condition Inspections during the contract POP?
When directed by the Navy, the UC-35 may have an Aircraft Conditional Inspection (ACI) performed. This is an in-depth aircraft inspection performed by a depot facility and includes a strip and paint of the aircraft. On a previous UC-35 contract, the prime contractor was asked to provide a draft ACI document to the Navy for review and possible incorporation to the contract. I believe this type of inspection would be performed every 5 years. This requirement could possibly affect the level of work the depot subcontractor is authorized or can perform.An answer will be posted on FBO as soon as possible.
14PWS
Section 1.1Are all spares considered government property? Will they be transferred to new contractor?Refer to PWS 1.1
15Tech LibraryCan you provide part usage history?Yes, via Technical Library, which will be available soon.
16PWSIs the number of aircraft staying the same over the 3-yr period?An answer will be posted on FBO as soon as possible.
17PWS
Section 1.6Will forecasted mission flight hours be provided?Refer to PWS 1.6
18PWS, Section 6.1
SurplusCan new surplus be used?Yes. Refer to PWS Para 6.1.
19PWS, Section 6.1
PartsAre there rules for parts condition codes?Yes. Refer to PWS Para 6.1.
20PWS, Section 6.1
PartsDo you always need traceability (authenticity) of parts to the OEM?Yes, refer to PWS 6.1.
21ENsDo responses in ENS require an answer plus revision pages, or only revision pages?This will be detailed in the discussion letter issued by the PCO, if required.
22RFP
Clause 52.219-4Does the HubZone clause apply to this RFP since this is a Small Business set-aside (i.e. is there a benefit for HubZone)?No. Clause 52.219-4 does not apply since this is a small business set-aside.
23RFP
Clause 52.219-4Is the 5-10% differential applicable?No. Clause 52.219-4 does not apply since this is a small business set-aside.
24Site VisitWill there be an opportunity for a site visit?The Government does not intend to sponsor a site visit.
25Tech LibraryWill information on the aircraft, engines, and any planned future overhauls be provided?Yes, see Technical Library, which will be available soon.
26Major ModsWill information on major modification be provided?No known requirements at this time.
27PWSIs there a specific AME (MC rate) rate to work to?An answer will be posted on FBO as soon as possible.
28PWSHow realistic are the OR rates (Mission Capability rates)? Has NAVAIR decided?An answer will be posted on FBO as soon as possible.
29RFP
Contract TypeIs this a services or supply contract?The predominant portion of this contract is for services; therefore, this contract will be a services contract under the Product Service Code (PSC) J015 "Maintenance, Repair, and Rebuilding of Equipment - Aircraft and Airframe Structural Components" and North American Industry Classification System (NAICS) code 488190 "Other Support Activities for Air Transportation."
30PWS, Section 5.1
FacilitiesFacilities for depot level or organizational repair?Organizational (O) level repair/maintenance will be perfomed primarily at Government facilities and IAW the PWS. PWS 5.1 BSO is where organizational maintenance is performed.
31RFP
Release DateDo you anticipate the release of both RFPs in August?Yes.
32RFP
Response TimeHow much time will be given to write the proposal? (suggests 60 days)The Government will provide at least 30 calendar days to submit a proposal in response to the final RFP.
33RFP, Section L, Part B, Paragraph 1.6
PhotographsWhat is meant by the photograph requirement in Section L? Type and number of photos?This section of the RFP is for the Executive Summary. The Offeror may submit up to five photographs if the Offeror feels this will aid in explaining their approach. See RFP Section L, Part B, Paragraph 1.6 for the limitations on the number and electronic format of photographs.
34PWS, Section 3.3.2
License AgreementIn regards to the license agreement, does it have to be between primes or can it be subs? When Government license agreements are required between the Contractor and the OEM, can those agreements be made between a subcontractor and the OEM? For example, the Prime's engine subcontractor will have an agreement for engine support, parts, engineering, etc. with the Engine OEM.The Government expects the Contractor to accomplish "O" to "D" level maintenance establishing agreements and utilizing OEMs as the Contractor deems appropriate in the performance of aircraft and engine maintenance as described in the PWS 3.3.2.
35RFP, Section L
Past PerformanceIs there a minimum or maximum for past performance information?Review RFP Section L. If that doesn't answer your question, submit this question formally.
36PWS, Section 3.3.2
OEMAre you looking for the OEM as an actual participant or just a relationship with the OEM? How much scope of effort are you looking for in OEM levels? Associate Contractor Requirements section 3.3.1 - Government states ".........and integration of work by the UC-35C/D Program Associated Contractors to ensure complete compatibility between equipment, data............and to maximize commonality." The term integration of work by the Program Associated Contractors appears to drive a requirement beyond the sub-paragraphs 3.3.2.1, 3.3.2.2, and 3.3.2.3. What level of work/Scope of effort is the government looking to have the Associated Contractors (Cessna and Pratt & Whitney) perform for the Prime Contractor? Can said such work be performed by an OEM authorized repair facility?The Government expects the Contractor to accomplish "O" to "D" level maintenance establishing agreements and utilizing OEMs as the Contractor deems appropriate in the performance of aircraft and engine maintenance as described in the PWS 3.3.2.
37PWS

Sections 5.13.4 & 5.13.6 CESCOM PWS paragraphs 5.13.4 and 5.13.6 appear to drive a requirement to purchase the CESCOM Maintenance Tracking Program, is this correct? If not, please clarify the statements "CESCOM maintenance program" utilized within the PWS referenced paragraphs.

Yes CESCOM is a requirement to track all maintenance actions performed.

38RFP
Release DateAre you able to shift so that both RFPs don't come out in August?The current contract is a combined UC-35 and C-26 contract; therefore, NAVAIR plans to run the competitions concurrently so the contracts are awarded at approximately the same time.
39PWS
Class 4 CFR Part 145Why is the Class "4" CFR Part 145 Repair Station Requirement required?To ensure that CLS provider has the capability to work on our class 4 aircraft.
40PWS
Part 145To meet FAA certification requirements to perform maintenance on requested aircraft you only need to have those aircraft listed on your Part 145 RS OPS Spec.An answer will be posted on FBO as soon as possible.
41PWS, Section 3.2
License RequirementsComment was made that all tech's will be required to have A&P holders. For many positions such as painters/preppers and other positions in a repair station, A&P Tickets are not attainable. IAW FAA CFR 165.Refer PWS 3.2 for BSO A&P license requirements.
42PWS, Appendix C
Spare EnginesHow many spare Government owned JT15-5D engines does the program currently have in support of the fleet?Please refer to PWS Appendix C for a listing of spare engines.
43RFP, Tech Volume
SB Set AsideSince this is a small business set aside, is the small business section going to be removed from the technical volume?No.
44RFP Section L

Section 2.1.1

Proposal SubmissionPara 2.1.1 states "shall submit all volumes of its proposal electronically" however Table 3.0 (page 138) indicates paper copies. Please clarify the submission shall include CD-ROM (2ea) and applicable paper copies as specifiedAn answer will be posted on FBO as soon as possible.
45PWS

Section 1.2

LocationPara 1.2 indicates 12 aircraft at 5 locations; however it also indicates 2 UC-35D are on long-term deployment in Doha, Qatar. Is the total 12 or 14 aircraft?An answer will be posted on FBO as soon as possible.
46PWS

Section 1.4

MaintenancePlease clarify the apparent contradiction stating "Maintenance or repair may be accomplished by the BSO…" and para 3.1 reference part 145. What entity can do what work?An answer will be posted on FBO as soon as possible.
47PWS

Section 3.15.2

Project ManagementPlease clarify this position is in addition to the BSO Site Manager? How is it priced?An answer will be posted on FBO as soon as possible.
48PWS

Section 3.16

WISSince it is imperative to have the ability to interact wit the government system, what is the current system in use by the contractor?An answer will be posted on FBO as soon as possible.
49PWS

Section 5.9

FCFPlease clarify who is responsible for performing the FCF- government or contractor?An answer will be posted on FBO as soon as possible.
50PWS

Section 6.1

MaterialPlease define "provide" given the government indicates this is a FFP CLIN and we cannot know what parts or material will be needed. How do we get reimbursed for parts if this costed by FH? Recommend parts as reimbursableAn answer will be posted on FBO as soon as possible.
51PWS

Section 6.2

Supplies"SAME AS Question 7" for supplies, i.e. cleaning - if the government determines more washes than planned we expense more supplies? Recommend supplies as reimbursableAn answer will be posted on FBO as soon as possible.
52PWS

Section 12.2, 13, & 2

ConsumablesGiven that the flying hour program could change - how would we reimburse when more is needed>An answer will be posted on FBO as soon as possible.
53Attach 1

Appendix F

Mission Essential PersonnelPlease clarify if positions can be consolidated? Is the intent to have them located at our main office?An answer will be posted on FBO as soon as possible.
54RFP

General

SOFAAre personnel assigned OCONUS for longer than TDY covered under SOFA? I.e. lodging, etc.An answer will be posted on FBO as soon as possible.
55RFP

General

DBA InsuranceSince DBA is only applicable to OCONUS and rates change is this to be reimbursable, and if so what CLIN?An answer will be posted on FBO as soon as possible.
56RFP

General

ManningWhat is the current staffing at each location?An answer will be posted on FBO as soon as possible.
57CBAHow does an offeror access the current UC-35 Collective Bargaining Agreement, or will that be posted soon on FBO?An answer will be posted on FBO as soon as possible.

File details come from the government source that posted it. Updated .