L-1_Vol_1_ES_Tables.xls

XLS spreadsheet 75 KB Posted

Attached to
Revised Proposal Due Date Federal contract opportunity
Solicitation number
N00019-15-R-0106
Issued by
Department of the Navy Naval Air Systems Command

About this file

Attachment L-1 Volume 1 ES Tables. The content of this file is exactly the same as the previously uploaded file L-1 Vol 1 ES Tables.xlsx.

View the file

Other files for this federal contract opportunity

Other files attached to Revised Proposal Due Date, newest first.
File Type Posted
Q A_Posted_on_FBO_2015-10-19.xlsx XLSX spreadsheet
N00019-15-R-0106_Amendment_0004.docx DOCX document
Q A_Posted_on_FBO_2015-10-15.xlsx XLSX spreadsheet
L-8_Vol_4_Price_Matrix_(revised_2015-09-30).xls XLS spreadsheet
N00019-15-R-0106_Amendment_0003.docx DOCX document
Q A_Posted_on_FBO_2015-10-09.xlsx XLSX spreadsheet
Q A_Posted_on_FBO_2015-09-30.xlsx XLSX spreadsheet
N00019-15-R-0106_Amendment_0002.docx DOCX document
N00019-15-R-0106_Amendment_0001.docx DOCX document
Q A_Posted_on_FBO_2015-09-24.xlsx XLSX spreadsheet
Q A_Posted_on_FBO_2015-09-21.xlsx XLSX spreadsheet
L-8_Vol_4_Price_Matrix.xls XLS spreadsheet
L-5_Vol_3_Tech_Exp.xls XLS spreadsheet
Attach_4a_-_WD_2012-0058_R3.txt TXT text file
L-7_Vol_3_Tech_SB_Goals.xls XLS spreadsheet
L-6_Vol_3_Tech_MP_Chart.xls XLS spreadsheet
L-8_Vol_4_Price_Matrix.xls XLS spreadsheet
Attach_4a_-_WD-12-0058-R1.txt TXT text file
Attach_4e_-_WD-05-2058.txt TXT text file
Attach_1_Appendix_B__Commercial_Derivative_Aircraft_Airworthiness_(2015-08-13).doc DOC document
Attach_4d_-_WD-05-2104.txt TXT text file
Attach_1_Appendix_H__Performance_Metrics_(2015-06-05).doc DOC document
UC-35_Technical_Library_Table_of_Content_150722.docx DOCX document
UC-35_Aircraft_Historical_Flt_Hrs_and_MC_rates.xlsx XLSX spreadsheet
UC-35_Parts_List_1_Dec_2014-28_Feb_2015rev1.pdf PDF
COMNAVAIRFORINST_4790.2_NAMP_Chapter_11_15_May12.pdf PDF
UC-35_Parts_List_1_Mar_2015_-_31_May_2015rev1.pdf PDF
UC-35_Aircraft_and_Engine_Depot_Schedule_FY16-FY18.xlsx XLSX spreadsheet
DoD_Joint_Travel_Regulations.pdf PDF
DCMA-INST-8210-1C.pdf PDF
NAVAIR_01-1A-509-1.pdf PDF
UC-35_Aircraft_Top_10_Degraders.xlsx XLSX spreadsheet
DOD_4145.26-M.pdf PDF
Q A_Posted_on_FBO_2015-07-29.xlsx XLSX spreadsheet
C-26_UC-35_pre-solic_brief_25June2015.pptx PPTX presentation
Pre-Solicitation_Conf_Attendee_List.xlsx XLSX spreadsheet
Attach_1_Appendix_F__Approved_Essential_Personnel_(2015-05-05).doc DOC document
L-8_Vol_4_Price_Matrix.xlsx XLSX spreadsheet
Attach_1_Appendix_B__Commercial_Derivative_Aircraft_Airworthiness_(2015-05-05).doc DOC document
Question_Template.xlsx XLSX spreadsheet
Attach_1_Appendix_D_Over_and_Above_Work_Request_Form_(2015-05-05).docx DOCX document
Attach_1_Appendix_I__UC-35_Minimum_Equipment_List_(2015-05-05).doc DOC document
Attach_1_Appendix_K__Marine_Customer_Satisfaction_Survey_(2015-05-05).pdf PDF
L-2_Vol_2_PPQ.docx DOCX document
L-7_Vol_3_Tech_SB_Goals.xlsx XLSX spreadsheet
Attach_1_Appendix_H__Performance_Metrics_(2015-06-05).doc DOC document
L-4_Vol_3_Tech_CRM.docx DOCX document
Attach_1_Appendix_G__Government_Furnished_Facilities_(2015-05-05).doc DOC document
Attach_1_Appendix_E__Contract_Fund_Status_Report_Format_(2015-05-05).xlsx XLSX spreadsheet
Exhibit_A_CDRL_Draft.pdf PDF
Show all 50

Revised Proposal Due Date has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

**NOTE: This tab contains instructions for completing Tables ES-1 and ES-2**
Instructions for the ES-1 Offeror Summary Table
Row 3Fill in the Offeror's Name.
Column AList the prime, all subcontractors (principal subcontractors, critical subcontractors, and all other subcontractors), JV team members, and others who will be involved with performance or management of the requirements of this solicitation. Add rows as necessary.
Column BList all Places of Performance with accurate physical locations.
Note: Place of Performance for this solicitation pertains to the physical location of the prime, principal subcontractor, critical subcontractor, and JV team members that are deploying personnel or responsible for the work; not the Government site where the work is being performed. If work is being performed at a contractor site, then that would also pertain to Place of Performance.
Column CProvide the CAGE codes and DUNS numbers associated with the entity that is proposing to perform the work for this solicitation.

Note: Past performance and corporate experience of any entity with multiple CAGE codes and DUNS will be considered for the same physical location if they have distinct roles and responsibilities. If multiple CAGE codes and DUNS for the same physical location will be involved with performance or management of the requirements of this solicitation, ensure they are identified on separate lines in Table ES-1 (Offeror Summary).

Column D Brief Work Description and/or Program Role and Responsibility for each CAGE Code and DUNs identified.

Note: Provide a definition of the legal relationship between the entities if it is other than a prime/subcontractor relationship.

Column EProvide the percentage of total proposed to include the prime, all subcontractors (principal subcontractors, critical subcontractors, and all other subcontractors), JV team members, or others so that the total proposed price adds up to 100% of the contract price. If there are current and previous CAGE codes and DUNS as a result of a corporate acquisition, reorganization, merger, or other administrative reason, that refer to the same division in the same physical location for where the work is being performed or from where the work is being directed, place N/A in this column and ensure the proposed price/work for this effort is covered under the current CAGE codes and DUNs.
Instructions for the ES-2 Relevant Contract Summary Table
Row 3Fill in the Offeror's Name.
Column AList the names of the Prime, principal subcontractors, critical subcontractors, and JV team members proposing for this solicitation. Add rows as necessary.
Column BProvide a unique contract reference number for all contracts proposed as relevant for Past Performance.
Utilize P1...Pn for the prime or Joint Venture Team proposing for this solicitation (regardless if the referenced contract was performed as a Prime or subcontractor).
Utilize P1...Pn for the prime or Joint Venture Team proposing for this solicitation (regardless if the referenced contract was performed as a Prime or subcontractor).
Utilize S1...Sn for contractors proposed as subcontractors for this solicitation (regardless if the referenced contract was performed as a prime or subcontractor).
Utilize T1...Tn for each JV team member proposed as part of a Joint Venture for this solicitation (only include contract references labeled as T1…Tn where the same Joint Venture Team members previously performed as a Joint Venture Team).
Note (1): Group the references by each entity where entity is defined as the Prime, principal subcontractors, critical subcontractors, or JV Team Member.
Note (2): 'n' is defined as the total number of contracts referenced for each type of entity.
Note (3): The contract references shall be numbered consecutively across all subcontractors and JV Team Members (as illustrated in the example tab) so that they are unique (e.g., there is only one P1, S1, T1).
Column CProvide the Contract Number (e.g., N00019-12-R-0001) for the referenced contract.
Column DInclude the Contract Type (CPIF etc) for the referenced contract.
Column EInclude the Contract Title for the referenced contract.
Column FPlace an X in this column if the referenced contract is included in the Past Performance Volume.
Note (1):The references designated in Table ES-2 Relevant Contract Summary, shall be used in completing Volume 2 Table PP-1 Past Performance Contract Data, and should be consistent throughout.

&L&"Times New Roman,Regular"&10L-1 Vol 1 ES Tables&R&"Times New Roman,Regular"&10N00019-15-R-0106 &C&P&R&"Times New Roman,Regular"&12Instructions

ES-1 Offeror Summary

Table ES-1 Offeror Summary Table
Offeror:
Contractor NamePlace of PerformanceCAGE Code and
DUNS NumberWork Description% of Total Proposed Cost/Price
Total Proposed Price (must add up to 100%)100%

&L&"Times New Roman,Regular"&10&K000000L-1 Vol 1 ES Tables&R&"Times New Roman,Regular"&10&K000000N00019-15-R-0106 &C&P

ES-2 Relevant Contract Summary

Table ES-2 Relevant Contract Summary Table
Offeror:Referenced in Vol 5 Past Performance
Contractor NameContract
ReferenceContract NumberContract TypeContract Title
Prime or Joint Venture CompanyP1
P2
P3
JV team member A (if applicable)T1
T2
T3
T4
JV team member N (if applicable)T5
Subcontractor AS1
S2
S3
Subcontractor BS4
S5
Subcontractor NS6

&L&"Times New Roman,Regular"&10&K000000L-1 Vol 1 ES Tables&R&"Times New Roman,Regular"&10&K000000N00019-15-R-0106 &C&P

ES-2 Relevant Contract Example

Table ES-2 Relevant Contract Summary Table
Offeror:Referenced in Vol 5 Past Performance
Contractor NameContract
ReferenceContract NumberContract TypeContract Title
Prime or Joint Venture CompanyP1xxxx-xx-x-xxxxFFPX
P2xxxx-xx-x-xxxxCPFFX
P3xxxx-xx-x-xxxxFFPX
JV team member A (if applicable)T1xxxx-xx-x-xxxxFFPX
T2xxxx-xx-x-xxxxFPIX
T3xxxx-xx-x-xxxxFFPX
T4xxxx-xx-x-xxxxCPFFX
FFP
JV team member N (if applicable)T5xxx-xx-x-xxxxFFPX
Subcontractor AS1xxxx-xx-x-xxxxFFPX
S2xxxx-xx-x-xxxxFFPX
S3xxxx-xx-x-xxxxFPIX
Subcontractor BS4xxxx-xx-x-xxxxFFPX
S5xxxx-xx-x-xxxxCPFFX
Subcontractor NS6xxxx-xx-x-xxxxFFPX

&L&"Times New Roman,Regular"&10&K000000L-1 Vol 1 ES Tables&R&"Times New Roman,Regular"&10&K000000N00019-15-R-0106 &C&P

File details come from the government source that posted it. Updated .