Question
No.
Contract Reference Industry Question/Recommendation Government Comment
89 Attachment 1 Aircraft
Intermediate Maintenance
Department (AIMD)
Performance Work
Statement (PWS) 18 October
PWS 9.2.2.4(AIMD NASCC)
Airframes (beginning in
Option Period 2) and PWS
9.2.3.1(AIMD NASP)
Airframes
A. Will the NASCC and NASWF’s ALSS and
Tire & Wheel consumable material/supplies continue to be stocked by T-6 COMBs contractor?
B. Will T-6 COMBs contractor maintain the T-6 tire pool at any of the sites (NASP, NASCC or
NASWF)?
A. Yes.
B. Yes.
90 Attachment 1 Aircraft
Intermediate Maintenance
Department (AIMD)
Performance Work
Discussion: PWS
9.2.2.4.a (AIMD NASCC)
Airframes (beginning in
Option Period 2) and
PWS 9.2.3.1.c (AIMD
NASP and NASWF)
Airframes
9.2.2.4.a
The Contractor shall perform the following I-
Level maintenance for the
T-6 and T-44 aircraft:
a. Disassemble, assemble, service, and test tire and
How will the retrograde tires (SE and aircraft) be disposed of at NASP, NASWF and NASCC?
Will the respective “O” Level contractors, COMBS, or ASD perform this task?
The O-level contractors will not perform this task. The I-
Level Contractor (AIMD) will be responsible for disposing of retrograde tires through the Defense Logistics Agency
Disposition (DLAD).
wheel components.
9.2.3.1.c
The Contractor shall:
c. Disassemble, assemble, service, and test tire and wheel components for all aircraft (to include T-
6 aircraft at NAS Whiting
Field excluding the Base and Option 1 periods of performance). The
Contractor shall provide manning on site at the
Whiting Field facilities to perform these services.
91 Attachment 1 Aircraft
Intermediate Maintenance
Department (AIMD)
Performance Work
Discussion: PWS 9.2.1
Operational Hours, PWS
9.2.2.4(AIMD NASCC)
Airframes (beginning in
Option Period 2) and PWS
9.2.3.1(AIMD NASP)
Airframes
AIMD NASCC and NASP’s
Working Hours are Monday-
Friday 0630-1500.
With the additional scope of work at NASCC and
NASWF starting in Option Period 2, is there a requirement to expand the hours at these or all the sites? And if so, will there be a PWS modification to adjust the required working hours at these sites to accommodate customers?
No
92 Request for Proposal dated
16 November 2016
Please clarify if clause is only applicable to modifications to the contract.
This clause (FAR 52.230-2) is be applicable to the awarded contract and all modifications.
Discussion: Section I -
Contract Clauses
CLAUSES INCORPORATED
BY REFERENCE
52.230-2 Cost
Accounting Standards OCT
93 SF33, Section 9; L.3.0, Table
G-2
Discussion: The SF33 requires that offerors submit original sealed offers plus 7 copies, but Table G-2 stipulates that only 1 Original hard copy of each proposal component is required.
Please confirm that only 1 Original hard copy is required for each component of our submittal.
Amendment 01 of the RFP modified Section A to clarify this issue.
94 SF33, Section 9; L.3.0, Table
G-2; L.3.3.a(1)
Discussion: Section L.3.3.a(1) instructs offerors to provide (in
Annex E) an electronic copy of the Statement of
Work/Performance Work
Statement for each of the referenced contracts. Table G-
2 stipulates that a hard copy of
Annex E is also required.
Considering the volume of pages of the
SOW/PWS for each of the referenced contracts, and the combined hard copy sum of these pages, is the Government certain that a hard copy of these documents is required (per Table G-2) or will an electronic version of these documents suffice?
One original hard copy of these documents is required.
95 Attachment 1 Aircraft
Intermediate Maintenance
Department (AIMD)
Performance Work
Statement (PWS) 18 October
Attachment 2, Applicable
Documents
Will the quality requirements be provided in
Attachment 2, Applicable Documents?
Yes. Attachment 2, Applicable Documents has been updated.
Discussion: PWS 9.1.2.2.1
The Contractor shall provide a quality system that complies with the requirements of
Section J, Attachment
2(Applicable Documents).
96 Exhibit A Contract Data
Requirements List
Discussion: Distribution
Statement D: Distribution
Authorized to the Department of Defense and U.S. DOD
Contractors only;
Administrative or Operational use; 30 Oct 2015. Other
Requests for this document shall be referred to Naval
Undergraduate Flight Training
Systems, ATTN: PMA-273, Saufley Road, Bldg. 3258, Patuxent River, MD 20670.
Contract Data Requirements Lists (CDRLs) contain information that is submitted with the
Offeror’s Proposal. Will the Government change the Distribution Statement to protect company proprietary information?
Distribution statements do not govern in the case of proprietary or technical data license rights. They are unrelated markings. The Government will distribute technical data in accordance with its license rights pursuant to DFARS 252.227-7013.
The Solicitation requires that all Exhibit A CDRLs shall contain all of the information required by the Date Item
Description (DID). Technical Data Deliverables shall NOT be marked Proprietary nor be marked with any other non-conforming or unjustified markings.
97 Attachment 1 Aircraft
Intermediate Maintenance
Department (AIMD)
Performance Work
Discussion: PWS
9.2.2(AIMD NASCC) and
PWS 9.2.3(AIMD NASP)
A. Will the government provide Deckplate data regarding the additional T-6 associated functions
(i.e. items processed/man-hours/type of
ALSS equipment) for the T-6 COMBS, ALSS, T-6 Tire and Wheel, Battery, and
NDI functions currently being maintained at
NASCC, NASP and NASCC that is not included in the competition library?
B. Will the government provide any supporting documentation for the additional T-6 scope of work at NASCC, NASP and NASWF (i.e., Parts vendors/manuals/consumables/MRCs/PMs)?
A. No historical DECKPLATE data exists for T-6 NDI, Tire & Wheel Maintenance, T-6 Support equipment
Management and T-6 Battery Maintenance. Historical actuals for T-6A at NAS Pensacola have been uploaded into the competition library.
B. All supporting documentation is listed in the competition library, applicable documents attachment, or NATEC.