85-87_Q A_to_Draft_RFP_with_LM_20161109.pdf

PDF 189 KB Posted

Attached to
Aircraft Intermediate Maintenance Departments (AIMD)
Solicitation number
N00019-15-R-0079
Issued by

About this file

Questions and Answers 85-87.

View the file

Other files

File Type Posted
N00019-15-R-0079_Amendment_02.pdf PDF
Att_2_Applicable_Docs__20161202.pdf PDF
89_-97-_Ind_Rep_to_Final_RFP.pdf PDF
Att_2_Applicable_Docs__20161202.pdf PDF
Att_L-4_Vol_3_PPQ-20160503_Revised.docm DOCM document
N00019-15-R-0079_Amendment_01_(113016).pdf PDF
Att_L-4_Vol_3_PPQ-20160503_Revised.docm DOCM document
88_-_Ind_Rep_to_Draft_RFP_with_LM_20161123_final_for_posting.pdf PDF
Att_L-3_Vol_2_Exp_Table_T-2__20160914.xlsx XLSX spreadsheet
Att_L-4_Vol_3_PPQ-20160503.docm DOCM document
Att_16_RGFP_AIMD_Pensacola.xls XLS spreadsheet
Att_9.1_ICRL_Corpus_Christi_20160331.xlsx XLSX spreadsheet
Att_20_AIMD_CSDR_Plan_15Dec2015.xlsx XLSX spreadsheet
Att_18_SGFP_AIMD_Corpus_Christi_.xls XLS spreadsheet
Att_17_1-_CDRL_Instructions_20160331.pdf PDF
Att_L-8_Vol_4_Non-Prime_Entity_CS-20160915.xlsx XLSX spreadsheet
Att_11_AIMD_NASP-NASWF_CBA.pdf PDF
Att_L-9_Vol_4_CSDR_Plan_20160607.xlsx XLSX spreadsheet
Att_L-7_Vol_4_Prime_CCS-20161006.xlsx XLSX spreadsheet
Att_26__Customer_Product_Order_Request_Form.xls XLS spreadsheet
Exhibit_A_CDRLs_20161110.pdf PDF
Att_3.2_-_AIMD_Facilities_NASCC_20161006.pdf PDF
Att_17.2-_AIMDNet_New_User_Account_Request.pdf PDF
Att_19_SGFP_AIMD_Pensacola_.xls XLS spreadsheet
Att_13_AIMD_AWD_WD_05-2508_Rev19.pdf PDF
Att_27__T-6_SE_for_AIMD_NASCC_10_14_16.xlsx XLSX spreadsheet
Att_7_Other_GFP_Corpus_Christi_20160331.xls XLS spreadsheet
Att_15_RGFP_AIMD_Corpus_Christi.xls XLS spreadsheet
Att_8_Other_GFP_Pensacola_20160331.xlsx XLSX spreadsheet
Exhibit_B_CDRLs_20161110.pdf PDF
Att_21_CAC_Procedures_20160329.pdf PDF
Att_L-5_Vol_3__PP-1_PP_Con_Data_20160914.xlsx XLSX spreadsheet
Att_28__T-6_SE_at_NAS_Whiting_Field_10_14_16.xlsx XLSX spreadsheet
N00019-15-R-0079.pdf PDF
Att_2_Applicable_Docs_20161024.xlsx XLSX spreadsheet
Att_L-6_Vol_4_Price_Matrix_B_20161114.xlsx XLSX spreadsheet
Att_1_PWS_20161018.pdf PDF
Att_29__T-6_SE_at_NAS_Pensacola_10_14_16.xlsx XLSX spreadsheet
Att_L-2_Ann_A_Manning20160503.xlsx XLSX spreadsheet
Att_L-1_Vol_1_ES_Tables_20160721.xlsx XLSX spreadsheet
Att_10_Acronyms_20160331.pdf PDF
Att_14_AIMD_AWD_WD_05-3034_Rev19.pdf PDF
Att_12_AIMD_NASCC_CBA.pdf PDF
Att_3.1_-_AIMD_Facilities_NASP_20161013.pdf PDF
Att_9.2_ICRL_Pensacola_20160331.xlsx XLSX spreadsheet
64-84_Q A_to_Draft_RFP_no_LM_20161109.pdf PDF
DRAFT_N00019-15-R-0079_with_L M.pdf PDF
DRAFT_Att_1_PWS.pdf PDF
DRAFT_Att_27__T-6_SE_for_AIMD_NASCC.xlsx XLSX spreadsheet
Site_Visit_Registration_ _Schedule.pdf PDF
Show 40 more

Latest 50 of 153 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00019-15-R-0079 Government Responses to Industry Questions

Question No. Contract Reference Industry Question/Recommendation Government Comment

85 Section L, L-1 CONTENT OF PROPOSALS

PART A GENERAL INSTRUCTIONS

2.0 PROPOSAL FORMAT AND SUBMISSION

Para 3.0 PROPOSAL CONTENT AND VOLUMES, page 97 and Table G-2 Proposal Structure Para 4.1 (Pricing) Volume Content

The RFP provides the requested proposal structure in Tables G-1 and G-

2. This requests 5 volumes and the five annexes.

Para 2.0 indicates that each Volume and Annex should be individually bound.

Para 4.1 indicates that pricing should only be included with Volume 4 (Price) Volume 5 Contracts and Annex D (Small Business Plan).

1. As each Annexes contents are specific to a particular volume, shouldn't the Annexes be included with (or bound with) the Volume that they are associated with. For example Annexes A, B, C should be included with (Bound with) the Technical Volume (Binder); Annex D with the Pricing Volume; and Annex E with the Past Performance Volume.

By including the annexes with the volumes they are naturally associated with, it will be easier for the reviewers to asses each contractor; and it will also reduce the number of physical binders that the government must keep track of during the evaluation.

No. Annexes and volumes should be bound and provided as required by Section L.

86 DRFP Section L, page 99; paragraph Section L 2.4, page 104 Does the Government expect just Table ES-2 (Relevant Contract Summary) to be submitted two weeks prior to specified Proposal submission date/time or the entire Past Performance Volume 3?

No. Please submit the entire Past Performance Volume 3.

87 DRFP Section L, page 104; paragraph Section L 2.4, page 104 The referenced paragraph says the Offeror must demonstrate the degree to which its previous experience is "similar" to the requirements of this solicitation but that experience "must" utilize Naval Aviation Maintenance Program CNAF 4790.2B processes and procedures. The above "required" policies and procedures are very "similar" to others used within DoD and/or commercial operations for this type of work.

Transitioning from a DoD system or a commercial system should not create an obstacle to bidding this effort. By establishing this requirement for only CNAF 4790.2B, the competition could be limited

1. Why can experience regarding AIMD requirements be "similar" yet the processes and procedures utilized "must" be the Naval Aviation Maintenance Program CNAF 4790.2B?

2. Please explain how the utilization of Naval Aviation Maintenance Program CNAF 4790.2B enhances competition on this program.

This is the Government requirement.