Exhibits_(A)(B)(C)_-_CDRLs.pdf
PDF 275 KB Posted
- Attached to
- C-40A Aircraft Contractor Logistics Support
- Solicitation number
- N00019-15-R-0011
About this file
Exhibits (A) (B) and (C) - Contract Data Requirements Lists
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Material Utilization and Forecasting Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81947 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 4.1.2 & 5.6.1
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
2TIMES/R (See Block 16)
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
31 December 2016
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Blocks 10 & 12: If CLIN 0001 is exercised, the Contractor shall submit the deliverable within 30 days after the materials inventory audit during the Transition Phase-In time period. If CLIN 0001 is not exercised, the Contractor shall submit the deliverable on 30 June 2016.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA-207
CNRFC N43
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
6/16/2014
I. APPROVED BY
David Adams
J. DATE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ILSS
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Consumable Parts Bondroom/Inventory and Parts Usage Report
3. SUBTITLE
Parts and Material Issued at Sites Report
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80834 (See Block 16)
5. CONTRACT REFERENCE
PWS para 5.7.3 & 5.7.4
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MTHLY
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: First submission is 45 days after base year of contract Period of Performance start date.
Block 13: Subsequent submissions shall be delivered on the 15th of following month until contract base year period of performance is completed.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA2071A
ACO
PCO
DCMA
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
6/16/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ILSS
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Spare Parts Usage Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80483 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.7.6
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME
12. DATE OF FIRST
SUBMISSION
30 June 2016
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
1 June 2016
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable. Deliver in an excel(.xls) file.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA 207A1
CNRFC N43
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
6/16/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
OTHER
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81534 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.12
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16 As
REQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 10: The Contractor shall submit the deliverable as required but no more than 10 per year.
Blocks 12 and 13: The Contractor shall submit all deliverables 45 days after deficiency report is posted on JDRS.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/8/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Conference Agenda
3. SUBTITLE
Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249A (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.1
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Meeting Agenda.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the agenda 14 days prior to the annaul PMR. Revisions as required.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
6/16/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Presentation Material
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373 (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Presentation Material.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the deliverable 14 days prior to the PMR. Revisions as required.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
6/30/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Conference Minutes
3. SUBTITLE
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250A (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.3
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Meeting Minutes.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the deliverable within 14 days after the PMR. Revisions as required.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
6/30/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AA01
2. TITLE OF DATA ITEM
Material Utilization and Forecasting Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81947 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.6.1
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
2TIMES
12. DATE OF FIRST
SUBMISSION
30 June 2017
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
1 June 2017
13. DATE OF SUBSEQUENT
SUBMISSION
31 December 2017
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA-207
CNRFC N43
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ILSS
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AA02
2. TITLE OF DATA ITEM
Consumable Parts Bondroom/Inventory and Parts Usage Report
3. SUBTITLE
Parts and Material Issued at Sites Report
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80834 (See Block 16)
5. CONTRACT REFERENCE
PWS para 5.7.3 & 5.7.4
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MTHLY
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Blocks 12 & 13: Continue submitting the deliverables on the 15th of each month.
Block 14: Place on Web-base Information System (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA2071A
ACO
PCO
DCMA
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ILSS
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AA03
2. TITLE OF DATA ITEM
Spare Parts Usage Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80483 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.7.6
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME
12. DATE OF FIRST
SUBMISSION
30 June 2017
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
1 June 2017
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable. Deliver in an excel(.xls) file.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA 207A1
CNRFC N43
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
OTHER
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AA04
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81534 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.12
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16 As
REQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 10: The Contractor shall submit the deliverable as required but no more than 10 per year.
Blocks 12 & 13: The Contractor shall submit all deliverables 45 days after deficiency report is posted on JDRS.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AA05
2. TITLE OF DATA ITEM
Conference Agenda
3. SUBTITLE
Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249A (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.1
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Meeting Agenda.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the agenda 14 days prior to the annual PMR. Revisions as required.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AA06
2. TITLE OF DATA ITEM
Presentation Material
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373 (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Presentation Material.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the deliverable 14 days prior to the PMR. Revisions as required.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AA07
2. TITLE OF DATA ITEM
Conference Minutes
3. SUBTITLE
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250A (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.3
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Meeting Minutes.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the deliverable within 14 days after the PMR. Revisions as required.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AB01
2. TITLE OF DATA ITEM
Material Utilization and Forecasting Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81947 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.6.1
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
2TIMES
12. DATE OF FIRST
SUBMISSION
30 June 2018
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
31 December 2018
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to NAVAIR PMA 207.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation or training (OMIT) of the C-40A.
PMA-207
CNRFC N43
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ILSS
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AB02
2. TITLE OF DATA ITEM
Consumable Parts Bondroom/Inventory and Parts Usage Report
3. SUBTITLE
Parts and Material Issued at Sites Report
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80834 (See Block 16)
5. CONTRACT REFERENCE
PWS para 5.7.3 & 5.7.4
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MTHLY
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to NAVAIR PMA 207.
Blocks 12 and 13: Continue submitting the deliverables on the 15th of each month.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation or training (OMIT) of the C-40A.
PMA2071A
ACO
PCO
DCMA
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ILSS
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AB03
2. TITLE OF DATA ITEM
Spare Parts Usage Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80483 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.7.6
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME
12. DATE OF FIRST
SUBMISSION
30 June 2018
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
1 June 2018
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable. Deliver in an excel(.xls) file.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA 207A1
CNRFC N43
CFLSW
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
OTHER
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AB04
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81534 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.12
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16 As
REQ
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 10: The Contractor shall submit the deliverable as required but no more than 10 per year.
Blocks 12 and 13: The Contractor shall submit all deliverables 45 days after deficiency report is posted on JDRS.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training (OMIT) of the C-40A.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AB05
2. TITLE OF DATA ITEM
Conference Agenda
3. SUBTITLE
Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249A (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.1
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Meeting Agenda.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the agenda 14 days prior to the annaul PMR. Revisions as required.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AB06
2. TITLE OF DATA ITEM
Presentation Material
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373 (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.2
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Presentation Material.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the deliverable 14 days prior to the PMR. Revisions as required.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
ADMN
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AB07
2. TITLE OF DATA ITEM
Conference Minutes
3. SUBTITLE
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250A (See Block 16)
5. CONTRACT REFERENCE
PWS 5.13.1.3
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
1TIME/R
12. DATE OF FIRST
SUBMISSION
See Block 16
8. APP CODE
A (See Block 16)
C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 8: PMA2071 will approve informally by e-mail the Meeting Minutes.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to PMA-207.
Block 12: The Contractor shall submit the deliverable within 14 days after the PMR. Revisions as required.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL.
PMA 207A1
(See Block 16)
15. TOTAL
G. PREPARED BY
Donna Elliott
H. DATE
7/9/2014
I. APPROVED BY
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY
MGMT
D. SYSTEM/ITEM
C-40A
E. CONTRACT/PR NO.
N00019-15-R-0011
F. CONTRACTOR
1. DATA ITEM NO.
AC01
2. TITLE OF DATA ITEM
Material Utilization and Forecasting Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81947 (See Block 16)
5. CONTRACT REFERENCE
PWS Para 5.6.1
6. REQUIRING OFFICE
PMA-207
7. DD 250
REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
2TIMES
12. DATE OF FIRST
SUBMISSION
30 June 2019
8. APP CODE
N/A C (See Block 16)
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
31 December 2019
14. DISTRIBUTION
b. COPIES
a. ADDRESSEE Final
Draft Reg. Repro
16. REMARKS
Block 4: Contractor format is acceptable.
Block 9: Distribution authorized to U.S. Government Agencies and their contractors for Administrative and Operational Use determined on 16 July 2014. Other requests for this document shall be referred to NAVAIR PMA 207.
Block 14: Place on Web-base Information system (WIS) and send an e-mail notification to the C-40A IPTL and DIPTL. The Government considers the data delivered herein as necessary for operation, maintenance, installation, or training…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .