N00019-15-R-0011
Attachment 1, Appendix (F)
Performance Metrics
15 April 2015
PERFORMANCE METRICS
Performance Metric PWS Para. Satisfactory Performance Marginal Performance
Lost/Damaged GFP 3.10.4 Notify PCO within 24 hours of discovery or lost, damaged, destroyed or stolen
GFP.
Project Management 3.17 Contractor is in compliance with their approved Project
Management Plan 90.0% of the time. This includes submission and accuracy of
Integrated Management
Schedule (IMS), Cost, Schedule and Performance status and information.
Contractor is in compliance with their PM Plan 85.0% to
89.9% of the time. This includes submissions and accuracy of IMS, Cost, Schedule and Performance status and information.
Project Manager 3.17.2 Provide name/info designee to PCO within 10 days of award.
Project Manager 3.17.2 Submit change of Project
Manager POC within 2 business days.
Maintenance
Recordkeeping
3.18 The Contractor is in
compliance with
Maintenance Recordkeeping and the information is current and real or near real-time and downloaded on a routine basis.
The Contractor is in compliance with
Maintenance Recordkeeping and the information is not available or downloaded on a routine basis.
Essential Personnel 3.19 Essential personnel positions are not vacant more than 30 consecutive days.
Essential Personnel 3.19 Any change to the essential personnel POC information is performed within 2 business days.
Performance Metrics
The Contractor shall document and report a joint inventory of GFP and COP at each facility annually.
The Contractor shall complete the annual inventory NLT fifteen
(15) working days prior to the end of the annual contract ordering period.
4.1.2
5.6.1
The Contractor shall maintain greater than 95.0% inventory accuracy with unreconciled inventory corrections not to exceed
$2,500 per year.
The Contractor shall maintain 90.0% to 94.9% inventory accuracy with unreconciled inventory corrections not to exceed
$4,000 per year.
Post Award Conference 4.1.4 Contractor to host 2 day conference NLT 30 days after Contract Award.
Additional Facility
Material
4.1.8 During Phase-In period (1st
60 days) the Contractor shall provide a listing of site support requirements to the
USG.
Export Licenses 4.1.9 ITAR license requests are submitted NLT 30 days after
Contract Award.
Schedule Changes 5.4.1 When MO notifies
Contractor with schedule changes, the Contractor shall provide a new schedule within 2 hours.
Part Requisition
Management, NALCOMIS/OOMA.
5.7.1 The Contractor provides
information to the
NALCOMIS/OOMA
database no later than 48 hours after filling a requisition. Information is accurate.
The Contractor provides information to the
NALCOMIS/OOMA
database after 72 hours of filling a requisition and there are errors found in the data accuracy.
Performance Metrics
For Non-Mission Capable
Supply/Aircraft on Ground
Requisitions:
5.7.2
5.7.3
7.0
Provide initial status of all requisitioned material to the squadron within one (1) hour and every four (4) hours thereafter during core work hours or upon status change.
Deliver all requisitioned material within twenty-four
(24) hours to the aircraft at any required Continental
United States (CONUS) location.
Deliver all requisitioned material within seventy-two
(72) hours to the aircraft at any required Outside
Continental United States
(OCONUS) location.
For Partial-Mission
Capable Supply/Mission degraded Requisitions
5.7.2
5.7.3
7.0
Provide initial status of all requisitioned material to the squadron within two (2) hours.
Deliver the requisitioned material within seventy-two
(72) hours to the aircraft at any required CONUS location.
Deliver all requisitioned material within ninety-six
(96) hours to the aircraft at any required OCONUS location.
Performance Metrics
The Contractor shall track all Government and
Contractor owned spares usage and deliver the
Spares Usage Report, inclusive of pricing information.
5.7.6 Pricing information is
included in the documentation 100%.
Pricing information is included in the documentation less than
100%.
The Contractor shall ensure that the Government receives the maximum benefit of all warranties offered for labor, parts and material that are repaired, purchased or replaced in the performance of this contract.
5.7.7 Warranty Entitlements:
When warranty entitlements apply, the Contractor proposal identifies
“WARRANTY
ENTITLEMENTS APPLY”.
95-100% of the proposal apply appropriate labor and material cost entitlements correctly.
Warranty Entitlements:
When warranty entitlements apply, the Contractor proposal identifies
“WARRANTY
ENTITLEMENTS APPLY”.
85% to 94.9% of the proposals apply appropriate labor and material cost entitlements correctly.
deploy all DSKs with
100% RFI assets.
5.10 100% Compliance N/A
Turn-around Time (TAT) for the Contractor to repair or replace GOP identified in Appendices (C), DSK and (E), Repairables
6.0 TAT starts upon delivery
order award and completes when the item is returned to
Navy inventory 100% compliance. (Excludes
Scheduled Depot Level
Maintenance C Checks).
TAT 90% to 99.9% compliance
TAT for the Contractor to repair or overhaul the High
Value Assets (HVA), Appendix (B)
15.0 TAT starts upon award of
delivery order and completes when the item is returned to
Navy inventory 96% compliance.
TAT 90.0% to 95.9% compliance.
Performance Metrics provide services, repair material and overhaul in accordance with Over and
Above Procedures, Appendix I.
15.0
16.0
17.0
The Contractor’s initial proposal for Over and Above work efforts shall be accurate, complete and timely. The proposal shall include supporting documentation for the
Government to make price reasonableness determinations in accordance with FAR Part 12. The
Contractor’s proposal submission meets the requested proposal due date.
deliver aircraft from depot maintenance to the
Government with no more than ten (10) minor defects, no 0 Major defects, and no
Critical defects attributed to the Contractor.
20.0
21.0
25.0
26.0
100% Compliance. Less than 99% compliance may result in a Contractor reduced payment of $5,000 on the appropriate CLIN or
1% of the delivery order negotiated invoiced amount, whichever is greater.
TAT for the Contractor to perform aircraft depot maintenance.
20.0
21.0
25.0
26.0
Depot TAT to include inspection, and repair of all defects, starts at the delivery order award date, and terminates upon a successful
Functional Check Flight
(FCF) by the USN 100% compliance.
Less than 100% compliance may result in a Contractor reduced payment of $5,000 or 1% of the delivery order negotiated invoiced amount, whichever is greater.
Performance Metrics
Accident/ Incident 20.2 Accident/ Incident
Return to Service: the
Contractor shall complete a comprehensive verification of the USN aircraft, engine, and component logbook entries for each
Depot visit.
20.3
20.4
Upon completion of the
Depot visit, an authorized representative shall sign an entry in the USN aircraft logbook certifying inspection and configuration status of the aircraft 100% compliance.
Less than 100% compliance may result in a Contractor reduced payment of $5,000 or 1% of the delivery order negotiated invoiced amount, whichever is greater.
The Contractor shall correct discrepancies discovered during a FCF, which are required to successfully complete the
FCF.
20.11
21.11
24.0
Successful functional check flight on first flight.
Discrepancies related to a
Depot task card affected system are discovered during
FCF. Additional FCF, if required, will be at “NO
ADDITIONAL CHARGE”
to the Government.
The Contractor shall update the applicable documentation and records for each C-40A aircraft for each Depot inspection and repair.
21.3
21.4
100% compliance with
Federal Aviation Regulation
(FAR) Parts 121.1105 and
121.1109.
Less than 100% compliance may result in a Contractor reduced payment of $5,000 or 1% of the delivery order
Performance Metrics
The Contractor shall strip and paint the aircraft in accordance with Boeing
Design D6-1816, (Process
Document for Decorative
Finishing of Airplane
Exteriors) and Boeing
Drawing 414A4147.
22.0 No major paint discrepancies
which require rework, or 5 or less minor paint discrepancies which require touch up, are discovered during the Government acceptance inspection.
No more than 4 major paint discrepancies which require rework, or no more than 6 to
10 minor paint discrepancies which require touch up, are discovered during the
Government acceptance inspection.
C Check Over and Above
Work, and Over and Above
Depot Maintenance
25.1
26.1
26.2
Successful functional check flight on first flight.
No discrepancies unrelated to any Depot task card affected system are discovered during FCF.
Additional FCF will be negotiated with the PCO to correct discrepancies.
C Check Over and Above
Work, and Over and Above
Depot Maintenance
25.1
26.1
26.2
Successful functional check flight on first flight.
Discrepancies related to a
Depot task card affected system are discovered during
FCF. Additional FCF, if required, will be at “NO
ADDITIONAL CHARGE”
to the Government.
The Contractor shall provide appropriate Return
To Service documentation entries into the USN aircraft, engine, and component logbooks.
25.0
26.0
100% Compliance. Less than 100% compliance may result in a Contractor reduced payment of $5,000 or 1% of the delivery order
Drop-In Maintenance 26.1 The Contractor shall notify the USG of POA&M and estimated costs within 5 days after PCO/ACO notification.
Performance Metrics
Contractor Field Team 26.2 The Contractor shall notify the IPTL of planned actions within 8 hours after PCO notifies the Contractor of the requirement.
CDRL delivery schedules Exhibits
A-C
On time delivery of each
CDRL per CDRL delivery requirements 100% compliance.
Less than 100% compliance with CDRL delivery schedule requirements
Wide Area Workflow
Payment Instructions
DFARS
252.232-
The Contractor shall submit accurate payment request and supporting documentation no later than
45 days after Government signature on the Certificate of Completion.
The Contractor shall submit accurate payment request and supporting documentation no later than
90 days after Government signature on the Certificate of Completion.