N00019-15-R-0011
Attachment 1, Appendix (F)
Performance Metrics
01 June 2015
PERFORMANCE METRICS
Performance
Metrics PWS Para. Satisfactory Performance
Marginal
Performance
Lost/Damaged GFP 3.10.4 Notify PCO within 24 hours of discovery or lost, damaged, destroyed or stolen GFP.
Maintenance
Recordkeeping
3.18 The Contractor is in compliance
with Maintenance
Recordkeeping and the information is current and real or near real-time and downloaded on a routine basis.
The Contractor is in compliance with
Maintenance
Recordkeeping and the information is not available or downloaded on a routine basis.
Critical Position 3.19 Critical position personnel positions are not vacant more than 30 consecutive days.
Critical Position 3.19 Any change to the critical position personnel POC information is performed within
2 business days.
Any change to the critical position personnel POC information is NOT provided within 2 business days.
The Contractor shall document and report a joint inventory of
GFP and COP at each facility annually. The
Contractor shall complete the annual inventory NLT fifteen
(15) working days prior to the end of the annual contract ordering period.
4.1.2
5.6.1
The Contractor shall maintain greater than 95.0% inventory accuracy with unreconciled inventory corrections not to exceed $2,500 per year.
The Contractor shall maintain 90.0% to
94.9% inventory accuracy with unreconciled inventory corrections not to exceed $4,000 per year.
Export Licenses 4.1.9 ITAR license requests are submitted NLT 30 days after
Contract Award.
Metrics PWS Para. Satisfactory Performance
Marginal
Performance
Part Requisition
Management, NALCOMIS/OOMA.
5.7.1 The Contractor provides
information to the
NALCOMIS/OOMA database no later than 48 hours after filling a requisition. Information is accurate.
The Contractor provides information to the
NALCOMIS/OOMA
database after 48 hours of filling a requisition and there are errors found in the data accuracy.
For Non-Mission
Capable
Supply/Aircraft on
Ground Requisitions:
5.7.2
5.7.3
7.0
Provide initial status of all requisitioned material to the squadron within one (1) hour and every four (4) hours thereafter during core work hours or upon status change.
Deliver all requisitioned material within twenty-four (24) hours to the aircraft at any required
Continental United States
(CONUS) location.
Deliver all requisitioned material within seventy-two (72) hours to the aircraft at any required
Outside Continental United States
(OCONUS) location.
For Partial-Mission
Capable
Supply/Mission degraded Requisitions
5.7.2
5.7.3
7.0
Provide initial status of all requisitioned material to the squadron within six (6) hours.
Deliver the requisitioned material within ninety-six (96) hours to the aircraft at any required CONUS location.
Deliver all requisitioned material within one hundred and twenty (120) hours to the aircraft at any required
OCONUS location.
PWS Para. Satisfactory Performance
Marginal
Performance
The Contractor shall track all Government and Contractor owned spares usage and deliver the Spares
Usage Report, inclusive of pricing information.
5.7.6 Pricing information is included
in the documentation 100%.
Pricing information is included in the documentation less than 100%.
The Contractor shall ensure that the
Government receives the maximum benefit of all warranties offered for labor, parts and material that are repaired, purchased or replaced in the performance of this contract.
5.7.7 Warranty Entitlements: When
warranty entitlements apply, the
Contractor proposal identifies
“WARRANTY
ENTITLEMENTS APPLY”. 95-
100% of the proposal apply appropriate labor and material cost entitlements correctly.
Warranty
Entitlements: When warranty entitlements apply, the Contractor proposal identifies
“WARRANTY
ENTITLEMENTS
APPLY”. 85% to
94.9% of the proposals apply appropriate labor and material cost entitlements correctly.
The Contractor shall deploy all DSKs with
100% RFI assets.
5.10 100% Compliance N/A
Turn-around Time
(TAT) for the
Contractor to repair or replace GOP identified in
Appendices (C), DSK and (E), Repairables
6.0 TAT starts upon delivery order
award and completes when the item is returned to Navy inventory 100% compliance.
(Excludes Scheduled Depot
Level Maintenance C Checks).
TAT 90% to 99.9% compliance
TAT for the
Contractor to repair or overhaul the High
Value Assets (HVA), Appendix (B)
15.0 TAT starts upon award of
delivery order and completes when the item is returned to
Navy inventory 96% compliance.
TAT 90.0% to 95.9% compliance.
PWS Para. Satisfactory Performance
Marginal
Performance
The Contractor shall provide services, repair material and overhaul in accordance with
Over and Above
Procedures, Appendix
I.
15.0
16.0
17.0
The Contractor’s initial proposal for Over and Above work efforts shall be accurate, complete and timely. The proposal shall include supporting documentation for the
Government to make price reasonableness determinations in accordance with FAR Part 12.
The Contractor’s proposal submission meets the requested proposal due date.
The Contractor’s proposal for Over and
Above work efforts are incomplete and do not contain sufficient supporting documentation to include as its basis of estimate to enable the
Government to make a price reasonableness determination in accordance with FAR
Part 12. The
Contractor’s proposal submission date is greater than 3 days beyond the due date.
The Contractor shall deliver aircraft from depot maintenance to the Government with no more than ten (10) minor defects, no
Major defects, and no
Critical defects attributed to the
Contractor.
20.0
21.0
25.0
26.0
100% Compliance. Less than 99% compliance may result in a Contractor reduced payment of $5,000 on the appropriate CLIN or 1% of the delivery order negotiated invoiced amount, whichever is greater.
TAT for the Contractor to perform aircraft depot maintenance.
20.0
21.0
25.0
26.0
Depot TAT to include inspection, and repair of all defects, starts at the delivery order award date, and terminates upon a successful
Functional Check Flight (FCF) by the USN 100% compliance.
Less than 100% compliance may result in a Contractor reduced payment of $5,000 or
1% of the delivery order negotiated invoiced amount, whichever is greater.
Custodial
Responsibility
20.2
21.2
22.2
23.1
26.4
The Contractor shall notify the
Government within 6 hours of any accident or incident affecting the aircraft.
The Contractor’s notification to the
Government of any accident or incident affecting the aircraft exceeds 6 hours.
PWS Para. Satisfactory Performance
Marginal
Performance
Return to Service: the
Contractor shall complete a comprehensive verification of the
USN aircraft, engine, and component logbook entries for each Depot visit.
20.3
20.4
Upon completion of the Depot visit, an authorized representative shall sign an entry in the USN aircraft logbook certifying inspection and configuration status of the aircraft 100% compliance.
Less than 100% compliance may result in a Contractor reduced payment of
$5,000 or 1% of the delivery order negotiated invoiced amount, whichever is greater.
The Contractor shall correct discrepancies discovered during a
FCF, which are required to successfully complete the FCF.
20.11
21.11
24.0
Successful functional check flight on first flight.
Discrepancies related to a Depot task card affected system are discovered during
FCF. Additional FCF, if required, will be at
“NO ADDITIONAL
CHARGE” to the
Government.
The Contractor shall update the applicable documentation and records for each C-
40A aircraft for each
Depot inspection and repair.
21.3
21.4
100% compliance with Federal
Aviation Regulation (FAR)
Parts 121.1105 and 121.1109.
Less than 100% compliance may result in a Contractor reduced payment of
$5,000 or 1% of the delivery order negotiated invoiced amount, whichever is greater.
The Contractor shall strip and paint the aircraft in accordance with Boeing Design
D6-1816, (Process
Document for
Decorative Finishing of Airplane Exteriors) and Boeing Drawing
414A4147.
22.0 No major paint discrepancies
which require rework, or 5 or less minor paint discrepancies which require touch up, are discovered during the
Government acceptance inspection.
No more than 4 major paint discrepancies which require rework, or no more than 6 to
10 minor paint discrepancies which require touch up, are discovered during the
Government acceptance inspection.
PWS Para. Satisfactory Performance Marginal
Performance
C Check Over and
Above Work, and
Over and Above
Depot Maintenance
25.1
26.1
26.2
Successful functional check flight on first flight.
Discrepancies related to a Depot task card affected system are discovered during
FCF. Additional FCF, if required, will be at
“NO ADDITIONAL
CHARGE” to the
Government.
The Contractor shall provide appropriate
Return To Service documentation entries into the USN aircraft, engine, and component logbooks.
25.0
26.0
100% Compliance. Less than 100% compliance may result in a Contractor reduced payment of
$5,000 or 1% of the delivery order negotiated invoiced amount, whichever is greater.
Wide Area Workflow
Payment Instructions
DFARS
252.232-
The Contractor shall submit accurate payment request and supporting documentation no later than 45 days after
Government signature on the
Certificate of Completion.
The Contractor shall submit accurate payment request and supporting documentation no later than 90 days after Government signature on the
Certificate of
Completion.