Industry Questions 9Dec11.docx

DOCX document 16 KB Posted

Attached to
Aircraft Intermediate Maintenance Departments (AIMD)
Solicitation number
N00019-11-R-0024
Issued by

About this file

Answers to Industry Questions 4

View the file

Other files

File Type Posted
Industry Questions 29-Dec-11.docx DOCX document
N00019-11-R-0024 Amendment 0003.doc DOC document
N00019-11-R-0024 Amendment 0003 Conformed Copy.doc DOC document
Industry Questions 22-Dec-11.docx DOCX document
Industry Questions 20-Dec-11.docx DOCX document
Industry Questions 19-Dec-11.docx DOCX document
N00019-11-R-0024 Amendment 0002 Conformed.pdf PDF
Attachment 4_Summary Relevant Contract Data.xlsx XLSX spreadsheet
Attachment 24_Corporate Experience Table 13Dec11.xlsx XLSX spreadsheet
AIMD PWS 8Dec11.doc DOC document
Attachment 22_Manning Attachment w Cost Inputs —
12111 Industry Questions.docx DOCX document
Attachment 22_Manning Attachment w Cost Inputs —
111811 Industry Questions.docx DOCX document
AIMD CDRL A008.docx DOCX document
AIMD NASCC Sect J Attach 25_1 NASCC 310 Format.rtf RTF text file
AIMD Sect J Attach 25_3 NASP 310 Format.pdf PDF
AIMD CDRL A013.docx DOCX document
AIMD NASCC Sect J Attach 25_2 NASK_NASCC 310 Format.rtf RTF text file
N00019-11-R-0024 Amendment 0001.doc DOC document
111711 AIMD Industry Questions Rev1.docx DOCX document
NASK-NASCC _2011-11-04__Format310.rtf RTF text file
NASP Format310.pdf PDF
111311_AIMD_Questions Rev 4.docx DOCX document
NASCC AMDCCA_2011-11-04-Format310.rtf RTF text file
AIMD NASCC Sect J Attachment 16 - CBA AFL_CIO 2916 v1.docx DOCX document
AIMD Sect J Attachment 17 - AWD 05_2508.pdf PDF
Attachment 22_Manning Chart TECHNICAL AND PRICE 8Nov11.xlsx XLSX spreadsheet
AIMD RFP 11-8-2011.rtf RTF text file
AIMD NASCC Sect J Attachment 16 - CBA AFL_CIO 2916.docx DOCX document
AIMD Sect J Attachment 19 - CPAR.docx DOCX document
AIMD NASCC Sect J Attachment 14_1 MDR 25Aug11.pdf PDF
AIMD CDRLS.pdf PDF
AIMD NASCC Sect J Attachment 10_1 PE v1.xls XLS spreadsheet
AIMD NASCC Sect J Attach 3_1 Facilities.doc DOC document
AIMD Sect J Attachment 13 Abbreviations and Definitions.doc DOC document
AIMD Sect J Attachment 7 NASCC IMRL v1.pdf PDF
AIMD NASP Sect J Attachmemt 3_2 Facilities.docx DOCX document
AIMD Sect J Attachment 14_2 MDR 25Aug11.pdf PDF
AIMD NASP Sect J Attachment 10_2 v1.xls XLS spreadsheet
Attachment 23 Section B Price Matrix.xls XLS spreadsheet
AIMD Section J Att 2_Applicable Docs _7Nov11.xlsx XLSX spreadsheet
AIMD Sect J Attachment 20- PPQ.doc DOC document
AIMD Sect J Attachment 12 - Other AIMD Support.xls XLS spreadsheet
AIMD NASP Sect J Attachment 11_2-ICRL v1.xls XLS spreadsheet
AIMD NASP Sect J Attachment 15 - CBA_AFL-CIO_Local 2777 Non Pilots.pdf PDF
AIMD Sect J Attachment 4 - Safety Measure Calculations v1.doc DOC document
AIMD NASCC Sect J Attachment 11_1 ICRL v1.xls XLS spreadsheet
Attachment 21_Manning Chart TECHNICAL ONLY 8Nov11.xlsx XLSX spreadsheet
AIMD Sect J Attachment 8 NASP IMRL v1.pdf PDF
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industry Questions Post RFP Release 9 December 2011

1) MDR reports (RFP Attachments 14.1 and 14.2) and MEASURE reports (RFP Attachments 25.1, 25.2, and 25.3) provide man-hours documented against Maintenance Action Forms (MAF) and Meter cards.

PWS paragraph 10.3, Non-CNATRA I-level Support. This paragraph identifies RFP Attachment 12 as workload data for I-level support to customers other than CNATRA through Work Authorization Requests (WAR).

We were unable; however, to locate workload data to quantify man-hours expended performing other normal AIMD functions in support of the CNATRA customer. For Example: instruction of the phase one portion of support equipment licensing training; Calibration Lab support (i.e. pick-up/delivery); Navy Oil Analysis Laboratory duties; travel time to and from outlying fields (i.e. NAS Whiting Field, NAS Kingsville); shop support/lead duties; or other indirect/support-type man-hours accomplished by direct labor personnel. Workload data of this type is not captured on MAFs or Meter cards, but could be significant and impact the ability of bidders to accurately assess the AIMD workload.

Question: Will the Government provide workload data for support-type man-hours accomplished by direct labor personnel in support of the CNATRA mission by the AIMDs at NASP and NASCC?

Answer: The Government has not tracked and cannot provide the requested data. Each Offeror should evaluate and assess the PWS and bid in accordance with the level of effort it considers necessary to support the tasking.

2) RFP Section L, Part A, paragraph 4.0 states: “However, Offeror shall also submit a copy of Volume I, Executive Summary “Offeror’s Summary Table”, 1.0 (ii) on 23 December 2011.”

Question: Is it acceptable to the Government for offerors to submit the “Offeror’s Summary Table” electronically via e-mail, or is hard-copy submission required by the 23rd of December?

Answer: Email submissions are acceptable for the 23rd of December; please ensure that a hard copy submission is included in the full proposal submission.

* These were the responses to the questions as of 9 December 2011; however, with Amendment 3 the due date for past performance questionnaires and proposal submissions is now 26 January 2011.

File details come from the government source that posted it. Updated .