Industry Questions 29-Dec-11.docx
DOCX document 13 KB Posted
- Solicitation number
- N00019-11-R-0024
About this file
Answers to Industry Questions 7
View the file
Other files
Show 40 more
Latest 50 of 106 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Questions Post RFP Release 29 December 2011
Background: In Amendment 2, for the Technical Volume, the layout of the PROPOSAL CONTENT AND VOLUMES table on pages 27-28 does not match the layout of Section 2.0 VOLUME 2: TECHNICAL on pages 31-33.
The specific area of discrepancy is the table on pages 27-28 lists the Technical Volume Documents in this order:
1. Volume 2, 2.3.1 Maintenance Management through 2.3.4 Transition
2. Annex A, 2.1 Staffing Plan
3. Annex B, 2.2 Quality Plan (with Quality Control Plan as an attachment)
4. Annex C, 2.3.5 Small Business Utilization (with Small Business Subcontracting Plan as an attachment)
While Part B Specific Instructions 2.0 Volume 2: Technical has the documents listed in this order (p. 31-33)
1. 2.1 Staffing Plan (no mention of Annex A)
2. 2.2 Quality Control Plan (with Quality Control Program Plan as Annex B)
3. 2.3 Management Plan
4. 2.3.5 Small Business Utilization (with Small Business Subcontracting Plan as Annex C)
Question: Could the Government please clarify which layout is correct?
Answer: The table in Part A 3.0 Proposal Content and Volumes is the layout to be used.
File details come from the government source that posted it. Updated .