Post RFP QAs 23 Sep 11.doc

DOC document 52 KB Posted

Attached to
C-9B Contractor Logistics Support Federal contract opportunity
Solicitation number
N00019-10-R-0039
Issued by
Department of the Navy Naval Air Systems Command

About this file

Responses to Questions received as of 9/23/11. Please continue to monitor NAVAIR Website for further updates.

View the file

Other files for this federal contract opportunity

Other files attached to C-9B Contractor Logistics Support, newest first.
File Type Posted
PWS attach 1 amend 0004.pdf PDF
amend 0004.pdf PDF
amend 3.pdf PDF
Post_RFP_QAs_03 Nov 11.doc DOC document
Post_RFP_QAs_27_OCT_11.doc DOC document
Amendment 2_27Oct11.doc DOC document
Post_RFP_QAs_21_OCT_11.doc DOC document
Amendment 1 18 Oct 11.doc DOC document
Attachment 1 PWS amend 1 - 01 Oct 11.docx DOCX document
A00T_DID OT-11-20014_C-9 Post Field Team Activity Unsch Maint Report.doc DOC document
C-9 ESV 1 2 Schedule.xlsx XLSX spreadsheet
A00Q_DID OT-11-20009_C-9 Airframe Maintenance History Summary Report.doc DOC document
A00L_DID OT-11-20019_C-9 Aircraft Time Cycle Comp Tracking Report.doc DOC document
CDRLs Oct 4 2011 - 31 pages.pdf PDF
A00A_DID OT-11-20028_CR Plan.doc DOC document
CDRL OT DID List.xls XLS spreadsheet
A00F_DID OT-11-20017_C-9 Phase Out Transition Plan.doc DOC document
Post_RFP_QAs_17_OCT_11.doc DOC document
A00B_DID OT-11-20029_CR Report.doc DOC document
Attachment 6 Airframe Contract Inventory at Depot 14 Oct 11.xls XLS spreadsheet
A00R_DID OT-11-20021_C-9 Engine Depot Status Report.doc DOC document
A00S_DID OT-11-20015_C-9 Engine Records Package Report.doc DOC document
A00K_DID OT-11-20012_C-9 No Defect Report.doc DOC document
A006_DID OT-11-20016_C-9 WIS Archival Data.doc DOC document
A00M_DID OT-11-20013_C-9 Engine Health Monitoring Report.doc DOC document
A00G_DID OT-11-20011_C-9 Loan Log.doc DOC document
Post RFP Q As 07 OCT 11.doc DOC document
Post RFP Q As 30 Sep 11.doc DOC document
C9_Depot_Schedule_Updated_FY12-17.xls XLS spreadsheet
JT8D Engine Depot Spec Rev 3 Sept 2009.pdf PDF
PSE Cherry Point.xls XLS spreadsheet
USMC DRAWING PACKAGE.pdf PDF
C-9B_DC-9 Aircraft Paint System MED-05_ammend_2.pdf PDF
C-9 SDLM Specification Rev 2011-08-19.docx DOCX document
Navy Paint Drawing.pdf PDF
C-9 CLS CDRLs DD Form 1423 02SEP2011.pdf PDF
Attachment 1 PWS - 1 Sep 11.docx DOCX document
Attachment 2 Navy C-9 Technical Manuals List 30 AUG 11.doc DOC document
Attachment 5 Engine Contract Inventory at Depot 30 AUG 11.xls XLS spreadsheet
N00019-10-R-0039 Final.doc DOC document
Attachment 3 C-9 PSE Calibration and Maintenance 30 AUG 11.xls XLS spreadsheet
Attachment 3 C-9 PSE Calibration and Maintenance.xls XLS spreadsheet
Attachment 1 PWS - 16 Aug 11.docx DOCX document
Attachment 4 C9 USN USMC Site Contract Inventory.xls XLS spreadsheet
Attachment 5 Engine Contract Inventory at Depot.xls XLS spreadsheet
Draft RFP Thru Section K 17 Aug 11.doc DOC document
Attachment 2 Navy C-9 Technical Manuals List.doc DOC document
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-9 CLS Effort Requests for Information

(Posted 23Sep2011)

#1 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph

PWS

3.1.1

Q: Will the Government consider multiple locations for different level PMI visits provided the entire PMI is performed at one facility and the aircraft is not ferried?

A: Yes, the Government will consider multiple certified locations in accordance with PWS paragraph 3.1.1.

#2 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
92
2.1

Q: Is the Offeror required to provide documentation and evidence of complying with prerequisite 2.1.3.2, Strip and Paint, at the time of proposal submittal or at the time of the first scheduled PMI depot event requiring strip and paint?

A: Each Offeror and its subcontractors must meet and provide documentation to demonstrate that the Offeror meets the prerequisites at the time of proposal submission. An Offeror who does not meet the prerequisites will be eliminated from this competition and be ineligible for award.

#3 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
89
4.0

Q: With regard to “Past Performance information in paragraphs 2.2 and 2.3…” we found nothing correlating to paragraphs 2.2 or 2.3 in the RFP. COULD YOU PLEASE CLARIFY?

A: Paragraph 4.0, Proposal Submission, contains referencing errors and should read as follows:

“4.0

PROPOSAL SUBMISSION

Clearly mark all packages with the solicitation number (DO NOT MARK EXTERIOR OF PACKAGING WITH ANY SOURCE SELECTION LEGENDS). The submission date for all Volumes shall be no later than the date and time specified in Block 9 of Standard Form 33 of the RFP. However, it is requested that the Volume 3, Past Performance Data Requirements and Contract Data table in paragraph 3.2 and the Volume 1, Executive Summary "Offeror's Summary Table", in paragraph 1.1.1, should be submitted three weeks prior to the submission date/time specified on Standard Form 33 (Block 9), as specified below.”

It is the Government’s intent to post a formal Amendment to the Request for Proposal.

#4 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
89
4.0

Q: With regard to “Volume 1, Executive Summary "Offeror's Summary Table," B (1)…” it is our belief the only portion of the Past Performance volume required early, is a completed “1.1.1 Offeror Summary Table” found on page 91 of the RFP. Is this correct?

A: Yes. See response to Question # 3.

#5 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L-Vol 2
92
2.1.3.3

Q: If the offeror's airport meets all the requirements of FAA FAR Part 139, is a FAA statement to that effect acceptable or does the airport have to have a FAA certificate?

A: An FAA statement that states the airport meets FAR Part 139 is acceptable. Additionally, to eliminate confusion generated from PWS Paragraphs 3.1.3.1 and 3.1.3.2, and Sec L Paragraph 2.1.3.3, these paragraphs will be changed to read:

PWS 3.1.3.1: The airport shall meet the requirements of FAA Federal Aviation Regulation Part 139 Certification of Airports, Sub Part D, Operations. The airport shall have a FAA approved and published Instrument Landing System (ILS) approach or equivalent approach system that meets ILS Category I weather minimum requirements.

PWS 3.1.3.2: The airport shall have an operating control tower or manned Aeronautical Advisory Station (UNICOM) for all C-9 aircraft arrivals and departures. If the airport does not have an operating tower, it shall have an Automated Terminal Information System (ATIS)/ Automated Weather Observing System (AWOS) or similar capability to provide accurate weather conditions for the landing runway. The manned UNICOM shall be able to maintain radio communication with the aircraft during all ground operations, such as taxi, take-off, and landing, and be able to alert the firefighting and medical facilities in the event of a mishap.

Sec L 2.1.3.3 Airport: The Offeror shall provide evidence that the airport where the aircraft repair facility is located meets the requirements of FAA FAR Part 139 Certification of Airports, Sub Part D, Operations; the airport has a FAA approved and published Instrument Landing System (ILS) approach or equivalent approach system that meets ILS Category I weather minimum requirements; and the Control Tower or manned UNICOM can maintain radio communication with the aircraft during all ground operations and be able to alert the firefighting and medical facilities in the event of a mishap.

It is the Government’s intent to post a formal Amendment to the Request for Proposal.