C-9 SDLM Specification Rev 2011-08-19.docx

DOCX document 3 MB Posted

Attached to
C-9B Contractor Logistics Support Federal contract opportunity
Solicitation number
N00019-10-R-0039
Issued by
Department of the Navy Naval Air Systems Command

About this file

C-9 SDLM Specification 08-19-2011

View the file

Other files for this federal contract opportunity

Other files attached to C-9B Contractor Logistics Support, newest first.
File Type Posted
PWS attach 1 amend 0004.pdf PDF
amend 0004.pdf PDF
amend 3.pdf PDF
Post_RFP_QAs_03 Nov 11.doc DOC document
Post_RFP_QAs_27_OCT_11.doc DOC document
Amendment 2_27Oct11.doc DOC document
Post_RFP_QAs_21_OCT_11.doc DOC document
Amendment 1 18 Oct 11.doc DOC document
Attachment 1 PWS amend 1 - 01 Oct 11.docx DOCX document
A00F_DID OT-11-20017_C-9 Phase Out Transition Plan.doc DOC document
Post_RFP_QAs_17_OCT_11.doc DOC document
A00B_DID OT-11-20029_CR Report.doc DOC document
Attachment 6 Airframe Contract Inventory at Depot 14 Oct 11.xls XLS spreadsheet
A00L_DID OT-11-20019_C-9 Aircraft Time Cycle Comp Tracking Report.doc DOC document
CDRLs Oct 4 2011 - 31 pages.pdf PDF
A00A_DID OT-11-20028_CR Plan.doc DOC document
CDRL OT DID List.xls XLS spreadsheet
A00T_DID OT-11-20014_C-9 Post Field Team Activity Unsch Maint Report.doc DOC document
C-9 ESV 1 2 Schedule.xlsx XLSX spreadsheet
A00Q_DID OT-11-20009_C-9 Airframe Maintenance History Summary Report.doc DOC document
A00R_DID OT-11-20021_C-9 Engine Depot Status Report.doc DOC document
A00S_DID OT-11-20015_C-9 Engine Records Package Report.doc DOC document
A00K_DID OT-11-20012_C-9 No Defect Report.doc DOC document
A006_DID OT-11-20016_C-9 WIS Archival Data.doc DOC document
A00M_DID OT-11-20013_C-9 Engine Health Monitoring Report.doc DOC document
A00G_DID OT-11-20011_C-9 Loan Log.doc DOC document
Post RFP Q As 07 OCT 11.doc DOC document
Post RFP Q As 30 Sep 11.doc DOC document
C9_Depot_Schedule_Updated_FY12-17.xls XLS spreadsheet
PSE Cherry Point.xls XLS spreadsheet
USMC DRAWING PACKAGE.pdf PDF
JT8D Engine Depot Spec Rev 3 Sept 2009.pdf PDF
C-9B_DC-9 Aircraft Paint System MED-05_ammend_2.pdf PDF
Navy Paint Drawing.pdf PDF
Post RFP QAs 23 Sep 11.doc DOC document
Attachment 3 C-9 PSE Calibration and Maintenance 30 AUG 11.xls XLS spreadsheet
Attachment 5 Engine Contract Inventory at Depot 30 AUG 11.xls XLS spreadsheet
N00019-10-R-0039 Final.doc DOC document
C-9 CLS CDRLs DD Form 1423 02SEP2011.pdf PDF
Attachment 1 PWS - 1 Sep 11.docx DOCX document
Attachment 2 Navy C-9 Technical Manuals List 30 AUG 11.doc DOC document
Attachment 5 Engine Contract Inventory at Depot.xls XLS spreadsheet
Attachment 3 C-9 PSE Calibration and Maintenance.xls XLS spreadsheet
Attachment 1 PWS - 16 Aug 11.docx DOCX document
Attachment 4 C9 USN USMC Site Contract Inventory.xls XLS spreadsheet
Draft RFP Thru Section K 17 Aug 11.doc DOC document
Attachment 2 Navy C-9 Technical Manuals List.doc DOC document
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAIR C-9B DEPOT SPECIFICATION

C-9B DEPOT LEVEL MAINTENANCE

SPECIFICATION

NAVY MODEL

C-9B

AIRCRAFT

PUBLISHED BY NAVAIR C-9B PROGRAM MANAGER PMA-207

This document is a complete revision and supersedes all previous editions.

All previous editions shall be destroyed.

15 August 2011 2-2

DEPARTMENT OF THE NAVY

NAVAL AIR SYSTEMS COMMAND

PATUXENT RIVER, MD 20670

Depot Level Maintenance Requirements for Navy and Marine C-9B aircraft.

1. This specification has been approved by the Naval Air Systems Command and is published to prescribe the Depot requirements for C-9B series aircraft.

2. Any recommendations for corrections, additions, or deletions should be addressed to:

Commander, Naval Air Systems Command (PMA-207) 46990 Hinkle Circle, Bldg 419 Attn: C-9B Engineering Patuxent River, MD 20670-1627

NAVAIR C-9B/DC-9 SDLM

iii

TABLE OF CONTENTS

Section/Paragraph Page

I.GENERAL INSTRUCTIONS
1-1.SCOPE1-1

1-2. DEPOT INTERVALS/STRUCTURAL SERVICE LIFE LIMITS 1-2

1-3. MAINTENANCE REFERENCES 1-3

1-4. AIRCRAFT EFFECTIVITY CODES 1-8

II.DEPOT REQUIREMENTS
2-1.GENERAL2-1
2-2.GENERAL MAINTENANCE STANDARDS2-1
2-2.1.REWORK REQUIREMENTS2-1
2-2.2.AIRCRAFT RECORDS MAINTENANCE2-2
2-2.3.TECHNICAL DIRECTIVE COMPLIANCE2-3
2-2.4.DEFECT CORRECTION CRITERIA2-3
2-2.5.SCHEDULED COMPONENT REMOVAL/ REPLACEMENT CRITERIA2-4
2-2.6.UNSCHEDULED ACCESSORY AND COMPONENT REWORK CRITERIA2-4
2-2.7.CONCURRENT REWORK OF REPAIRABLE COMPONENTS2-5
2-2.8.ECONOMICAL REPAIR DETERMINATION2-5
2-2.9.AIRCRAFT ORGANIZATIONAL LEVEL SCHEDULED MAINTENANCE REQUIREMENTS2-5
2-2.10.CORROSION CORRECTION CRITERIA2-5
2-2.11.GROUND HANDLING, OPERATION, AND SAFETY
PRECAUTIONS2-5
2-2.12.STRUCTURAL REPAIRS2-6
2-2.13.REPLACEMENT PARTS AND SUBSTITUTIONS2-7
2-2.14.UNAUTHORIZED INSTALLATIONS2-7
2-2.15.DISTURBED SYSTEMS2-7
2-2.16.DEPOT TEST EQUIPMENT2-7
2-2.17.WEIGHT AND BALANCE2-8
2-2.18.REPORT REQUIREMENTS2-8
2-2.19.ENGINEERING SUPPORT REQUIREMENTS2-8

NAVAIR C-9B DEPOT SPECIFICATION

i v

Section/Paragraph Page

2-3.INDUCTION INTO DEPOT2-8
2-3.1.REPORTING CUSTODIAN RESPONSIBILITIES PRIOR TO EACH DEPOT VISIT2-8
2-3.2.AIRCRAFT EQUIPMENT INVENTORY2-8
2-3.3.PRESERVATION2-9
2-4.SURFACE CONDITIONING2-9
2-4.1.CLEANING2-9
2-4.2.EXTERIOR SURFACE REPAINT REQUIREMENTS2-10
2-4.3.EXAMINATION AND REPAIR OF BARE SURFACES2-10
2-4.4.SURFACE RESTORATION2-10
2-5.DISASSEMBLY2-13
2-5.1.INSTALLATION OF SAFETY DEVICES AND PROCEDURES2-13
2-5.2.GENERAL2-13
2-6.STRUCTURAL AND ZONAL REQUIREMENTS2-14
2-6.1.EXPLANATION OF HEADINGS2-15
2-7.ZONAL INSPECTION PROCEDURES AND ZONE DESCRIPTIONS2-45
2-7.1.SCOPE OF ZONAL INSPECTIONS2-45
2-7.2.ZONE DESCRIPTIONS2-46
2-8.SYSTEMS AND COMPONENTS REQUIREMENTS2-57
2-8.1EXPLANATION OF HEADINGS2-57

ii

Section/Paragraph Page

2-9. DELETED

2-10. DELETED

2-11.OVER AND ABOVE TASKS2-75
2-11.1.ONE-TIME O&A TASKS2-75
2-11.2.REPETITIVE O&A TASKS2-78
2-12.COMBINED ST/SY TASKS LISTED BY PMI2-85
2-12.1.PMI-12-85
2-12.2.PMI-22-87
2-12.3.PMI-32-103
2-12.4.PMI-42-105

III. PMI-1 THROUGH PMI-4 FUNCTIONAL FLIGHT CHECK AND GOVERNMENT ACCEPTANCE

3-1.FINAL PROCESSING3-1
3-1.1.WEIGHT AND BALANCE3-1
3-1.2.LOGS AND RECORDS3-1
3-1.3.INVENTORY EQUIPMENT3-2
3-1.4.SERVICING3-2
3-1.5.LUBRICATION3-2
3-1.6.OPERATIONAL TESTS3-3
3-1.7.COMPASS CALIBRATION3-4

3-2. FUNCTIONAL CHECK FLIGHT 3-4

3-3.GOVERNMENT ACCEPTANCE3-5
3-3.1.CORRECTION OF DISCREPANCIES3-5
3-3.2.ACCEPTANCE3-5

IV. COMPONENT REMOVAL AND REPLACEMENT

4-1. DELETED 4-1

4-2. DELETED 4-1

NAVAIR C-9B DEPOT SPECIFICATION

iii

Section/Paragraph Page

V.PMI-1 THROUGH PMI-4 REPORTS
5-1.GENERAL5-1
5-1.1.GENERAL REPORT REQUIREMENTS5-1

5-2. NOTED BUT NOT CORRECTED REPORT 5-1

5-3.AIRFRAME REPAIRS REPORT5-1
5-3.1.SPECIFIC REPORT REQUIREMENTS5-1
5-4.CORROSION INSPECTION REPORT5-5
5-4.1.SPECIFIC REPORT REQUIREMENTS5-5

5-5. STRUCTURAL ALTERATION REPORT 5-7

VI. APPENDIX

6-1.AIRCRAFT PAINT SYSTEMS6-1
6-1.1.REFERENCES6-1
6-1.2.STRIP AND PAINT6-1
6-2.DEFINITIONS6-2
6-2.1.GENERAL6-2

6-3. ACRONYMS 6-12

iv vii

LIST OF TABLES

Table No.

Title
Page
I.Area Designations5-12
II.Type Designations5-19
III.Category Designations5-20

NAVAIR C-9B DEPOT SPECIFICATION

v

THIS PAGE INTENTIONALLY LEFT BLANK

vi

SECTION I: GENERAL INSTRUCTIONS

1-1 SCOPE. This specification establishes the depot level maintenance requirements for the PMI-1, PMI-2, PMI-3, PMI-4, and the Structural Integrity Assessment Program (SIAP) for Navy/Marine C9B aircraft.

1-1.1 The Planned Maintenance Interval (PMI)-1 through PMI-4 requirements defined herein provide for airframe, systems and component inspection, defect correction, preventive maintenance, and technical directive compliance. These requirements include, but are not limited to:

a. A comprehensive inspection of selected aircraft structures, flight essential systems, flight critical components, and subsequent repair and preventive maintenance as required ensuring serviceability until the next sequential Depot Level Maintenance or PMI induction.

b. Replacement of depot level time-change components, which will exceed the specified replacement intervals prior to the next scheduled depot visit.

c. Compliance with all approved technical directives, with the exception of deviations specified herein.

1-1.2 Adjustments, checks, tests, repairs, modifications, inspections, preventive maintenance, and rework shall be accomplished in accordance with the latest revision (unless otherwise specified) of applicable directives and publications as directed by this specification. Nonstandard repairs shall be developed when required by contractor's engineering in accordance with FAA requirements and approval of NAVAIR C-9B Engineering.

1-1.3 Section I of this specification provides general instructions relative to:

a.The purpose and scope of PMI-1 through PMI-4, and Structural Integrity Assessment Specification.
b.Operating service periods/service life limits.
c.Definitions of the terminology of PMI-1 through PMI-4.
d.Maintenance references, publications, and documents required to perform PMI-1 through PMI-4.
e.Aircraft effectivity codes.

NAVAIR C-9B DEPOT SPECIFICATION

1-1 1-2

1-1.4 Section II of this specification provides PMI-1 through PMI-4 and structural integrity program requirements relative to specific rework, inspection, and test requirements to be accomplished by the depot level rework activity responsible for the standard depot level maintenance of the C-9B aircraft.

1-1.5Section III of this specification provides specific instructions relative to:
(1) Final processing.
(2) Functional check flight.
(3) Government acceptance to be performed subsequent to rework.

1-1.6 Section IV of this specification is a compilation of the Component Removal and Replacement requirements contained in Section II of PMI-1 through PMI-4 requirements and specifies the authorized disposition of replaced components.

1-1.7Section V of this specification describes the engineering reports that shall be submitted to the following address subsequent to government acceptance of each aircraft that has undergone PMI-1, PMI-2, PMI-3, or PMI-4:
Commander, Naval Air Systems Command (PMA-207)
46990 Hinkle Circle, Bldg 419,
Attn: C-9B Engineering
Patuxent River, MD 20670-1627

1-1.8 Section VI of this specification contains the Appendices that contain the paint specs and aircraft drawings and list of definitions and acronyms.

1-2 DEPOT INTERVALS/STRUCTURAL SERVICE LIFE LIMITS. Depot level maintenance for the C-9B aircraft is composed of repetitive rework at specified time intervals over the planned operational service life of the weapon system.

Model
Operational Service

Periods Planned Operational Period (Mos) Operational Service Life (Mos.)

C-9B
6.375
80
510

1-2

1-2.1 The depot level maintenance program consists of four scheduled depot level maintenance inductions during one operational service period cycle. These inductions are identified as PMI-1 at 20 months, PMI-2 at 40 months, PMI-3 at 60 months, and PMI-4 at 80 months. Specification inspection requirements which have an 80 month interval will be accomplished during the PMI-4 visit. Specification inspection requirements which have a 40 month interval will be accomplished during both the PMI-2 and PMI-4 visits. Specification inspection requirements which have a 20 month interval will be accomplished during the PMI-1, PMI-2, PMI-3 and PMI-4 visits. A complete Operational Service Period (OSP) will consist of a 20 month PMI-1, 40 month PMI-2, 60 month PMI-3, and 80 month PMI-4. Aircraft are not taken out of reporting during PMI events.

1-2.2 The operating service periods, planned operational service life (OSL), and authorized extensions are established by OPNAVINST 3110.11 (Series).

1-3 MAINTENANCE REFERENCES. To obtain maximum benefits available from the commercial sector, the use of commercial maintenance regulations, standards, etc. shall be used, when possible, in lieu of Navy documents normally required in these types of specifications. Therefore, commercial maintenance regulations, standards, etc. that are equivalent to the references listed below and annotated by "*" shall be used as an authorized substitution. Refer to paragraph 2-2.1 (Rework Requirements) of this specification for additional information.

PUBLICATIONS

TITLE

* Denotes Navy maintenance references; commercial maintenance regulations that are equivalent to these references can be used as a substitute to utilize best commercial practices

Boeing Commercial Manual
Structural Repair Manual - All Series
Boeing Commercial Manual
Non-Destructive Testing Manual - All Series
CS-001
C-9B Component Specification
NA 01-1A-16
Non-Destructive Inspection Methods
*NA 01-1A-17
Aircraft Hydraulic Manual
*NA 01-1A-503
Maintenance of Aeronautical Anti-Friction Bearings
*NA 01-1A-505
Aircraft Electrical and Electronic Wiring, Installation Practices
*NA 01-1A-507
Cements, Sealants, and Coatings, General Use of

1-3 1-4

PUBLICATIONS (cont’d)

TITLE

* Denotes Navy maintenance references; commercial maintenance regulations that are equivalent to these references can be used as a substitute to utilize best commercial practices

*NA 01-1A-516
Grits and Abrasive Materials for Naval Air Systems Maintenance and Overhaul Operations
*NA 01-1A-509
Aircraft Cleaning and Corrosion Control for Organizational and Intermediate Maintenance Levels
*NA 01-1A-509-1/3/4
Avionics Cleaning and Corrosion/Prevention/Control
NA 01-1B-40
Handbook of Weight and Balance Data
NA 01-1B-50
USN Aircraft Weight and Balance Control
NA 01-C9B-2 (Series)
C-9B Maintenance Manuals
NA 01-C9B-4 (Series)
C-9B Illustrated Parts Breakdown Manuals
NA 01-C9B-6
Periodic Maintenance Information Cards
NA 01-C9B-6-1
Turnaround Checklist
NA 01-C9B-6-3
Daily/Servicing, Special, Conditional Maintenance Requirement Cards
NA 01-C9B-6-4
Phased Maintenance Requirements Cards
NA 01-C9BAAA-1
C-9B NATOPS Flight Manual
NA 01-C9BAAA-1F
C-9B NATOPS Check Flight Checklist
NA 01-C9BAAA-8
Work Unit Code Manual
NA 02B-JT8D-9A (Series)
JT8D Engine Illustrated Parts Catalog and Maintenance Manual
NA 02B-JTD-6-1
JT8D Engine Turn Around Checklist
NA 03B-105BC (Series)
Auxiliary Power Unit Illustrated Parts Manual and Maintenance Manual
*NA 13-1-6.1-1
Inflatable Survival Equipment
*NA 13-1-6.4-1
Oxygen Equipment Aviation Crew System
NA 15-01-500
Preservation of Naval Aircraft
NA 16-1-540
Avionics Cleaning and Corrosion Prevention Control
*NA 17-15BAD-1
Batteries, Stowage, Naval Aircraft

1-4

PUBLICATIONS (cont’d)

TITLE

* Denotes Navy maintenance references; commercial maintenance regulations that are equivalent to these references can be used as a substitute to utilize best commercial practices

ULSS-C9-2011
C-9B User’s Logistics Support Summary
Industry Aircraft Paint Specifications
Aircraft Exterior Coatings Document (Associated Painters, Inc.), July 2007
INSTRUCTIONS
TITLE
OPNAVINST3110.11T (Series)
Policies and Peacetime Planning Factors Governing the Use of Naval Aircraft

NAVAIRINST

3710.1 (Series) Contractors Flight and Ground Operations

OPNAVINST

3710.7 (Series) NATOPS, General Flight and Operating Instructions

OPNAVINST

3750.6 (Series) Naval Aviation Safety Program

COMNAVAIRFORINST 4790.2 (Series)
The Naval Aviation Maintenance Program

NAVAIRINST

4790.3 (Series) Aeronautical Time Cycle Management Program

OPNAVINST

5442.4 (Series) Aircraft and Training Devices Material Condition, Definitions, Mission Essential Subsystems Matrices (MESM) and Mission Descriptions

LES 7359
Horizontal stab gearbox inspection instructions (ref card 2-54)
STANDARDS
TITLE

* Denotes Navy maintenance references; commercial maintenance regulations that are equivalent to these references can be used as a substitute to utilize best commercial practices

*MIL-STD-765A
Compass Swinging, Aircraft, General Requirements for
*MS33540J
Safety Wire, General Practices

1-5 1-6

MILITARY

SPECIFICATIONS

TITLE

* Denotes Navy maintenance references; commercial maintenance regulations that are equivalent to these references can be used as a substitute to utilize best commercial practices

*MIL-C-5501G
Cap and Plug, Protection, Dust and Moisture Seal
MIL-W-25140B
Weight and Balance Control Data

MANUALS/

DIRECTIVES

TITLE

DoD Manual

5220.22 (Series) Industrial Security Manual for Safeguarding Classified Information

MIL HDBK 61A
Configuration Management
DRAWINGS
TITLE
4025AS0200
C-9B Aircraft (Navy) Exterior Surface Paint and Major Markings
4024AS0200
C-9B Aircraft (Marines) Exterior Surface Paint and Major Markings

1-6

FORMS
TITLE
DD Form 254
DOD Contract Classification Specification
DD Form 365-1
Basic Weight Checklist
DD Form 365-2
Airplane Weighing Record
DD Form 365-3
Basic Weight Plus Changes
DD Form 365-4
Complete Weight for Flight
DD Form 780-1
Inventory Record, Equipment List
DD Form 780-2
Inventory Shortage

OPNAV Form 3760/2 Navy Aircraft Flight Record Discrepancy Report (Yellow Sheets)

OPNAV Form 4790/23A Repair/Rework Record

OPNAV Form 4790/24A Technical Directives

OPNAV Form 4790/27A Inventory Record

OPNAV Form 4790/28A Scheduled Removal Component Cards

OPNAV Form 4790/29 Aeronautical Equipment Service Record

OPNAV Form 4790/65 SDLM Special Work Request Form

OPNAV Form 4790/104 Aircraft Inventory Record Transfer Certification

OPNAV Form SF-368
Aircraft Discrepancy Form

1-7 1-4 AIRCRAFT EFFECTIVITY CODES. The effectivity code consists of four alphanumeric characters (i.e., A10K, B24K, etc.). The left alpha character is the application code. The numerical characters and the right alpha character identifies the threshold. In addition, a cross reference chart which incorporates the effectivity codes and corresponding BUNOs. The application code and threshold are further described below:

a. Effectivity code. Effectivity codes A through D are listed on page 1-27 identifying the aircraft bureau number(s) affected by the requirement.

NOTE
Aircraft effectivity code applies unless individual bureau numbers are otherwise specified in the task.

b. An “X” preceding the effectivity code means that these tasks are Service Action [i.e. Service Bulletin (SB) or FAA Airworthiness Directive (AD)] related and could require repetitive action or terminating action and shall be accomplished only if directed by PMA 207.

NOTE
Not all aircraft within an effectivity code may be affected by the service action referred to in the requirements block of a particular task. Since “X” effectivity codes are not part of the basic inspection requirements they will always be listed in the paragraph 2-11.1 Over & Above One Time or paragraph 2-11.2 Over & Above Repetitive Inspections sections.
c.Threshold. The numerical character and the right alpha character identify the value (in thousands). The abbreviation for the applicable unit (i.e. FLTHRS = Flight Hours, LDGS = Landings) follows the effectivity code when the requirement is to be initiated on the aircraft specified by the application code. Threshold examples:
36K LDGS = 36,000 Landings
24K FLTHRS = 24,000 Flight Hours
NOTE
(1)An inspection requirement is to be accomplished on a given BUNO if that BUNO has reached or will exceed prior to the next scheduled depot visit the threshold specified in the effectivity code for that requirement.
(2)Omission of a threshold requires that an inspection be accomplished on the BUNOs defined by the applicable effectivity code regardless of total accumulated landings or flight hours.
d.Below are examples of effectivity codes listed in paragraph 1-4a. above.
A30K LDGS - Applies to all C-9B aircraft and is initiated when those aircraft have reached or will exceed prior to the next scheduled depot visit a total accumulation of 30,000 landings.

C24K FLTHRS - Applies to BUNOs 161266, 161529, and 161530 and is initiated when those aircraft have reached or will exceed prior to the next scheduled depot visit a total accumulation of 24,000 flight hours.

XB - Applies to BUNOs 159113 thru 159116, 159118, and 160046 thru 160051 which are listed in the effectivity section of the referenced service action. These service actions may or may not have had terminating action therefore; they are listed in paragraph 2-11.1 or 2-11.2.

NAVAIR C-9B DEPOT SPECIFICATION

NAVAIR C-9B DEPOT SPECIFICATION

C - Applies to BUNOs 159266, 160529 and 160530.

1-

1-9

AIRCRAFT APPLICABILITY CHART

CODE
EFFECTIVITY
EFFECTIVITY CROSS REFERENCE
A
C-9B (BUNOs 160046 thru 160051, 161529, and 161530)
10-17 (All)
B
C-9B (BUNOs 160046 thru 160051)
10-14
C
C-9B (BUNOs 161529, and 161530)
16-17

C-9B EFFECTIVITY CROSS REFERENCE LIST

Effectivity
BUNO
S/N
Fuselage #
10
160046
47684
786
11
160047
47687
795
13
160050
47699
801
14
160051
47700
811
16
161529
48165
1081
17
161530
48166
1084

2-1

SECTION II: DEPOT REQUIREMENTS

2-1 GENERAL. This section of the Depot Specification contains specific rework, inspection, test, and preventive maintenance requirements to be accomplished by the depot level rework activity responsible for accomplishing the PMI-1 at 20 months, PMI-2 at 40 months, PMI-3 at 60 months, PMI-4 at 80 months of Navy/Marine C9B aircraft. Each requirement shall be complied with as an item of scheduled maintenance at each depot visit, unless otherwise specified.

a. Nomenclature. Component nomenclature used in this specification is in general agreement with that used in the aircraft technical Maintenance Instruction Manuals. Inspection requirements for items identified by nomenclature are applicable to the entire class of part numbers for that item.

b. Specific Equipment. The inspection, replacement, or other maintenance actions required by this specification on specific equipment not installed on a particular C-9B aircraft shall be disregarded.

c. Part Numbers. Part numbers listed in this section are identifying the item for which a specific inspection exists.

2-2 GENERAL MAINTENANCE STANDARDS. This paragraph contains maintenance requirements and related instructions applicable to the rework of the aircraft weapons system. These standards do not establish inspection requirements. The information in this paragraph is necessary knowledge prior to the actual induction of the aircraft into depot level maintenance.

2-2.1 REWORK REQUIREMENTS. Contractor shall comply with the latest version (update, revision, change, Rapid Action Change (RAC), etc.) of publications, specifications, handbooks changes, bulletins, directives, and other publications listed in paragraphs 1-3, 2-6, and 2-8 of this specification and other applicable C-9B Engineering/NAVAIR directives, drawings, and publications, as required. The dates and update issues shown in the maintenance reference section are current as of the issue date of this specification and are to be used as a baseline only.

a. Applicable Documents. All maintenance practices and structural repairs shall be accomplished in accordance with applicable Federal Aviation Administration and Federal Aviation Regulations; NAVAIR 01-C9B-2 (Series) Maintenance Instruction Manuals; Boeing Commercial Aircraft DC-9 Series 30 Structural Repair Manual; Boeing Commercial Aircraft DC-9 Series 30 Overhaul Manual; and Navy instructions, manuals, standards, and specifications as required and listed in paragraph 13. When a conflict exists between C-9B specific publications and general Navy publications, the C-9B specific publication will take precedence.

(1) Contractor shall ensure that all installed TDs and terminating FAA and commercial directives are maintained and not removed during the PMI-1 through PMI-4 process.

b. Rework Procedures Approval. Rework procedures for the accomplishment of rework requirements shall be subject to inspection and approval by the Cognizant Government Representative or C-9B Engineering Department, as applicable.

c. Previous Improper Repairs. All previously installed repairs, which do not conform to FAA-approved maintenance practices, shall be identified and submitted for O&A rework to FAA standards in accordance with maintenance references listed in paragraph 1-3.

2-2.2 AIRCRAFT RECORDS MAINTENANCE. The Rework Activity shall maintain aircraft logbooks and records in accordance with COMNAVAIRFORINST 4790.2 (Series) from the date of acceptance of the aircraft into Rework/Repair to the date of acceptance by the aircraft custodian or his designated representative (see paragraph 3-1 for details).

a. PMI-1 through PMI-4 Compliance. A logbook entry shall be made stating compliance with the requirements of this specification upon completion of each depot visit. The total flight times accrued to date shall be entered with the above entry in the aircraft logbook.

b. TD Incorporation. All aircraft changes, bulletins, and other directives and modifications accomplished by the rework activity shall be properly reported and recorded in the applicable section of the aircraft logbook.

c. Entries and Insertions. Other logbook entries or page insertions shall be recorded in the aircraft logbook as specified by the requirements of this specification and as specifically directed by the Cognizant Government Representative or the C-9B Engineering Department.

NAVAIR C-9B DEPOT SPECIFICATION

2-2

2-2

d. Unauthorized Entries. Terminating action for Airworthiness Directives (ADs), Service Bulletins (SBs), and All Operator Letters (AOLs) that are contained in the requirements of this specification shall be entered into the Aircraft Logbook Miscellaneous History Section. Repetitive inspection requirements shall not be entered into the Navy/USMC logbook unless specifically authorized by the C-9B Engineering Department.

2-2.3 TECHNICAL DIRECTIVE COMPLIANCE. All effective U.S Navy Technical Directives (TDs) not a part of this specification shall only be complied with and/or incorporated when directed by the Procurement Contracting Officer/Administrative Contracting Officer (PCO/ACO).

2-2.4 DEFECT CORRECTION CRITERIA. Defect classification shall be subject to the approval of the Cognizant Government Representative. The correction criteria for each classified defect are as follows:

a. Critical Defects. A defect that judgment and experience indicate is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the product; or a defect that judgment and experience indicate is likely to prevent performance of the tactical function of the aircraft. All critical defects discovered as a direct result of or incidental to, compliance with PMI-1, PMI-2, PMI-3, or PMI-4 requirements shall be corrected in accordance with documents listed in paragraph 1-3.

b. Major Defects. A defect, other than critical, that is likely to result in failure, or to reduce materially the usability of the unit of product for its intended purpose. All major defects discovered as a direct result of compliance with PMI-1, PMI-2, PMI-3, or PMI-4 requirements shall be corrected in accordance with documents listed in paragraph 1-3.

c. Minor Defects. A defect that is not likely to reduce materially, the usability of the unit or product for its intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the unit. Minor defects shall be corrected in areas not normally accessible at the squadron level only if approved by local TYCOM liaison representative. Minor defects not corrected shall be annotated on the NBNC Report.

d.Defects Caused by the Rework Activity. All defects caused by the Rework Activity shall be corrected in accordance with documents listed in paragraph 1-3.
e.Noted But Not Corrected (NBNC) Defects. All minor defects that are not required to be corrected by this specification shall be annotated on the NBNC Report.

2-2.4.1 REDUCTION OF INSPECTION INTERVAL. In cases where a defect would cause a reduction in the inspection interval (i.e. less than 80, 60, 40, or 20 months), this reduction must be approved by the NAVAIR C-9B Engineering Department.

2-2.5 SCHEDULED COMPONENT REMOVAL/REPLACEMENT CRITERIA. Removal/replacement of components or accessories to be replaced with a new or overhauled item at scheduled aircraft flight hours, unit operating time, maintenance interval or calendar time not specified in Section 4.1 of this specification shall be accomplished only when ordered by the PCO/ ACO. Disposition of any such item shall also be specified by the PCO/ ACO. These items are identified in the C-9B Periodic Maintenance Information Cards (PMIC), NA 01-C9B-6.

2-2.6 UNSCHEDULED ACCESSORY AND COMPONENT REWORK CRITERIA. Unscheduled removal of components shall only be accomplished on an as required basis. Disposition of removed repairable components shall be specified by the PCO/ACO. Repairable accessories and components not otherwise scheduled for removal/replacement shall be subject to rework only on a discrepancy basis; i.e., determined defective by in-place operational checks/tests and inspections. Items removed on a discrepancy basis will normally receive specific repair in accordance with the following process:

a. Checks/test/examinations, as necessary, to isolate and identify the discrepancy.

b. Disassembly and rework only to the extent necessary to correct the discrepancy.

c. Correction of major and critical defects discovered coincidental to work.

d. Checks/tests only as necessary to validate the rework performed.

e. Installed operational checks/tests to validate proper operation in the design environment.

NAVAIR C-9B DEPOT SPECIFICATION

2-4

2-3
2-2.7CONCURRENT REWORK OF REPAIRABLE COMPONENTS. Commercially-obtained serviceable parts and components shall be utilized as required to rework/replace repairable components to support the aircraft processing schedule. Refer to the C-9B Component Specification, CS-001. PMA 207 shall be notified of the need for high cost or long lead time repairable components. This will allow PMA 207 to assist the depot PCO by utilizing existing Navy spares vice high cost or long lead time commercial procurement.

2-2.8 ECONOMICAL REPAIR DETERMINATION. Economical repair determination shall be in accordance with local government procedures. This requirement may be waivered on individual basis by the PCO/ACO due to non-availability of replacement items.

2-2.9 AIRCRAFT ORGANIZATIONAL LEVEL SCHEDULED MAINTENANCE REQUIREMENTS.

a. Aircraft Phase/Special Inspections. Aircraft Phase/Special inspection requirements shall be accomplished, when due and if applicable, to the specific BUNO inducted when requested by the reporting custodian on the SWR and approved by NAVAIR.

b. Aircraft Conditional Inspections. Conditional inspections, when due, shall be performed during each scheduled depot visit.

2-2.10 CORROSION CORRECTION CRITERIA. Corrosion detected as a result of, or incidental to, compliance with Depot specification requirements shall be corrected in accordance with NA 01-1A-509 or NA 16-1-540, NA 01C9B2 (Series) Maintenance Manual and the Boeing Commercial Aircraft DC-9 (Series) 30 Structural Repair Manual.

2-2.11 GROUND HANDLING, OPERATION, AND SAFETY PRECAUTIONS. Personnel involved in the ground handling and operation of an aircraft shall be thoroughly familiar with the emergency procedures of applicable documents listed in paragraph 1-3.

NAVAIR C-9B DEPOT SPECIFICATION

2-5

a. Aircraft Fueling Operation. The instructions, procedures, and precautions of aircraft fueling operations shall be as specified by applicable documents and as directed by the Cognizant Government Representative or C-9B Engineering Department.

b. Aircraft Servicing. Aircraft servicing, taxiing, towing, parking, jacking, moving, and hoisting shall be conducted in accordance with COMNAVAIRFORINST 4790.2 (Series), OPNAVINST 3710.7 (Series), and equivalent commercial procedures as directed by the Cognizant Government Representative or C-9B Engineering Department.

c. Ground Operation of Engines. Ground operation of engines shall be in accordance with COMNAVAIRFORINST 4790.2 (Series) and OPNAVINST 3710.7 (Series) or equivalent commercial procedures.

2-2.12 STRUCTURAL REPAIRS. All structural repairs shall be accomplished in accordance with Boeing Commercial Aircraft DC-9 Series 30 Structural Repair Manual, NA 01C9B (Series) Manuals, and other applicable documents. These repairs shall be subject to inspection and approval of the Cognizant Government Representative or the C-9B Engineering Department.

a. Extent of Corrosion. When corrosion is detected by an inspection requirement or otherwise suspected and the extent cannot be determined, the adjacent structure shall be disassembled; i.e., the skin shall be peeled back, fittings or other structural members removed to determine the extent required.

b. Previous Repairs. All previous repairs that are not authorized by or do not meet the standards of quality, security, or strength of the applicable maintenance references shall be brought to the attention of the C-9B Engineering Department or the Cognizant Government Representative for disposition.

c. Major Structural Repairs. For repairs of a major nature exceeding the depth of coverage of the applicable maintenance reference, rework activities shall submit a detailed description of damage, method and details of recommended repair procedures, stress analysis, drawings, and specifications to the Cognizant Government Representative and C-9B Engineering Department.

d. Stress Analysis Criteria. The rework activity shall certify that each major structural repair meets the structural strength requirements specified by applicable documents.

NAVAIR C-9B DEPOT SPECIFICATION

2-6

2-6

e. Welding. Weld repairs of structural members and primary components shall be performed in accordance with Boeing Commercial Aircraft DC-9 Series 30 Structural Repair Manual.

f. Invalidated Non-Destructive Inspection (NDI) Requirements. An NDI requirement of an area may be invalidated by a previous structural repair contained within that area. When a requirement or any portion cannot be accomplished due to a previous repair, the rework activity shall contact the Cognizant Government Representative for disposition. Resulting changes to requirements shall be documented in the Maintenance History Summary Report.

2-2.13 REPLACEMENT PARTS AND SUBSTITUTIONS. Replacement parts and material substitutions shall be in accordance with applicable NAVAIR 01-C9B (Series) Maintenance Manuals, FAA documents, NAVAIR TD, or C-9B Engineering Department direction.

2-2.14 UNAUTHORIZED INSTALLATIONS. All unauthorized installations or configuration shall be restored to an authorized configuration in accordance with applicable aircraft technical manuals.

a. Exceptions. Aircraft Controlling Custodian (ACC) authorized prototype Airframe Change (AFC), or Research, Development, Test & Evaluation (RDT&E) special installations shall only be restored or reworked when specifically requested by the ACC and approved by the Cognizant Government Representative or NAVAIR as applicable.

b. Interference with Depot Level Rework. When any of the above listed exceptions interferes with depot level or authorized work, the Cognizant Government Representative or NAVAIR shall be consulted for disposition.

2-2.15 DISTURBED SYSTEMS. Aircraft systems that are not inspected and are disturbed during the depot level maintenance process shall be operationally checked as necessary to verify proper installation and operation.

2-2.16 DEPOT TEST EQUIPMENT. All required test equipment shall be provided by the Commercial Rework Activity and shall be maintained with current calibration cycles and tags.

NAVAIR C-9B DEPOT SPECIFICATION

2-7 2-2.17 WEIGHT AND BALANCE. Weight and balance control of the aircraft during each depot visit shall be accomplished in accordance with NA-01-1B-50, NAVAIR 01-1B-40, and COMNAVAIRFORINST 4790.2 (Series), Volume II. When available, the preferred method is to utilize the Automated Weight and Balance System (AWBS) software available at (https://awbs.hill.af.mil/). A list of Chart "A" (DD Form 365-1) items not in the aircraft at time of weighing shall be provided in Chart "B" (DD Form 365-2) excluding items listed for compartment E through L (passenger/cargo rigging).

2-2.18 REPORT REQUIREMENTS. All rework activities shall prepare and submit required reports in accordance with Section VI of this specification.

2-2.19 ENGINEERING SUPPORT REQUIREMENTS. The rework activity shall provide engineering capability as required to perform continuous surveillance of the rework process, to solve problems, and to develop rework procedures, processes, or repairs not provided by applicable technical publications.

2-3 INDUCTION INTO DEPOT. This paragraph presents responsibilities of the reporting custodian prior to induction of the aircraft, procedures for conducting the aircraft equipment inventory, procedures for performing the aircraft records analysis, and the procedures for preservation.

2-3.1 REPORTING CUSTODIAN RESPONSIBILITIES PRIOR TO EACH DEPOT VISIT. With delivery of the aircraft to the depot facility, the reporting custodian shall provide:

a. Current Aircraft/Engine Logs and Records.

b. Aircraft Discrepancy Book

c. Mission-Essential Equipment.

d. Ferry Flight Discrepancy List.

2-3.2 AIRCRAFT EQUIPMENT INVENTORY. The rework activity shall conduct an equipment inventory jointly with the designated representative of the delivery activity as soon as possible after receiving the aircraft. The rework activity shall inventory aircraft equipment against property listed in the latest Aircraft Inventory Record, DD Form 7801/2 and OPNAV Form 4790/104. Accountability and shortages shall be documented in accordance with the aircraft inventory records.

NAVAIR C-9B DEPOT SPECIFICATION

2-8

a. Classified Equipment. The rework activity shall inspect for the presence of classified equipment. If classified equipment is discovered that is not recorded on DD Form 254 in accordance with DoD 5220.22 (Series), the rework activity shall contact the local cognizant government representative for disposition.

2-3.3 PRESERVATION.

a. Scheduled /Unscheduled Maintenance

(1) Aircraft and Components. Aircraft and components shall receive preservation in accordance with requirements of COMNAVAIRFORINST 4790.2 (Series), NA 15-01-500 Preservation Manual and NA 03-105BC-39 APU Maintenance Manual.

(2) Aircraft Engines. Power plants shall be preserved in accordance with requirements of COMNAVAIRFORINST 4790.2 (Series) and NA 02BJT8D61 Maintenance Manual.

2-4 SURFACE CONDITIONING. In this paragraph, an overview for aircraft cleaning, condition evaluation, stripping of painted surfaces, corrosion removal, treatment, and painting are presented. In an effort to adhere to industry specifications to the highest extent possible, NAVAIR has authorized the use of commercial painting and stripping procedures outlined in the industry aircraft paint specifications using the contractor’s reference, Aircraft Exterior Coatings document. Former guidance was outlined in Maintenance Engineering Directive (MED) 05, Aircraft Paint System. General guidance is available in Appendix 6-1 and specific guidance can be obtained by contacting C-9B Engineering, PMA 207.

2-4.1 CLEANING.

a. Metal Surfaces. Clean external and accessible internal metal surfaces, equipment, and furnishings using methods and materials in the Aircraft Exterior Coatings document. General guidelines for the Aircraft Paint Specifications are included in section 6-1 of the Appendix.

b. Plastic Surfaces. Clean transparent and reinforced plastic surfaces using methods and materials specified by NA 011A509 and NA 01-C9B-2 (Series) Maintenance Instruction Manuals.

NAVAIR C-9B DEPOT SPECIFICATION

2-9 2-4.2 EXTERIOR SURFACE REPAINT REQUIREMENTS. On aircraft undergoing PMI-4 inspection frequency, the exterior surface of the aircraft shall be completely stripped and repainted IAW industry specific painting and stripping reference, Aircraft Exterior Coatings.

2-4.3 EXAMINATION AND REPAIR OF BARE SURFACES.

a. All surfaces shall be examined for corrosion, defective sealant, and/or missing fasteners.

b. Corrosion shall be removed and the affected areas treated or repaired in accordance with Aircraft Exterior Coatings (Associated Painters, Inc., July 2007), NA 01-1A-509, and applicable NA 01C9B2 (Series) Maintenance Instruction Manuals.

2-4.4 SURFACE RESTORATION.

a. Aircraft Exterior.

(1) All exterior seams and access panels shall be sealed with the exception of doors and panels routinely opened for maintenance and servicing (See NA 01C9B63 and 01-C9B64).

(2) Defective sealants shall be replaced in accordance with procedures in Aircraft Exterior Coatings (Associated Painters, Inc., July 2007) and Boeing Commercial Aircraft DC-9 (Series) 30 Structural Repair Manual.

(3) Prepare the surface for painting in accordance with the procedures in Aircraft Exterior Coatings (Associated Painters, Inc., July 2007).

(4) Apply the exterior finish, markings, and insignias per current C9B paint drawing and NAVAIR 01-C9B-2-11.

(5) The finished paint system shall be evaluated in accordance with the quality criteria in Aircraft Exterior Coatings (Associated Painters, Inc., July 2007).

(6) Touch-up shall be accomplished per instruction in Aircraft Exterior Coatings (Associated Painters, Inc., July 2007).

NAVAIR C-9B DEPOT SPECIFICATION

2-10

(7) Anti-chafe coatings and Mylar tape shall be applied in areas specified by in accordance with NA 01-C9B-2 (Series) Maintenance Instruction Manuals and Boeing Commercial Aircraft DC-9 (Series) 30 Structural Repair Manual, Chapter 51. Restore stabilizer rub area, anti-chafe coating, and fairing rub strips as follows:

(a) Remove all horizontal stabilizer fairings. Inspect fairing for damaged and/or missing rub strips. Remove and replace defective parts.

(b) Inspect vertical stabilizer skin in rub area for evidence of chafing (scratches and gouges). Restore surface in accordance with Boeing Commercial Aircraft DC-9 (Series) 30 Structural Repair Manual.

(c) Apply anti-chafe coating to vertical stabilizer surface areas which are covered by horizontal stabilizer fairings at both full nose up/down trim positions. Use gray anti-chafe coating number 7X83 paint kit consisting of 7-X-83 base material, 10-C-81 catalyst, and 60-C-20 thinner manufactured by Dexter Corporation, Haywood, California. Prepare surface, mix and apply paint, cure, and observe safety precautions in accordance with Boeing/Douglas Process Standards (DPS) 4.50-131F. If the above standard is not available, refer to Boeing Commercial Aircraft DC-9 (Series) 30 Structural Repair Manual, Section 51-10-8, pages 1 through 4 with the following changes that reflect newer paint (7-X-83 vice 7-X-75).

1) Use mixing ratios, paragraph 2A:

66.6 Parts by Weight: Base

18.5 Parts by Weight: Catalyst

14.9 Parts by Weight: Thinner

Mix only amount of paint to be consumed in four (4) hours.

2) Allow five (5) minutes drying time between coats of anti-chafe paint.

3) Total cure time at ambient temperature is 24 hours.

NAVAIR C-9B DEPOT SPECIFICATION

2-11

(d) Reassemble and shim horizontal fairings in accordance with NA 01-C9B-2 (Series) Maintenance Instruction Manual.

b. Interior Surfaces. Interior finish shall be applied in accordance with Boeing Commercial Aircraft DC-9 (Series) 30 Structural Repair Manual.

(1) Finish battery boxes and bay areas using materials specified in Boeing Commercial Aircraft DC9 (Series) 30 Structural Repair Manual.

(2) Finish interior metal surfaces in inhabited areas, as required. Ensure Mylar Tape is applied to lavatory floors.

(3) Finish interior metal surfaces in uninhabited areas as required. Apply interior markings in accordance with NA 01-C9B-2 (Series) Maintenance Instruction Manuals and Illustrated Parts Manuals, Boeing Commercial Aircraft DC-9 (Series) 30 Structural Repair Manual, DS-3902A-C and DS3933, Navy LMAC Report No. C9B2511 Revision B, and Marine LMAC Report No. C9B-DFSM 01 Detail Specifications.

c. Main and Nose Landing Gear Wheel Wells. Interior surfaces of these areas will receive selective touch-up. Determinations for touch up efforts will be made by inspecting wheel well areas for corrosion, flaking, and alligatored paint surfaces. These conditions, if present, will be corrected by feathering the adjacent paint surface treatment, primer, and application of a top coat in accordance with Boeing Commercial Aircraft DC-9 (Series) 30 Structural Repair Manual.

d. Flaps and Slats. All exposed areas of fully extended flaps and slats shall be stripped, treated, primed, sealed, and painted using the same procedure that applies to aircraft exterior surfaces. Flap wells shall be cleaned and inspected for corrosion and flaking or alligatored paint surfaces. Selective touch-up as necessary.

e. Wing Fillets. Wing fillets shall be removed and the interior side and exposed wing/fuselage areas shall be cleaned, inspected, and paint surfaces restored by selective touch-up. Corrosion preventative compound DINOL AV-30 or equivalent per DMS 2150 shall be maintained in accordance with NA 01-1A-509.

f. Servicing and Routinely Opened Panels. Inspect for general condition and paint deterioration. Clean, sand, seal, and touch up paint as necessary.

NAVAIR C-9B DEPOT SPECIFICATION

2-12

g. Fiberglass Surfaces. Exterior fiberglass surfaces including antennas shall be cleaned and inspected for cracks. All fiberglass surfaces shall be scuff sanded and feathered prior to aircraft painting.

h. Access Panels. Panels not routinely opened shall be maintained with a coating of DINOL AV-30 or equivalent with approval from C-9B Engineering PMA 207 per DMS 2150 corrosion preventative compound in those areas susceptible to corrosion.

i. Stairwell. Stairwells shall be maintained with a coating of DINOL AV-30 or equivalent with approval from C-9B Engineering PMA 207 per DMS 2150 corrosion preventative compound.

j. Fuselage Bilge. Interior fuselage structure between longerons 26L to 26R shall be maintained with DINOL AV-30 or equivalent with approval from C-9B Engineering PMA 207 per DMS 2150 corrosion preventative compound.

2-5 DISASSEMBLY. In this paragraph, installation of safety devices, safety procedural requirements, the criteria for disassembly, the extent of disassembly, and defects discovered during disassembly are presented.

2-5.1 INSTALLATION OF SAFETY DEVICES AND PROCEDURES. Ensure safety devices are installed in accordance with applicable NAVAIR and Boeing/DAC documents.

2-5.2 GENERAL.

a. Criteria for Disassembly. Disassemble the aircraft sufficiently to perform the inspection requirements of paragraphs 2-4, 2-6, and 2-8, required restoration, authorized modifications, and tests.

(1) It is intended that the disassembly examination be accomplished by the highest quality personnel to preclude the possibility of overlooking structural deficiencies that may escape detection by less skilled personnel.

NAVAIR C-9B DEPOT SPECIFICATION

2-13

2-5.2.1 ADDITIONAL SPECIFIC DISASSEMBLY AND PROCESSES.

Description
Generated By
Frequency

MAP ALL FLOOR BOARDS AND PROVIDE DOCUMENTATION TO NAVAIR VIA WEB-BASED INFORMATION SYSTEM (WIS). MAPS WILL BE TAIL NUMBER AND BUNO SPECIFIC. VALIDATE AT EACH PMI.

NEED TO REMOVE FLOORBOARDS IN AFT CARGO PIT FROM 26L THROUGH 30L AND 26R THROUGH 30 R.
ST 122
PMI-4
NEED TO REMOVE FLOOR PANELS IN FWD PIT FROM 26L TO 30 L AND 26R TO 30 R.
ST 100
PMI-4
REMOVE CABIN FLOOR BOARDS TO FOM OF CABIN FLOOR BEAM INSPECTION.
ST 080
PMI-4
FORWARD GALLEY, G3, NEEDS TO BE REMOVE F.O.M.
ST 086
PMI-2&4
FORWARD LAV NEEDS TO BE REMOVED F.O.M.
ST 086
PMI-2&4
FORWARD RIGHT HAND COAT CLOSET NEEDS TO BE REMOVED F.O.M.
ST 086
PMI-2&4
REMOVE LEFT AFT OVERWING EXIT LINER TO FOM.
SY 003
PMI-4
REMOVE LEFT FWD OVERWING EXIT LINER TO FOM.
SY 003
PMI-4
RIGHT AFT OVERWING EXIT LINER NEEDS REMOVED TO FACILITATE INSPECTION.
SY 003
PMI-4
REMOVE RIGHT FWD OVERWING EXIT LINER TO FOM.
SY 003
PMI-4
REMOVE SIDEWALLS FROM LEFT AND RIGHT SIDE TO FOM OF LONGERON INSPECTION.
ST 136
PMI-4
REMOVE STOWBINS FROM LEFT AND RIGHT SIDE TO FOM OF LONGERON INSPECTION.
ST 136
PMI-4
REMOVE DADO'S FROM LEFT AND RIGHT SIDE TO FOM OF LONGERON INSPECTION.
ST 136
PMI-4
REMOVE CEILING PANELS TO FOM OF LONGERON INSPECTION.
ST 136
PMI-4
REMOVE OR DISPLACE INSULATION FROM STA 239 TO 996 TO FOM LONGERON INSPECTION.
ST 136
PMI-4
INTERIOR CABIN DISTRIBUTION DUCT REQUIRES REMOVAL FOR STRUCTURES INSPECTION ON WORK CARD ST 163, AAR CARD # 17814-2000-0008.
ST 136
PMI-4
REMOVE RIGHT HAND ELEVATOR CONTROL TAB FOR NDT INSPECTION, REF SDLM TASK ST 082.
ST 063
PMI-2&4
INSTALL RIGHT HAND ELEVATOR CONTROL TAB AFTER SDLM ST 082 HAS BEEN ACCOMPLISHED.
ST 063
PMI-2&4
REMOVE LEFT HAND ELEVATOR CONTROL TAB FOR NDT INSPECTION REF SDLM TASK ST 077.
ST 060
PMI-2&4
INSTALL LEFT HAND ELEVATOR CONTROL TAB AFTER SDLM TASK ST 077 HAS BEEN ACCOMPLISHED.
ST 060
PMI-2&4
REMOVE RIGHT HAND ELEVATOR GEAR TAB FOR NDT INSPECTION, REF SDLM TASK ST 081.
ST 062
PMI-2&4
INSTALL RIGHT HAND ELEVATOR GEAR TAB AFTER SDLM TASK ST 081 HAS BEEN ACCOMPLISHED.
ST 062
PMI-2&4
REMOVE LEFT HAND ELEVATOR GEAR TAB FOR NDT INSPECTION, REF SDLM TASK ST 076.
ST 059
PMI-2&4
INSTALL LEFT HAND ELEVATOR GEAR TAB AFTER SDLM TASK ST 076 HAS BEEN ACCOMPLISHED.
ST 059
PMI-2&4
REMOVE RUDDER TAB FOR NDT INSPECTION, REF SDLM TASK ST 204.
ST 166
PMI-2&4
INSTALL RUDDER TAB AFTER SDLM TASK ST 204 HAS BEEN ACCOMPLISHED.
ST 166
PMI-2&4
L/H WING, NEED TO REMOVE SEALANT FROM FITTING FOR NDT INSPECTION OF FITTING O/B OF XOS 115.
ST 029
PMI-2&4
L/H WING, NEED TO REMOVE RIB PANEL FOR NDT INSPECTION OF FITTING O/B OF 1307A.
ST 029
PMI-2&4
L/H WING NEED TO REMOVE FUEL LINE FOR NDT TO INSPECT FITTING O/B OF PANEL 1307A.
ST 029
PMI-2&4
AD DRIVEN LH WING FLIGHT SPOILER DRIVE LINK AT WING STATION 206.852 REQUIRES REMOVAL FOR FURTHER NDT EVALUATION.
ST 023
PMI-2&4
R/H WING STA XOS 80 BY PANEL 1410A SEALANT NEEDS REMOVED FOR NDT INSPECTION OF FITTING.
ST 036
PMI-2&4
R/H WING NEED TO REMOVE RIB PANEL O/B OF 1410A AND 1409A FOR NDT INSPECTION OF FITTING.
ST 036
PMI-2&4
R/H WING STA XO 80, NEED TO REMOVE FUEL LINE FOR NDT INSPECTION OF FITTING, O/B OF 1410A AND 1409A PANEL.
ST 036
PMI-2&4
AD DRIVEN RH WING FLIGHT SPOILER DRIVE LINK AT WING STATION 206.852 REQUIRES REMOVAL FOR FURTHER NDT EVALUATION.
ST 023
PMI-2&4
AD DRIVEN RH WING FLIGHT SPOILER DRIVE LINK AT WING STATION 297.140 REQUIRES REMOVAL FOR FURTHER NDT EVALUATION.
ST 023
PMI-2&4
LEFT MAIN LANDING GEAR DOOR PANELS JUST FORWARD AND AFT OF DOOR REMOVED FOM, FOR DOOR REMOVAL.
Paragraph 2-4.2
PMI-4
RIGHT MAIN LANDING GEAR DOOR PANELS JUST FORWARD AND AFT OF DOOR REMOVED FOM, FOR DOOR REMOVAL.
Paragraph 2-4.2
PMI-4
REMOVE L/H MLG DOORS TO FOM. (I.E. PAINT) REINSTALL AND ADJUST WHEN MAINTENANCE IS COMPLETE.
Paragraph 2-4.2
PMI-4
REMOVE R/H MLG DOORS TO FOM. (I.E. PAINT) REINSTALL AND ADJUST WHEN MAINTENANCE IS COMPLETE.
Paragraph 2-4.2
PMI-4
REMOVE LH/RH KEEL BEAM PANELS FORWARD OF MLG WHEEL WELL TO FACILITATE STEAM CLEANING OF THE AREA. ENSURE DRAINS ARE CLEAR PRIOR TO, AND AFTER, THE ACCOMPLISHMENT OF THE RELATED TASKS.
ST 110 &

ST113

PMI-1Thru 4

2-6 STRUCTURAL AND ZONAL REQUIREMENTS. The inspection and rework requirements listed in this paragraph shall be accomplished during PMI-1 through PMI-4 processing.

a. Structural Inspection Requirements. The structural inspection requirements are listed in this paragraph in ascending zone sequence. Each item listed shall be inspected, tested, reworked, or replaced as specified, at the designated frequency.

b. Zone Description. The descriptions of the boundaries of each zone are covered in paragraph 2-7 of this specification.

c. Corrosion Inspections. Perform all specified corrosion inspections in accordance with NA 01-1A-509, NA 01-C9B-2 (Series) Maintenance Instruction Manuals.

d. Visual and Non-Destructive Inspections (NDIs). The zone inspection requirements specified in this part provide for visual inspection and NDIs to be performed on selected parts of the aircraft. When cracks or defects are suspected, the subject part shall be inspected using NDI methods in accordance with Boeing Commercial Aircraft (Series) 30 Structural Repair Manual/NDI Manual. Unless otherwise specified, all inspections are performed visually with sufficient lighting. Areas inspected shall be cleaned as necessary to accomplish the inspection.

2-6.1 EXPLANATION OF HEADINGS. The columns in the STRUCTURAL AND ZONAL REQUIREMENTS table are explained as follows:

a. Task Identification (ID) Number. This is a unique reference for each inspection requirement in sequential order and is located in the extreme left hand column of the structural and zonal requirements listing. The task "ID" number consists of five or six alpha-numeric characters (i.e., ST002, ST002A, SY032, SY180B). The first two characters are alpha characters which identify the requirement category. In this section are "Structural and Zonal" requirements which are identified by "ST". The middle three characters are numbers sequentially assigned starting with 001 for each requirements category. The last character is an alpha character used to denote that a requirement has been added following a basic sequence number.

b. Zone Number. This is the location on the aircraft where the inspection is to be performed. See paragraph 2-7 for zone locations and inspection scope.

c. Effectivity. This identifies specific aircraft bureau numbers and any applicable threshold for which a given inspection task applies. See paragraph 1-4 of this specification for code/aircraft bureau number and threshold identification.

d. Requirement. This identifies the zone for the requirements, the nomenclature of the items in the zone to be inspected, the inspection requirement, and the identification of applicable sampling…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .