amend 0004.pdf

PDF 199 KB Posted

Attached to
C-9B Contractor Logistics Support Federal contract opportunity
Solicitation number
N00019-10-R-0039
Issued by
Department of the Navy Naval Air Systems Command

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to C-9B Contractor Logistics Support, newest first.
File Type Posted
PWS attach 1 amend 0004.pdf PDF
amend 3.pdf PDF
Post_RFP_QAs_03 Nov 11.doc DOC document
Post_RFP_QAs_27_OCT_11.doc DOC document
Amendment 2_27Oct11.doc DOC document
Post_RFP_QAs_21_OCT_11.doc DOC document
Amendment 1 18 Oct 11.doc DOC document
Attachment 1 PWS amend 1 - 01 Oct 11.docx DOCX document
A00L_DID OT-11-20019_C-9 Aircraft Time Cycle Comp Tracking Report.doc DOC document
CDRLs Oct 4 2011 - 31 pages.pdf PDF
A00A_DID OT-11-20028_CR Plan.doc DOC document
CDRL OT DID List.xls XLS spreadsheet
A00F_DID OT-11-20017_C-9 Phase Out Transition Plan.doc DOC document
Post_RFP_QAs_17_OCT_11.doc DOC document
A00B_DID OT-11-20029_CR Report.doc DOC document
Attachment 6 Airframe Contract Inventory at Depot 14 Oct 11.xls XLS spreadsheet
A00T_DID OT-11-20014_C-9 Post Field Team Activity Unsch Maint Report.doc DOC document
C-9 ESV 1 2 Schedule.xlsx XLSX spreadsheet
A00Q_DID OT-11-20009_C-9 Airframe Maintenance History Summary Report.doc DOC document
A00R_DID OT-11-20021_C-9 Engine Depot Status Report.doc DOC document
A00S_DID OT-11-20015_C-9 Engine Records Package Report.doc DOC document
A00K_DID OT-11-20012_C-9 No Defect Report.doc DOC document
A006_DID OT-11-20016_C-9 WIS Archival Data.doc DOC document
A00M_DID OT-11-20013_C-9 Engine Health Monitoring Report.doc DOC document
A00G_DID OT-11-20011_C-9 Loan Log.doc DOC document
Post RFP Q As 07 OCT 11.doc DOC document
Post RFP Q As 30 Sep 11.doc DOC document
C9_Depot_Schedule_Updated_FY12-17.xls XLS spreadsheet
JT8D Engine Depot Spec Rev 3 Sept 2009.pdf PDF
PSE Cherry Point.xls XLS spreadsheet
USMC DRAWING PACKAGE.pdf PDF
C-9B_DC-9 Aircraft Paint System MED-05_ammend_2.pdf PDF
C-9 SDLM Specification Rev 2011-08-19.docx DOCX document
Navy Paint Drawing.pdf PDF
Post RFP QAs 23 Sep 11.doc DOC document
Attachment 5 Engine Contract Inventory at Depot 30 AUG 11.xls XLS spreadsheet
N00019-10-R-0039 Final.doc DOC document
Attachment 3 C-9 PSE Calibration and Maintenance 30 AUG 11.xls XLS spreadsheet
C-9 CLS CDRLs DD Form 1423 02SEP2011.pdf PDF
Attachment 1 PWS - 1 Sep 11.docx DOCX document
Attachment 2 Navy C-9 Technical Manuals List 30 AUG 11.doc DOC document
Attachment 5 Engine Contract Inventory at Depot.xls XLS spreadsheet
Attachment 3 C-9 PSE Calibration and Maintenance.xls XLS spreadsheet
Attachment 1 PWS - 16 Aug 11.docx DOCX document
Attachment 4 C9 USN USMC Site Contract Inventory.xls XLS spreadsheet
Draft RFP Thru Section K 17 Aug 11.doc DOC document
Attachment 2 Navy C-9 Technical Manuals List.doc DOC document
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT

1. CONTRACTID CODE

S 1 I 3

2. AMENDMENTfMODIFICA TION NO. 3. EFFECTIVE DAlE

30-Nov-2011

IS.PROJECTNO.(lf8PPliCabIC)4. REQUISITION/PURCHASE REQ. NO.

6. ISSUED BY CODE IIKlOO19 a..;.;.;;.::..:....:~___--1

NAVALAlR SYSTEMS COMMAND AlR-2.3.S.1 i 21467GREATMIU.SROAD BlDG. CAB III, SUITE B LEXINGTON PARKMD 2fll63

7.ADMINIS1EREDBY (Ifotherthanitcm6) CODE I~___~_____---I

See Item 6

I

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, COImty, State andZip Code)

'CODE IFACTT.TTYOODF.

X 9A. AMENDMENT OF SOLICITATION NO.

IIKlOO19-10-R-0039

X 9B. DATED (SEE ITEM 11)

09-Sep-2011 lOA. MOD. OF CONTRACT/ORDER NO.

lOB. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[2$JThC above nunbered solicitation is ammded as set fOrth in ItemI4. TIle hour and date specified flrreceipt ofOlir o is extended, o is not extended.

Oller trust acknowledge receipt ofthis atrendment prior to the hour and date specified in the solicitation or as amended by one ofthe fOllowing mrthods:

(a) By eorrpleting Items 8 and 15, and returning 1 copies ofthe ammdment; (b) By acknowledging receipt ofthis ammdrrent on eaeh copy ofthe otirsubnitted;

or (0) By separate letter or te1egramwhich incIud~ceto the solicitation and atrendment nurrbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

REJECTION OF YOUR OFFER. Ifby virtue ofthi. amendmmt you desire to change an olir already submitted, such change rmy bewde by telegram or letter, provided eaeh telegramor letter wkes renence to the solicitation and this ammdmont, and is received prior to the opening hour and date specified.

12. ACCOUNTINGAND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODlFICATIONSOF CONTRACTS'ORDERS.

IT MODlFIESTHE CONTRACT/ORDERNO. AS DESCRIBED IN ITEM 14.

I

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA.

B. THE ABOVE NUMBERED CONTRACT 10RDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR43, 103(B).

C. THIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor 0 is not, 0 is required to sign this document and return copies to the issuing office.

IPAGE OF PAGES

RECEIVED ATTHE PLACE DESIGN A lED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DAlE SPECIFIED MAY RESULT IN

I

I

I

I

14. DESCRIPTION OF AMENDMENT !MODIFICATION (Organized by UCF section headings, including solicitationlcontract subject matter \\here feasible.)

The purpose of this amendment is to provide various changes to Sections I, Land Mand Attachment (1) RIVS. See continuation pages for rrore details. Accordingly, RFPNQOO19-10-R-0039 is hereby amended as follows:

,Except as provided herein, all tel1llS and conditions ofthe document re1i:renced in Item9A or lOA, as heretoflre changed, remains unchanged and in full ilrce and etict.

I5A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEl: EMAIl:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign) lSC. DATE SIGNED 16B. UNITED ST ATES OF AMERICA

BY

(Signature 0 f Contracting Officer)

16C. DATE SIGNED

30-Nov-2011

EXCEPTION TO SF 30 30-105-04 ST ANDARD FORM 30 (Rev, 10-83) APPROVED BY OIRM 11-84 Prescribed by GSA

FAR (48 CPR) 53.243

NOOO 19-10-R-0039

Page 2 of3

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

Block 9 of the SF 33 has been revised as follows:

The required response date/time has changed from 07-Nov-2011 02:00 PM to 03-Jan-2012 02:00 PM.

SECTION I - CONTRACT CLAUSES

The following Clauses have been revised:

252.227-7013 252.227-7015 252.227-7037

Rights in Technical Data - Noncommercial Items Technical Data-Commercial Items Validation of Restrictive Markings on Technical Data

SEP 2011

SEP 20] 1

SEP 2011

SECTION J LIST OF DOCUMENTS, EXHffiITS AND· OTHER ATTACHMENTS

The following Attachments have been deleted and replaced in their entirety (revised and added paragraphs are identified in yellow highlight):

Attachment

Navy/Marine Corps Performance Work Statement 29 November 2011 21

SECTION L -INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

The following paragraphs under Part B, Specific Instructions, are being deleted and replaced in their entirety:

2.1 Prerequisites

Each Offeror and its subcontractors must meet and provide documentation to demonstrate that the Offeror meets the prerequisites listed below. These requirements will be validated on a pass/fail assessment. An Offeror who does not meet these prerequisites will be ineligible for award.

2.1.1 FAA FAR Part 145 Certification

The Offeror shall provide 14 CFRPart 145 Certifications and show capability to perform maintenance on DC-9-30 series aircraft (C-9B), JT8D engines, and associated systems effective as ofthe date the initial proposal submission for any facility performing repair or maintenance for the C-9 Aircraft and JT8D Engine.

2.1.3.3 Airport.

The Offeror shan provide documentation obtained from the airport sponsor that demonstrates that the airport where the aircraft repair facility is located meets the intent of 14 CFR Part 139, sections 305, 309, 311, 313, 315, 317, 319, 321,323,325,329,331,333,335,337,339 and 341 for the size and weight of the C-9B aircraft; the airport has a FAA approved and published Instrument Landing System (ILS) approach or equivalent approach system with weather minimums no higher than 400-]; and the Control Tower or the Offeror's airframe repair facility can maintain radio communication with the aircraft during all ground operations and be able to alert the firefighting and medical facilities in the event of a mishap.

N00019-10-R-0039

Page 3 of3

2.2 Foreign Object Damage Prevention and Tool Control

The Offeror shall describe its approach to ensure that its Foreign Object Damage Prevention and Tool Control programs will meet the requirements ofNational Aerospace Standard 412 and Commander, Naval Air Force Instruction (CNAFINST) 4790.2 series at the Contractor's airframe repair facility (including spaces assigned to the Contractor and subcontractor in Government facilities).

4.3.2 Over and Above and Engineering and Technical Services CLINs

The Offeror shall provide fully-burdened rates (e.g., "composite wrap-rate") for CLINs; OXll, OX12, OX15, 0X24, and OX25. The Offeror shall include a breakdown of the composition of the respective labor rates including mix of labor categories and labor rates by labor category.

The following paragraph under Part B, Specific Instructions, is being added:

4.3.4 FAR 52.217-8 Option to Extend Services CLINs

CLINs for the Option to Extend Services are not included in Section B. The Government will compute the prices for this option in accordance with Section M, paragraph 2.4 for evaluation purposes. The Offeror shall not provide any pricing information for this option and any information provided will not be considered for evaluation.

SECTION M -EVALUATION FACTORS FOR A WARD

Paragraph 2.4 is deleted in its entirety and replaced as follows:

2.4 Price

Each Offeror's price proposal shall be evaluated to determine ifit is complete, consistent and reasonable with the Offeror's technical approach, reflects a clear understanding of the solicitation requirements and contains no material imbalances. Inconsistencies between the Technical and Price Volumes, unbalanced pricing, or other pricing anomalies will be assessed in the Technical or Risk ratings In its evaluation, the Government may use commercial published data, same or similar DoD contracts, Government estimates, industry standards, DCAA audit information, or other information as deemed appropriate by the Government. The Government will evaluate overall contract price, which for evaluation purposes only, will include:

• Sum of the base CLINs and all Option CLINs (the amount for CLIN OX22 will include the Government estimate and any Offeror proposed overhead rate)

• 6 month extension under FAR 52.217-8 (computed by multiplying the estimated price of CLINs 0402 through 0425 by 50%)

• Adjustments for costs to the Government (Government costs required to accomplish the Offeror's proposed approach with the exception of those costs to the Government that are equal to all Offerors (e.g., additional Govermuent-Fumished EquipmentlGovernment.;Furnished Informationrequired by the Offeror to implement its approach»

(End of Summary of Changes)

File details come from the government source that posted it. Updated .