Post_RFP_QAs_17_OCT_11.doc

DOC document 159 KB Posted

Attached to
C-9B Contractor Logistics Support Federal contract opportunity
Solicitation number
N00019-10-R-0039
Issued by
Department of the Navy Naval Air Systems Command

About this file

Responses to Questions received as of 17 Oct 2011. Please continue to monitor both FBO and NAVAIR Websites for further updates.

View the file

Other files for this federal contract opportunity

Other files attached to C-9B Contractor Logistics Support, newest first.
File Type Posted
PWS attach 1 amend 0004.pdf PDF
amend 0004.pdf PDF
amend 3.pdf PDF
Post_RFP_QAs_03 Nov 11.doc DOC document
Post_RFP_QAs_27_OCT_11.doc DOC document
Amendment 2_27Oct11.doc DOC document
Post_RFP_QAs_21_OCT_11.doc DOC document
Amendment 1 18 Oct 11.doc DOC document
Attachment 1 PWS amend 1 - 01 Oct 11.docx DOCX document
A00L_DID OT-11-20019_C-9 Aircraft Time Cycle Comp Tracking Report.doc DOC document
CDRLs Oct 4 2011 - 31 pages.pdf PDF
A00A_DID OT-11-20028_CR Plan.doc DOC document
CDRL OT DID List.xls XLS spreadsheet
A00T_DID OT-11-20014_C-9 Post Field Team Activity Unsch Maint Report.doc DOC document
C-9 ESV 1 2 Schedule.xlsx XLSX spreadsheet
A00Q_DID OT-11-20009_C-9 Airframe Maintenance History Summary Report.doc DOC document
A00R_DID OT-11-20021_C-9 Engine Depot Status Report.doc DOC document
A00S_DID OT-11-20015_C-9 Engine Records Package Report.doc DOC document
A00K_DID OT-11-20012_C-9 No Defect Report.doc DOC document
A006_DID OT-11-20016_C-9 WIS Archival Data.doc DOC document
A00M_DID OT-11-20013_C-9 Engine Health Monitoring Report.doc DOC document
A00G_DID OT-11-20011_C-9 Loan Log.doc DOC document
A00F_DID OT-11-20017_C-9 Phase Out Transition Plan.doc DOC document
A00B_DID OT-11-20029_CR Report.doc DOC document
Attachment 6 Airframe Contract Inventory at Depot 14 Oct 11.xls XLS spreadsheet
Post RFP Q As 07 OCT 11.doc DOC document
Post RFP Q As 30 Sep 11.doc DOC document
C9_Depot_Schedule_Updated_FY12-17.xls XLS spreadsheet
JT8D Engine Depot Spec Rev 3 Sept 2009.pdf PDF
C-9B_DC-9 Aircraft Paint System MED-05_ammend_2.pdf PDF
C-9 SDLM Specification Rev 2011-08-19.docx DOCX document
Navy Paint Drawing.pdf PDF
PSE Cherry Point.xls XLS spreadsheet
USMC DRAWING PACKAGE.pdf PDF
Post RFP QAs 23 Sep 11.doc DOC document
Attachment 5 Engine Contract Inventory at Depot 30 AUG 11.xls XLS spreadsheet
N00019-10-R-0039 Final.doc DOC document
C-9 CLS CDRLs DD Form 1423 02SEP2011.pdf PDF
Attachment 1 PWS - 1 Sep 11.docx DOCX document
Attachment 2 Navy C-9 Technical Manuals List 30 AUG 11.doc DOC document
Attachment 3 C-9 PSE Calibration and Maintenance 30 AUG 11.xls XLS spreadsheet
Attachment 3 C-9 PSE Calibration and Maintenance.xls XLS spreadsheet
Attachment 1 PWS - 16 Aug 11.docx DOCX document
Attachment 4 C9 USN USMC Site Contract Inventory.xls XLS spreadsheet
Draft RFP Thru Section K 17 Aug 11.doc DOC document
Attachment 2 Navy C-9 Technical Manuals List.doc DOC document
Attachment 5 Engine Contract Inventory at Depot.xls XLS spreadsheet
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-9 CLS Effort

Requests for Information

(Posted 17 Oct 2011)

#1 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph

PWS

3.1.1

Q: Will the Government consider multiple locations for different level PMI visits provided the entire PMI is performed at one facility and the aircraft is not ferried?

A: Yes, the Government will consider multiple certified locations in accordance with PWS paragraph 3.1.1.

#2 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
92
2.1

Q: Is the Offeror required to provide documentation and evidence of complying with prerequisite 2.1.3.2, Strip and Paint, at the time of proposal submittal or at the time of the first scheduled PMI depot event requiring strip and paint?

A: Each Offeror and its subcontractors must meet and provide documentation to demonstrate that the Offeror meets the prerequisites at the time of proposal submission. An Offeror who does not meet the prerequisites will be eliminated from this competition and be ineligible for award.

#3 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
89
4.0

Q: With regard to “Past Performance information in paragraphs 2.2 and 2.3…” we found nothing correlating to paragraphs 2.2 or 2.3 in the RFP. COULD YOU PLEASE CLARIFY?

A: Paragraph 4.0, Proposal Submission, contains referencing errors and should read as follows:

“4.0

PROPOSAL SUBMISSION

Clearly mark all packages with the solicitation number (DO NOT MARK EXTERIOR OF PACKAGING WITH ANY SOURCE SELECTION LEGENDS). The submission date for all Volumes shall be no later than the date and time specified in Block 9 of Standard Form 33 of the RFP. However, it is requested that the Volume 3, Past Performance Data Requirements and Contract Data table in paragraph 3.2 and the Volume 1, Executive Summary "Offeror's Summary Table", in paragraph 1.1.1, should be submitted three weeks prior to the submission date/time specified on Standard Form 33 (Block 9), as specified below.”

The RFP will be amended accordingly.

#4 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
89
4.0

Q: With regard to “Volume 1, Executive Summary "Offeror's Summary Table," B (1)…” it is our belief the only portion of the Past Performance volume required early, is a completed “1.1.1 Offeror Summary Table” found on page 91 of the RFP. Is this correct?

A: Yes. See response to Question # 3.

#5 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L-Vol 2
92
2.1.3.3

Q: If the offeror's airport meets all the requirements of FAA FAR Part 139, is a FAA statement to that effect acceptable or does the airport have to have a FAA certificate?

A Revised: An FAA statement that states the airport meets FAR Part 139 is acceptable. Additionally, to eliminate confusion generated from PWS Paragraphs 3.1.3.1 and 3.1.3.2, and Sec L Paragraph 2.1.3.3, these paragraphs will be changed to read:

PWS 3.1.3.1: The airport shall meet the requirements of FAA Federal Aviation Regulation Part 139 Certification of Airports, Sub Part D, Operations. The airport shall have a FAA approved and published Instrument Landing System (ILS) approach or equivalent approach system with weather minimums no higher than 400-1.

PWS 3.1.3.2: The airport shall have an operating control tower or manned Aeronautical Advisory Station (UNICOM) for all C-9 aircraft arrivals and departures. If the airport does not have an operating tower, it shall have an Automated Terminal Information System (ATIS)/ Automated Weather Observing System (AWOS) or similar capability to provide accurate weather conditions for the landing runway. The manned UNICOM shall be able to maintain radio communication with the aircraft during all ground operations, such as taxi, take-off, and landing, and be able to alert the firefighting and medical facilities in the event of a mishap.

Sec L 2.1.3.3 Airport: The Offeror shall provide evidence that the airport where the aircraft repair facility is located meets the requirements of FAA FAR Part 139 Certification of Airports, Sub Part D, Operations; the airport has a FAA approved and published Instrument Landing System (ILS) approach or equivalent approach system with weather minimums no higher than 400-1; and the Control Tower or manned UNICOM can maintain radio communication with the aircraft during all ground operations and be able to alert the firefighting and medical facilities in the event of a mishap.

The RFP will be amended accordingly.

#6 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
B
3

Q: Does the amount of $5.4 Million allocated to CLIN 0X05 include Landing Gear and APU repairs/overhaul, if required?

A: Yes, the cost to repair/overhaul the landing gear and APU is included in the Government’s $5.4M.

#7 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
General
4-6

Q: With respect to CLIN 0X06-0X08, Periodic Maintenance Inspections and CLIN 0X09-0X10, Engine Shop Visits, the RFP states: “The Contractor shall provide all the operations/services necessary to perform the requirement of Section 5.5 ‘Periodic Maintenance Inspections’ under Attachment 1, and PWS. Parts and Materials (including shipping) costs are funded under CLIN 0X05.” CLIN 0X09-0X10 states: “The Contractor shall provide all the operations/services necessary to perform the requirement of Section 5.6 ‘Engine Shop Visits,’ Attachment 1, and PWS.”

How should the Contractor forecast O&A materials from aircraft and engine depot?

A: The Contractor is not required to forecast O&A materials. Unless otherwise specified in the PWS or C-9 SDLM specification, parts and materials required to support discrepancies discovered during the PMI are funded under CLIN 0X05. For Engine Shop Visits (ESVs), in accordance with PWS paragraph 5.6.1.1, “the Contractor shall furnish all materials required to accomplish ESV requirements in the JT8D Engine Specification. All consumable materials required to complete the schedule inspections shall be included in the price for the ESV.” Parts and materials to support discrepancies identified during the ESV not included in the JT8D Engine Specification ESV requirements will be funded under CLIN 0X05.

#8 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
B
5-6

Q: The CLINS for both ESV-1 and ESV-2 require transportation cost to be included in the FFP. Since engines may be shipped from two different home base locations and possibly the aircraft depot, how is the contractor to determine shipping costs?

A: The ESV CLINs 0X09 and 0X10 are FOB Origin. Therefore, the Government is responsible for the transportation/shipping costs. The RFP will be amended accordingly to revise PWS paragraph 5.6.1.1 to remove “transportation,” from the first sentence.

#9 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
B
5-6

Q: Shipping costs vary by distance and are affected by variables such as fuel and maintenance costs. Since the first motor will not probably be shipped until FY13, is there a Gov’t suggested escalation rate or can shipping costs be adjusted after the fact?

A: See response to question #8.

#10 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
85-87
2.1.2-2.1.7

Q: Paragraphs 2.1.2 and 2.1.7 appear to conflict. While 2.1.2 specifically addresses using Microsoft Office 2007 applications (which uses 4-letter file extensions), paragraph 2.1.7 directs usage of 3-letter file extensions (.doc, .xls, .ppt, .mpp), which are associated with earlier editions of Microsoft Office.

Would the Gov’t please clarify?

A: The Government requires the use of Microsoft Office 2007 applications, which use 4-letter file extensions. Paragraph 2.1.7 will be amended to reflect this update.

#11 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
93
2.4.2

Q: Unscheduled Maintenance: Based on the identified scenario the use of contract field teams (CFT) will likely require the payment of overtime to employees comprising these teams and could involve extensive travel. Other potential scenarios might not call for the payment of overtime to personnel or the use of a full or partial CFT. No CLIN is included in the Schedule B for CFT or for overtime. We believe the inclusion of CLINs for CFT and for overtime has the potential to save the Gov’t money.

Will the Gov’t provide a separate CFT CLIN?

A: No, the Over and Above labor rates for CLINs 0X11 and 0X12 are composite labor rates for both “in house” O&A requirements, as well as field team requirements. However, the Government does intend to amend the RFP to include overtime O&A CLINs only applicable to engine and airframe field team requirements.

#12 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
93
2.4.2

Q: With respect to Question 11: If no CLIN is established, will CFTs be billable within the Over and Above CLINs utilizing the proposed composite rate even though their composition might be different than that of a composite rate calculated for more normal over and above types of work that might be performed onsite at the established maintenance facility? If so, which over and above CLIN should be utilized?

A: See response to question #11.

#13 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
PWS
7
3.7

Q: Contract Inventory Cost Reduction Program: The PWS requires Contractor to establish and maintain a Cost Reduction Program. Would the Gov’t identify an avenue for Contractor to sell excess or obsolete assets?

A: The intent of the cost reduction program is to identify processes to reduce the operating cost of CLIN 0X05. Government material cannot be sold through commercial sources under this contract. It is the Navy’s intent to use Defense Reutilization and Marketing Office procedures for off loading excess assets.

#14 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
PWS
8
3.8.3

Q: Export Compliance: The Contractor will comply with applicable International Traffic in Arms Regulation and the Export Administration Regulations. Will the Gov’t provide a listing of countries previously serviced by the C-9 fleet?

A: A listing of countries the Navy and Marine Corps C-9s have historically flown is provided below. However, current and future operations are not limited to these countries.

EUCOM: Italy, Spain, Germany, Scotland, Ireland, Greece, Portugal, United Kingdom, France, Romania, Morocco, Iceland

CENTCOM: Egypt, Kuwait, Bahrain, Djibouti, Qatar, United Arab Emirates, Turkey, Iraq, Afghanistan

PACOM: Japan, Singapore, Guam (US), Australia, Vietnam, Korea, Thailand, Philippines, Also: Chile, Cuba (Guantanamo Bay), Curacao, Canada

#15 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
PWS
15
5.3.4

Q: Engine Health Monitoring Program: The Contractor shall provide EHM reports to the Gov’t, will the Gov’t supply a sample of the current reports being supplied to allow the Contractor to assure the OEM license will afford proper coverage?

A: CDRL A00M will be updated to include the OT DID that covers EHM reporting requirements. The current reports are proprietary and will not be provided. CDRL A00M states the Engine Health Monitoring Reports shall include the following: Assessment Date; Aircraft BuNo; Engine Position; Engine Serial Number; Engine Install Date; Cruise Date; Cruise Exhaust Gas Temperature (EGT); Cruise N1 Vibration; Cruise N2 Vibration; Oil Pressure; Oil Temperature; Satisfactory/Unsatisfactory operating determination; Comments.

#16 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
RFP
92
2.1.2

Q: Boeing License Agreement: Boeing has stated that its fee for a license agreement will be a percentage of the total contract value. How should offerors allow for the cost of this license agreement? Should the fee be based on all contract CLINs including the cost reimbursable? Should there be a separate contract CLIN for this expense?

A: There will not be a separate CLIN for licensing agreements. In accordance with Section L paragraph 2.1.2, the Offeror’s shall meet the prerequisite requirements. It is the responsibility of the Offeror to negotiate the cost for these licensing agreements and allocate the cost accordingly.

#17 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
Q&A
Q #5

Q: Would the Government reconsider on the matter of the FAR Part 139 and Instrument Landing System (ILS) approach requirements for the airport, provided that the Offeror can demonstrate the following?

· NAS 3306 compliance with regard to airfield facilities accommodating the DC-9/C-9 aircraft, including a 6,000-foot long runway, which exceeds the NAS 3306 requirements and meets the PWS requirements, and appropriate airfield rescue and firefighting capabilities

· A published ADF and two (2) RNAV instrument approaches, a modern and operational control tower (operated by the U.S. Army conducting Dodd operations) and UNICOM radio frequencies, thus maintaining radio communication with the aircraft during all ground operations such as taxi, take-off, landing and the ability to alert firefighting and medical facilities in the event of a mishap

· The ability to provide for safe landing, taxi and take-off of the DC-9/C-9 aircraft

· The capability to perform electronic compass calibration

A: The Offeror shall demonstrate that NAS 3306 compliance meets the intent of FAR Part 139. Additionally, the Offeror shall demonstrate the airport’s instrument approaches are equivalent to an Instrument Landing System (ILS) approach with weather minimums no higher than 400-1 (see revised Question 5).

#18 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
PWS
2

Q: Will NAVAIR provide these Government documents:

NA 01-C9BAAA-1

C-9B NATOPS Flight Manual

NA 01-1B-40

Weight and Balance Data Handbook

NA 01-1B-50

Weight and Balance Control Manual

NA 01-C9B-6-2

Daily Maintenance Requirement Cards

NA 01-C9B-2 Series C-9B Maintenance Instruction Manuals

A Revised: The documents identified above will be made available to Offerors upon request. Contractors should contact Jim Smith or Cindi Hodskins via email, james.m.smith@navy.mil, cindi.hodskins@navy.mil , with their request, Point of Contact, and delivery address for delivery of DVD information package.

#19 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
PWS
17
5.4.1

Q: Paragraph 5.4.1 states “ the Contractor shall procure or repair non-serviceable Contract Inventory with new or serviceable like items.” Pricing Note B6 states “the Contractor will be reimbursed for direct cost only. Overhead charges and profit for the Prime or any supply chain subcontractor will not be allowed.” Where should the Contractor capture these costs? If these costs are to be captured in CLINs 0X02 and 0X03, what should the Contractor base these costs on?

A: The procurement and handling of parts/materials shall be captured under CLINs 0X02 and 0X03, and in accordance with paragraph 5.3.3 of the PWS. Cost basis for these services are at the Contractor’s discretion.

#20 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph

Q: How will the Government address the cost of transferring the inventory to the successful offeror’s facility? We assume the Government will address it outside this solicitation/contract to ensure a level playing field for all competitors. Please advise.

A: Transferring of inventory will be handled by the Government, and is outside the scope of this effort.

#21 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
Q&A
Q #5

Q: Follow-on for Question & Answer #17: Are the NAVAIR/USMC C-9 aircraft currently configured with the capability to utilize Localizer Performance with Vertical Guidance (LPV) / Wide Area Augmentation System (WAAS) landing approaches?

A: Yes, the USN and USMC C-9Bs have LPV and WAAS landing approach capability with the new UNS-1Fw FMS upgrade that was installed in 2009.

#22 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
Sect J
Attach 5

Q: Approximately how much government-owned (aircraft) contract inventory (including parts, tooling and equipment) is currently at the incumbent’s depot facility that will need to be transferred and accommodated at the new depot?

A: Attachment 5 to the RFP is a listing of the Government owned contract inventory currently located at the incumbent’s engine depot facility. The RFP will be amended to include Attachment 6, which is the Government owned contract inventory currently located at the incumbent’s airframe depot facility.

#23 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
PWS
18
5.5.6.1

Q: Is buffing minor paint flaws such as possible dust particles or sags permissible to meet the C-9 paint specification?

A: The buffing of minor paint flaws is permissible only if in accordance with Paragraph 5.5.6.1 Aircraft Touch Up Painting, in Attachment 1, PWS.

#24 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
PWS
11
5.1.1

Q: The projected contract award date is April 30, 2012 and 50 calendar days makes the Inventory Report due approximately June 19, 2012. Does the Government want an Inventory Report without Joint Inventory information and prior to Phase-in?

A: The Government has provided 30 April 2012 as a projected award date, with full performance commencing on 01 Aug 2012. The phase in period is, at a minimum, the first 60 days of contract performance. Based on the Actual Contract Award Date, the Phase-In Inventory Report shall be completed during the Phase-in transition period and in accordance with Paragraph 5.1.1, Phase-In Inventory, of Attachment 1, PWS and CDRL A00E.

#25 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
L
89
4.0 & 5.0

Q: Paragraph 4.0 requests early submission of portions of Volume 1 and 3. Paragraph 5.0 provides detailed instructions on packaging and marking submissions. Since the information provided prior to the closing date will also be provided with the full proposal, does the paragraph 5.0 apply to the early submission? If not, is an e-mail response acceptable for the paragraph 4.0 early submission?

A: Paragraph 5.0 does not apply to the requested early submission information. An e-mail response is acceptable for the response to the paragraph 4.0 early submission.

#26 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph
PWS
5.6

Q: Is there a projected or anticipated schedule for ESV-1 and ESV-2 events?

A: The projected schedule for the ESV 1 & 2 events is as follows:

AIRCRAFT

ENGINE S/N

POSITION

ESV

DATE

160046

667216

ESV 1 (HSI)

30-Nov-15

160046

667244

ESV 2 (OVHL)

30-Sep-14

160047

657591

ESV 1 (HSI)

30-Sep-15

160047

667135

ESV 1 (HSI)

31-Dec-15

160050

666661

ESV 2 (OVHL)

31-Aug-14

160050

666918

ESV 1 (HSI)/ASB6431

22-Sep-15

160051

653699

ESV 1 (HSI)

31-Jan-15

161529

667203

ESV 2 (OVHL)/ASB6431

16-Nov-16

161530

656975

C-1 DISK

30-Aug-13

161530

666804

ESV 2 (OVHL)/ASB6431

4-Sep-14

#27 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph

General

Q: Previous responses to questions have indicated an amendment to the RFP is forthcoming. When can the amendment be expected?

A: It is anticipated that the RFP amendment will be issued no later than COB Wednesday 19 October 2011.

The amendment will include an address change for the submission of proposals to:

Mr. James M. Smith, AIR 2.3.5.1

CAB III Bldg, Suite B

21487 Great Mills Road

Lexington Park, MD 20653

#28 C-9 CLS RFP, N00019-10-R-0039, QUESTIONS/ANSWERS

Section
Page
Paragraph

CDRLs

Q: Several CDRLs have OT-XX-XX-XXXX (See Block 16) listed in Block 4, “Authority (Data Acquisition Document No.).” Block 16, “Remarks,” states “One Time DID. Contractor Format is acceptable.” Will the Government provide a copy of the One Time DIDs for each of the CDRLs that have One Time DIDs referenced?

A: Yes, the applicable DIDs will be provided. Additionally, the RFP will be amended to revise Block 4 of CDRLS A006, A009, A00A, A00R, A00G, A00K, A00L, A00M, A00Q, A00R, A00S, A00T, and A00U to include the Data Item Description Number .