A00L_DID OT-11-20019_C-9 Aircraft Time Cycle Comp Tracking Report.doc

DOC document 49 KB Posted

Attached to
C-9B Contractor Logistics Support
Solicitation number
N00019-10-R-0039
Issued by

About this file

A00L_DID OT-11-20019_C-9 Aircraft Time Cycle Comp Tracking Report

View the file

Other files

File Type Posted
amend 0004.pdf PDF
PWS attach 1 amend 0004.pdf PDF
amend 3.pdf PDF
Post_RFP_QAs_03 Nov 11.doc DOC document
Amendment 2_27Oct11.doc DOC document
Post_RFP_QAs_27_OCT_11.doc DOC document
Post_RFP_QAs_21_OCT_11.doc DOC document
Attachment 1 PWS amend 1 - 01 Oct 11.docx DOCX document
Amendment 1 18 Oct 11.doc DOC document
A00M_DID OT-11-20013_C-9 Engine Health Monitoring Report.doc DOC document
CDRL OT DID List.xls XLS spreadsheet
A00G_DID OT-11-20011_C-9 Loan Log.doc DOC document
A00T_DID OT-11-20014_C-9 Post Field Team Activity Unsch Maint Report.doc DOC document
A00F_DID OT-11-20017_C-9 Phase Out Transition Plan.doc DOC document
C-9 ESV 1 2 Schedule.xlsx XLSX spreadsheet
A00R_DID OT-11-20021_C-9 Engine Depot Status Report.doc DOC document
A00K_DID OT-11-20012_C-9 No Defect Report.doc DOC document
A00S_DID OT-11-20015_C-9 Engine Records Package Report.doc DOC document
Post_RFP_QAs_17_OCT_11.doc DOC document
A00B_DID OT-11-20029_CR Report.doc DOC document
Attachment 6 Airframe Contract Inventory at Depot 14 Oct 11.xls XLS spreadsheet
A00Q_DID OT-11-20009_C-9 Airframe Maintenance History Summary Report.doc DOC document
A006_DID OT-11-20016_C-9 WIS Archival Data.doc DOC document
A00A_DID OT-11-20028_CR Plan.doc DOC document
CDRLs Oct 4 2011 - 31 pages.pdf PDF
Post RFP Q As 07 OCT 11.doc DOC document
Post RFP Q As 30 Sep 11.doc DOC document
C9_Depot_Schedule_Updated_FY12-17.xls XLS spreadsheet
C-9B_DC-9 Aircraft Paint System MED-05_ammend_2.pdf PDF
USMC DRAWING PACKAGE.pdf PDF
PSE Cherry Point.xls XLS spreadsheet
Navy Paint Drawing.pdf PDF
C-9 SDLM Specification Rev 2011-08-19.docx DOCX document
JT8D Engine Depot Spec Rev 3 Sept 2009.pdf PDF
Post RFP QAs 23 Sep 11.doc DOC document
Attachment 2 Navy C-9 Technical Manuals List 30 AUG 11.doc DOC document
Attachment 3 C-9 PSE Calibration and Maintenance 30 AUG 11.xls XLS spreadsheet
C-9 CLS CDRLs DD Form 1423 02SEP2011.pdf PDF
Attachment 1 PWS - 1 Sep 11.docx DOCX document
N00019-10-R-0039 Final.doc DOC document
Attachment 5 Engine Contract Inventory at Depot 30 AUG 11.xls XLS spreadsheet
Attachment 5 Engine Contract Inventory at Depot.xls XLS spreadsheet
Draft RFP Thru Section K 17 Aug 11.doc DOC document
Attachment 1 PWS - 16 Aug 11.docx DOCX document
Attachment 3 C-9 PSE Calibration and Maintenance.xls XLS spreadsheet
Attachment 4 C9 USN USMC Site Contract Inventory.xls XLS spreadsheet
Attachment 2 Navy C-9 Technical Manuals List.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title:

Aircraft Time/Cycle component Tracking Report Number:

OT-11-20019

Approval Date:

20110707 AMSC Number:

N/A Limitation:

NA

DTIC Applicable:

N/A GIDEP Applicable:

N/A Office of Primary Responsibility:

AS/PMA 207

Applicable Forms:

N/A

Use/relationship:

Aircraft Time/Cycle Component Tracking Report provides tracking of specific components that are turned in to the repair facility based on the time and cycles spent on the aircraft.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS).

This DID is for One-Time use for solicitation N00019-10-R-0039.

Requirements:

1. Format. The Aircraft Time/Cycle Component Tracking Report shall be in the Contractor’s format.

2. Content. The Aircraft Time/Cycle Component Tracking report shall contain the following sections:

2.1 Section 1 – This section shall include the elements of the Airframe and shall identify:

a. Aircraft Serial Number

b. Total Flight Hour/Cycles/Landings

c. Part Number of Component

d. Nomenclature

e. Serial Number of component

f. Installed Date

g. Installed Hours/Cycles/Landings

h. Time Between Overhaul (TBO) Interval

i. Time Since Overhaul (TSO) Interval

j. Time Remaining

k. Life Limited Components Status

2.2 Section 2 – This section shall include the elements of the Engine and shall identify:

a. Engine Serial Number (ESN)

b. Site Location and Spares

c. Aircraft BUNO and position on Aircraft

d. Last ESV 1 inspection completion data

e. Last ESV 2 inspection completion date

f. Engine install date after stop visit and hours to next scheduled shop visit

g. C-1 and C-2 disk serial number listing with dates, total hours and cycles available for that disk and hours and cycles remaining

h. Alert Service Bulletins and Service Bulletins 6228, 6230, 6431, 6038, 5639, 5913 to include last inspection or compliance and next scheduled requirements determined by hours, cycles or delays as required.

3. End of OT-11-20019

8 February 2011

File details come from the government source that posted it. Updated .