A00F_DID OT-11-20017_C-9 Phase Out Transition Plan.doc

DOC document 48 KB Posted

Attached to
C-9B Contractor Logistics Support Federal contract opportunity
Solicitation number
N00019-10-R-0039
Issued by
Department of the Navy Naval Air Systems Command

About this file

A00F_DID OT-11-20017_C-9 Phase Out Transition Plan

View the file

Other files for this federal contract opportunity

Other files attached to C-9B Contractor Logistics Support, newest first.
File Type Posted
amend 0004.pdf PDF
PWS attach 1 amend 0004.pdf PDF
amend 3.pdf PDF
Post_RFP_QAs_03 Nov 11.doc DOC document
Amendment 2_27Oct11.doc DOC document
Post_RFP_QAs_27_OCT_11.doc DOC document
Post_RFP_QAs_21_OCT_11.doc DOC document
Attachment 1 PWS amend 1 - 01 Oct 11.docx DOCX document
Amendment 1 18 Oct 11.doc DOC document
A00R_DID OT-11-20021_C-9 Engine Depot Status Report.doc DOC document
A00S_DID OT-11-20015_C-9 Engine Records Package Report.doc DOC document
A00K_DID OT-11-20012_C-9 No Defect Report.doc DOC document
A006_DID OT-11-20016_C-9 WIS Archival Data.doc DOC document
A00M_DID OT-11-20013_C-9 Engine Health Monitoring Report.doc DOC document
A00G_DID OT-11-20011_C-9 Loan Log.doc DOC document
A00L_DID OT-11-20019_C-9 Aircraft Time Cycle Comp Tracking Report.doc DOC document
CDRLs Oct 4 2011 - 31 pages.pdf PDF
A00A_DID OT-11-20028_CR Plan.doc DOC document
CDRL OT DID List.xls XLS spreadsheet
A00T_DID OT-11-20014_C-9 Post Field Team Activity Unsch Maint Report.doc DOC document
C-9 ESV 1 2 Schedule.xlsx XLSX spreadsheet
A00Q_DID OT-11-20009_C-9 Airframe Maintenance History Summary Report.doc DOC document
Post_RFP_QAs_17_OCT_11.doc DOC document
A00B_DID OT-11-20029_CR Report.doc DOC document
Attachment 6 Airframe Contract Inventory at Depot 14 Oct 11.xls XLS spreadsheet
Post RFP Q As 07 OCT 11.doc DOC document
Post RFP Q As 30 Sep 11.doc DOC document
C9_Depot_Schedule_Updated_FY12-17.xls XLS spreadsheet
C-9B_DC-9 Aircraft Paint System MED-05_ammend_2.pdf PDF
C-9 SDLM Specification Rev 2011-08-19.docx DOCX document
Navy Paint Drawing.pdf PDF
JT8D Engine Depot Spec Rev 3 Sept 2009.pdf PDF
PSE Cherry Point.xls XLS spreadsheet
USMC DRAWING PACKAGE.pdf PDF
Post RFP QAs 23 Sep 11.doc DOC document
Attachment 5 Engine Contract Inventory at Depot 30 AUG 11.xls XLS spreadsheet
N00019-10-R-0039 Final.doc DOC document
C-9 CLS CDRLs DD Form 1423 02SEP2011.pdf PDF
Attachment 1 PWS - 1 Sep 11.docx DOCX document
Attachment 2 Navy C-9 Technical Manuals List 30 AUG 11.doc DOC document
Attachment 3 C-9 PSE Calibration and Maintenance 30 AUG 11.xls XLS spreadsheet
Draft RFP Thru Section K 17 Aug 11.doc DOC document
Attachment 2 Navy C-9 Technical Manuals List.doc DOC document
Attachment 3 C-9 PSE Calibration and Maintenance.xls XLS spreadsheet
Attachment 1 PWS - 16 Aug 11.docx DOCX document
Attachment 4 C9 USN USMC Site Contract Inventory.xls XLS spreadsheet
Attachment 5 Engine Contract Inventory at Depot.xls XLS spreadsheet
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title:

Phase-Out Transition Plan Number:

OT-11-20017

Approval Date:

20110707 AMSC Number:

N/A Limitation:

NA

DTIC Applicable:

N/A GIDEP Applicable:

N/A Office of Primary Responsibility:

PMA 207

Applicable Forms:

N/A

Use/relationship:

Phase-Out Transition Plan provides a detailed description of the transfer of full assumption of duties at each site, Airframe and Engine Depot to the follow-on contractor.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS). It should be tailored to the minimum data requirements of the applicable contract or purchase order. This DID is for One-Time use for solicitation N00019-10-R-0039.

Requirements:

1. Format. Contractor format is acceptable.

2.

Content. The Phase-Out Transition Plan content shall include:

a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.

b. Details of accounts and subscription services to be terminated or transferred.

c. Process to conduct a full joint inventory and transference of all Government Furnished Material inventory including all records.

d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.

e. Details for the removal of all contractor owned items.

f. Critical path schedule for risk mitigation of the transition period.

3. End of OT-11-20017

13 October 2010