A00Q_DID OT-11-20009_C-9 Airframe Maintenance History Summary Report.doc

DOC document 57 KB Posted

Attached to
C-9B Contractor Logistics Support Federal contract opportunity
Solicitation number
N00019-10-R-0039
Issued by
Department of the Navy Naval Air Systems Command

About this file

A00Q_DID OT-11-20009_C-9 Airframe Maintenance History Summary Report

View the file

Other files for this federal contract opportunity

Other files attached to C-9B Contractor Logistics Support, newest first.
File Type Posted
PWS attach 1 amend 0004.pdf PDF
amend 0004.pdf PDF
amend 3.pdf PDF
Post_RFP_QAs_03 Nov 11.doc DOC document
Post_RFP_QAs_27_OCT_11.doc DOC document
Amendment 2_27Oct11.doc DOC document
Post_RFP_QAs_21_OCT_11.doc DOC document
Amendment 1 18 Oct 11.doc DOC document
Attachment 1 PWS amend 1 - 01 Oct 11.docx DOCX document
A00T_DID OT-11-20014_C-9 Post Field Team Activity Unsch Maint Report.doc DOC document
C-9 ESV 1 2 Schedule.xlsx XLSX spreadsheet
A00L_DID OT-11-20019_C-9 Aircraft Time Cycle Comp Tracking Report.doc DOC document
CDRLs Oct 4 2011 - 31 pages.pdf PDF
A00A_DID OT-11-20028_CR Plan.doc DOC document
CDRL OT DID List.xls XLS spreadsheet
A00R_DID OT-11-20021_C-9 Engine Depot Status Report.doc DOC document
A00S_DID OT-11-20015_C-9 Engine Records Package Report.doc DOC document
A00K_DID OT-11-20012_C-9 No Defect Report.doc DOC document
A006_DID OT-11-20016_C-9 WIS Archival Data.doc DOC document
A00M_DID OT-11-20013_C-9 Engine Health Monitoring Report.doc DOC document
A00G_DID OT-11-20011_C-9 Loan Log.doc DOC document
A00F_DID OT-11-20017_C-9 Phase Out Transition Plan.doc DOC document
Post_RFP_QAs_17_OCT_11.doc DOC document
A00B_DID OT-11-20029_CR Report.doc DOC document
Attachment 6 Airframe Contract Inventory at Depot 14 Oct 11.xls XLS spreadsheet
Post RFP Q As 07 OCT 11.doc DOC document
Post RFP Q As 30 Sep 11.doc DOC document
C9_Depot_Schedule_Updated_FY12-17.xls XLS spreadsheet
JT8D Engine Depot Spec Rev 3 Sept 2009.pdf PDF
C-9B_DC-9 Aircraft Paint System MED-05_ammend_2.pdf PDF
C-9 SDLM Specification Rev 2011-08-19.docx DOCX document
Navy Paint Drawing.pdf PDF
PSE Cherry Point.xls XLS spreadsheet
USMC DRAWING PACKAGE.pdf PDF
Post RFP QAs 23 Sep 11.doc DOC document
C-9 CLS CDRLs DD Form 1423 02SEP2011.pdf PDF
Attachment 1 PWS - 1 Sep 11.docx DOCX document
Attachment 2 Navy C-9 Technical Manuals List 30 AUG 11.doc DOC document
Attachment 5 Engine Contract Inventory at Depot 30 AUG 11.xls XLS spreadsheet
N00019-10-R-0039 Final.doc DOC document
Attachment 3 C-9 PSE Calibration and Maintenance 30 AUG 11.xls XLS spreadsheet
Attachment 3 C-9 PSE Calibration and Maintenance.xls XLS spreadsheet
Attachment 1 PWS - 16 Aug 11.docx DOCX document
Attachment 4 C9 USN USMC Site Contract Inventory.xls XLS spreadsheet
Draft RFP Thru Section K 17 Aug 11.doc DOC document
Attachment 2 Navy C-9 Technical Manuals List.doc DOC document
Attachment 5 Engine Contract Inventory at Depot.xls XLS spreadsheet
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title:

Airframe Maintenance History Summary Report Number:

OT-11-20009

Approval Date:

20110707 AMSC Number:

N/A Limitation:

NA

DTIC Applicable:

N/A GIDEP Applicable:

N/A Office of Primary Responsibility:

AS/PMA 207

Applicable Forms:

N/A

Use/relationship:

Airframe Maintenance History Summary Report provides a detailed description of all maintenance performed on inducted aircraft at a repair facility. The information in the report will be retained as a permanent part of the maintenance records of the individual aircraft.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS).

This DID is for One-Time use for solicitation N00019-10-R-0039.

Requirements:

1. Format. Report to be in accordance with Section V of the SDLM Spec (Attachment 4) for PMI 1, PMI 2, PMI 3, PMI 4, Phase Un-Scheduled maintenance, and modifications. The format may be of the contractors choosing, but must be mutually agreed upon by the government and the contractor.

2. Content. The report shall include:

1. Aircraft Type/Model/Series

2. Aircraft Bureau Number

3. PMI Number

4. Total flight hours and landings since new and last rework

5. Number of extension and total months extended

6. Operating months during last service period and total since new

7. Date aircraft was inducted into rework

8. Date rework was completed.

9. Number of days aircraft rework was in process.

10. Technical Directives Incorporated/complied with by number and title.

11. Reporting Activity (Contractor performing rework)

12. Contractor point of contact, name and telephone number for report.

13. Inspection Results and Corrective Action Details:

(a) Task Identification (ID) Number 1) Assigned Tasks - This is a unique reference for each inspection requirement and is located in the far left-hand column of the Structural-Zonal and System-Component Requirement listing located in Section II of this specification.

2) Other Defects - For defects discovered outside of the assigned inspections in section II of this specification, the contractor shall assign task numbers sequentially as follows: C001, C002, C003, etc. These tasks and other required information shall be listed following the “Assigned Task” discussed above.

(b) Part Number/Item Nomenclature - This is the part number and nomenclature of the component or part as listed in the IPC.

(c) Defect Class Code - Codes to identify category of defect(s) found as defined in paragraph 2-2.4 of this specification and as listed in the heading on the Maintenance History Summary Report form.

(d) Description of Defect - Provide complete information on defect(s) found. Defect information is to include but not limited to the following:

1) Type of Defect - crack, corrosion, deformation, wear, etc.

2) Defect Location – describes location of the defect.

3) Detail Description - provide sufficient detail to accurately describe defects such as:

4) Cracks - provide length, depth, location.

5) Corrosion - provide type, depth, category (severity), extent (see Table II and III, pages 5-18 and 5-19 of this specification for assistance in developing verbal description)

6) Wear - depth and extent

(e) Description of Corrective Action - Provide a thorough description of corrective action accomplished to include listing the document number(s) and page number(s) from which corrective action was taken.

(f) Inspection Man-hours - Provide actual manhours required to accomplish inspection.

(g) Corrective Action Man-hours - Provide actual manhours required to accomplish corrective action.

(h) DF - Defects found. This field is used when more than one defect is found under one task. Sequentially number each defect with the same task number.

Example:

TASK

DF

ST005

ST005

ST005

(14) Total Manhours:

(a) Defect - Total manhours required to correct defects while aircraft is undergoing PMI-1, PMI-2, PMI-3 or PMI-4.

(b) Inspection - Total manhours required to perform inspection tasks while aircraft is undergoing PMI-1, PMI-2, PMI-3 or PMI-4.

(c) Total - Sum of manhours in paragraphs (14)(a) and (14)(b) above.

(15) Date: Date aircraft MHS Report was completed.

(16) Page: Sequential number assigned to a specific page.

(17) Remarks: Pertinent maintenance information that does not fit any of the MHS requirement categories above is to be recorded in this paragraph. Examples are provided below:

(a) Special Work Request - Describe work accomplished from squadron work request accompanying the aircraft for induction into PMI-1, PMI-2, PMI-3 or PMI-4.

(b) Interval Change Recommendations to Inspection Tasks Listed in the PMI-1 through PMI-4 Specification - Interval(s) of Inspection Task(s) may need to be changed due to defects discovered or other pertinent factors. Request contact or provide Task ID number; recommended interval and technical justification.

(c) Add or Delete Inspection Task(s) - Damage discovered to item(s) peripheral to a listed inspection task item or discovery of unrecorded modification(s) (terminating actions may be justification for adding inspection requirements).. Request contractor provide specific recommendation(s) and technical justification.

(d) Aging Aircraft - Provide details of inspections performed and any defects found, accomplished, terminating modifications, etc.

(e) Incoming Discrepancies - Provide details of incoming discrepancy defects and any corrective action performed.

(f) Components that are Replaced or Overhauled - Provide details on defect, if applicable, and part numbers or serial numbers.

(g) Other Directives Accomplished - Please provide detailed descriptions as well as findings for any directives that are accomplished during PMI-1, PMI-2, PMI-3 or PMI-4; i.e., inspected in accordance with Revision 2 Option I Phase III.

(h) Miscellaneous - Record any other pertinent PMI-1 through PMI-4 maintenance information related to C-9B aircraft.

(18) Results of all Non-Destructive Inspections (NDIs) accomplished.

(19) A listing of all Noted But Not Corrected (NBNC) discrepancies.

(20) All corrosion found during inspections and the resulting actions taken.

3. End of OT-11-20009

File details come from the government source that posted it. Updated .