MICHSpec Rev032022 V12.pdf

PDF 109 KB Posted

Attached to
472/19503. SMD; Lakeland CF (SRF) - Building 29 HVAC Upgrades
Solicitation number
RFQ 171 230000000791 2
Issued by
Barry County, Michigan

About this file

This is a supplementary conditions document from the State of Michigan Department of Technology, Management and Budget establishing standard contract forms and conditions for construction projects. The document outlines mandatory requirements for contractors performing work on state facilities, including provisions for COVID-19 safety protocols, equipment removal procedures, temporary climate control systems, daily debris removal, and daily reporting requirements. Contractors must maintain heating availability from October 15 through May 1 and cooling availability from May 1 through September 15, except for coordinated switchover shutdowns. The document addresses special working conditions applicable to demolition and remodeling projects, soil erosion and sedimentation control programs, and recycled materials tracking. No substitution requests are permitted after the bid date.

For projects receiving federal funding in whole or in part, contractors and all subcontractors must comply with the Davis-Bacon Act wage requirements for prime construction contracts exceeding $2,000. This includes payment of prevailing wages at rates no less than those specified in advertised specifications, with weekly payment to all mechanics and laborers directly employed on site. Contractors must maintain payrolls and records for three years following project completion and submit certified payroll reports using the US Department of Labor Form WH-347 weekly to document compliance. Prevailing wage schedules and classifications applicable to the project location are included in the appendices. The document references federal regulations at 40 USC 3141-3148 and 29 CFR Part 5 regarding labor standards for federally financed construction.

View the file

Other files

File Type Posted
Drawings 1 of 12.pdf PDF
Drawings 2 of 12.pdf PDF
Drawings 8 of 12.pdf PDF
Drawings 4 of 12.pdf PDF
Drawings 5 of 12.pdf PDF
Drawings 12 of 12.pdf PDF
47219503.SMD - Addendum 1 Write-Up.pdf PDF
Lakeland - Specifications.pdf PDF
Drawings 10 of 12.pdf PDF
Drawings 9 of 12.pdf PDF
Drawings 7 of 12.pdf PDF
LEIN Request 19503.pdf PDF
Walkthrough Sign-in Sheet.pdf PDF
MICHSpec Rev032022 V12 - 47219503.SMD.pdf PDF
Drawings 6 of 12.pdf PDF
DTMB Advertisement.pdf PDF
Drawings 3 of 12.pdf PDF
Drawings 11 of 12.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MICHIGAN (OWNER AND CONTRACTOR) SUPPLEMENTARY CONDITIONS

MICHSPEC DTMB 00800 − 1 (R 03/22)

Clarification: Contractor cannot remove any equipment until the new replacement equipment has been received by the contractor (i.e.

demolition of a boiler cannot start until the contractor has received the new replacement boilers).

Clarification: Contractor to provide an on-site Covid Safety Plan. Also the contractor’s shall meet any Michigan Department of Corrections Covid safety requirements (wear mask whenever indoors on Department of Corrections property, temperature screening daily, questionnaire daily). The contractor shall comply with any changes to the Michigan Department of Corrections safety requirements, which may change at any time.

Clarification: Contractor shall remove all debris at the end of each workday. The on-site dumpster shall be empty at the end of each day, no demolished work shall remain. No new components not installed are permitted to remain within the secured area.

Clarification: The facility will allow temporary heating & cooling in the facility. Temporary heating and cooling must be distributed through the existing supply air ductwork system and cannot be distributed down the main corridors. The contractor must inform the facility of their intent to use temporary heating or cooling an minimum of three weeks prior to its use and must receive approval from the facility prior to providing the equipment.

ARTICLE 4 CONTROL OF THE WORK – GENERAL PROVISIONS

ADD Section 4.4.14 as follows:

4.4.14 The Contractor shall note and comply with APPENDIX I SPECIAL WORKING CONDITIONS and APPENDIX II SPECIAL PROJECT PROCEDURES as part of and in conjunction with all other contract requirements. APPENDIX I & II immediately follow and are attached hereto

SECTION 00800.

ARTICLE 7 LEGAL AND CONTRACTUAL REQUIREMENTS; INSURANCE

ADD Section 7.14.3 for projects with Federal Funding:

7.14.3 FEDERALLY FUNDED PROJECT PREVAILING WAGE REQUIREMENTS

If a project is funded in whole or in part by federal dollars, the Contractor and all Subcontractors must comply with the most recent version of Federal Provisions Addendum and all Laws pertaining to occupational classifications and prevailing wage requirements as follows:

1. FEDERAL PROVISIONS ADDENDUM

a. The most current version of Federal Provisions Addendum shall apply to this contract and is included in Appendix III.

2. DAVIS BACON ACT WAGE AND CLASSIFICATIONS

a. If applicable, the Contractor (and its Subcontractors) for prime construction contracts in excess of $2,000 must comply with the Davis-Bacon Act (40 USC 3141-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”).

b. The Contractor (and its Subcontractors) shall pay all mechanics and laborers employed directly on the site of the work, unconditionally and at least once a week, and without subsequent deduction or rebate on any account, the full amounts accrued at time of payment, computed at wage rates not less than those stated in the advertised specifications, regardless of any contractual relationship which may be alleged to exist between the Contractor or subcontractor and the laborers and mechanics.

c. The Contractor will post the scale of wages to be paid in a prominent and easily accessible place at the site of the work.

d. There may be withheld from the Contractor so much of accrued payments as the contracting officer considers necessary to pay to laborers and mechanics employed by the Contractor or any Subcontractor on the work the difference between the rates of wages required by the Contract to be paid laborers and mechanics on the work and the rates of wages received by the laborers and mechanics and not refunded to the Contractor or Subcontractors or their agents.

e. The Contractor shall maintain payrolls and basic records relating thereto for a period of three (3) years after the project; contractor shall submit Certified Payroll Reports using US Department of Labor Wage and Hour Division Form WH-347 for each weekly payroll to support and document compliance with the Davis Bacon Wage rates.

f. Davis Bacon wage and classification schedules applicable for this project/location are included in Appendix III.

https://www.law.cornell.edu/uscode/text/40/subtitle-II/part-A/chapter-31/subchapter-IV https://www.law.cornell.edu/cfr/text/29/part-5 https://www.law.cornell.edu/cfr/text/29/part-5

STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
MICHSPEC( 2008 VERSION, OWNER AND CONTRACTOR
STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
MICHSPEC( No. 97.0820 ( 00020 THROUGH 97.0820 ( 00440
RELEASED ON NOVEMBER 1, 1997.
Developed from
1997 Edition/R 03/22 Version
1.1 Defined Terms:
STATE OF MICHIGAN MODEL
1.2 Division 0 Rules of Construction:
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
Clarification: There will be no substitution request after Bid Date.
Clarification: Cooling must be available from May 1st through September 15th except for short switch over shutdowns that are coordinated with the owner.
Clarification: Heating must be available from October 15st through May 1st except for short switch over shutdowns that are coordinated with the owner.
Clarification: Heating and Cooling must be maintained in the buildings while upgrading controls except for short switch over shutdowns that are coordinated with the owner.
Clarification: Contractor is required to fill out daily reports. Reports to be submitted daily or once a week.
Clarification: Contractor is required to track recycled materials quantities.
Clarification: Contractor cannot remove any equipment until the new replacement equipment has been received by the contractor (i.e. demolition of a boiler cannot start until the contractor has received the new replacement boilers).
If a project is funded in whole or in part by federal dollars, the Contractor and all Subcontractors must comply with the most recent version of Federal Provisions Addendum and all Laws pertaining to occupational classifications and prevailing wage re...
PART 1 - GENERAL
1.01 SUMMARY
PART 3 ( EXECUTION
END OF SECTION 01310
APPENDIX I
SPECIAL WORKING CONDITIONS
STATE FACILITIES ADMINISTRATION, DESIGN AND CONSTRUCTION DIVISION
SOIL EROSION AND SEDIMENTATION CONTROL PROGRAM
The SESC Implementation Plan must include:
DEMOLITION/REMODELING PROJECT PROCEDURES
STATE OF MICHIGAN PREVAILING WAGE SCHEDULES
& WAGE RATE SCHEDULES

File details come from the government source that posted it. Updated .