Drawings 6 of 12.pdf

PDF 6 MB Posted

Attached to
472/19503. SMD; Lakeland CF (SRF) - Building 29 HVAC Upgrades
Solicitation number
RFQ 171 230000000791 2
Issued by
Barry County, Michigan

About this file

This file consists of mechanical demolition and construction drawings prepared by Matrix Consulting for the Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division of the State of Michigan. The drawings depict demolition work across three connected buildings (29A, 29B, and 29C) with both base bid and alternate pricing options. The project involves extensive disconnection, removal, and demolition of existing HVAC systems including relief air ductwork, intake louvers, cooling coils, supply and return air ductwork, pneumatic VAV boxes, and associated controls and accessories. Additional demolition includes piping systems such as steam piping, heating water supply and return piping, condensate piping, expansion tanks, circulation pumps, heat exchanger skids, radiant floor heating systems, radiant ceiling panels, and pneumatic control systems. The drawings are scaled appropriately for construction and include detailed demolition notes with numbered references corresponding to specific areas on each plan, covering basement, first floor, and attic spaces across all three buildings.

The contract work is organized with a base bid for Buildings 29A and portions of 29B, and alternate pricing (Add Alternate #1) for Buildings 29B and 29C. Multiple systems are designated to remain in place, including existing make-up air units, supply fans, exhaust fans, certain louvers, cabinet unit heaters, condensing units, fin tube heating elements, and radiant heating systems designated for reuse. The project involves modification of existing piping and ductwork connections to accommodate new control valves, shutoff valves, and balance valves. Construction is scheduled based on the issue date of September 14, 2023, with drawings prepared by DBP and checked by CAT under consultant job number 20080.00 and contract order number 472/LCFMAINTPROJ with funding code 472/19503.SMD.

View the file

Other files

File Type Posted
Drawings 1 of 12.pdf PDF
Drawings 2 of 12.pdf PDF
Drawings 8 of 12.pdf PDF
Drawings 4 of 12.pdf PDF
Drawings 5 of 12.pdf PDF
Drawings 12 of 12.pdf PDF
47219503.SMD - Addendum 1 Write-Up.pdf PDF
Lakeland - Specifications.pdf PDF
Drawings 10 of 12.pdf PDF
Drawings 9 of 12.pdf PDF
Drawings 7 of 12.pdf PDF
LEIN Request 19503.pdf PDF
Walkthrough Sign-in Sheet.pdf PDF
MICHSpec Rev032022 V12 - 47219503.SMD.pdf PDF
DTMB Advertisement.pdf PDF
Drawings 3 of 12.pdf PDF
Drawings 11 of 12.pdf PDF
MICHSpec Rev032022 V12.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X-8x8

SA DN

X-20x12

SA DN

X-14x10

SA DN

X-20x10

SA DN

X-10x10

SA DN

X-18x10

SA DN

X-14x10

SA DN

X-12x10

RA DN

X-16x10

RA DN

X-10x10 RA DN

X-12x8

SA DN

X-24x12

RA DN

X-10x10

EA DN

X-28x10

SA DN

X-10" EA DN

X-18x16

RA DN

X-12x8

SA DN

X-12x8

EA DN

X-20x16

RA DN

X-12x10

EA DN

X-20x10

RA DN

X-8x8

EA DN

X-20x12

SA DN

X-18x18

RA DN

X-18x12

EA DN

X-18x18

RA DN

X-EXHAUST

LOUVER

X-16x10 RA

X-18x18 RA X-20x18 RA

X-10x10 RA

X-14x22 RA X-36x22 RA

X-22x22 RA

X-32x16

RA

X-20x16 RA X-18x16 RA

X-14x16 RA

X-18x16 RA

X-36x32 RA

X-18x18 RA

X-18x18 RA

X-36x26 RA X-38x10 RA

(BELOW)

X-38x30 RA

X-20x24

OA

X-20x20

OA

X-30x24 OA

X-20x12 SA X-12x8 SA X-20x14

SA

X-16x6 SA

X-6x6

SA

X-14x8

SA

X-22x16 SA X-24x28

SA

X-30x16

SA

X-16x18

SA

X-18x18

SA

X-16x16 SA

X-22x14 SA

X-2x14 SA

X-8x6 SA

X-4x4 SA

X-8x6 SA

X-8x6 SA X-2x12 SA

X-20x12 SA

X-8x6 SA X-16x6 SA

X-8x6 SA

X-14x8 SA

X-16x6 SAX-14x10 SAX-16x6 SA

X-12x16

SA

X-18x12 SA

X-12x8 SA

X-12x8 SA

X-16x10 SA

X-10x6 SA X-16x6 SA

X-16x8 SA

X-24x30 SA

X-34x26

SA

X-18x32

SA

X-34x18

SA

X-8x10 SA

X-24x24 SAX-24x16 SA

X-24x16 SA

X-16x10

SA

X-20x8 SA

X-16x6 SA

X-10x10 EA X-16x10 EA

X-12x10

EA

X-12x8 EA

X-8x12 EA

X-20x10 EA X-20x12 EA X-22"ø EA

X-18x12 EA

X-HC

X-FILTER

X-SF-10

X-RF-10

X-12x12 SA

X-12x24 SA

X-14"ø SA X-14"ø SA

X-12"ø SA X-12"ø SA

X-20x20 SA

X-20x18

SA

X-20x16

SA

X-14x10 SA

X-12x16

SA

X-10x16 SA

X-8x6 SA

X-6x8SA

X-INTAKE LOUVER

X-8x8

SA DN

X-40x20 RA

X-8x6

EA DN

X-20x20 EA

X-MAU

X-16x16 SA

X-SF-13

X-12x20 SA

X-12x8

SA DN

X-12x8

SA DN

X-EF-10

X-EXHAUST

LOUVER

X-RELIEF

LOUVER

X-INTAKE

LOUVER

X-INTAKE

LOUVER X-INTAKE

LOUVER

X-80x76 RA

X-38x32 SA

X-SD 400

20x6 TYP. 4

X-8x8

SA DN

X-8x8

SA DN

X-8x8

SA DN

X-8x8

SA DN

X-8x6

SA DN

X-12x12

SA DN

X-EF-19

X-16x6

SA DN

X- SA DN

TO X-CUH

(280 CFM)

X-6x6

SA DN

X-12x10

SA DN

X-26x12

SA DN

X-16x6

SA DN

X-16x6

SA DN

X-8x6

SA DN

X-16x6

SA DN

X-16x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-HUMIDIFIER

X-HC

X-FILTER

X-CC

2 2

4 4

X-4x4 SA DN

DEMOLITION NOTES

DISCONNECT, REMOVE AND DEMO EXISTING

RELIEF AIR DUCTWORK AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. EXISTING

LOUVER TO REMAIN. BLANK OFF UNUSED

LOUVER SECTION WITH GALVANIZED STEEL

AND INSTALL 2" FIBERBOARD INSULATION

BEHIND BLANK OFF.

DISCONNECT, REMOVE, AND DEMO EXISTING

INTAKE LOUVER AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE AND DEMO EXISTING

SHED DORMER LOUVER OPENING PER

ARCHITECTURAL DRAWINGS. PATCH ROOF

PENETRATION NOT USED FOR NEW SUPPLY AIR

DUCT AND RETURN AIR DUCT ROUTING PER

ARCHITECTURAL DRAWINGS TO MAINTAIN ALL

WARRANTIES, MATCH EXISTING ROOFING, AND

SEAL WATER TIGHT.

DISCONNECT, REMOVE, AND DEMO EXISTING

INTAKE LOUVER, OUTSIDE AIR DUCTWORK,

HEATING COILS, FILTERS, AND ALL ASSOCIATED

ACCESSORIES. REUSE ROOF PENETRATION

FOR ROUTING OF NEW SUPPLY AND RETURN

AIR DUCTWORK INTO ATTIC.

DISCONNECT, REMOVE, AND DEMO EXISTING

COOLING COILS, FILTERS, HUMIDIFIER, SUPPLY

FAN, CONTROLS, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING

SUPPLY AIR DUCTWORK, RETURN AIR

DUCTWORK, AND ALL ASSOCIATED

ACCESSORIES TO THE EXTENTS SHOWN.

DISCONNECT, REMOVE, AND DEMO EXISTING

PNEUMATIC VAV BOXES, CONTROLS,

PNEUMATIC TUBING AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. MODIFY

ASSOCIATED DUCTWORK AS REQUIRED TO

CONNECT TO NEW VAV BOX.

EXISTING MAKE UP AIR UNIT TO REMAIN.

DISCONNECT, REMOVE, AND DEMO EXISTING

PNEUMATIC TUBING, CONTROLS, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

EXISTING SUPPLY FAN TO REMAIN.

DISCONNECT, REMOVE, AND DEMO PNEUMATIC

TUBING, CONTROLS, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING

RETURN FAN, CONTROLS, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

EXISTING EXHAUST FAN TO REMAIN.

DISCONNECT, REMOVE, AND DEMO PNEUMATIC

TUBING, CONTROLS, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY.

EXISTING LOUVER TO REMAIN.

GENERAL NOTES

1. DISCONNECT, REMOVE, AND DEMO ALL

PREVIOUSLY ABANDONED DUCTWORK, PIPING,

FITTINGS, AND ALL ASSOCIATED ACCESSORIES

IN THEIR ENTIRETY IN ATTIC SPACE.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29C UPPER ATTIC

PLAN - MECHANICAL

DEMOLITION

N BUILDING 29C UPPER ATTIC PLAN - MECHANICAL DEMOLITION (ADD ALTERNATE #1)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-306

DBP

CAT

X-HX SKID

(AHU COILS)

X-HX SKID

(FIN TUBE)

X-SC PUMP

X-HX

X-PUMP

X-XT

X-PUMP

X-HX

X-SC PUMP

X-AS

X-3-1/2" STM UP

X-2"

SC UP

X-1" HR UP

X-1" HR UP

X-1" HR UP

X-1" HR UP

X-1" HR UP

X-1" HR UP

X-1" HR UP

X-1" HR UP

X-1" HR UP

X-6" HR UP

X-2" HR

UP

X-1" HR UP

X-1" HR UP

P

X-2-1/2" HS

UP

X-2" HS UP

X-2" HS UP

X-3" HS UP

X-3" HS UP

X-2" HS UP

X-2" HS UP

X-2" HS UP

X-1" HS UP

X-1" HS UP

X-1" HS

X-1-1/4"

HS

X-1" HS UP

X-1" HS UP

X-1" HS

X-1" HS

X-1"

HS UP

X-1" HS UP

X-1" HS UP

X-1-1/2" HS

X-1-1/4" HS UP

X-1" HS UP

X-1-1/2" CW

X-1-1/2" CW

X-6" HR

X-1-1/2" HR

X-1-1/2" HR

X-3/4" STM UP

X-1-1/2"

STM UP

X-2-3/4"

STM UP

X-1"

SC UP

X-1"

SC UP

X-1-1/2"

STM

X-4" STM

X-6" STM

X-6" STM

X-6" STM

X-SC

X-SC

X-SC

X-3" STM

X-3" HR

X-2-1/2" HR X-3" HS

X-2-1/2" HS

X-2-1/2"

HR UP

X-3" HR UP

X-AS 6

X-3" HS UP X-2-1/2"

HS UP

X-PRV-1

X-PRV-2

X-4" STM

X-2-1/2" G

TO GAS SEVICE

X-2-1/2" G

X-2-1/2" G 4

DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING

HEAT EXCHANGER, AIR SEPARATOR, PIPING, AND

ALL ASSOCIATED ACCESSORIES IN THEIR

ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING

CIRCULATION PUMP, CONTROLS, PIPING,

CONCRETE PADS, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY.

EXISTING STEAM CONDENSATE PUMP TO REMAIN.

DISCONNECT, REMOVE, AND DEMO EXISTING HEAT

EXCHANGER SKID PACKAGE, CONTROLS, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO PIPING AND

ALL ASSOCIATED ACCESSORIES TO THE EXTENTS

SHOWN.

DISCONNECT, REMOVE, AND DEMO EXISTING

IN-FLOOR HEATING SUPPLY PIPING, HEATING

RETURN PIPING AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. CAP PIPING AT

CEILING PENETRATION.

DISCONNECT, REMOVE AND DEMO EXISTING

STEAM PIPING, CONDENSATE PIPING, AND ALL

ASSOCIATED ACCESSORIES TO THE EXTENTS

SHOWN.

DISCONNECT, REMOVE, AND DEMO EXISTING

EXPANSION TANK, PIPING AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING MAKE

UP COLD WATER PIPING AND ALL ASSOCIATED

ACCESSORIES TO THE EXTENTS SHOWN.

DISCONNECT, REMOVE, AND DEMO EXITING STEAM

PRESSURE REDUCING VALVE, RELIEF VALVE, AND

ALL ASSOCIATED ACCESSORIES TO THE EXTENTS

SHOWN.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29B BASEMENT

PLAN - PIPING DEMOLITION

N BUILDING 29B BASEMENT PLAN - PIPING DEMOLITION (BASE BID)

M-307

DBP

CAT

SCALE: 1/4" = 1'-0"

0 1 5 10

ZONE # F-2

AREA = 2,252 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,252 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,762 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,762 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,050 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,050 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,925 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,925 SQ. FT.

(ABANDONED)

ZONE # F-4

AREA = 1,125 SQ. FT.

(ABANDONED)

ZONE # F-3

AREA = 1,133 SQ. FT.

(ABANDONED)

ACTIVE ZONE

AREA = 800 SQ. FT.

ACTIVE ZONE

AREA = 800 SQ. FT.

1 1

2 2

ZONE # F-2

AREA = 2,252 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,252 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,762 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,762 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,050 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,050 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,925 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,925 SQ. FT.

(ABANDONED)

ZONE # F-4

AREA = 1,125 SQ. FT.

(ABANDONED)

ZONE # F-3

AREA = 1,133 SQ. FT.

(ABANDONED)

ACTIVE ZONE

AREA = 800 SQ. FT.

ACTIVE ZONE

AREA = 800 SQ. FT.

1 1

2 2

DEMOLITION NOTES

EXISTING ABANDONED RADIANT FLOOR HEAT,

PIPING, AND ALL ASSOCIATED ACCESSORIES TO

REMAIN. PIPING TO BE CAPPED IN BASEMENT AT

RISER LOCATIONS.

EXISTING RADIANT FLOOR HEAT, PIPING, AND ALL

ASSOCIATED ACCESSORIES TO REMAIN AND BE

REUSED. DISCONNECT, REMOVE, AND DEMO

EXISTING CONTROLS, PNEUMATIC TUBING, AND

ALL ASSOCIATED ACCESSORIES.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29A BELOW FIRST

FLOOR PLAN - RADIANT

FLOOR DEMOLITION

N BUILDING 29A BELOW FIRST FLOOR PLAN - RADIANT FLOOR DEMOLITION (BASE BID)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-308

ZONE # C-2

AREA = 478 SQ. FT

(ABANDONED)

ZONE # C-4

AREA = 106 SQ FT

(ABANDONED)

ZONE # C-2

AREA = 478 SQ. FT

(ABANDONED)

ZONE # C-3

AREA = 750 SQ. FT

(ABANDONED)

ZONE # C-4

AREA = 1005 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 455 SQ. FT

(ABANDONED)ZONE # C-1

AREA = 553 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 466 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 466 SQ. FT

(ABANDONED)

ZONE # C-2

AREA =561 SQ. FT

(ABANDONED) ZONE # C-2

AREA = 750 SQ. FT

(ABANDONED)

ACTIVE ZONE

AREA = 800 SQ. FT ACTIVE ZONE

AREA = 800 SQ. FT

M-309

1 1

2 2

X-2"ø

X-1-1/2"ø

X-1-1/4"ø

X-4"ø

X-2"ø X-1-1/4"ø

X-3"ø

X-1-1/4"ø

X-1-1/2"ø

X-2"ø

X-1-1/2"ø

X-2"ø

X-2"ø X-2-1/2"ø

X-1"ø

DEMOLITION NOTES

EXISTING ABANDONED RADIANT CEILING PANELS

AND ALL ASSOCIATED ACCESSORIES TO REMAIN.

PIPING TO BE CAPPED IN BASEMENT AT RISER

LOCATIONS. DISCONNECT, REMOVE, AND DEMO

EXISTING RADIANT CEILING PANEL PIPING,

IN-FLOOR HEAT PIPING, AND ALL ASSOCIATED

ACCESSORIES TO THE EXTENTS SHOWN IN

ATTIC.

EXISTING RADIANT CEILING PANELS, PIPING, AND

ALL ASSOCIATED ACCESSORIES TO REMAIN AND

BE REUSED. DISCONNECT, REMOVE, AND DEMO

EXISTING CONTROLS, PNEUMATIC TUBING, AND

ALL ASSOCIATED ACCESSORIES.

DISCONNECT, REMOVE, AND DEMO EXISTING

PNEUMATIC CONTROL VALVE, PNEUMATIC

TUBING, CONTROLS, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. MODIFY

EXISTING PIPING AS NEEDED FOR NEW CONTROL

VALVE CONNECTION.

DISCONNECT, REMOVE, AND DEMO EXISTING

3-WAY PNEUMATIC CONTROL VALVE, PNEUMATIC

TUBING, CONTROLS, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. MODIFY

EXISTING PIPING AS NEEDED FOR NEW CONTROL

VALVE CONNECTION.

EXISTING PUMP TO REMAIN. DISCONNECT,

REMOVE, AND DEMO EXISTING CONTROLS AND

ALL ASSOCIATED ACCESSORIES IN THEIR

ENTIRETY.

EXISTING HEAT EXCHANGER TO REMAIN.

EXISTING EXPANSION TANK TO REMAIN.

X-HX

X-ET

P P P P

P

PP

X-HR

X-HS

X-STM

X-CW

X-PRESSURE

GUAGE (TYP.)

X-SHUTOFF

VALVE (TYP.)

X-PUMP

(TYP. 2)

X-CONTROL

VALVE

X-3-WAY CONTROL VALVE

(TYP. 2)

X-BACK FLOW

PREVENTER

X-STRAINER

X-PRESSURE

REDUCING VALVE

X-PRESSURE

RELIEF VALVE

FTX-STEAM

TRAP

X-SC TO SC PUMP

FROM GYM / WORKOUT 1

FROM GYM / WORKOUT 2

TO GYM / WORKOUT 1

TO GYM / WORKOUT 2

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29A FIRST FLOOR

PLAN - RADIANT CEILING

DEMOLITION

N BUILDING 29A FIRST FLOOR PLAN - RADIANT CEILING DEMOLITION (BASE BID)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-309

DBP

CAT

1 MECHANICAL ROOM - PIPING DEMOLITION

SCALE: NTS

ZONE # C-4

AREA = 710 SQ. FT

(ABANDONED)

ZONE # C-3

AREA = 172 SQ. FT

(ABANDONED)

ZONE # C-4

AREA = 598 SQ. FT

(ABANDONED)

ZONE # C-3

AREA = 342 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 293 SQ. FT

(ABANDONED)

ZONE # C-2

AREA = 355 SQ. FT

(ABANDONED)

ZONE # C-2

AREA = 200 SQ. FT

(ABANDONED)

X-2"ø

X-4"ø

X-3/4"ø

X-1-1/4"ø

X-2"ø

X-2"ø

X-2-1/2"ø

X-1-1/2"øX-2"ø

X-1-1/2"ø

X-1-1/2"ø

X-1"ø

X-2"øX-1-1/2"ø

X-1-1/4"ø

X-1-1/2"ø

X-1"ø X-2"ø

X-1"ø

X-1"ø

X-1-1/4"ø

X-1-1/2"ø

X-2"ø

X-1-1/4"ø

X-2-1/2"ø

X-3/4"ø

X-2"ø

X-1-1/2"ø

1 1

1 1 1 1

DEMOLITION NOTES

EXISTING ABANDONED RADIANT CEILING PANELS

AND ALL ASSOCIATED ACCESSORIES TO REMAIN.

PIPING TO BE CAPPED IN BASEMENT AT RISER

LOCATIONS. DISCONNECT, REMOVE, AND DEMO

EXISTING RADIANT CEILING PANEL PIPING,

IN-FLOOR HEAT PIPING, AND ALL ASSOCIATED

ACCESSORIES TO THE EXTENTS SHOWN IN

ATTIC.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

N BUILDING 29B FIRST FLOOR PLAN - RADIANT CEILING DEMOLITION (ADD ALTERNATE #1)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-310

DBP

CAT

BUILDING 29B FIRST FLOOR

PLAN - RADIANT CEILING

DEMOLITION

ZONE # C-2

AREA = 1940 SQ. FT

(ABANDONED)

ZONE # C-2

AREA = 110 SQ. FT

(ABANDONED)

ZONE # C-2

AREA = 630 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 347 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 135 SQ. FT

(ABANDONED)

ZONE # C-4

AREA = 316 SQ. FT

(ABANDONED) ZONE # C-3

AREA = 540 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 132 SQ. FT

(ABANDONED)

X-3"ø

X-2"øX-1-1/2"ø

X-2"ø

X-4"ø

X-1-1/2"ø

X-1-1/2"ø X-1-1/4"ø

DEMOLITION NOTES

EXISTING ABANDONED RADIANT CEILING PANELS

AND ALL ASSOCIATED ACCESSORIES TO REMAIN.

PIPING TO BE CAPPED IN BASEMENT AT RISER

LOCATIONS. DISCONNECT, REMOVE, AND DEMO

EXISTING RADIANT CEILING PANEL PIPING,

IN-FLOOR HEAT PIPING, AND ALL ASSOCIATED

ACCESSORIES TO THE EXTENTS SHOWN IN

ATTIC.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

N BUILDING 29C FIRST FLOOR PLAN - RADIANT CEILING DEMOLITION (ADD ALTERNATE #1)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-311

DBP

CAT

BUILDING 29C FIRST FLOOR

PLAN - RADIANT CEILING

DEMOLITION

333333333333

3 3 3 3 3 3 3 3

3 3 3 3 3 3 3

3333333

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

333333

X-1-1/4"ø

HWR

X-1-1/4"ø

HWR

X-1-1/4"ø HWR X-1-1/4"ø

HWR

X-1-1/4"ø

HWR

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1-1/4"ø

HWR

X-1-1/4"ø

HWR

X-1-1/4"ø

HWR

X-2" HWR

& HWR

X-2-1/2"ø HWR

X-2" HWS

& HWR

X-2-1/2"ø HWR

& HWS

X-STM HC

X-CC

X-STM HC

X-CC

X-STM HC

X-CC

X-STM HC

X-CC

X-COND

X-COND

X-CONCRETE PAD

X-CONCRETE PAD

X-COND

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

1T T T T

T T T

T

T

TTTT

TTTT

T

T T T

T T

T T T

T T T T

TTT

T

4 4 4 4 4

4444444

44444

4 4 4 4 4 4 4 4 4

4 4 4

4 4 4 4 4 4

4 4 4 4 4 4

44444

44444

5 5 5 5 5 5 5 5

5 5 5

5 5 5

X-DX1

X-DX1

X-DX 1

X-DX1

X-DX 1

X-DX

X-DX

X-DX

X-DX

DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMO EXISTING

CONDENSING UNIT, COOLING COIL, CONCRETE

PAD, REFRIGERANT PIPING, CONTROLS,

PNEUMATIC TUBING AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING

STEAM HEATING COILS, STEAM PIPING, STEAM

CONDENSATE PIPING, CONTROLS, PNEUMATIC

TUBING, AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY.

EXISTING FIN TUBE TO REMAIN. EXISTING FIN

TUBE THROUGHOUT THE BUILDING TO REMAIN

UNLESS OTHERWISE NOTED.

DISCONNECT REMOVE, AND DEMO EXISTING

PNEUMATIC CONTROL VALVE, PNEUMATIC

TUBING, CONTROLS, AND ALL ASSOCIATED

ACCESSORIES. MODIFY HEATING PIPING AS

REQUIRED TO INSTALL NEW SHUTOFF VALVES,

CONTROL VALVES, AND BALANCE VALVE.

REMOVE EXISTING SHUTOFF VALVES AND

BALANCE VALVE.

DISCONNECT, REMOVE, AND DEMO EXISTING

WALL MOUNTED THERMOSTATS, CONTROLS,

PNEUMATIC TUBING AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. PATCH,

PRIME, AND PAINT LOCATIONS WHERE

THERMOSTATS WERE REMOVED TO MATCH

EXISTING.

GENERAL NOTES

1. THERMOSTATS ARE LOCATED IN THE

OCCUPIED SPACE. THERMOSTATS SHOWN

ON THIS PLAN FOR CLARITY.

2. DISCONNECT, REMOVE, AND DEMO ALL

PREVIOUSLY ABANDONED PIPING, FITTINGS,

AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY IN ATTIC SPACE.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29A LOWER ATTIC

PLAN - PIPING DEMOLITION

N BUILDING 29A LOWER ATTIC PLAN - PIPING DEMOLITION (BASE BID)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-312

TT

T

T

T

T

T

T

T T

T T

T

T

T

T

T

T

T X-3/4"ø

HWS DN

X-2-1/2" HS

& 3" HR

X-3/4"

HS DN

X-3" HR DN

TO X-CONV

X-2-1/2" HS

DN TO X-CONV

X-3/4" HS & HR

X-2" HS &

1" HR

X-1" HS DN

X-3/4" HS & HR

(TYP.)

X-3" HS &

1" HR

X-3/4" HR DN

X-2" HS &

1" HR

X-3" HS

X-3/4" HS

& HR

X-3/4" HS &

HR (TYP.)

X-3/4" HS

& HR UP

X-2" HS

X-1" HS DN

X-1" HS DN

X-1" HR DN

X-3/4" HS &

HR (TYP.)

X-1" HS & HR

X-1" HS & HR

X-1" HS & HR

X-1-1/4" HS

& 2" HR

X-3/4" HS DN

X-FIN TUBE

X-3/4" HS DN X-3/4" HR DN

X-2" HS &

2-1/2" HR

X-3/4" HS

& HR

X-3/4" HS &

HR (TYP.)

X-3/4" HS

& HR UP

X-1-1/2" HS

& 2-1/2" HR

X-1-1/2" HS

& 2-1/2" HR

X-3/4" HS

& HR UP

X-1" HS DN

X-FIN TUBE

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HR DN

X-1" HS

& HR

X-3/4" HS &

HR (TYP.)

X-1" HS

& HR

X-1-1/4" HS

& 2-1/2" HR

X-1-1/4" HS

& 2-1/2" HR

X-3/4" HS

& HR UP

X-1" HS & 3" HR

X-1" HS &

2-1/2" HR

X-3/4"

HS DN

X-3/4"

HR DN

X-3/4"

HS DNX-3/4"

HS DN

X-3/4" HS

& HR UP

X-3/4" HS

& HR UP

X-3" HS DN TO

X-CONV

T

X-2-1/2"

& 3" HR

X-FIN

TUBE

X-2-1/2"

HRX-2-1/2"

HR

X-2-1/2" HR DN

TO X-CONV

X-3/4"

HS & HR

6 6

6 6 6

X-2-1/2"ø HWR

& HWS

7 7

X-CONCRETE PAD

X-COND

X-COND

X-CUH

X-CUH

X-CUH

X-CUH

X-CUH

(ABANDONED)

X-AC

X-AC

X-AC

X-AC

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-CU

X-DX2

X-DX2

X-2-1/2" G

TO BASEMENT

X-2-1/2"

G UP

DEMOLITION NOTES

DISCONNECT, REMOVE, DEMO EXISTING

PNEUMATIC VAV BOXES, CONTROLS, PNEUMATIC

TUBING AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY. MODIFY ASSOCIATED PIPING AS

REQUIRED TO CONNECT TO NEW VAV BOX.

DISCONNECT, REMOVE, AND DEMO EXISTING

CONDENSER, CONTROLS, PNEUMATIC TUBING,

CONCRETE PAD, REFRIGERANT PIPING, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING

ABANDONED CABINET UNIT HEATER, PNEUMATIC

TUBING, CONTROLS, PIPING AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING

HEATING WATER SUPPLY PIPING, HEATING

WATER RETURN PIPING, AND ALL ASSOCIATED

ACCESSORIES TO THE EXTENTS SHOWN.

EXISTING CABINET UNIT HEATER TO REMAIN.

DISCONNECT, REMOVE, AND DEMO EXISTING

CONTROLS, CONTROL VALVE, PNEUMATIC

TUBING, AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY.

EXISTING FIN TUBE TO REMAIN. EXISTING FIN

TUBE THROUGHOUT THE BUILDING TO REMAIN

UNLESS OTHERWISE NOTED.

DISCONNECT, REMOVE, AND DEMO EXISTING

PNEUMATIC THERMOSTAT, PNEUMATIC TUBING,

AND ALL ASSOCIATED PNEUMATIC TUBING IN

THEIR ENTIRETY.

EXISTING CONDENSING UNITS TO REMAIN.

EXISTING AIR CONDITIONING UNITS TO REMAIN.

DISCONNECT AND MODIFY EXISTING HEATING

PIPING AS REQUIRED TO INSTALL NEW SHUTOFF

VALVES, CONTROL VALVES, AND BALANCE

VALVE. REMOVE EXISTING VALVES WHERE

APPLICABLE.

GENERAL NOTES

1. THERMOSTATS ARE LOCATED IN THE

OCCUPIED SPACE. THERMOSTATS SHOWN

ON THIS PLAN FOR CLARITY.

2. DISCONNECT, REMOVE, AND DEMO ALL

PREVIOUSLY ABANDONED PIPING, FITTINGS,

AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY IN ATTIC SPACE.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29B LOWER ATTIC

PLAN - PIPING DEMOLITION

N BUILDING 29B LOWER ATTIC PLAN - PIPING DEMOLITION (ADD ALTERNATE #1)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-313

Sheets and Views
M-000-2008000-T-000
M100-2008000-M-100
M300-2008000-M-300
M301-2008000-M-301
M302-2008000-M-302
M303-2008000-M-303
M304-2008000-M-304
M305-2008000-M-305
M306-2008000-M-306
M307-2008000-M-307
M308-2008000-M-308
M309-2008000-M-309
M310-2008000-M-310
M311-2008000-M-311
M312-2008000-M-312
M313-2008000-M-313
M314-2008000-M-314
M315-2008000-M-315
M316-2008000-M-316
M317-2008000-M-317
M318-2008000-M-318
M319-2008000-M-319
M320-2008000-M-319
M400-2008000-M-400
M401-2008000-M-401
M402-2008000-M-402
M403-2008000-M-403
M404-2008000-M-404
M405-2008000-M-405
M406-2008000-M-406
M600-2008000-M-600
M601-2008000-M601
M602-2008000-M602
M603-2008000-M603
M604-2008000-M604
M605-2008000-M605
M606-2008000-M606
M607-2008000-M607
M608-2008000-M608
M609-2008000-M-609
M610-2008000-M-610
M611-2008000-M-611
M800-2008000-M-800
M801-2008000-M-801
M802-2008000-M-802
M900-2008000-M-900

File details come from the government source that posted it. Updated .