Drawings 12 of 12.pdf
PDF 1 MB Posted
- Solicitation number
- RFQ 171 230000000791 2
- Issued by
- Barry County, Michigan
About this file
This is an electrical riser diagram drawing prepared by the State of Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division for a facility maintenance project (Contract Order No. 472/LCFMAINTPROJ, Consultant Job No. 20080.00). The document presents two electrical riser diagrams—one showing existing equipment designated for demolition and a second showing the proposed new electrical configuration. The project involves modifications to the main distribution panel (MDP) rated at 2500A serving 120/208V three-phase, four-wire service, with work including the removal of a 50A breaker and installation of a 60A three-phase breaker to feed new equipment. The scope includes installation of new switchgear and breakers tied into the existing MDP, with the contractor required to match existing switchgear manufacturers and provide space for four spare 400A breakers. The project also requires installation of a new 1200A breaker in existing switchgear with arc flash reduction capability and coordination with the switchgear manufacturer.
The electrical modifications involve multiple distribution panels located in basements and attics, with connections to new rooftop units (RTU-1 through RTU-5) and existing HVAC systems, emergency power panels, UPS panels, and information system panels. New feeder circuits are specified with wire sizes ranging from 6 to 500KCMIL copper conductors with appropriate ground wires and conduit sizes. The project requires proper grounding integration with existing systems including water pipes, building steel, and footing steel grounds. The drawings were issued for construction on 9/14/2023 and reference comprehensive mechanical, electrical, and architectural sheet sets for the full project scope. The document was prepared by consultant JFS under the supervision of Director Adam P. Lach, RA, with drawing prepared by JKB.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND BUS
EXISTING "MDP"
120/208V-3Ø, 4W 2500A
A/
3P
PANEL
EXISTING
BASEMENT 3
120/208V 3Ø, 4W
0A
/3P
SPARE
0A
/3P
PANEL
EXISTING
BASEMENT 2
120/208V 3Ø, 4W
0A
/3P
EXISTING
TO AC-2
0A
/3P
EXISTING
TO AC-3
0A
/3P
EXISTING
TO AC-1
0A
/3P
PANEL
EXISTING
A2 120/208V 3Ø, 4W
PANEL
EXISTING
A3 120/208V 3Ø, 4W
SECTION 1
2500A/3P
EXISTING
CUSTOMER
2400V : 120/208V, 3PH 4W
5A
/3P
TO EXISTING
EMERGENCY
POWER
PANEL
EXISTING
EMERGENCY
120/208V 3Ø, 4W
PANEL
EXISTING
EM2
120/208V 3Ø, 4W
5A
/3P
5A
/3P
PANEL
EXISTING
A6 120/208V 3Ø, 4W
PANEL
EXISTING
A7 120/208V 3Ø, 4W
5A
/3P
EXISTING
TO INFO
PANEL
A/
3P
A/
3P
0A
/3P
0A
/3P
0A
/3P
5A
/3P
5A
/3P
SECTION 2
5A
/3P
0A
/3P
5A
/3P
A/
3P
EXISTING
TO EAST AC
EXISTING
TO EAST AC
PANEL
EXISTING
ATTIC HVAC
120/208V 3Ø, 4W
PANEL
EXISTING
ATTIC A
120/208V
3Ø, 4W EXISTING
TO UPS
PANEL
EXISTING
A5 120/208V 3Ø, 4W
PANEL
EXISTING
ATTIC A5
120/208V 3Ø, 4W
EXISTING
TO INFO
PANEL
PANEL
EXISTING
BASEMENT 1
120/208V 3Ø, 4W
PANEL
EXISTING
A6 120/208V 3Ø, 4W
PANEL
EXISTING
FOOD TENT
120/208V
3Ø, 4W EXISTING
TO AC-A2
EXISTING EXISTING
EXISTING ELECTRICAL RISER DIAGRAM - DEMOLITION
SCALE: N.T.S.
1 3 5 7 9 11 13 15 17 19 21 2 4 6 8 10 12 14 16 18 20 22
GROUND BUS
EXISTING "MDP"
120/208V-3Ø, 4W 2500A
A/
3P
PANEL
EXISTING
BASEMENT 3
120/208V 3Ø, 4W
0A
/3P
SPARE
0A
/3P
PANEL
EXISTING
BASEMENT 2
120/208V 3Ø, 4W
0A
/3P
TO NEW
RTU-3
0A
/3P
TO NEW
RTU-1
0A
/3P
0A
/3P
PANEL
EXISTING
A2 120/208V 3Ø, 4W
PANEL
EXISTING
A3 120/208V 3Ø, 4W
SECTION 1
2500A/3P
EXISTING
CUSTOMER
2400V : 120/208V, 3PH 4W
5A
/3P
TO EXISTING
EMERGENCY
POWER
PANEL
EXISTING
EMERGENCY
120/208V 3Ø, 4W
PANEL
EXISTING
EM2
120/208V 3Ø, 4W
5A
/3P
5A
/3P
PANEL
EXISTING
A6 120/208V 3Ø, 4W
PANEL
EXISTING
A7 120/208V 3Ø, 4W
5A
/3P
EXISTING
TO INFO
PANEL
A/
3P
A/
3P
0A
/3P
0A
/3P
0A
/3P
5A
/3P
5A
/3P
SECTION 2
5A
/3P
0A
/3P
5A
/3P
A/
3P
PANEL
EXISTING
ATTIC HVAC
120/208V 3Ø, 4W
PANEL
EXISTING
ATTIC A
120/208V
3Ø, 4W EXISTING
TO UPS
PANEL
EXISTING
A5 120/208V 3Ø, 4W
PANEL
EXISTING
ATTIC A5
120/208V 3Ø, 4W
EXISTING
TO INFO
PANEL
PANEL
EXISTING
BASEMENT 1
120/208V 3Ø, 4W
PANEL
EXISTING
A6 120/208V 3Ø, 4W
PANEL
EXISTING
FOOD TENT
120/208V
3Ø, 4W EXISTING
TO AC-A2
EXISTING EXISTING
EXISTING ELECTRICAL RISER DIAGRAM - NEW
SCALE: N.T.S.
1 3 5 7 9 11 13 15 17 19 21 2 4 6 8 10 12 14 16 18 20 22
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT EQUIPMENT FOR REMOVAL BY OTHERS. CONDUIT AND WIRE
TO REMAIN, MODIFY AS REQUIRED TO FEED NEW EQUIPMENT.
DISCONNECT EQUIPMENT FOR REMOVAL BY OTHERS. REMOVE ASSOCIATED
CONDUIT AND WIRE.
DEMOLITION NOTES
1 1
1 1 1 1
1 1 1
1 1
12 3 3 3 3
SPARE SPARE
ELECTRICAL KEY NOTES
REMOVE EXISTING 50A BREAKER AND PROVIDE AND INSTALL A 60A-3P
BREAKER TO FEED NEW EQUIPMENT.
CONTRACTOR SHALL PROVIDE AND INSTALL A NEW SECTION OF
SWITCHGEAR AND BREAKERS, TIE INTO EXISTING MDP. MATCH EXISTING
SWITCHGEAR MANUFACTURE. PROVIDE ENOUGH SPACE IN SWITCHGEAR TO
HOUSE (4) SPARE 400A BREAKERS.
TIE GROUND INTO EXISTING GROUNDING, WATER PIPE, BUILDING STEEL
AND FOOTING STEEL GROUNDS.
PROVIDE AND INSTALL NEW 1200A BREAKER IN EXISTING SWITCHGEAR.
COORDINATE INSTALLATION WITH SWITCHGEAR MANUFACTURE. BREAKER
MUST HAVE ARC FLASH REDUCTION.
TO NEW
RTU-2
0A
/3P
GROUND BUS
SECTION 3 "MDP-S3"
NEW
TO NEW
RTU-4
0A
/3P
TO NEW
RTU-5
SPACE
(4) 400KCMIL
(1) #3 GND
3" CND
(4) 500KCMIL
(1) #3 GND
3" CND
(4) 3/0
(1) #6 GND
2" CND
(4) 3/0
(1) #6 GND
2" CND
(4) 6
(1) #10 GND
1" CND
EXISTING
750KVA
EXISTING
750KVA
EX
EX
A/ 3P
4 SETS OF
(4) 350KCMIL
(1) 3/0 GND
3" CND
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
9/14/2023 FOR CONSTRUCTION
E-600
JKB
JFS
ELECTRICAL
RISER
DIAGRAM
| Sheets and Views |
| M-000-2008000-T-000 |
| M100-2008000-M-100 |
| M300-2008000-M-300 |
| M301-2008000-M-301 |
| M302-2008000-M-302 |
| M303-2008000-M-303 |
| M304-2008000-M-304 |
| M305-2008000-M-305 |
| M306-2008000-M-306 |
| M307-2008000-M-307 |
| M308-2008000-M-308 |
| M309-2008000-M-309 |
| M310-2008000-M-310 |
| M311-2008000-M-311 |
| M312-2008000-M-312 |
| M313-2008000-M-313 |
| M314-2008000-M-314 |
| M315-2008000-M-315 |
| M316-2008000-M-316 |
| M317-2008000-M-317 |
| M318-2008000-M-318 |
| M319-2008000-M-319 |
| M320-2008000-M-319 |
| M400-2008000-M-400 |
| M401-2008000-M-401 |
| M402-2008000-M-402 |
| M403-2008000-M-403 |
| M404-2008000-M-404 |
| M405-2008000-M-405 |
| M406-2008000-M-406 |
| M600-2008000-M-600 |
| M601-2008000-M601 |
| M602-2008000-M602 |
| M603-2008000-M603 |
| M604-2008000-M604 |
| M605-2008000-M605 |
| M606-2008000-M606 |
| M607-2008000-M607 |
| M608-2008000-M608 |
| M609-2008000-M-609 |
| M610-2008000-M-610 |
| M611-2008000-M-611 |
| M800-2008000-M-800 |
| M801-2008000-M-801 |
| M802-2008000-M-802 |
| M900-2008000-M-900 |
| Elec.pdf |
| Sheets and Views |
| E100-2008000-30x42 |
| E300-200800-30x42 |
| E301-2008000-30x42 |
| E302-2008000-30x42 |
| E303-2008000-30x42 |
| E304-2008000-30x42 |
| E305-2008000-30x42 |
| E500-2008000-30x42 |
| E501-2008000-30x42 |
| E502-2008000-30x42 |
| E503-2008000-30x42 |
| E600-2008000-30x42 |
File details come from the government source that posted it. Updated .