Drawings 4 of 12.pdf
PDF 6 MB Posted
- Solicitation number
- RFQ 171 230000000791 2
- Issued by
- Barry County, Michigan
About this file
This is a mechanical design drawing and specifications document prepared by the State of Michigan's Department of Technology, Management and Budget for a HVAC renovation project. The project encompasses three sections: Section A (Healthcare Wing), Section B (Deputy's Wing), and Section C (Warden's Wing), with work to be performed on heating and cooling system equipment, ductwork, piping, controls, and related accessories. The base bid includes all demolition and new work for the Healthcare Wing and a basement mechanical room in the Deputy's Wing, covering systems RTU-1 through RTU-3, exhaust fans, heat pumps, heating coils, supply diffusers, return grilles, and control valves with integration into a new direct digital control (DDC) system. Add Alternate #1 encompasses identical demolition and new work for the Deputy's Wing and Warden's Wing, including additional RTU units, heating coils, and VAV boxes. Add Alternate #2 includes extending the underground steam tunnel to provide new connections in four additional building mechanical rooms. The project phasing schedule requires heating system equipment replacement from June 1st through September 15th with full functionality by September 15th, while cooling system equipment replacement extends from September 15th through June 1st with full functionality by June 1st.
The specifications establish comprehensive technical requirements including installation per manufacturer instructions, field verification of existing conditions, rebalancing of existing systems, use of licensed contractors compliant with Michigan Mechanical Code, coordination among all trades to avoid conflicts, low-pressure duct fittings per SMACNA standards, and tamperproof fasteners in inmate-accessible areas. Contractors must maintain building heating throughout the project, conduct pre-construction tab readings of all HVAC equipment and balance systems accordingly, attend post-construction meetings at six and eleven months post-completion, track and document material recycling, provide a minimum escort throughout the project, and patch and paint walls as needed. The contract requires removal of existing pneumatic tubing and controls in Section A as part of the base bid, with removal of remaining pneumatic systems in Sections B and C as part of Add Alternate #1, and replacement with new DDC wiring. All hot work requires one-day advance notice to the facility to allow fire alarm disablement, and contractors must maintain the integrity of all equipment and materials in new condition during construction.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L
L R
A
N C
A R
B
D
IR
E C
T O
R
F A
C
IL
IT
IE
S A
N D
B U
S
IN
E S
S S
E R
V
IC
E S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
MM MM
aa aa tt tt rr rr ii ii xx xx
GENERAL HVAC NOTES
1. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
2. ALL EXISTING SYSTEMS (INCLUDING EXHAUST FANS; AIR HANDLING
UNITS; PUMPS) THAT SERVE AREAS BEING RENOVATED SHALL BE
REBALANCED AS REQUIRED.
3. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION THAT
MAY AFFECT NORMAL OPERATION OF OTHER AREAS.
4. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY CONFLICT
WITH NEW CONSTRUCTION AND RELOCATE AS NEEDED.
5. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.
6. PROVIDE BALANCE DAMPERS FOR EACH DIFFUSER/GRILLE AND
BRANCH DUCT.
7. FIRE DAMPERS SHALL MATCH RATING OF WALL. UNLESS NOTED
OTHERWISE.
8. ALL REHEAT COIL HS&R RUNOUT PIPES SHALL BE 3/4" UNLESS
OTHERWISE NOTED.
9. PROVIDE ACCESS PANELS ON EACH SIDE OF REHEAT COILS.
10. PROVIDE 5 FT MIN BEFORE ANY DUCT TAKEOFF FOR DUCTWORK
DOWNSTREAM OF VAV BOXES.
11. PROVIDE 1 1/2 DUCT DIAMETERS MIN. DUCT LENGTH OF HIGH
PRESSURE BRANCH DUCTWORK ON THE UPSTREAM SIDE OF VAV
BOXES.
12. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
13. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
14. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT MAY
AFFECT THE WORK.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE
INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"
CONDITION DURING CONSTRUCTION.
16. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS AND
SUBCONTRACTORS AS REQUIRED BY LAW.
17. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
18. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT FITTINGS IN
ACCORDANCE WITH SMACNA. (WYES, RADIUSED OR VANED TEES,
ETC.) DUCTWORK SHALL BE GALVANIZED SHEET METAL, MIN. 26 GA.
19. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSION.
INCREASE DUCT SIZE FOR LINING.
20. LINE 10'-0" OF SUPPLY DUCTWORK AFTER EACH VAV BOX.
21. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE FLEXIBLE
DUCT CONNECTORS.
22. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST ITEM
SHALL BE USED.
23. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION
OF PIPES AND DUCTS AND SUGGESTED ROUTES. IT IS NOT
INTENTION OF DRAWINGS TO INDICATE ALL NECESSARY OFFSETS.
INSTALL WORK IN MANNER TO CONFORM TO STRUCTURE, AVOID
OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM DRAWINGS.
24. CONTRACTOR TO REMOVE AND REINSTALL CEILING GRID AS
REQUIRED TO COMPLETE WORK.
25. DISCONNECT AND REMOVE ALL PNEUMATIC TUBING AND PNEUMATIC
CONTROLS IN SECTION A (HEALTHCARE WING) AS PART OF BASE BID.
DISCONNECT AND REMOVE THE REMAINDER OF PNEUMATIC TUBING
AND PNEUMATIC CONTROLS IN SECTION B (DEPUTY'S WING) AND
SECTION C (WARDEN'S WING) AS PART OF ADD ALTERNATE #1.
26. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST
CONSTRUCTION MEETING WITH THE ENGINEER AND OWNER TO
REVIEW ISSUES DURING THE WARRANTY PERIOD.
27. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO OWNER OF
THE AMOUNT OF MATERIAL BEING RECYCLED THROUGHOUT THE
PROJECT.
28. CONTRACTOR WILL HAVE MINIMUM OF 1 ESCORT TO WORK WITH
THROUGHOUT THE PROJECT.
29. CONTRACTOR TO PATCH AND PAINT EXISTING WALLS AS NEEDED TO
MATCH EXISTING WHERE DEMOLITION AND/OR NEW WORK IS
COMPLETED.
30. CONTRACTOR TO PROVIDE A ROOM BY ROOM PRE CONSTRUCTION
TAB READING OF ALL DIFFUSERS AND GRILLES FOR SYSTEMS WITH
VAV BOXES. ALL OTHER SYSTEMS TO HAVE PRE CONSTRUCTION TAB
READING OF THE AIR HANDLING UNITS. PRE CONSTRUCTION TAB
READINGS OF ALL HEAT EXCHANGER SKID PACKAGE HEATING PUMPS
SHALL BE COMPLETED. PRE CONSTRUCTION TAB READINGS FOR
EXISTING FIN TUBE SHALL BE COMPLETED. CONTRACTOR TO VERIFY
AND BALANCE ALL THE DIFFUSERS, GRILLES, AHUS, FIN TUBE AND
PUMPS TO THE PRE CONSTRUCTION FLOWS UNLESS DIRECTED
OTHERWISE BY ENGINEER BASED ON THE PRE-TAB REPORT.
31. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING HEAT IN BUILDINGS
THROUGHOUT THE PROJECT.
32. ALL EXISTING PNEUMATIC TUBING TO BE REPLACED BY NEW DDC
WIRING IN SECTION A (HEALTHCARE WING) AS PART OF BASE BID.
ALL EXISTING PNEUMATIC TUBING TO BE REPLACED BY NEW DDC
WIRING IN SECTION B (DEPUTY'S WING) AND SECTION C (WARDEN'S
WING) AS PART OF ADD ALTERNATE #1
33. FIELD VERIFY EXISTING SIZE OF ALL DAMPERS/VALVES AND
EQUIPMENT PRIOR TO ORDERING.
34. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN ADVANCE
FOR ANY HOT WORK TO ALLOW THE OWNER TO DISABLE THE FIRE
ALARM.
35. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL USE
TAMPERPROOF SCREWS.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLSHVAC PIPING
HVAC DUCTWORK
F/S
F/S s s
TEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AP ACCESS PANEL
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
TURNING VANES
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
90° TEE W/45° APPROACH
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
EXISTING VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
EXISTING HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
ACCESS PANEL
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWS
S
L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
P
H
S
T
T P
T N
M
M
SD
PROJECT BREAKDOWN SUMMARY
BASE BID PROJECT SCOPE:
ALL DEMOLITION AND NEW WORK SHOWN FOR THE HEALTHCARE WING (SECTION A)
ON DRAWINGS AND MECHANICAL ROOM IN THE BASEMENT OF DEPUTY'S WING
(SECTION B). THIS INCLUDES ALL NEW WORK FOR SYSTEMS PERTAINING TO RTU-1,
RTU-2, RTU-3, EF-1, HTP-1, HTP-2, HC-1, HC-2, HC-3, SUPPLY DIFFUSERS, RETURN
GRILLES, CONTROL VALVES AND ALL ASSOCIATED ACCESSORIES. THESE NEW
SYSTEMS ARE ALSO TO BE ADDED TO A NEW DDC CONTROL SYSTEM.
ADD ALTERNATE #1:
ALL DEMOLITION AND NEW WORK SHOWN FOR THE DEPUTY WING (SECTION B) AND
WARDEN WING (SECTION C) ON DRAWINGS. THIS INCLUDES ALL WORK FOR SYSTEMS
PERTAINING TO RTU-4, RTU-5, HC-4, HC-5, NEW DDC VAV BOXES, AND ALL
ASSOCIATED ACCESSORIES. THESE NEW SYSTEMS ARE ALSO TO BE ADDED TO A
NEW DDC CONTROL SYSTEM.
ADD ALTERNATE #2:
ALL NEW WORK SHOWN FOR EXTENDING THE UNDERGROUND STEAM TUNNEL ON
DRAWINGS. THIS WORK INCLUDES EXTENDING THE STEAM TUNNEL TO HAVE NEW
CONNECTIONS IN THE MECHANICAL ROOMS OF BUILDINGS 51 HOUSING, 52 HOUSING,
53 SCHOOL, AND 54 FOOD SERVICES.
PROJECT PHASING SCHEDULE
BASE BID
1. HEATING SYSTEM EQUIPMENT TO BE REPLACED FROM JUNE 1ST THROUGH
SEPTEMBER 15TH. ALL NEWLY INSTALLED AND REMAINING EXISTING HEATING
EQUIPMENT TO BE FULLY FUNCTIONAL BY SEPTEMBER 15TH.
2. COOLING SYSTEM EQUIPMENT TO BE REPLACED FROM SEPTEMBER 15TH
THOUGHT JUNE 1ST. ALL NEWLY INSTALLED AND REMAINING EXISTING
COOLING EQUIPMENT TO BE FULLY FUNCTIONAL BY JUNE 1ST.
ADD ALTERNATE #1
1. HEATING SYSTEM EQUIPMENT TO BE REPLACED FROM JUNE 1ST THROUGH
SEPTEMBER 15TH. ALL NEWLY INSTALLED AND REMAINING EXISTING HEATING
EQUIPMENT TO BE FULLY FUNCTIONAL BY SEPTEMBER 15TH.
2. 2.COOLING SYSTEM EQUIPMENT TO BE REPLACED FROM SEPTEMBER 15T
THOUGHT JUNE 1ST. ALL NEWLY INSTALLED AND REMAINING EXISTING
COOLING EQUIPMENT TO BE FULLY FUNCTIONAL BY JUNE 1ST.
ADD ALTERNATE #2
1. TUNNEL ROUTING AND CONSTRUCTION CAN BE COMPLETED ANYTIME
THROUGHOUT THE YEAR
2. NEW HOT WATER AND HOT WATER RETURN PIPING CONNECTIONS CAN BE
MADE ANYTIME THROUGHOUT THE YEAR. HOT WATER MUST BE MAINTAINED IN
THE BUILDINGS WHILE MAKING THE NEW CONNECTIONS EXCEPT FOR SHORT
SWITCH OVER SHUTDOWNS THAT ARE COORDINATED WITH THE OWNER.
3. NEW STEAM AND STEAM CONDENSATE PIPING CONNECTIONS ARE TO BE MADE
FROM JUNE 1ST TO SEPTEMBER 15TH. ALL NEWLY INSTALLED AND REMAINING
EXISTING HEATING EQUIPMENT TO BE FULLY FUNCTIONAL BY SEPTEMBER 15TH.
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
9/14/2023 FOR CONSTRUCTION
M-100
DBP
CAT
MECHANICAL SYMBOLS,
NOTES, AND ABBREVIATIONS
X-HX SKID
(AHU COILS)
X-HX SKID
(FIN TUBE)
X-SC PUMP
X-HX
X-PUMP
X-XT
X-COMP
X-EF
X-PUMP
X-HX
X-SC PUMP
T
X-ABANDONED LOUVER
(BACKFILLED)
X-COMP
X-COMP
X-AIR DRYER
X-CPX-CP
X-CPX-CP
X-CP
X-AIR DRYER
X-CP (DDC) 3
BASE BID DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING HEAT EXCHANGER, AIR
SEPARATOR, ELEVATED STEEL FRAME, PIPING, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING CIRCULATION PUMP,
CONTROLS, PNEUMATIC TUBING, PIPING, CONCRETE PAD, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
EXHAUST FAN AND LOCAL CONTROLS TO REMAIN.
EXISTING STEAM CONDENSATE PUMP TO REMAIN.
DISCONNECT, REMOVE, AND DEMO EXISTING EXPANSION TANK, PIPING,
AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING HEAT EXCHANGER SKID
PACKAGE, PUMPS, HEAT EXCHANGER, EXPANSION TANK, PIPING,
CONTROLS, PNEUMATIC TUBING AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY.
ADD ALTERNATE #1: DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING AIR COMPRESSOR, AIR DRYER, PNEUMATIC TUBING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING PNEUMATIC CONTROL PANELS, PNEUMATIC TUBING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING DDC CONTROL PANEL, CONTROL WIRING, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
KEY PLAN
9/14/2023 FOR CONSTRUCTION
BUILDING 29B BASEMENT
PLAN - MECHANICAL
DEMOLITION
N BUILDING 29B BASEMENT PLAN - MECHANICAL DEMOLITION (BASE BID)
M-300
SCALE: 1/4" = 1'-0"
0 1 5 10
DBP
CAT
File details come from the government source that posted it. Updated .