Drawings 9 of 12.pdf

PDF 6 MB Posted

Attached to
472/19503. SMD; Lakeland CF (SRF) - Building 29 HVAC Upgrades
Solicitation number
RFQ 171 230000000791 2
Issued by
Barry County, Michigan

About this file

This file consists of mechanical engineering drawings for a state of Michigan Department of Technology, Management and Budget facility project, specifically for Buildings 29A, 29B, and 29C. The drawings document comprehensive HVAC, piping, and radiant heating/cooling system installations and modifications. The project includes installation of new DDC (Direct Digital Control) VAV (Variable Air Volume) boxes, rooftop units (RTUs), heat exchanger skid packages, radiant floor and ceiling panels, makeup air units, exhaust fans, and associated ductwork and piping systems. The scope encompasses modifications to existing ductwork, piping, and mechanical systems across multiple building levels including basements, first floors, lower attics, and upper attics. The project involves connection of new mechanical components to new DDC control panels and modification of existing piping as required for new connections. The drawings reference both a base bid and an Add Alternate #1, indicating phased or optional construction scope. The contract order number is 472/LCFMAINTPROJ, with consultant job number 20080.00 assigned to Matrix, and drawings are dated 9/14/2023 for construction.

The drawings specify detailed installation requirements including concrete pads for equipment, piping sizes and configurations, fin tube heating elements, control valves, pumps, pressure reducing valves, and condensate drainage systems. Key mechanical specifications include heating water supply and return piping, steam and steam condensate connections, makeup cold water piping, and routing of new supply and return ductwork through newly constructed chases. The project requires balancing of existing diffusers and grilles to existing CFM upon construction completion, installation per manufacturer specifications, and coordination with existing building systems. Funding is identified through a funding code associated with the Department of Technology, Management and Budget under State Facilities Administration, Design and Construction Division. The drawings are prepared by DBP CAT for consultant review, with scales varying by plan type (1/4" = 1'-0" and 1/8" = 1'-0") and include a comprehensive list of 47 drawing sheets covering structural, mechanical, and system details for the multi-building mechanical upgrade project.

View the file

Other files

File Type Posted
Drawings 1 of 12.pdf PDF
Drawings 2 of 12.pdf PDF
Drawings 8 of 12.pdf PDF
Drawings 4 of 12.pdf PDF
Drawings 5 of 12.pdf PDF
Drawings 12 of 12.pdf PDF
47219503.SMD - Addendum 1 Write-Up.pdf PDF
Lakeland - Specifications.pdf PDF
Drawings 10 of 12.pdf PDF
Drawings 7 of 12.pdf PDF
LEIN Request 19503.pdf PDF
Walkthrough Sign-in Sheet.pdf PDF
MICHSpec Rev032022 V12 - 47219503.SMD.pdf PDF
Drawings 6 of 12.pdf PDF
DTMB Advertisement.pdf PDF
Drawings 3 of 12.pdf PDF
Drawings 11 of 12.pdf PDF
MICHSpec Rev032022 V12.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X-8x8

SA DN

X-20x12

SA DN

X-14x10

SA DN

X-20x10

SA DN

X-10x10

SA DN

X-18x10

SA DN

X-14x10

SA DN

X-12x10

RA DN

X-10x10 RA DN

X-12x8

SA DN

X-24x12

RA DN

X-10x10

EA DN

X-28x10

SA DN

X-10" EA DN

X-18x16

RA DN

X-12x8

SA DN

X-12x8

EA DN

X-20x16

RA DN

X-12x10

EA DN

X-20x10

RA DN

X-8x8

EA DN

X-20x12

SA DN

X-18x18

RA DN

X-18x12

EA DN

X-18x18

RA DN

X-EXHAUST

LOUVER

X-18x18 RA X-20x18 RA

X-10x10 RA

X-14x22 RA X-36x22 RA

X-22x22 RA

X-32x16

RA

X-20x16 RA X-18x16 RA

X-14x16 RA

X-18x16 RA

X-36x32 RA

X-18x18 RA

X-18x18 RA

X-20x12 SA X-12x8 SA X-20x14

SA

X-16x6 SA

X-6x6

SA

X-14x8

SA

X-22x16 SA X-24x28

SA

X-30x16

SA

X-16x18

SA

X-18x18

SA

X-16x16 SA

X-22x14 SA

X-2x14 SA

X-8x6 SA

X-4x4 SA

X-8x6 SA

X-8x6 SA X-2x12 SA

X-20x12 SA

X-8x6 SA X-16x6 SA

X-8x6 SA

X-14x8 SA

X-16x6 SAX-14x10 SAX-16x6 SA

X-12x16

SA

X-18x12 SA

X-12x8 SA

X-12x8 SA

X-16x10 SA

X-10x6 SA X-16x6 SA

X-16x8 SA

X-24x30 SA

X-34x18

SA

X-8x10 SA

X-24x24 SAX-24x16 SA

X-24x16 SA

X-16x10

SA

X-20x8 SA

X-16x6 SA

X-10x10 EA X-16x10 EA

X-12x10

EA

X-12x8 EA

X-8x12 EA

X-20x10 EA X-20x12 EA X-22"ø EA

X-18x12 EA

X-12x12 SA

X-12x24 SA

X-14"ø SA X-14"ø SA

X-12"ø SA X-12"ø SA

X-20x20 SA

X-20x18

SA

X-20x16

SA

X-14x10 SA

X-12x16

SA

X-10x16 SA

X-8x6 SA

X-6x8SA

X-INTAKE LOUVER

X-8x8

SA DN

X-8x6

EA DN

X-20x20 EA

X-MAU

X-16x16 SA

X-SF-13

X-12x20 SA

X-12x8

SA DN

X-12x8

SA DN

X-EF-10

X-EXHAUST

LOUVER

X-SD 400

20x6 TYP. 4

X-8x8

SA DN

X-8x8

SA DN

X-8x8

SA DN

X-8x8

SA DN

X-8x6

SA DN

X-12x12

SA DN

X-EF-19

X-16x6

SA DN

X- SA DN

TO X-CUH

(280 CFM)

X-6x6

SA DN

X-12x10

SA DN

X-26x12

SA DN

X-16x6

SA DN

X-16x6

SA DN

X-8x6

SA DN

X-16x6

SA DN

X-16x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-4x4 SA DN

X-8x8

SA DN

X-20x12

SA DN

X-14x10

SA DN

X-20x10

SA DN

X-10x10

SA DN

X-18x10

SA DN

X-14x10

SA DN

X-12x10

RA DN

X-10x10 RA DN

X-12x8

SA DN

X-24x12

RA DN

X-10x10

EA DN

X-28x10

SA DN

X-10" EA DN

X-18x16

RA DN

X-12x8

SA DN

X-12x8

EA DN

X-20x16

RA DN

X-12x10

EA DN

X-20x10

RA DN

X-8x8

EA DN

X-20x12

SA DN

X-18x18

RA DN

X-18x12

EA DN

X-18x18

RA DN

X-EXHAUST

LOUVER

X-18x18 RA X-20x18 RA

X-10x10 RA

X-14x22 RA X-36x22 RA

X-22x22 RA

X-32x16

RA

X-20x16 RA X-18x16 RA

X-14x16 RA

X-18x16 RA

X-36x32 RA

X-18x18 RA

X-18x18 RA

X-20x12 SA X-12x8 SA X-20x14

SA

X-16x6 SA

X-6x6

SA

X-14x8

SA

X-22x16 SA X-24x28

SA

X-30x16

SA

X-16x18

SA

X-18x18

SA

X-16x16 SA

X-22x14 SA

X-2x14 SA

X-8x6 SA

X-4x4 SA

X-8x6 SA

X-8x6 SA X-2x12 SA

X-20x12 SA

X-8x6 SA X-16x6 SA

X-8x6 SA

X-14x8 SA

X-16x6 SAX-14x10 SAX-16x6 SA

X-12x16

SA

X-18x12 SA

X-12x8 SA

X-12x8 SA

X-16x10 SA

X-10x6 SA X-16x6 SA

X-16x8 SA

X-24x30 SA

X-34x18

SA

X-8x10 SA

X-24x24 SAX-24x16 SA

X-24x16 SA

X-16x10

SA

X-20x8 SA

X-16x6 SA

X-10x10 EA X-16x10 EA

X-12x10

EA

X-12x8 EA

X-8x12 EA

X-20x10 EA X-20x12 EA X-22"ø EA

X-18x12 EA

X-12x12 SA

X-12x24 SA

X-14"ø SA X-14"ø SA

X-12"ø SA X-12"ø SA

X-20x20 SA

X-20x18

SA

X-20x16

SA

X-14x10 SA

X-12x16

SA

X-10x16 SA

X-8x6 SA

X-6x8SA

X-INTAKE LOUVER

X-8x8

SA DN

X-8x6

EA DN

X-20x20 EA

X-MAU

X-16x16 SA

X-SF-13

X-12x20 SA

X-12x8

SA DN

X-12x8

SA DN

X-EF-10

X-EXHAUST

LOUVER

X-SD 400

20x6 TYP. 4

X-8x8

SA DN

X-8x8

SA DN

X-8x8

SA DN

X-8x8

SA DN

X-8x6

SA DN

X-12x12

SA DN

X-EF-19

X-16x6

SA DN

X- SA DN

TO X-CUH

(280 CFM)

X-6x6

SA DN

X-12x10

SA DN

X-26x12

SA DN

X-16x6

SA DN

X-16x6

SA DN

X-8x6

SA DN

X-16x6

SA DN

X-16x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-8x6

SA DN

X-4x4 SA DN

18x12

RA DN

44x30

SA DN

60x30

RA DN

VAV-C05VAV-C06

VAV-C17

VAV-C18

VAV-C16

VAV-C20

VAV-C19

1 1

40x40 RA

44x30 SA

40x20

SA

VAV-C311

24"Ø SA

M-800

24"Ø SA

16"Ø SA

24"Ø RA

22"Ø RA

24"Ø RA

22"Ø RA

HVAC KEY NOTES

INSTALL NEW DDC VAV BOX AT LOCATION

SHOWN. MODIFY DUCTWORK AS REQUIRED FOR

NEW CONNECTION. CONNECT NEW DDC VAV

BOXES TO NEW DDC CONTROL PANEL.

ROUTE NEW SUPPLY AND RETURN DUCTWORK

UP THE SIDE OF THE BUILDING IN NEWLY

CONSTRUCTED CHASE TO NEW ATTIC

PENETRATIONS IN NEW ROOF GABLE.

CONNECT EXISTING MAKE UP AIR UNIT AND

SUPPLY FAN TO NEW DDC CONTROL PANEL.

CONNECT NEW SUPPLY AIR DUCTWORK,

RETURN AIR DUCTWORK, AND ALL ASSOCIATED

ACCESSORIES TO THE EXTENTS SHOWN.

MODIFY EXISTING DUCTWORK AS NEEDED FOR

NEW CONNECTION.

CONNECT EXISTING EXHAUST FAN TO NEW DDC

CONTROL PANEL.

GENERAL NOTES

1. SEE M-800 SHEET FOR DETAILS SHOWING

NEW TRUNK LINE SUPPLY AND RETURN

DUCT ROUTING AND ORIENTATION

THROUGH JOIST OPENINGS. ONLY

LARGEST TRUNK LINE DUCT SIZE SHOWN

ON DETAIL. CONTINUATION OF DUCT

ROUTING TO USE SIMILAR ROUTING PATH

THROUGH JOIST OPENINGS AT SIZES

SHOWN.

2. ALL EXISTING DIFFUSERS & GRILLES TO BE

BALANCED TO EXISTING CFM AT THE END

OF CONSTRUCTION UNLESS OTHERWISE

NOTED ON DRAWINGS.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29C UPPER ATTIC

PLAN - MECHANICAL NEW

N BUILDING 29C UPPER ATTIC PLAN - MECHANICAL NEW (ADD ALTERNATE #1)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-406

DBP

CAT

X-SC PUMP

X-SC PUMP

P

X-SC PUMP

X-SC PUMP

HTP-1HTP-2

3/4" MAKEUP

CW DN

3/4" MAKEUP

CW DN

1-1/2" MAKEUP

CW

1-1/2" MAKEUP

CW

3/4" MAKEUP CW

X-3-1/2" STM UP

X-2"

SC UP

X-1-1/2" CW

X-1-1/2" CW

X-3/4" STM UP

X-1-1/2"

STM UP

X-2-3/4"

STM UP

X-1"

CD UP

X-1"

CD UP

X-1-1/2"

STM

X-4" STM

X-6" STM

X-6" STM

X-6" STM

X-6" STM

6" STM

X-2-1/2" HR UP

X-3" HR UP

X-3" HS UP X-2-1/2" HS UP

1 1

3" HR2-1/2" HS & HR

4" HS

6" STM4" STM

PRV-1

6" STM

PRV-2

BFP

2" SC2" SC

3" SC

X-2-1/2" G

TO GAS SEVICE

X-2-1/2" G

6" V

6" V

6" V UP

3 5

3" HS

PIPING KEY NOTES

INSTALL NEW HEAT EXCHANGER SKID PACKAGE

AND ALL ASSOCIATED ACCESSORIES PER

MANUFACTURE'S INSTALLATION INSTRUCTIONS.

INSTALL SKID PACKAGE IN LOCATION SHOWN ON

NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP

IN ALL DIRECTIONS.

CONNECT NEW STEAM, STEAM CONDENSATE,

HEATING SUPPLY, HEATING RETURN, AND

MAKEUP COLD WATER PIPING TO EXISTING

PIPING AS SHOWN. MODIFY EXISTING PIPING AS

NEEDED TO MAKE NEW CONNECTION.

INSTALL NEW PRESSURE REDUCING VALVE,

PRESSURE RELIEF VALVE, SHUTOFF VALVES,

VENT PIPING, AND ALL ASSOCIATED

ACCESSORIES AS SHOWN. INSTALL PRESSURE

REDUCING VALVES IN 1/3 - 2/3 CONFIGURATION.

CONNECT NEW STEAM PIPING TO EXISTING

STEAM PIPING. MODIFY EXISTING PIPING AS

REQUIRED FOR NEW CONNECTION.

INSTALL NEW VENT PIPING AND ALL ASSOCIATED

ACCESSORIES IN LOCATION SHOW. ROUTE VENT

PIPE THROUGH EXTERIOR WALL IN LOCATION

SHOWN AND ROUTE UP 8' ABOVE EXISTING

GRADE ALONG EXTERIOR WALL. ROUTE PIPING IN

LOCATION CLEAR OF WINDOWS AND OTHER

OBSTRUCTIONS. FASTEN PIPING TO EXTERIOR

WALL WITH UNITSTRUT FRAME. INSTALL A 90

DEGREE ELBOW AT THE END OF VENT PIPING

FACING OPPOSITE DIRECTION OF BUILDING.

PATCH BASEMENT WALL PENETRATION TO

MATCH EXISTING AND SEAL WATER TIGHT.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29B BASEMENT

PLAN - PIPING NEW

N BUILDING 29B BASEMENT PLAN - PIPING NEW (BASE BID)

M-600

DBP

CAT

SCALE: 1/4" = 1'-0"

0 1 5 10

ZONE # F-2

AREA = 2,252 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,252 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,762 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,762 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,050 SQ. FT.

(ABANDONED)

ZONE # F-2

AREA = 2,050 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,925 SQ. FT.

(ABANDONED)

ZONE # F-1

AREA = 1,925 SQ. FT.

(ABANDONED)

ZONE # F-4

AREA = 1,125 SQ. FT.

(ABANDONED)

ZONE # F-3

AREA = 1,133 SQ. FT.

(ABANDONED)

ACTIVE ZONE

AREA = 800 SQ. FT.

ACTIVE ZONE

AREA = 800 SQ. FT.

1 1

2 2

2 2

HVAC KEY NOTES

REUSE EXISTING RADIANT INFLOOR HEAT,

PIPING, AND ALL ASSOCIATED ACCESSORIES

WITH NEW DDC CONTROLS.

ABANDON EXISTING RADIANT INFLOOR HEAT,

PIPING, AND ALL ASSOCIATED ACCESSORIES.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

BUILDING 29A BELOW FIRST

FLOOR PLAN - RADIANT

FLOOR NEW

N BUILDING 29A BELOW FIRST FLOOR PLAN - RADIANT FLOOR NEW (BASE BID)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

M-601

ZONE # C-2

AREA = 478 SQ. FT

(ABANDONED)

ZONE # C-4

AREA = 106 SQ FT

(ABANDONED)

ZONE # C-2

AREA = 478 SQ. FT

(ABANDONED)

ZONE # C-3

AREA = 750 SQ. FT

(ABANDONED)

ZONE # C-4

AREA = 1005 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 455 SQ. FT

(ABANDONED)ZONE # C-1

AREA = 553 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 466 SQ. FT

(ABANDONED)

ZONE # C-1

AREA = 466 SQ. FT

(ABANDONED)

ZONE # C-2

AREA =561 SQ. FT

(ABANDONED) ZONE # C-2

AREA = 750 SQ. FT

(ABANDONED)

ACTIVE ZONE

AREA = 800 SQ. FT ACTIVE ZONE

AREA = 800 SQ. FT

X-2"ø

X-1-1/2"ø

X-1-1/4"ø

X-4"ø

X-2"ø X-1-1/4"ø

X-3"ø

X-1-1/4"ø

X-1-1/2"ø

X-2"ø

X-1-1/2"ø

X-2"ø

X-2"ø X-2-1/2"ø

M-602

4 4

5 5

HVAC KEY NOTES

CONNECT EXISTING PUMP TO NEW DDC

CONTROL PANEL.

INSTALL NEW DDC CONTROL VALVE. SIZE

CONTROL VALVE BASED ON EXISTING PIPING.

MODIFY EXISTING PIPING AS NEEDED TO MAKE

NEW CONNECTION. CONNECT CONTROL VALVE

TO DDC CONTROL PANEL.

INSTALL NEW 3-WAY DDC CONTROL VALVE. SIZE

CONTROL VALVE BASED ON EXISTING PIPING.

MODIFY EXISTING PIPING AS NEEDED TO MAKE

NEW CONNECTION. CONNECT CONTROL VALVE

TO DDC CONTROL PANEL.

REUSE EXISTING RADIANT CEILING PANELS,

PIPING, AND ALL ASSOCIATED ACCESSORIES

WITH NEW DDC CONTROLS.

ABANDON EXISTING RADIANT CEILING PANELS,

PIPING, AND ALL ASSOCIATED ACCESSORIES.

X-HX

X-ET

P P P P

P

PP

X-HR

X-HS

X-STM

X-CW

X-PRESSURE

GUAGE (TYP.)

X-SHUTOFF

VALVE (TYP.)

X-PUMP

(TYP. 2)

X-BACK FLOW

PREVENTER

X-STRAINER

X-PRESSURE

REDUCING VALVE

X-PRESSURE

RELIEF VALVE

FTX-STEAM

TRAP

X-SC TO SC PUMP

FROM GYM / WORKOUT 1

FROM GYM / WORKOUT 2

TO GYM / WORKOUT 1

TO GYM / WORKOUT 2

3-WAY MODULATING

CONTROL VALVE (TYP. 2)

2-WAY MODULATING

CONTROL VALVE

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

M-602

BUILDING 29A FIRST FLOOR

PLAN - RADIANT CEILING

NEW

N BUILDING 29A FIRST FLOOR PLAN - RADIANT CEILING NEW (BASE BID)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

DBP

CAT

1 MECHANICAL ROOM - PIPING NEW

SCALE: 1/4" = 1'-0"

X-1-1/4"ø

HWR

X-1-1/4"ø

HWR

X-1-1/4"ø HWR X-1-1/4"ø

HWR

X-1-1/4"ø

HWR

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1"ø HWS

(TYP.)

X-1-1/4"ø

HWR

X-1-1/4"ø

HWR

X-1-1/4"ø

HWR

X-2" HWR

& HWR

X-2" HWS

& HWR

X-2-1/2"ø HWR

& HWS

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

RTU-1

RTU-2

RTU-3

3" HS

& HR

3" HS

& HR

2" HS &

HR DN TO HC-3

2" HS &

HR DN TO HC-1

1-1/2" HS &

HR DN TO HC-2

2" HS

& HR

2" HS

& HR

2" HS

& HR

S

P-1

P-2

P-3

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE

X-FIN TUBE

S S

S

SSS

S

2 2 2

4 4

4 4 4 4 4 4 4

S S S

SSS

S

S

2 2 2

4 4 4 4 4

44444

S S S S

S

SSSS

2 2 2 2

4 4 4 4 4 4 4

4444444

S S S S

SSSS

2 2 2 2

S2

4 4 4 4 4 4 4

4444444

RTU-1

RTU-1 RTU-1

RTU-1

RTU-3

RTU-3

RTU-3

RTU-3

S

2 RTU-2

S

2 RTU-2

S

2RTU-2

S

2RTU-2

CONCRETE PAD

CONCRETE PAD

CONCRETE PAD

1-1/4" CD

1-1/4" CD

1" CD

PIPING KEY NOTES

INSTALL NEW GRADE MOUNTED ROOF TOP UNIT.

PER MANUFACTURERS INSTALLATION

INSTRUCTIONS. INSTALL NEW ROOF TOP UNIT ON

NEW 12" THICK CONCRETE PAD.

INSTALL NEW DDC FLAT PLATE SENSORS IN THE

AND ASSOCIATED DDC WIRING IN LOCATION SHOWN.

MOUNT NEW FLAT PLATE SENSORS USING TAMPER

PROOF SCREWS

ROUTE NEW HEATING HOT WATER SUPPLY PIPING,

HEATING HOT WATER RETURN PIPING, PUMP, AND

ALL ASSOCIATED ACCESSORIES DOWN NEWLY

CONSTRUCTED CHASE TO NEW HEATING COILS.

INSTALL NEW PIPING, SHUT OFF VALVES, BALANCE

VALVE, AND 2-WAY MODULATING CONTROL VALVE

AT LOCATION SHOWN. MODIFY EXISTING PIPING AS

NEEDED TO MAKE NEW CONNECTION. BALANCE TO

MATCH GPM PRIOR TO CONSTRUCTION.

INSTALL NEW HEATING COIL CIRCULATION PUMP

PER MANUFACTURER'S INSTALLATION

INSTRUCTIONS INSIDE NEWLY CONSTRUCTED

CHASE IN VERTICAL SECTION OF HEATING HOT

WATER SUPPLY PIPE. MOUNT NEW PUMP

APPROXIMATELY 60" ABOVE ROOF TOP UNIT

CONCRETE PAD.

INSTALL NEW CONDENSATE PIPING AND ALL

ASSOCIATED ACCESSORIES ON PAD TO ROUTE

CONDENSATE AWAY FROM THE RTU AND DRAIN ON

GRADE AS SHOWN.

GENERAL NOTES

1. SENSORS ARE LOCATED IN THE OCCUPIED

SPACE. THERMOSTATS SHOWN ON THIS PLAN

FOR CLARITY.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

M-603

BUILDING 29A LOWER ATTIC

PLAN - PIPING NEW

N BUILDING 29A LOWER ATTIC PLAN - PIPING NEW (BASE BID)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

X-2-1/2"ø HWR

& HWS

RTU-4

VAV-B02

VAV-B03

VAV-B04

VAV-B10

VAV-B11

VAV-B06

VAV-B05

VAV-B13VAV-B14

VAV-B22

VAV-B23

VAV-B21

VAV-B20

VAV-B19

VAV-B18

VAV-B01

VAV-B17

VAV-B15

2" HS

& HR DN

TO HC-4

2" HS

X-3/4"ø

HWS DN

X-2-1/2" HS

& 3" HR

X-3/4"

HS DN

X-3" HR DN

TO HTP-1

X-2-1/2" HS

DN TO HTP-2

X-3/4" HS & HR

X-2" HS &

1" HR

X-1" HS DN

X-3" HS &

1" HR

X-3/4" HR DN

X-2" HS &

1" HR

X-3" HS

X-3/4" HS

& HR

X-3/4" HS &

HR (TYP.)

X-3/4" HS

& HR UP

X-2" HS

X-1" HS DN

X-1" HS DN

X-1" HR DN

X-3/4" HS &

HR (TYP.)

X-1" HS & HR

X-1" HS & HR

X-1" HS & HR

X-1-1/4" HS

& 2" HR

X-3/4" HS DN

X-FIN TUBE

X-3/4" HS DN X-3/4" HR DN

X-2" HS &

2-1/2" HR

X-3/4" HS & HR

X-3/4" HS

& HR UP

X-1-1/2" HS

& 2-1/2" HR

X-1-1/2" HS

& 2-1/2" HR

X-1" HS DN

X-FIN TUBE

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HR DN

X-1" HS

& HR

X-3/4" HS &

HR (TYP.)

X-1" HS

& HR

X-1-1/4" HS

& 2-1/2" HR

X-1-1/4" HS

& 2-1/2" HR

X-3/4" HS

& HR UP

X-1" HS & 3" HR

X-1" HS &

2-1/2" HR

X-3/4"

HS DN

X-3/4" HR DN

X-3/4"

HS DN

X-3/4"

HR DN

X-3/4" HS

& HR UP

X-3/4" HS

& HR UP

X-3" HS DN TO

HTP-1

X-2-1/2"

HS & 3" HR

X-FIN TUBE

X-2-1/2"

HRX-2-1/2"

HR

X-2-1/2" HR DN

TO HTP-2

X-3/4"

HS & HR

3" HS

3" HS

& HR

3" HS

& HR

3 3

6 P-4

S

S 3

S

S

X-CUH

X-CUH

X-CUH

X-CUH

X-AC

X-AC

X-AC

X-AC

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-CU

S

S

S

S

S

S S

S

3X-3/4" HS & HR

(TYP.)

0.50

GPM

1.00 GPM

2.50 GPM

2.50 GPM X-2-1/2" G UP

S

S

S

S

S

S

S

S

S

S

3/4" HS & HR

3/4" HS & HR

3/4"

HS & HR

S

S

VAV-B27

VAV-B284

VAV-B24

VAV-B25

S

CONCRETE PAD

1-1/4" CD

X-3/4" HS

& HR UP

PIPING KEY NOTES

INSTALL NEW GRADE MOUNTED ROOF TOP UNIT.

PER MANUFACTURERS INSTALLATION

INSTRUCTIONS. INSTALL NEW ROOF TOP UNIT ON

NEW 12" THICK CONCRETE PAD.

CONNECT NEW HEATING SUPPLY AND HEATING

RETURN PIPING WHERE SHOWN. MODIFY EXISTING

PIPING AS NEEDED FOR NEW CONNECTION.

INSTALL NEW DDC FLAT PLATE SENSORS IN THE

AND ASSOCIATED DDC WIRING IN LOCATION SHOWN.

MOUNT NEW FLAT PLATE SENSORS USING TAMPER

PROOF SCREWS

INSTALL NEW VAV BOXES IN NEW LOCATIONS

SHOWN PER MANUFACTURE'S INSTALLATION

INSTRUCTIONS. MODIFY EXISTING PIPING AS

NEEDED FOR NEW VAV BOX INSTALLATION AND AS

NEEDED TO INSTALL NEW SHUTOFF VALVES,

BALANCE VALVE, AND CONTROL VALVE.

INSTALL NEW PIPING, SHUT OFF VALVES, BALANCE

VALVE, AND 2-WAY MODULATING CONTROL VALVE

AT LOCATION SHOWN. MODIFY EXISTING PIPING AS

NEEDED TO MAKE NEW CONNECTION. BALANCE TO

GPM SHOWN.

ROUTE NEW HEATING HOT WATER SUPPLY PIPING,

HEATING HOT WATER RETURN PIPING, AND ALL

ASSOCIATED ACCESSORIES DOWN NEWLY

CONSTRUCTED CHASE TO NEW HEATING COILS.

INSTALL NEW HEATING COIL CIRCULATION PUMP

PER MANUFACTURER'S INSTALLATION

INSTRUCTIONS INSIDE NEWLY CONSTRUCTED

CHASE IN VERTICAL SECTION OF HEATING HOT

WATER SUPPLY PIPE. MOUNT NEW PUMP

APPROXIMATELY 72" ABOVE ROOF TOP UNIT

CONCRETE PAD.

INSTALL NEW CONDENSATE PIPING AND ALL

ASSOCIATED ACCESSORIES ON PAD TO ROUTE

CONDENSATE AWAY FROM THE RTU AND DRAIN ON

GRADE AS SHOWN.

SEE M-607 FOR PIPING CONTINUATION.

GENERAL NOTES

1. SENSORS ARE LOCATED IN THE OCCUPIED

SPACE. THERMOSTATS SHOWN ON THIS PLAN

FOR CLARITY.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

M-604

BUILDING 29B LOWER ATTIC

PLAN - PIPING NEW

N BUILDING 29B LOWER ATTIC PLAN - PIPING NEW (ADD ALTERNATE #1)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

RTU-5

VAV-C02

VAV-C01

VAV-C03

VAV-C04

VAV-C07VAV-C08VAV-C09

VAV-C10

VAV-C29

VAV-C28

VAV-C27

VAV-C26

VAV-C15

VAV-C21

VAV-C22

VAV-C23

VAV-C24

VAV-C25

VAV-C14

VAV-C13 VAV-C11

VAV-C12

2" HS &

HR DN TO HC-5

X-1" HR

HWR UP

X-1" HS DN

X-1" HR DN

X-1" HS

DN

X-1" HR DN

X-1-1/4"

HS & HR X-2" HS &

1-1/4" HR

X-1-1/4" HS

& 1-1/2" HR

X-1" HS & HR

X-3/4" HS &

HR (TYP.)

X-3/4" HS &

HR (TYP.)

X-1" HS

& HR

X-3/4" HS

& HR UP

X-3/4" HS

& HR UP

X-2" HS &

1-1/4 HR

X-1" HS

X-1" HS &

HR

X-1" HS DN X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS

DN

X-1" HS

DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HR DN

X-1"

HS & HR

X-1"

HS & HR

X-3/4"

HS & HR

X-3/4" HS

& HR UP

X-3/4" HS

& HR UP

X-2" HS &

1-1/2 HR

X-1-1/2" HS

& 1-1/2" HR

X-1-1/2" HS

& 1-1/2" HR

X-1-1/2" HS

& 2" HR

X-3/4" HS &

HR (TYP.)

X-1-1/2" HS

& 1-1/4" HR

X-3/4" HR DN

X-1" HS DN

X-3/4" HS DN

X-1" HR DNX-1-1/2" HS

& 1-1/4" HR

X-2" HS &

1" HR

X-1" HS DN

X-2" HS &

1" HR

X-3/4" HS

& HR UP

X-3/4" HS &

HR (TYP.)

X-3/4" HS DN

X-1-1/4'' HS

& 1-1/2" HR

X-2" HS &

1" HR

X-2" HS &

1" HR

X-2" HS &

1" HR

X-1" HS DN

X-2" HS &

1" HR

X-2" HS &

1" HR

X-1-1/4" HS

& 2" HR

X-1-1/4" HS

& 2" HR

X-1-1/4" HS

X-1'' HS & HR

X-3/4" HS

& HR UP

X-3/4" HS

& HR UP

X-1-1/4" HR

X-1" HS &

2" HR

X-1" HS DN

X-1" HS DN

X-1" HS DN

X-1" HR DN

X-1-1/4" HR X-3/4" HS

& 2" HR

X-3/4" HS DN X-3/4" HR DN

X-2" HS &

1" HR

X-3/4" HS

& HR UP

X-1" HS DN

X-1-1/4" HS

& 2" HR

X-2" HS &

2-1/2" HR

3 33 3

4 4 4

VAV-C30 4

4 4 4

P-5 7

S

S

S

S3X-CUH

X-CUH

X-FIN TUBEX-FIN TUBEX-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE

X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE X-FIN TUBEX-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-FIN TUBE

X-CUX-CU

S3

S

X-3/4" HS & HR

(TYP.)

2.50 GPM

X-3/4" HS

& HR (TYP.)

1.50 GPM

2.50 GPM

S

S

S S

S

S S

S

S

S S

S S

S

S

S

S

S

S

S

1-1/4" CD

CONCRETE PAD

X-3/4" HS

& HR UP

PIPING KEY NOTES

INSTALL NEW GRADE MOUNTED ROOF TOP UNIT.

PER MANUFACTURERS INSTALLATION

INSTRUCTIONS. INSTALL NEW ROOF TOP UNIT ON

NEW 12" THICK CONCRETE PAD.

CONNECT NEW HEATING SUPPLY AND HEATING

RETURN PIPING WHERE SHOWN. MODIFY EXISTING

PIPING AS NEEDED FOR NEW CONNECTION.

INSTALL NEW DDC FLAT PLATE SENSORS IN THE

AND ASSOCIATED DDC WIRING IN LOCATION SHOWN.

MOUNT NEW FLAT PLATE SENSORS USING TAMPER

PROOF SCREWS.

INSTALL NEW VAV BOXES IN NEW LOCATIONS

SHOWN PER MANUFACTURE'S INSTALLATION

INSTRUCTIONS. MODIFY EXISTING PIPING AS

NEEDED FOR NEW VAV BOX INSTALLATION AND AS

NEEDED TO INSTALL NEW SHUTOFF VALVES,

BALANCE VALVE, AND CONTROL VALVE.

INSTALL NEW PIPING, SHUT OFF VALVES, BALANCE

VALVE, AND 2-WAY MODULATING CONTROL VALVE

AT LOCATION SHOWN. MODIFY EXISTING PIPING AS

NEEDED TO MAKE NEW CONNECTION. BALANCE TO

GPM SHOWN.

ROUTE NEW HEATING HOT WATER SUPPLY PIPING,

HEATING HOT WATER RETURN PIPING, AND ALL

ASSOCIATED ACCESSORIES DOWN NEWLY

CONSTRUCTED CHASE TO NEW HEATING COILS.

INSTALL NEW HEATING COIL CIRCULATION PUMP

PER MANUFACTURER'S INSTALLATION

INSTRUCTIONS INSIDE NEWLY CONSTRUCTED

CHASE IN VERTICAL SECTION OF HEATING HOT

WATER SUPPLY PIPE. MOUNT NEW PUMP

APPROXIMATELY 72" ABOVE ROOF TOP UNIT

CONCRETE PAD.

INSTALL NEW CONDENSATE PIPING AND ALL

ASSOCIATED ACCESSORIES ON PAD TO ROUTE

CONDENSATE AWAY FROM THE RTU AND DRAIN ON

GRADE AS SHOWN.

SEE M-608 FOR PIPING CONTINUATION.

GENERAL NOTES

1. SENSORS ARE LOCATED IN THE OCCUPIED

SPACE. THERMOSTATS SHOWN ON THIS PLAN

FOR CLARITY.

file no.

checked by drawn by consultant contract order no.

472/LCFMAINTPROJ

consultant job no.

20080.00

M a t r ix

472/19503.SMD

funding code sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N issue date

KEY PLAN

9/14/2023 FOR CONSTRUCTION

M-605

BUILDING 29C LOWER ATTIC

PLAN - PIPING NEW

N BUILDING 29C LOWER ATTIC PLAN - PIPING NEW (ADD ALTERNATE #1)

SCALE: 1/8" = 1'-0"

0 1 5 10 20

Sheets and Views
M-000-2008000-T-000
M100-2008000-M-100
M300-2008000-M-300
M301-2008000-M-301
M302-2008000-M-302
M303-2008000-M-303
M304-2008000-M-304
M305-2008000-M-305
M306-2008000-M-306
M307-2008000-M-307
M308-2008000-M-308
M309-2008000-M-309
M310-2008000-M-310
M311-2008000-M-311
M312-2008000-M-312
M313-2008000-M-313
M314-2008000-M-314
M315-2008000-M-315
M316-2008000-M-316
M317-2008000-M-317
M318-2008000-M-318
M319-2008000-M-319
M320-2008000-M-319
M400-2008000-M-400
M401-2008000-M-401
M402-2008000-M-402
M403-2008000-M-403
M404-2008000-M-404
M405-2008000-M-405
M406-2008000-M-406
M600-2008000-M-600
M601-2008000-M601
M602-2008000-M602
M603-2008000-M603
M604-2008000-M604
M605-2008000-M605
M606-2008000-M606
M607-2008000-M607
M608-2008000-M608
M609-2008000-M-609
M610-2008000-M-610
M611-2008000-M-611
M800-2008000-M-800
M801-2008000-M-801
M802-2008000-M-802
M900-2008000-M-900

File details come from the government source that posted it. Updated .