This file consists of mechanical engineering drawings for a state of Michigan Department of Technology, Management and Budget facility project, specifically for Buildings 29A, 29B, and 29C. The drawings document comprehensive HVAC, piping, and radiant heating/cooling system installations and modifications. The project includes installation of new DDC (Direct Digital Control) VAV (Variable Air Volume) boxes, rooftop units (RTUs), heat exchanger skid packages, radiant floor and ceiling panels, makeup air units, exhaust fans, and associated ductwork and piping systems. The scope encompasses modifications to existing ductwork, piping, and mechanical systems across multiple building levels including basements, first floors, lower attics, and upper attics. The project involves connection of new mechanical components to new DDC control panels and modification of existing piping as required for new connections. The drawings reference both a base bid and an Add Alternate #1, indicating phased or optional construction scope. The contract order number is 472/LCFMAINTPROJ, with consultant job number 20080.00 assigned to Matrix, and drawings are dated 9/14/2023 for construction.
The drawings specify detailed installation requirements including concrete pads for equipment, piping sizes and configurations, fin tube heating elements, control valves, pumps, pressure reducing valves, and condensate drainage systems. Key mechanical specifications include heating water supply and return piping, steam and steam condensate connections, makeup cold water piping, and routing of new supply and return ductwork through newly constructed chases. The project requires balancing of existing diffusers and grilles to existing CFM upon construction completion, installation per manufacturer specifications, and coordination with existing building systems. Funding is identified through a funding code associated with the Department of Technology, Management and Budget under State Facilities Administration, Design and Construction Division. The drawings are prepared by DBP CAT for consultant review, with scales varying by plan type (1/4" = 1'-0" and 1/8" = 1'-0") and include a comprehensive list of 47 drawing sheets covering structural, mechanical, and system details for the multi-building mechanical upgrade project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X-8x8
SA DN
X-20x12
SA DN
X-14x10
SA DN
X-20x10
SA DN
X-10x10
SA DN
X-18x10
SA DN
X-14x10
SA DN
X-12x10
RA DN
X-10x10 RA DN
X-12x8
SA DN
X-24x12
RA DN
X-10x10
EA DN
X-28x10
SA DN
X-10" EA DN
X-18x16
RA DN
X-12x8
SA DN
X-12x8
EA DN
X-20x16
RA DN
X-12x10
EA DN
X-20x10
RA DN
X-8x8
EA DN
X-20x12
SA DN
X-18x18
RA DN
X-18x12
EA DN
X-18x18
RA DN
X-EXHAUST
LOUVER
X-18x18 RA X-20x18 RA
X-10x10 RA
X-14x22 RA X-36x22 RA
X-22x22 RA
X-32x16
RA
X-20x16 RA X-18x16 RA
X-14x16 RA
X-18x16 RA
X-36x32 RA
X-18x18 RA
X-18x18 RA
X-20x12 SA X-12x8 SA X-20x14
SA
X-16x6 SA
X-6x6
SA
X-14x8
SA
X-22x16 SA X-24x28
SA
X-30x16
SA
X-16x18
SA
X-18x18
SA
X-16x16 SA
X-22x14 SA
X-2x14 SA
X-8x6 SA
X-4x4 SA
X-8x6 SA
X-8x6 SA X-2x12 SA
X-20x12 SA
X-8x6 SA X-16x6 SA
X-8x6 SA
X-14x8 SA
X-16x6 SAX-14x10 SAX-16x6 SA
X-12x16
SA
X-18x12 SA
X-12x8 SA
X-12x8 SA
X-16x10 SA
X-10x6 SA X-16x6 SA
X-16x8 SA
X-24x30 SA
X-34x18
SA
X-8x10 SA
X-24x24 SAX-24x16 SA
X-24x16 SA
X-16x10
SA
X-20x8 SA
X-16x6 SA
X-10x10 EA X-16x10 EA
X-12x10
EA
X-12x8 EA
X-8x12 EA
X-20x10 EA X-20x12 EA X-22"ø EA
X-18x12 EA
X-12x12 SA
X-12x24 SA
X-14"ø SA X-14"ø SA
X-12"ø SA X-12"ø SA
X-20x20 SA
X-20x18
SA
X-20x16
SA
X-14x10 SA
X-12x16
SA
X-10x16 SA
X-8x6 SA
X-6x8SA
X-INTAKE LOUVER
X-8x8
SA DN
X-8x6
EA DN
X-20x20 EA
X-MAU
X-16x16 SA
X-SF-13
X-12x20 SA
X-12x8
SA DN
X-12x8
SA DN
X-EF-10
X-EXHAUST
LOUVER
X-SD 400
20x6 TYP. 4
X-8x8
SA DN
X-8x8
SA DN
X-8x8
SA DN
X-8x8
SA DN
X-8x6
SA DN
X-12x12
SA DN
X-EF-19
X-16x6
SA DN
X- SA DN
TO X-CUH
(280 CFM)
X-6x6
SA DN
X-12x10
SA DN
X-26x12
SA DN
X-16x6
SA DN
X-16x6
SA DN
X-8x6
SA DN
X-16x6
SA DN
X-16x6
SA DN
X-8x6
SA DN
X-8x6
SA DN
X-8x6
SA DN
X-8x6
SA DN
X-8x6
SA DN
X-4x4 SA DN
X-8x8
SA DN
X-20x12
SA DN
X-14x10
SA DN
X-20x10
SA DN
X-10x10
SA DN
X-18x10
SA DN
X-14x10
SA DN
X-12x10
RA DN
X-10x10 RA DN
X-12x8
SA DN
X-24x12
RA DN
X-10x10
EA DN
X-28x10
SA DN
X-10" EA DN
X-18x16
RA DN
X-12x8
SA DN
X-12x8
EA DN
X-20x16
RA DN
X-12x10
EA DN
X-20x10
RA DN
X-8x8
EA DN
X-20x12
SA DN
X-18x18
RA DN
X-18x12
EA DN
X-18x18
RA DN
X-EXHAUST
LOUVER
X-18x18 RA X-20x18 RA
X-10x10 RA
X-14x22 RA X-36x22 RA
X-22x22 RA
X-32x16
RA
X-20x16 RA X-18x16 RA
X-14x16 RA
X-18x16 RA
X-36x32 RA
X-18x18 RA
X-18x18 RA
X-20x12 SA X-12x8 SA X-20x14
SA
X-16x6 SA
X-6x6
SA
X-14x8
SA
X-22x16 SA X-24x28
SA
X-30x16
SA
X-16x18
SA
X-18x18
SA
X-16x16 SA
X-22x14 SA
X-2x14 SA
X-8x6 SA
X-4x4 SA
X-8x6 SA
X-8x6 SA X-2x12 SA
X-20x12 SA
X-8x6 SA X-16x6 SA
X-8x6 SA
X-14x8 SA
X-16x6 SAX-14x10 SAX-16x6 SA
X-12x16
SA
X-18x12 SA
X-12x8 SA
X-12x8 SA
X-16x10 SA
X-10x6 SA X-16x6 SA
X-16x8 SA
X-24x30 SA
X-34x18
SA
X-8x10 SA
X-24x24 SAX-24x16 SA
X-24x16 SA
X-16x10
SA
X-20x8 SA
X-16x6 SA
X-10x10 EA X-16x10 EA
X-12x10
EA
X-12x8 EA
X-8x12 EA
X-20x10 EA X-20x12 EA X-22"ø EA
X-18x12 EA
X-12x12 SA
X-12x24 SA
X-14"ø SA X-14"ø SA
X-12"ø SA X-12"ø SA
X-20x20 SA
X-20x18
SA
X-20x16
SA
X-14x10 SA
X-12x16
SA
X-10x16 SA
X-8x6 SA
X-6x8SA
X-INTAKE LOUVER
X-8x8
SA DN
X-8x6
EA DN
X-20x20 EA
X-MAU
X-16x16 SA
X-SF-13
X-12x20 SA
X-12x8
SA DN
X-12x8
SA DN
X-EF-10
X-EXHAUST
LOUVER
X-SD 400
20x6 TYP. 4
X-8x8
SA DN
X-8x8
SA DN
X-8x8
SA DN
X-8x8
SA DN
X-8x6
SA DN
X-12x12
SA DN
X-EF-19
X-16x6
SA DN
X- SA DN
TO X-CUH
(280 CFM)
X-6x6
SA DN
X-12x10
SA DN
X-26x12
SA DN
X-16x6
SA DN
X-16x6
SA DN
X-8x6
SA DN
X-16x6
SA DN
X-16x6
SA DN
X-8x6
SA DN
X-8x6
SA DN
X-8x6
SA DN
X-8x6
SA DN
X-8x6
SA DN
X-4x4 SA DN
18x12
RA DN
44x30
SA DN
60x30
RA DN
VAV-C05VAV-C06
VAV-C17
VAV-C18
VAV-C16
VAV-C20
VAV-C19
1 1
40x40 RA
44x30 SA
40x20
SA
VAV-C311
24"Ø SA
M-800
24"Ø SA
16"Ø SA
24"Ø RA
22"Ø RA
24"Ø RA
22"Ø RA
HVAC KEY NOTES
INSTALL NEW DDC VAV BOX AT LOCATION
SHOWN. MODIFY DUCTWORK AS REQUIRED FOR
NEW CONNECTION. CONNECT NEW DDC VAV
BOXES TO NEW DDC CONTROL PANEL.
ROUTE NEW SUPPLY AND RETURN DUCTWORK
UP THE SIDE OF THE BUILDING IN NEWLY
CONSTRUCTED CHASE TO NEW ATTIC
PENETRATIONS IN NEW ROOF GABLE.
CONNECT EXISTING MAKE UP AIR UNIT AND
SUPPLY FAN TO NEW DDC CONTROL PANEL.
CONNECT NEW SUPPLY AIR DUCTWORK,
RETURN AIR DUCTWORK, AND ALL ASSOCIATED
ACCESSORIES TO THE EXTENTS SHOWN.
MODIFY EXISTING DUCTWORK AS NEEDED FOR
NEW CONNECTION.
CONNECT EXISTING EXHAUST FAN TO NEW DDC
CONTROL PANEL.
GENERAL NOTES
1. SEE M-800 SHEET FOR DETAILS SHOWING
NEW TRUNK LINE SUPPLY AND RETURN
DUCT ROUTING AND ORIENTATION
THROUGH JOIST OPENINGS. ONLY
LARGEST TRUNK LINE DUCT SIZE SHOWN
ON DETAIL. CONTINUATION OF DUCT
ROUTING TO USE SIMILAR ROUTING PATH
THROUGH JOIST OPENINGS AT SIZES
SHOWN.
2. ALL EXISTING DIFFUSERS & GRILLES TO BE
BALANCED TO EXISTING CFM AT THE END
OF CONSTRUCTION UNLESS OTHERWISE
NOTED ON DRAWINGS.
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
KEY PLAN
9/14/2023 FOR CONSTRUCTION
BUILDING 29C UPPER ATTIC
PLAN - MECHANICAL NEW
N BUILDING 29C UPPER ATTIC PLAN - MECHANICAL NEW (ADD ALTERNATE #1)
SCALE: 1/8" = 1'-0"
0 1 5 10 20
M-406
DBP
CAT
X-SC PUMP
X-SC PUMP
P
X-SC PUMP
X-SC PUMP
HTP-1HTP-2
3/4" MAKEUP
CW DN
3/4" MAKEUP
CW DN
1-1/2" MAKEUP
CW
1-1/2" MAKEUP
CW
3/4" MAKEUP CW
X-3-1/2" STM UP
X-2"
SC UP
X-1-1/2" CW
X-1-1/2" CW
X-3/4" STM UP
X-1-1/2"
STM UP
X-2-3/4"
STM UP
X-1"
CD UP
X-1"
CD UP
X-1-1/2"
STM
X-4" STM
X-6" STM
X-6" STM
X-6" STM
X-6" STM
6" STM
X-2-1/2" HR UP
X-3" HR UP
X-3" HS UP X-2-1/2" HS UP
1 1
3" HR2-1/2" HS & HR
4" HS
6" STM4" STM
PRV-1
6" STM
PRV-2
BFP
2" SC2" SC
3" SC
X-2-1/2" G
TO GAS SEVICE
X-2-1/2" G
6" V
6" V
6" V UP
3 5
3" HS
PIPING KEY NOTES
INSTALL NEW HEAT EXCHANGER SKID PACKAGE
AND ALL ASSOCIATED ACCESSORIES PER
MANUFACTURE'S INSTALLATION INSTRUCTIONS.
INSTALL SKID PACKAGE IN LOCATION SHOWN ON
NEW 4" THICK CONCRETE PAD WITH 4" OVERLAP
IN ALL DIRECTIONS.
CONNECT NEW STEAM, STEAM CONDENSATE,
HEATING SUPPLY, HEATING RETURN, AND
MAKEUP COLD WATER PIPING TO EXISTING
PIPING AS SHOWN. MODIFY EXISTING PIPING AS
NEEDED TO MAKE NEW CONNECTION.
INSTALL NEW PRESSURE REDUCING VALVE,
PRESSURE RELIEF VALVE, SHUTOFF VALVES,
VENT PIPING, AND ALL ASSOCIATED
ACCESSORIES AS SHOWN. INSTALL PRESSURE
REDUCING VALVES IN 1/3 - 2/3 CONFIGURATION.
CONNECT NEW STEAM PIPING TO EXISTING
STEAM PIPING. MODIFY EXISTING PIPING AS
REQUIRED FOR NEW CONNECTION.
INSTALL NEW VENT PIPING AND ALL ASSOCIATED
ACCESSORIES IN LOCATION SHOW. ROUTE VENT
PIPE THROUGH EXTERIOR WALL IN LOCATION
SHOWN AND ROUTE UP 8' ABOVE EXISTING
GRADE ALONG EXTERIOR WALL. ROUTE PIPING IN
LOCATION CLEAR OF WINDOWS AND OTHER
OBSTRUCTIONS. FASTEN PIPING TO EXTERIOR
WALL WITH UNITSTRUT FRAME. INSTALL A 90
DEGREE ELBOW AT THE END OF VENT PIPING
FACING OPPOSITE DIRECTION OF BUILDING.
PATCH BASEMENT WALL PENETRATION TO
MATCH EXISTING AND SEAL WATER TIGHT.
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
KEY PLAN
9/14/2023 FOR CONSTRUCTION
BUILDING 29B BASEMENT
PLAN - PIPING NEW
N BUILDING 29B BASEMENT PLAN - PIPING NEW (BASE BID)
M-600
DBP
CAT
SCALE: 1/4" = 1'-0"
0 1 5 10
ZONE # F-2
AREA = 2,252 SQ. FT.
(ABANDONED)
ZONE # F-2
AREA = 2,252 SQ. FT.
(ABANDONED)
ZONE # F-1
AREA = 1,762 SQ. FT.
(ABANDONED)
ZONE # F-1
AREA = 1,762 SQ. FT.
(ABANDONED)
ZONE # F-2
AREA = 2,050 SQ. FT.
(ABANDONED)
ZONE # F-2
AREA = 2,050 SQ. FT.
(ABANDONED)
ZONE # F-1
AREA = 1,925 SQ. FT.
(ABANDONED)
ZONE # F-1
AREA = 1,925 SQ. FT.
(ABANDONED)
ZONE # F-4
AREA = 1,125 SQ. FT.
(ABANDONED)
ZONE # F-3
AREA = 1,133 SQ. FT.
(ABANDONED)
ACTIVE ZONE
AREA = 800 SQ. FT.
ACTIVE ZONE
AREA = 800 SQ. FT.
1 1
2 2
2 2
HVAC KEY NOTES
REUSE EXISTING RADIANT INFLOOR HEAT,
PIPING, AND ALL ASSOCIATED ACCESSORIES
WITH NEW DDC CONTROLS.
ABANDON EXISTING RADIANT INFLOOR HEAT,
PIPING, AND ALL ASSOCIATED ACCESSORIES.
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
KEY PLAN
9/14/2023 FOR CONSTRUCTION
BUILDING 29A BELOW FIRST
FLOOR PLAN - RADIANT
FLOOR NEW
N BUILDING 29A BELOW FIRST FLOOR PLAN - RADIANT FLOOR NEW (BASE BID)
SCALE: 1/8" = 1'-0"
0 1 5 10 20
M-601
ZONE # C-2
AREA = 478 SQ. FT
(ABANDONED)
ZONE # C-4
AREA = 106 SQ FT
(ABANDONED)
ZONE # C-2
AREA = 478 SQ. FT
(ABANDONED)
ZONE # C-3
AREA = 750 SQ. FT
(ABANDONED)
ZONE # C-4
AREA = 1005 SQ. FT
(ABANDONED)
ZONE # C-1
AREA = 455 SQ. FT
(ABANDONED)ZONE # C-1
AREA = 553 SQ. FT
(ABANDONED)
ZONE # C-1
AREA = 466 SQ. FT
(ABANDONED)
ZONE # C-1
AREA = 466 SQ. FT
(ABANDONED)
ZONE # C-2
AREA =561 SQ. FT
(ABANDONED) ZONE # C-2
AREA = 750 SQ. FT
(ABANDONED)
ACTIVE ZONE
AREA = 800 SQ. FT ACTIVE ZONE
AREA = 800 SQ. FT
X-2"ø
X-1-1/2"ø
X-1-1/4"ø
X-4"ø
X-2"ø X-1-1/4"ø
X-3"ø
X-1-1/4"ø
X-1-1/2"ø
X-2"ø
X-1-1/2"ø
X-2"ø
X-2"ø X-2-1/2"ø
M-602
4 4
5 5
HVAC KEY NOTES
CONNECT EXISTING PUMP TO NEW DDC
CONTROL PANEL.
INSTALL NEW DDC CONTROL VALVE. SIZE
CONTROL VALVE BASED ON EXISTING PIPING.
MODIFY EXISTING PIPING AS NEEDED TO MAKE
NEW CONNECTION. CONNECT CONTROL VALVE
TO DDC CONTROL PANEL.
INSTALL NEW 3-WAY DDC CONTROL VALVE. SIZE
CONTROL VALVE BASED ON EXISTING PIPING.
MODIFY EXISTING PIPING AS NEEDED TO MAKE
NEW CONNECTION. CONNECT CONTROL VALVE
TO DDC CONTROL PANEL.
REUSE EXISTING RADIANT CEILING PANELS,
PIPING, AND ALL ASSOCIATED ACCESSORIES
WITH NEW DDC CONTROLS.
ABANDON EXISTING RADIANT CEILING PANELS,
PIPING, AND ALL ASSOCIATED ACCESSORIES.
X-HX
X-ET
P P P P
P
PP
X-HR
X-HS
X-STM
X-CW
X-PRESSURE
GUAGE (TYP.)
X-SHUTOFF
VALVE (TYP.)
X-PUMP
(TYP. 2)
X-BACK FLOW
PREVENTER
X-STRAINER
X-PRESSURE
REDUCING VALVE
X-PRESSURE
RELIEF VALVE
FTX-STEAM
TRAP
X-SC TO SC PUMP
FROM GYM / WORKOUT 1
FROM GYM / WORKOUT 2
TO GYM / WORKOUT 1
TO GYM / WORKOUT 2
3-WAY MODULATING
CONTROL VALVE (TYP. 2)
2-WAY MODULATING
CONTROL VALVE
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
KEY PLAN
9/14/2023 FOR CONSTRUCTION
M-602
BUILDING 29A FIRST FLOOR
PLAN - RADIANT CEILING
NEW
N BUILDING 29A FIRST FLOOR PLAN - RADIANT CEILING NEW (BASE BID)
SCALE: 1/8" = 1'-0"
0 1 5 10 20
DBP
CAT
1 MECHANICAL ROOM - PIPING NEW
SCALE: 1/4" = 1'-0"
X-1-1/4"ø
HWR
X-1-1/4"ø
HWR
X-1-1/4"ø HWR X-1-1/4"ø
HWR
X-1-1/4"ø
HWR
X-1"ø HWS
(TYP.)
X-1"ø HWS
(TYP.)
X-1"ø HWS
(TYP.)
X-1"ø HWS
(TYP.)
X-1"ø HWS
(TYP.)
X-1"ø HWS
(TYP.)
X-1"ø HWS
(TYP.)
X-1"ø HWS
(TYP.)
X-1-1/4"ø
HWR
X-1-1/4"ø
HWR
X-1-1/4"ø
HWR
X-2" HWR
& HWR
X-2" HWS
& HWR
X-2-1/2"ø HWR
& HWS
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
RTU-1
RTU-2
RTU-3
3" HS
& HR
3" HS
& HR
2" HS &
HR DN TO HC-3
2" HS &
HR DN TO HC-1
1-1/2" HS &
HR DN TO HC-2
2" HS
& HR
2" HS
& HR
2" HS
& HR
S
P-1
P-2
P-3
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE
X-FIN TUBE
S S
S
SSS
S
2 2 2
4 4
4 4 4 4 4 4 4
S S S
SSS
S
S
2 2 2
4 4 4 4 4
44444
S S S S
S
SSSS
2 2 2 2
4 4 4 4 4 4 4
4444444
S S S S
SSSS
2 2 2 2
S2
4 4 4 4 4 4 4
4444444
RTU-1
RTU-1 RTU-1
RTU-1
RTU-3
RTU-3
RTU-3
RTU-3
S
2 RTU-2
S
2 RTU-2
S
2RTU-2
S
2RTU-2
CONCRETE PAD
CONCRETE PAD
CONCRETE PAD
1-1/4" CD
1-1/4" CD
1" CD
PIPING KEY NOTES
INSTALL NEW GRADE MOUNTED ROOF TOP UNIT.
PER MANUFACTURERS INSTALLATION
INSTRUCTIONS. INSTALL NEW ROOF TOP UNIT ON
NEW 12" THICK CONCRETE PAD.
INSTALL NEW DDC FLAT PLATE SENSORS IN THE
AND ASSOCIATED DDC WIRING IN LOCATION SHOWN.
MOUNT NEW FLAT PLATE SENSORS USING TAMPER
PROOF SCREWS
ROUTE NEW HEATING HOT WATER SUPPLY PIPING,
HEATING HOT WATER RETURN PIPING, PUMP, AND
ALL ASSOCIATED ACCESSORIES DOWN NEWLY
CONSTRUCTED CHASE TO NEW HEATING COILS.
INSTALL NEW PIPING, SHUT OFF VALVES, BALANCE
VALVE, AND 2-WAY MODULATING CONTROL VALVE
AT LOCATION SHOWN. MODIFY EXISTING PIPING AS
NEEDED TO MAKE NEW CONNECTION. BALANCE TO
MATCH GPM PRIOR TO CONSTRUCTION.
INSTALL NEW HEATING COIL CIRCULATION PUMP
PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS INSIDE NEWLY CONSTRUCTED
CHASE IN VERTICAL SECTION OF HEATING HOT
WATER SUPPLY PIPE. MOUNT NEW PUMP
APPROXIMATELY 60" ABOVE ROOF TOP UNIT
CONCRETE PAD.
INSTALL NEW CONDENSATE PIPING AND ALL
ASSOCIATED ACCESSORIES ON PAD TO ROUTE
CONDENSATE AWAY FROM THE RTU AND DRAIN ON
GRADE AS SHOWN.
GENERAL NOTES
1. SENSORS ARE LOCATED IN THE OCCUPIED
SPACE. THERMOSTATS SHOWN ON THIS PLAN
FOR CLARITY.
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
KEY PLAN
9/14/2023 FOR CONSTRUCTION
M-603
BUILDING 29A LOWER ATTIC
PLAN - PIPING NEW
N BUILDING 29A LOWER ATTIC PLAN - PIPING NEW (BASE BID)
SCALE: 1/8" = 1'-0"
0 1 5 10 20
X-2-1/2"ø HWR
& HWS
RTU-4
VAV-B02
VAV-B03
VAV-B04
VAV-B10
VAV-B11
VAV-B06
VAV-B05
VAV-B13VAV-B14
VAV-B22
VAV-B23
VAV-B21
VAV-B20
VAV-B19
VAV-B18
VAV-B01
VAV-B17
VAV-B15
2" HS
& HR DN
TO HC-4
2" HS
X-3/4"ø
HWS DN
X-2-1/2" HS
& 3" HR
X-3/4"
HS DN
X-3" HR DN
TO HTP-1
X-2-1/2" HS
DN TO HTP-2
X-3/4" HS & HR
X-2" HS &
1" HR
X-1" HS DN
X-3" HS &
1" HR
X-3/4" HR DN
X-2" HS &
1" HR
X-3" HS
X-3/4" HS
& HR
X-3/4" HS &
HR (TYP.)
X-3/4" HS
& HR UP
X-2" HS
X-1" HS DN
X-1" HS DN
X-1" HR DN
X-3/4" HS &
HR (TYP.)
X-1" HS & HR
X-1" HS & HR
X-1" HS & HR
X-1-1/4" HS
& 2" HR
X-3/4" HS DN
X-FIN TUBE
X-3/4" HS DN X-3/4" HR DN
X-2" HS &
2-1/2" HR
X-3/4" HS & HR
X-3/4" HS
& HR UP
X-1-1/2" HS
& 2-1/2" HR
X-1-1/2" HS
& 2-1/2" HR
X-1" HS DN
X-FIN TUBE
X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HR DN
X-1" HS
& HR
X-3/4" HS &
HR (TYP.)
X-1" HS
& HR
X-1-1/4" HS
& 2-1/2" HR
X-1-1/4" HS
& 2-1/2" HR
X-3/4" HS
& HR UP
X-1" HS & 3" HR
X-1" HS &
2-1/2" HR
X-3/4"
HS DN
X-3/4" HR DN
X-3/4"
HS DN
X-3/4"
HR DN
X-3/4" HS
& HR UP
X-3/4" HS
& HR UP
X-3" HS DN TO
HTP-1
X-2-1/2"
HS & 3" HR
X-FIN TUBE
X-2-1/2"
HRX-2-1/2"
HR
X-2-1/2" HR DN
TO HTP-2
X-3/4"
HS & HR
3" HS
3" HS
& HR
3" HS
& HR
3 3
6 P-4
S
S 3
S
S
X-CUH
X-CUH
X-CUH
X-CUH
X-AC
X-AC
X-AC
X-AC
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-CU
S
S
S
S
S
S S
S
3X-3/4" HS & HR
(TYP.)
0.50
GPM
1.00 GPM
2.50 GPM
2.50 GPM X-2-1/2" G UP
S
S
S
S
S
S
S
S
S
S
3/4" HS & HR
3/4" HS & HR
3/4"
HS & HR
S
S
VAV-B27
VAV-B284
VAV-B24
VAV-B25
S
CONCRETE PAD
1-1/4" CD
X-3/4" HS
& HR UP
PIPING KEY NOTES
INSTALL NEW GRADE MOUNTED ROOF TOP UNIT.
PER MANUFACTURERS INSTALLATION
INSTRUCTIONS. INSTALL NEW ROOF TOP UNIT ON
NEW 12" THICK CONCRETE PAD.
CONNECT NEW HEATING SUPPLY AND HEATING
RETURN PIPING WHERE SHOWN. MODIFY EXISTING
PIPING AS NEEDED FOR NEW CONNECTION.
INSTALL NEW DDC FLAT PLATE SENSORS IN THE
AND ASSOCIATED DDC WIRING IN LOCATION SHOWN.
MOUNT NEW FLAT PLATE SENSORS USING TAMPER
PROOF SCREWS
INSTALL NEW VAV BOXES IN NEW LOCATIONS
SHOWN PER MANUFACTURE'S INSTALLATION
INSTRUCTIONS. MODIFY EXISTING PIPING AS
NEEDED FOR NEW VAV BOX INSTALLATION AND AS
NEEDED TO INSTALL NEW SHUTOFF VALVES,
BALANCE VALVE, AND CONTROL VALVE.
INSTALL NEW PIPING, SHUT OFF VALVES, BALANCE
VALVE, AND 2-WAY MODULATING CONTROL VALVE
AT LOCATION SHOWN. MODIFY EXISTING PIPING AS
NEEDED TO MAKE NEW CONNECTION. BALANCE TO
GPM SHOWN.
ROUTE NEW HEATING HOT WATER SUPPLY PIPING,
HEATING HOT WATER RETURN PIPING, AND ALL
ASSOCIATED ACCESSORIES DOWN NEWLY
CONSTRUCTED CHASE TO NEW HEATING COILS.
INSTALL NEW HEATING COIL CIRCULATION PUMP
PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS INSIDE NEWLY CONSTRUCTED
CHASE IN VERTICAL SECTION OF HEATING HOT
WATER SUPPLY PIPE. MOUNT NEW PUMP
APPROXIMATELY 72" ABOVE ROOF TOP UNIT
CONCRETE PAD.
INSTALL NEW CONDENSATE PIPING AND ALL
ASSOCIATED ACCESSORIES ON PAD TO ROUTE
CONDENSATE AWAY FROM THE RTU AND DRAIN ON
GRADE AS SHOWN.
SEE M-607 FOR PIPING CONTINUATION.
GENERAL NOTES
1. SENSORS ARE LOCATED IN THE OCCUPIED
SPACE. THERMOSTATS SHOWN ON THIS PLAN
FOR CLARITY.
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
KEY PLAN
9/14/2023 FOR CONSTRUCTION
M-604
BUILDING 29B LOWER ATTIC
PLAN - PIPING NEW
N BUILDING 29B LOWER ATTIC PLAN - PIPING NEW (ADD ALTERNATE #1)
SCALE: 1/8" = 1'-0"
0 1 5 10 20
RTU-5
VAV-C02
VAV-C01
VAV-C03
VAV-C04
VAV-C07VAV-C08VAV-C09
VAV-C10
VAV-C29
VAV-C28
VAV-C27
VAV-C26
VAV-C15
VAV-C21
VAV-C22
VAV-C23
VAV-C24
VAV-C25
VAV-C14
VAV-C13 VAV-C11
VAV-C12
2" HS &
HR DN TO HC-5
X-1" HR
HWR UP
X-1" HS DN
X-1" HR DN
X-1" HS
DN
X-1" HR DN
X-1-1/4"
HS & HR X-2" HS &
1-1/4" HR
X-1-1/4" HS
& 1-1/2" HR
X-1" HS & HR
X-3/4" HS &
HR (TYP.)
X-3/4" HS &
HR (TYP.)
X-1" HS
& HR
X-3/4" HS
& HR UP
X-3/4" HS
& HR UP
X-2" HS &
1-1/4 HR
X-1" HS
X-1" HS &
HR
X-1" HS DN X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HS
DN
X-1" HS
DN
X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HR DN
X-1"
HS & HR
X-1"
HS & HR
X-3/4"
HS & HR
X-3/4" HS
& HR UP
X-3/4" HS
& HR UP
X-2" HS &
1-1/2 HR
X-1-1/2" HS
& 1-1/2" HR
X-1-1/2" HS
& 1-1/2" HR
X-1-1/2" HS
& 2" HR
X-3/4" HS &
HR (TYP.)
X-1-1/2" HS
& 1-1/4" HR
X-3/4" HR DN
X-1" HS DN
X-3/4" HS DN
X-1" HR DNX-1-1/2" HS
& 1-1/4" HR
X-2" HS &
1" HR
X-1" HS DN
X-2" HS &
1" HR
X-3/4" HS
& HR UP
X-3/4" HS &
HR (TYP.)
X-3/4" HS DN
X-1-1/4'' HS
& 1-1/2" HR
X-2" HS &
1" HR
X-2" HS &
1" HR
X-2" HS &
1" HR
X-1" HS DN
X-2" HS &
1" HR
X-2" HS &
1" HR
X-1-1/4" HS
& 2" HR
X-1-1/4" HS
& 2" HR
X-1-1/4" HS
X-1'' HS & HR
X-3/4" HS
& HR UP
X-3/4" HS
& HR UP
X-1-1/4" HR
X-1" HS &
2" HR
X-1" HS DN
X-1" HS DN
X-1" HS DN
X-1" HR DN
X-1-1/4" HR X-3/4" HS
& 2" HR
X-3/4" HS DN X-3/4" HR DN
X-2" HS &
1" HR
X-3/4" HS
& HR UP
X-1" HS DN
X-1-1/4" HS
& 2" HR
X-2" HS &
2-1/2" HR
3 33 3
4 4 4
VAV-C30 4
4 4 4
P-5 7
S
S
S
S3X-CUH
X-CUH
X-FIN TUBEX-FIN TUBEX-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE X-FIN TUBE
X-FIN TUBEX-FIN TUBEX-FIN TUBEX-FIN TUBE X-FIN TUBEX-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-FIN TUBE
X-CUX-CU
S3
S
X-3/4" HS & HR
(TYP.)
2.50 GPM
X-3/4" HS
& HR (TYP.)
1.50 GPM
2.50 GPM
S
S
S S
S
S S
S
S
S S
S S
S
S
S
S
S
S
S
1-1/4" CD
CONCRETE PAD
X-3/4" HS
& HR UP
PIPING KEY NOTES
INSTALL NEW GRADE MOUNTED ROOF TOP UNIT.
PER MANUFACTURERS INSTALLATION
INSTRUCTIONS. INSTALL NEW ROOF TOP UNIT ON
NEW 12" THICK CONCRETE PAD.
CONNECT NEW HEATING SUPPLY AND HEATING
RETURN PIPING WHERE SHOWN. MODIFY EXISTING
PIPING AS NEEDED FOR NEW CONNECTION.
INSTALL NEW DDC FLAT PLATE SENSORS IN THE
AND ASSOCIATED DDC WIRING IN LOCATION SHOWN.
MOUNT NEW FLAT PLATE SENSORS USING TAMPER
PROOF SCREWS.
INSTALL NEW VAV BOXES IN NEW LOCATIONS
SHOWN PER MANUFACTURE'S INSTALLATION
INSTRUCTIONS. MODIFY EXISTING PIPING AS
NEEDED FOR NEW VAV BOX INSTALLATION AND AS
NEEDED TO INSTALL NEW SHUTOFF VALVES,
BALANCE VALVE, AND CONTROL VALVE.
INSTALL NEW PIPING, SHUT OFF VALVES, BALANCE
VALVE, AND 2-WAY MODULATING CONTROL VALVE
AT LOCATION SHOWN. MODIFY EXISTING PIPING AS
NEEDED TO MAKE NEW CONNECTION. BALANCE TO
GPM SHOWN.
ROUTE NEW HEATING HOT WATER SUPPLY PIPING,
HEATING HOT WATER RETURN PIPING, AND ALL
ASSOCIATED ACCESSORIES DOWN NEWLY
CONSTRUCTED CHASE TO NEW HEATING COILS.
INSTALL NEW HEATING COIL CIRCULATION PUMP
PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS INSIDE NEWLY CONSTRUCTED
CHASE IN VERTICAL SECTION OF HEATING HOT
WATER SUPPLY PIPE. MOUNT NEW PUMP
APPROXIMATELY 72" ABOVE ROOF TOP UNIT
CONCRETE PAD.
INSTALL NEW CONDENSATE PIPING AND ALL
ASSOCIATED ACCESSORIES ON PAD TO ROUTE
CONDENSATE AWAY FROM THE RTU AND DRAIN ON
GRADE AS SHOWN.
SEE M-608 FOR PIPING CONTINUATION.
GENERAL NOTES
1. SENSORS ARE LOCATED IN THE OCCUPIED
SPACE. THERMOSTATS SHOWN ON THIS PLAN
FOR CLARITY.
file no.
checked by drawn by consultant contract order no.
472/LCFMAINTPROJ
consultant job no.
20080.00
M a t r ix
472/19503.SMD
funding code sheet description
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N issue date
KEY PLAN
9/14/2023 FOR CONSTRUCTION
M-605
BUILDING 29C LOWER ATTIC
PLAN - PIPING NEW
N BUILDING 29C LOWER ATTIC PLAN - PIPING NEW (ADD ALTERNATE #1)
SCALE: 1/8" = 1'-0"
0 1 5 10 20
| Sheets and Views |
| M-000-2008000-T-000 |
| M100-2008000-M-100 |
| M300-2008000-M-300 |
| M301-2008000-M-301 |
| M302-2008000-M-302 |
| M303-2008000-M-303 |
| M304-2008000-M-304 |
| M305-2008000-M-305 |
| M306-2008000-M-306 |
| M307-2008000-M-307 |
| M308-2008000-M-308 |
| M309-2008000-M-309 |
| M310-2008000-M-310 |
| M311-2008000-M-311 |
| M312-2008000-M-312 |
| M313-2008000-M-313 |
| M314-2008000-M-314 |
| M315-2008000-M-315 |
| M316-2008000-M-316 |
| M317-2008000-M-317 |
| M318-2008000-M-318 |
| M319-2008000-M-319 |
| M320-2008000-M-319 |
| M400-2008000-M-400 |
| M401-2008000-M-401 |
| M402-2008000-M-402 |
| M403-2008000-M-403 |
| M404-2008000-M-404 |
| M405-2008000-M-405 |
| M406-2008000-M-406 |
| M600-2008000-M-600 |
| M601-2008000-M601 |
| M602-2008000-M602 |
| M603-2008000-M603 |
| M604-2008000-M604 |
| M605-2008000-M605 |
| M606-2008000-M606 |
| M607-2008000-M607 |
| M608-2008000-M608 |
| M609-2008000-M-609 |
| M610-2008000-M-610 |
| M611-2008000-M-611 |
| M800-2008000-M-800 |
| M801-2008000-M-801 |
| M802-2008000-M-802 |
| M900-2008000-M-900 |
File details come from the government source that posted it. Updated .