This solicitation requests proposals for Multiple Award Contract Indefinite Delivery, Indefinite Quantity contracts to provide sustainment services for Littoral Combat Ships on the East Coast. The Naval Sea Systems Command will award contracts for drydocking selected restricted availabilities, selected restricted availabilities, continuous maintenance availabilities, unscheduled maintenance, and all outside the continental United States maintenance. The scope includes three MAC constructs for availabilities within and outside of the continental United States. MAC III is anticipated to be a small business set aside for preventative/planned maintenance, facility maintenance, and corrosion control within the continental United States. All MAC IDIQ contracts will have a term of five one-year ordering periods. Interested offerors should monitor the System for Award Management for any amendments and request restricted attachments related to force requirements, paint specifications, interface documents, and notional work packages by September 8, 2020. Award of the MAC IDIQ contracts is anticipated in March 2021, with performance at locations including the South East Regional Maintenance Center in Mayport, Florida and other domestic and overseas sites.

View the file

Other files

File Type Posted
LCS SEC Attachment J-20 Labor and Material Burden Ceiling Rates Price Sheets Rev.2.xlsx XLSX spreadsheet
LCS SEC EAST II PPI Responses 97-98.pdf PDF
N00024-20-R-4408 RFP Amendment 0004.pdf PDF
N00024-20-R-4408 RFP Amendment 0003.pdf PDF
LCS SEC EAST II PPI Responses 91-96.pdf PDF
LCS SEC Attachment J-20 Labor and Material Burden Ceiling Rates Price Sheets Rev1.xlsx XLSX spreadsheet
LCS SEC EAST II PPI Responses 75-90.pdf PDF
N00024-20-R-4408 RFP Amendment 0002.pdf PDF
N00024-20-R-4408 RFP Amendment 0001.pdf PDF
LCS SEC EAST II PPI Responses 9-74.pdf PDF
LCS SEC Attachment J-11 Logistics Mgmt Info Worksheets.docx DOCX document
LCS SEC EAST II RFP Pre-Proposal Inquiry Responses 1.pdf PDF
LCS SEC Attachment S-6 Pre-award Survey SF 1408.pdf PDF
LCS SEC Attachment J-18 Growth Management Request Form.docx DOCX document
LCS SEC Attachment J-14 List of OEMs.docx DOCX document
LCS SEC Attachment J-17 LCSRON TWO Camera Use Request.docx DOCX document
LCS SEC Attachment S-1 Questions and Comments Form.docx DOCX document
LCS SEC Attachment S-2 Technical Capabilities Data Sheet.docx DOCX document
N00024-20-R-4408 RFP.pdf PDF
LCS SEC Attachment J-2 MILSTRAP DHA_BHJ Desk Gude for Demand Only Transaction Reporting 2016.pdf PDF
LCS SEC Attachment J-16 Contract Security Classification Specification DD Form 254 dtd May 20.pdf PDF
LCS SEC EAST II Exhibits A-C.pdf PDF
LCS SEC Attachment J-20 Labor and Material Burden Ceiling Rates Price Sheets.xlsx XLSX spreadsheet
LCS SEC Attachment S-4 Eligibility Criteria Data Sheet.pdf PDF
LCS SEC Attachment J-1 Desk Guide for Ships 3-M Parts Usage Reporting Ver7 9 Aug 2018.pdf PDF
LCS SEC Attachment S-3 Past Performance Questionaire.docx DOCX document
LCS SEC Attachment J-4 COMLCSRONTWOINST 4750.1C Compartment Cleaning Plan.pdf PDF
LCS SEC Attachment J-7 Contractor PMS Reporting Template (SKED).pdf PDF
LCS SEC Attachment J-5 Tag-Out User Manual (TUM) S-0400-AD-URM_TUM Revision 7 dtd 21 Nov 2013.pdf PDF
LCS SEC Attachment J-10 Provisioning Statement of Work.docx DOCX document
LCS SEC Attachment J-6 Work Authorization Form (WAF) COMUSFLTFORCOMINST 4790.pdf PDF
LCS SEC Attachment J-8 Facilities Maintenance Work Specification Template.pdf PDF
LCS SEC Attachment J-13 PMS 505 Instructions for Seaframe Mission Critical Systems.pdf PDF
LCS SEC Attachment J-19 CNRMCINST 4280.1 Master Agreement for Repair and Alteration of Vessels .pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROVISIONING REQUIREMENTS INTRODUCTION

This section provides requirements/specifications for Contractor’s use in submitting Provisioning Data Products and participating in the provisioning process with the Government.

1. Prime Provisioning Activity. The Prime Provisioning Activity (PPA) is the NAVSEA Engineering Activity designated as the Technical Support Activity (TSA). The PPA/TSA will be the Government Activity that is listed on the Contract Data Requirements List (CDRL) for delivery of the LMI Data Products for DID DI-SESS-81758A. The PPA may be re-negotiated at the PGC. The PPA (Address and Zip Code):

Commander NSWC Carderock Division (Code 94512) Building 4 Philadelphia, PA 19112-5083

2. Correspondence. Address all correspondence, Provisioning Data Products, Engineering Data for Provisioning (EDFP) documentation, etc., pertaining to spare/repair parts provisioning and related data items to the PPA.

3. Conferences. The requirements for provisioning related conferences will be determine at the PGC or by the PPA. The PGC is / is not required.

4. Sample Article. A sample article of the component/end item is required / is not required at the provisioning conference. A sample article of the component/end item will be viewed / disassembled at the provisioning conference.

5. Incremental Submission. Incremental submission concentrates provisioning efforts on portions of the system which are considered design stable. By authorizing incremental submission, the Provisioning Data Products for the stable aspects of the system can be processed while waiting for the remainder of the system to mature. Incremental submission of Provisioning Data Products is / is not authorized. This will be determined at the PGC.

6. Special Tools and Test Equipment. STTE will / will not be included in the Provisioning Data Products.

7. Vendors/Subcontractors. When the prime contractor buys end articles or a portion thereof from a vendor/subcontractor, the prime contractor shall impose this specification upon its vendors/subcontractors. The inclusion of the requirement for such data on contractor’s subcontracts/purchase orders to its vendor/subcontractors does not relieve the prime contractor of its obligation to insure timely delivery of the required Provisioning Data Products and EDFP.

8. Ordering of Spare/Repair Parts. The Government will use provisioned Item Order (PIO) if the Government elects to procure spares/repair parts from the prime contractor. The Government reserves the right to place additional orders for spare/repair parts during the life of the contract. PIOs will be placed directly with vendors if it is determined that such purchase will reduce acquisition costs without compromising the integrity of the system in which the parts are to be used.

9. Delivery of Spare/Repair Parts. Spare/repair parts shall be delivered in accordance with the delivery schedule provided in the PIO unless specified otherwise. The delivery schedule provided to the contractor in the PIO will become the definite/firm schedule unless the contractor takes exception and provides an alternative delivery schedule with which the government agrees within 60 calendar days from receipt of the PIO.

10. Interim Support Items. The requirement for Interim Support Items is a contract option that the Government may exercise at any time during the life of contract. The Interim Supply Support (ISS) process will be discussed at the PGC.

11. Interim Release. Interim release should be employed when there are spares required that take longer to manufacture than the time available in the normal provisioning process. By requiring the use of interim release, the contractor shall prepare a listing of items which fall into this category. These items comprise the Long Lead Time Items List (LLTIL). Interim Release is /is not required.

12. Provisioning Performance Schedule. The Provisioning Performance Schedule (PPS) is used to consolidate all provisioning-related requirements of the contract into a time-sequenced format. If required, the contractor shall complete the PPS and submit it as part of their offer. The schedule shall be finalized at the PGC. The Provisioning Performance Schedule is / is not required.