L-3 CEMAT N00024-26-R-4114.xlsx

XLSX spreadsheet 105 KB Posted

Attached to
Carrier/Surface Ship Engineering Maintenance Assist Team (CEMAT/SEMAT)
Solicitation number
N0002426R4114
Issued by

About this file

This is a cost proposal template and labor hour breakdown for the Surface/Carrier Engineering Maintenance Assist Team (S/CEMAT) contract N00024-26-R-4114, a five-year Cost Plus Fixed Fee (CPFF) Indefinite Delivery/Indefinite Quantity (IDIQ) contract with the Naval Sea Systems Command (NAVSEA). The solicitation seeks engineering and technical support for maintenance, overhaul, and repair of equipment and systems on U.S. Navy Aircraft Carriers (CVN) and Surface Ships, with major performance locations including Norfolk VA, Newport News VA, San Diego CA, Bremerton WA, Pearl Harbor HI, Yokosuka Japan, Sasebo Japan, and Everett WA.

The cost proposal includes CLINs for direct labor (CLIN 0001), materials (CLIN 0002), and other direct costs/ODCs including travel and incidental materials (CLIN 0003), with a total proposed cost of $189,516,699 across the five-year performance period. Labor hour requirements total 6,062,848 hours across multiple contract line items (CEMAT, RCOH, CNAL, CNAP, CNSL, CNSP/SEMAT) and incorporate diverse labor categories including program managers, project engineers, production managers, various maintenance and engineering technicians (mechanical, electrical, hull), material management specialists, and administrative personnel, distributed between contractor and government sites. Materials costs total $173,274,781 and ODCs total $16,111,195. The template specifies requirements for detailed cost breakdowns by labor category with hourly rates, indirect cost rates (labor overhead, material G&A, and cost of money), subcontractor data, consultant agreements, equipment, travel, and miscellaneous expenses, with supporting documentation required for substantiation.

View the file

Other files

File Type Posted
L-2 RIS Past Performance Questionnaire (PPQ) CEMAT_A0002.docx DOCX document
N0002426R4114 Amendment 0002.pdf PDF
N0002426R4114 Amendment 0001.pdf PDF
L-0 Section L Amendment 0001.pdf PDF
CEMAT Glossary Page Amendment 0001.pdf PDF
J-19 Non-Key Personnel Reference Guide Amendment 0001.pdf PDF
L-1_Bidders_Question_Answers 7.31.26 Amendment 0001.pdf PDF
J-12 Attachment Key Personnel List Amendment 0001.pdf PDF
J-1 TAM.pdf PDF
J-7 042-010 Nuclear Powered Ships-Nuclear Support Ships special requirements.pdf PDF
J-8 042-037 General Requirements for Work Within Naval Station Norfolk accomplish.pdf PDF
J-9 077-001 Hazardous Waste Produced on Naval Vessels control.pdf PDF
DD-2345_Template.pdf PDF
L-0 Section L.pdf PDF
N0002426R4114 RFP_6.24.26_final.pdf PDF
J-11 DD254 for N00024-26-R-4114 - Signed.pdf PDF
J-12 Attachment Key Personnel List.pdf PDF
J-13 SIF and SBPIF.pdf PDF
L-2 RIS Past Performance Questionnaire (PPQ) CEMAT.docx DOCX document
Posting_Offer.pdf PDF
J-5 042-006 General Occupational Safety OSHE Requirements for NNS accomplish.pdf PDF
J-6 042-007 Security Requirements for Work Within Norfolk Naval Shipyard accomplish.pdf PDF
J-0 Statement of Work.pdf PDF
J-2 FY25 NWRMC Local Standard Items - Base 1.pdf PDF
J-3 FY20 099-05PH MISC.pdf PDF
J-4 042-005 NNSY Work Authorization Form (WAF) Requirements.pdf PDF
J-10 Contractor Badging and Access Requirements Solicitation.pdf PDF
J-18 NAVSEA INST 5100.3E.pdf PDF
L-1_Bidders Question Submittal Form_CEMAT.xlsx XLSX spreadsheet
M-0 Section M.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001_Labor Hours

Labor Category SummaryYear 1Year 2Year 3Year 4Year 5Total
Labor CategoryHoursHoursHoursHoursHoursHours
Program Manager (Contractor Site)10,34810,34810,3489,9089,90850,860
Program Manager (Government Site)7707707707707703,850
Project Engineer/Manager (Contractor Site)11,15611,15611,15610,71610,07654,260
Project Engineer/Manager (Government Site)3,2953,2953,2953,2953,29516,475
Production Manager (Contractor Site)141,583141,583141,583141,583141,583707,915
Production Manager (Government Site)61,37863,47859,03857,83857,838299,570
Senior Maintenance Specialist – Mechanical (Contractor Site)57,25857,25857,25857,25857,258286,290
Senior Maintenance Specialist – Mechanical (Government Site)149,560151,660147,216145,616145,816739,868
Senior Maintenance Specialist - Electrical (Contractor Site)20,60020,60020,60020,60020,600103,000
Senior Maintenance Specialist - Electrical (Government Site)67,41369,51365,06963,46963,669329,133
Senior Maintenance Specialist – Hull (Contractor Site)000000
Senior Maintenance Specialist – Hull (Government Site)30,11532,21527,69026,49026,490143,000
Senior Engineering Technician – Mechanical (Contractor Site)28,60028,60028,60027,30027,400140,500
Senior Engineering Technician – Mechanical (Government Site)77,87979,97975,45473,85474,054381,220
Senior Engineering Technician – Electrical (Contractor Site)25,60025,60025,60027,00027,100130,900
Senior Engineering Technician – Electrical (Government Site)83,80685,90681,48979,88980,089411,179
Senior Engineering Technician – Hull (Contractor Site)97,56097,56097,56097,56097,560487,800
Senior Engineering Technician – Hull (Government Site)45,92048,02043,63542,03542,235221,845
Corrosion Technician (Government Site)5,4685,4685,4685,4685,46827,340
Engineering Technician – Mechanical (Contractor Site)17,60017,60017,60017,60017,60088,000
Engineering Technician – Mechanical (Government Site)39,30441,40437,47335,87336,073190,127
Engineering Technician – Electrical (Contractor Site)17,60017,60017,60017,60017,60088,000
Engineering Technician – Electrical (Government Site)32,41934,51928,92627,32627,526150,716
Engineering Technician – Hull (Contractor Site)49,34149,34149,34149,34149,341246,705
Engineering Technician – Hull (Government Site)27,20329,30325,31823,71823,918129,460
Material Management Specialist (Contractor Site)39,04740,04738,04738,04738,047193,235
Material Management Specialist (Government Site)33,73033,73033,73033,73040,230175,150
Computer Programmer (Contractor Site)5,8205,8205,8205,8205,82029,100
Computer Programmer (Government Site)000000
Draftsman/CAD Operator (Contractor Site)3203203203203201,600
Data Entry Operator (Contractor Site)11,64712,64710,64710,64710,64756,235
Data Entry Operator (Government Site)2,1682,1682,1682,1682,16810,840
Technical Typist (Contractor Site)4,6744,6748,6748,6748,67435,370
Administrative Assistant (Contractor Site)24,61125,61123,61123,61123,611121,055
Program Cost Control Analyst (Contractor Site)2,4502,4502,4502,4502,45012,250
Grand Totals1,226,2431,250,2431,203,5541,187,5741,195,2346,062,848
CEMAT RCOHCNALCNAPCNSLCNSP
Labor Category Summary - Breakout by regionYear 1Year 2Year 3Year 4Year 5TotalYear 1Year 2Year 3Year 4Year 5TotalYear 1Year 2Year 3Year 4Year 5TotalYear 1Year 2Year 3Year 4Year 5TotalYear 1Year 2Year 3Year 4Year 5Total
Labor CategoryHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHoursHours
Program Manager (Contractor Site)1,0801,0801,0806406404,5202402402402402401,2008026802680268026802640,1301241241241241246208788788788788784,390
Program Manager (Government Site)0000000000000000000000007707707707707703,850
Project Engineer/Manager (Contractor Site)1,0801,0801,08064003,8800000006500650065006500650032,5000000003576357635763576357617,880
Project Engineer/Manager (Government Site)0000000000000000005945945945945942,9702701270127012701270113,505
Production Manager (Contractor Site)00000192019201920192019209,600139663139663139663139663139663698,315000000000000
Production Manager (Government Site)18,94021,04016,60015,40015,40087,380153601536015360153601536076,8000000003173317331733173317315,8652390523905239052390523905119,525
Senior Maintenance Specialist – Mechanical (Contractor Site)0000005760576057605760576028,8005149851498514985149851498257,490000000000000
Senior Maintenance Specialist – Mechanical (Government Site)29,78031,88027,43625,83626,036140,968154001540015400154001540077,0009784978497849784978448,9208354835483548354835441,7708624286242862428624286242431,210
Senior Maintenance Specialist - Electrical (Contractor Site)0000000000002060020600206002060020600103,000000000000000
Senior Maintenance Specialist - Electrical (Government Site)29,78031,88027,43625,83626,036140,96840404040402005208520852085208520826,0404648464846484648464823,2402773727737277372773727737138,685
Senior Maintenance Specialist – Hull (Contractor Site)000000000000000000000000000000
Senior Maintenance Specialist – Hull (Government Site)29,87531,97527,45026,25026,250141,8000000002402402402402401,200000000000000
Senior Engineering Technician – Mechanical (Contractor Site)3,0003,0003,0001,7001,80012,5000000002560025600256002560025600128,000000000000000
Senior Engineering Technician – Mechanical (Government Site)30,67532,77528,25026,65026,850145,200154801548015480154801548077,4002402402402402401,2004184418441844184418420,9202730027300273002730027300136,500
Senior Engineering Technician – Electrical (Contractor Site)0001,4001,5002,9000000002560025600256002560025600128,000000000000000
Senior Engineering Technician – Electrical (Government Site)29,48531,58527,16825,56825,768139,574154401544015440154401544077,2000000003694369436943694369418,4703518735187351873518735187175,935
Senior Engineering Technician – Hull (Contractor Site)0000000000009756097560975609756097560487,800000000000000
Senior Engineering Technician – Hull (Government Site)29,13531,23526,85025,25025,450137,920000000000000000000167851678516785167851678583,925
Corrosion Technician (Government Site)0000000000000000000000005468546854685468546827,340
Engineering Technician – Mechanical (Contractor Site)000000000000176001760017600176001760088,000000000000000
Engineering Technician – Mechanical (Government Site)24,14326,24322,31220,71220,912114,3223840384038403840384019,200000000000000113211132111321113211132156,605
Engineering Technician – Electrical (Contractor Site)000000000000176001760017600176001760088,000000000000000
Engineering Technician – Electrical (Government Site)22,42324,52318,93017,33017,530100,7363840384038403840384019,2000000000000006156615661566156615630,780
Engineering Technician – Hull (Contractor Site)0000000000004934149341493414934149341246,705000000000000
Engineering Technician – Hull (Government Site)24,73526,83522,85021,25021,450117,1200000000000000000002468246824682468246812,340
Material Management Specialist (Contractor Site)10,84711,8479,8479,8479,84752,2350000002820028200282002820028200141,000000000000000
Material Management Specialist (Government Site)00006,5006,500153601536015360153601536076,8000000002112211221122112211210,560162581625816258162581625881,290
Computer Programmer (Contractor Site)0000000000005820582058205820582029,100000000000000
Computer Programmer (Government Site)000000000000000000000000000000
Draftsman/CAD Operator (Contractor Site)0000000000003203203203203201,600000000000000
Data Entry Operator (Contractor Site)10,84711,8479,8479,8479,84752,2350000008008008008008004,000000000000000
Data Entry Operator (Government Site)0000000000000000000000002168216821682168216810,840
Technical Typist (Contractor Site)004,0004,0004,00012,0000000003353335333533353335316,7652082082082082081,040111311131113111311135,565
Administrative Assistant (Contractor Site)108471184798479847984752,2350000009484948494849484948447,4202082082082082081,0404072407240724072407220,360
Program Cost Control Analyst (Contractor Site)2450245024502450245012,250000000000000000000000000
Grand Totals309,122333,122286,433270,453278,1131,477,24392,68092,68092,68092,68092,680463,400523,037523,037523,037523,037523,0372,615,18527,29927,29927,29927,29927,299136,495274,105274,105274,105274,105274,1051,370,525

CLINS 0002_3 Material & ODC

CLINDescriptionYear 1Year 2Year 3Year 4Year 5Grand
Totals
0002Materials$ 35,048,000.00$ 35,075,775.00$ 34,404,244.39$ 32,933,425.49$ 35,813,336.12$ 173,274,781.00
0003Other Direct Costs (ODCs): incidental materials, travel and subsistence.$ 2,992,163.72$ 3,251,338.94$ 3,412,228.40$ 3,221,201.42$ 3,234,262.30$ 16,111,194.78
CEMAT RCOHDescriptionYear 1Year 2Year 3Year 4Year 5Grand
CLINTotals
0002Materials$11,200,000.00$11,200,000.00$10,500,000.00$9,000,000.00$12,000,000.00$ 53,900,000.00
0003ODC$143,418.04$130,052.51$278,860.82$75,430.04$75,782.04$ 703,543.45
CNAPDescriptionYear 1Year 2Year 3Year 4Year 5Grand
CLINTotals
0002Materials$17,827,000.00$17,827,000.00$17,827,000.00$17,827,000.00$17,677,000.00$ 88,985,000.00
0003ODC$2,144,624.08$2,404,624.08$2,404,624.08$2,404,624.08$2,404,624.08$ 11,763,120.40
CNALDescriptionYear 1Year 2Year 3Year 4Year 5Grand
CLINTotals
0002Materials$10,000.00$10,000.00$10,000.00$10,000.00$10,000.00$ 50,000.00
0003ODC$74,039.60$74,039.60$74,039.60$74,039.60$74,039.60$ 370,198.00
CNSLDescriptionYear 1Year 2Year 3Year 4Year 5Grand
CLINTotals
0002Materials$140,000.00$143,500.00$147,087.50$150,764.69$154,533.80$ 735,885.99
0003ODC$262,064.00$268,439.00$274,973.38$281,671.11$288,536.29$ 1,375,683.78
CNSP SEMATDescriptionYear 1Year 2Year 3Year 4Year 5Grand
CLINTotals
0002Materials$5,871,000.00$5,895,275.00$5,920,156.89$5,945,660.80$5,971,802.32$ 29,603,895.01
0003ODC$368,018.00$374,183.75$379,730.52$385,436.59$391,280.29$ 1,898,649.15

Total Proposed

CARRIER/ SURFACE ENGINEERING MAINTENANCE ASSIST TEAM (C/SEMAT)

N00024-26-R-4114: Cost Proposal Submission

CLINDescriptionDirect CostIndirect Cost
(Note 1)Indirect Cost
(Note 1)Indirect Cost
(Note 1)Indirect Cost
(Note 1)Indirect Cost
(Note 1)Indirect Cost
(Note 1)Fixed Fee
(Note 1)Total
0001Labor$ 118,665$ 12,058$ 130,723
CLIN 0001 Totals$ 118,665$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 12,058$ 130,723
0002Material$ 173,274,781$ - 0$ 173,274,781
CLIN 0002 Totals$ 173,274,781$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 173,274,781
0003ODC$ 16,111,195$ - 0$ 16,111,195
CLIN 0003 Totals$ 16,111,195$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 16,111,195
Grand Total$ 189,504,640$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 12,058$ 189,516,699

Note 1 Bidders will need to link the associated indirect cost factors to each CLIN for associated materials and travel expenses. Should vendors need additional indirect columns, they will need to be added by the vendor. The vendor should update the associated title with the respective indirect rate to indicate the indirect rate type.

Direct Labor and Fee categories have already been linked for the Offeror to each associated tab. (Please note values present in the overview tab are directly tied to the sample entry provided by the Government for instructional purposes only). Once the vendor removes the sample data from each CLIN tab, the associated cost for the sample will automatically be removed from the overview tab. Direct material and ODC have been linked as well for CLINs 0002 and 0003.

CLIN Detail (Template)

Name of Project: CARRIER/ SURFACE ENGINEERING MAINTENANCE ASSIST TEAM (C/SEMAT)
SOLICITATION NO. N00024-26-R-4114
ATTACHMENT L-3
Document Template dtd 24 SEPT 24
Cost Proposal for CLIN XXXX (include Purpose/Description of CLIN)
Prime / Offeror:
Labor Category (Note 2)Name (Last, First)Year AYear BYear CYear DYear ETotal (Note 3)
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: ENG, Level IISmith, John20$56.00$1,120.00100$57.40$5,740.00100$58.84$5,884.0080$60.31$4,824.80$0.00300$17,568.80
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor20$1,120.00100$5,740.00100$5,884.0080$4,824.800$0.00300$17,568.80
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: Acme Anvils100$500.00$50,000.000ERROR:#DIV/0!$0.000ERROR:#DIV/0!$0.000ERROR:#DIV/0!$0.000ERROR:#DIV/0!$0.00$50,000.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$50,000.00$0.00$0.00$0.00$0.00$50,000.00
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: Trusted Ex-Employee52$195.31$10,214.72209195.9784659636$40,881.110ERROR:#DIV/0!$0.000ERROR:#DIV/0!$0.000ERROR:#DIV/0!$0.00261$51,095.83
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
Total Consultants Costs52$10,214.72209$40,881.11$0.00$0.00$0.00261$51,095.83
BaseRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: Materials and Supplies$1,647.50$0.00$0.00$0.00$0.00$1,647.50
Sample: Equipment$560.00$0.00$0.00$0.00$0.00$560.00
Sample: Travel$0.00$8,060.00$0.00$0.00$0.00$8,060.00
Sample: Miscellaneous$0.00$0.00$5,000.00$0.00$0.00$5,000.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Total ODCs$2,207.50$8,060.00$5,000.00$0.00$0.00$15,267.50

Total Direct Costs $63,542.22 $54,681.11 $10,884.00 $4,824.80 $0.00 561 $133,932.13

BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $HoursExtended $
Sample: Labor and Material Overhead$2,767.5090.20%$2,496.29$5,740.0090.20%$5,177.48$5,884.0090.20%$5,307.37$4,824.8090.20%$4,351.97$0.00$17,333.11
Sample: Material G&A$1,647.5016.30%$268.54$0.0016.30%$0.00$0.0016.30%$0.00$0.0016.30%$0.00$0.00$268.54
Sample: Cost of Money (CoM)$66,307.050.05400%$35.81$59,858.590.05400%$32.32$16,191.370.05400%$8.74$9,176.770.05400%$4.96$0.00$81.83
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Total Indirect Costs$2,800.64$5,209.80$5,316.11$4,356.93$0.00$17,683.48

Total Estimated Costs $66,342.86 $59,890.91 $16,200.11 $9,181.73 $0.00 $151,615.61

Fee / Profit on Prime Labor (Note 6)$65,747.056.00%$3,944.82$59,858.596.00%$3,591.52$16,191.376.00%$971.48$9,176.776.00%$550.61$0.006.00%$0.00$9,058.43
Fee / Profit on Subcontractor Labor (Note 6)$50,000.006.00%$3,000.00$0.006.00%$0.00$0.006.00%$0.00$0.006.00%$0.00$0.006.00%$0.00$3,000.00

Total Price / Costs Plus Fixed Fee $73,287.68 $63,482.42 $17,171.59 $9,732.34 $0.00 $163,674.03

Instructions: • Add a separate tab for each separately priced CLIN in the proposal and indicate the CLIN number / Description as the name of the tab. If more than one CLIN tab is used, an additional tab shall be inserted as the first tab that summarizes subsequent CLIN specific tabs. The summay tab shall be linked to the CLIN specific tabs for the formulas for any rate or dollar value. The CLIN specific tabs shall be linked directly to the detailed tabs for labor and indirect rates, subcontractors, consultants, materials-supplies, equipment, travel, and misc.ODCs. Remember that the total of all Base and Option worksheets should equal the total of the summary worksheet.

• A sample is included in all tabs to demonstrate how to properly complete this worksheet (noted in blue font). Delete all sample entries when completing the worksheets to avoid erroneous cost enteries in you final submission.

Note 1: Indicate whether the Offeror's Contractor's accounting system is based on a calendar year or fiscal year. Indicate the months during the period of performance that these rates apply.

Note 2: Any proposed personnel in the technical proposal should be identified with their labor category. List Principal Investigator and Key Personnel (as appropriate) working on the project even if they receive no salary support.

Note 3: The values under Total Direct Labor "hours/base" column indicate the total for the effort for the project for each cost category.

Note 4: The Offeror/Contractor shall link to associated tab for the details. Indicate when submission is from a prime, subcontractor or consultant.

Note 5: The Offeror/Contractor shall include all indirect costs applied and identified in the Labor & Indirect Rates tab and shall specify and enumerate the basis in which those rates apply. This may include, but is not limited to Fringe Benefits, Labor Overhead, Material Handling, General and Administrative, and Facilities Cost of Money.

Note 6: Profit or fee is not allowed on direct costs for equipment, Government entities, facilities capital cost of money or cost share contracts. In addition, a DD Fom 1547 (DFARS 215.404-70) will be utilized in calculating the Government objective for fee.

&"Arial,Bold"&12&A

Labor & Indirect Rates LABOR Rate Information

(Note 2)Year AYear BYear CYear DYear EBasis of Labor Rate
(Note 3)MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR
Labor Category (Note 1)Employee NameRateRateRateRate
Sample: ENG, Level IISmith, John$56.00$57.40$58.84$60.31Individual Pay Rate with 2.5% annual escalation
Indirect Rate Information
Year AYear BYear CYear DBasis of Indirect Rate (Note 5)Applied Against (Note 6)
Rate Category (Note 4)RateRateRateRate
Sample: Labor and Material Overhead90.20%90.20%90.20%90.20%FPRA Approved by DCMA/DCAA on 2/13/20Direct Labor and Material, not Subcontracts or ODC
Sample: Material G&A16.30%16.30%16.30%16.30%FPRA Approved by DCMA/DCAA on 2/13/20Direct Material, excludes material overhead
Sample: Cost of Money (CoM)0.05400%0.05400%0.05400%0.05400%FPRA Approved by DCMA/DCAA on 2/13/20Total cost (not fee)

Instructions: • If the rates have been approved/negotiated by a Government agency, provide a copy of the memorandum/agreement.

• If the rates have not been approved/negotiated, provide sufficient detail to enable a determination of allowability, allocability and reasonableness of the allocation bases and how the rates are calculated.

• If composite rates are used, provide the calculations used in deriving the composite rates.

• Example Basis of Estimates for Direct Labor include Individual Payrate, Average for Job Category, etc. Examle Basis of Indirect Rate include FPRA, FPRP, Estimate, etc.

Note 1: Add additional labor categories if needed.

Note 2: Add additional years if needed (unless specifically authorized, this shall not exceed 5 years).

Note 3: Identify the month and year tied to when rates change according with the Contractor's accounting system, not tied to the year after contract award. It is understood that a contractor's fiscal year may not align with the contract year of performance or the Government Fiscal Year.

Note 4: Categories of indirect rates may include, but not be limited to, labor and material overheads, fringe benefits, approved materials escalations, general and administrative (G&A) costs applied to labor/material/total/etc., scrap, warranty (if requested), material handling, facility capital cost of money applied to various elements, etc. Include all distinctions between on and off site rates.

Note 5:Add additional indirect rates as needed.
If the offeror does not have a Forward Pricing Rate Agreement (FPRA), Forward Pricing Rate Recommendation (FPRR), or provisional billing rates; in order to assist the Government in evaluating the reasonableness of your proposed indirect rates, please provide the following information:
1. Proforma data used to develop your proposed indirect rates. This typically consists of pool costs and base costs that demonstrate how the indirect rates were derived.
2. Information regarding your projections for out years, including your assumptions and method for developing these estimates.

Note 6: Indicate what the base is that the rate on which the rate is applied, or if it applied to multiple cost elements each should be identified.

Subcontractors

SUBCONTRACTOR DATA
Name
(Note 1)SubcontractorCAGE
CodeYear AppliedTotal HoursTotal CostCompetitive/ Sole SourceCost/Price analysis included (Y/N)Type of Subcontract (i.e., Fixed Price, Time and Materials, etc.)Competitive Quotes or Sole Source Documentation Included (Y/N)Total amount exceeds $10M (Y/N)
CLIN 0001
1Sample: Acme Anvils1YES1Year A100$50,000.00CompetitiveNoFixed PriceYesNo

Instructions: Subcontracts/Interorganizational Transfers – A fully disclosed cost proposal as detailed as the Offeror’s cost proposal including support documentation will be required to be submitted by all proposed subcontractors and for all interorganizational transfers over $10M AND 10% of costs (not include fee). For subcontracts and interorganizational transfers under $10M AND 10% of costs, only a cost proposal with cost categories broken out must be provided. If options are proposed, the option periods should be separately priced. The subcontract or interorganizational transfer proposal, along with supporting documentation, must be provided either with the prime’s proposal or via email directly to the Program Officer or Contract Specialist upon request. The email should identify the prime Offeror, proposal title, and that the attached proposal is a subcontract. The subcontractor and interorganizational transfer proposals with supporting documentation must be received and reviewed before the Government can complete its cost analysis of the proposal and enter negotiations.

The prime contractor should perform and provide a cost/price analysis of each subcontractor’s cost proposal. Offerors are required to obtain competition to the maximum extent practicable when selecting subcontractors; if the offeror has obtained competitive quotes, copies should be provided. If the Offeror has selected other than the low bid for inclusion in their proposal or intends to award the subcontract on a sole-source basis, the offeror should provide rationale for their decision. For sole-sourced subcontracts, the prime contractor must provide a short sole-source justification.

Certified cost or pricing data may be required for subcontractor proposals over $10,000,000. Does not apply in competitive environment.

*Note: Federal Acquisition Regulation provision 52.215-22 (Limitations on Pass-Through Charges--Identification of Subcontract Effort) may be incorporated into this solicitation by reference. The offeror is to exclude excessive pass-through charges from subcontractors. The offeror must identify in its proposal the percentage of effort it intends to perform and the percentage to be performed by each of its proposed subcontractors. If more than 70 percent of the total effort will be performed through subcontractors, the offeror must include the additional information required by the above-cited clause.

&"Arial,Bold"&12&A

Consultants-if apply

CONSULTANTS

Name
(Note 1)Description of effort to be performed by the Consultant or attach Consultant Statement of Work (Note 2)Year AppliedNumber of Labor HoursLabor Hourly RateLabor CostTravel costsOther CostsTotal CostBasis of EstimateIncluded copy of Consulting Agreement or other documentation supporting the proposed rate (Y/N)Supporting Documentation Reference Number
CLIN 0001
1Sample: Trusted Ex-Employee. Selection criteria: only source of knowledge on how things get done here.Year A52.3$190.53$9,964.72$200.00$50.00$10,214.72QuoteYesMr. Taylor Quote #3
2Sample: Trusted Ex-Employee. Selection criteria: only source of knowledge on how things get done here.Year B208.6$194.78$40,631.11$200.00$50.00$40,881.11QuoteYesMr. Taylor Quote #3
$0.00$0.00
$0.00$0.00
SubTotal:$51,095.83
Option X
Sample: Not Applicable$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
SubTotal:$0.00
TOTAL$51,095.83
Instructions:• Indicate “Not Applicable” in column B if there is no information to include for the Base and Options.

• Fill out all columns on the Consultants Tab for each item.

Note 1:Include a separate section in the above table for the Base and each Option.
Note 2:Describe how and why the consultant was selected.

ODC Materials-Supplies MATERIALS - SUPPLIES (Note 1)

Item
(Note 2)Description of MaterialQtyUnit of IssueUnit PriceTotal PriceYear AppliedCompetitive /Sole SourceCommercial Off The Shelf (COTS) item (Y/N)Vendor/Source (If known)Basis of Estimate (Note 3)Supporting documentation has been provided (Y/N) (Note 3)Supporting Documentation Reference Number
CLIN 0001
1Sample: Wing nut50Boxes$32.95$1,647.50Year ACompetitionYesHome DepotInternetYesAttachment 3 web page
20$0.00$0.00
30$0.00$0.00
40$0.00$0.00
50$0.00$0.00
60$0.00$0.00
70$0.00$0.00
80$0.00$0.00
90$0.00$0.00
100$0.00$0.00
SubTotal:$1,648
Option X
1Sample: Not Applicable0$0.00$0.00
20$0.00$0.00
30$0.00$0.00
40$0.00$0.00
50$0.00$0.00
SubTotal:$0

TOTAL $1,647.50

Instructions: • Indicate “Not Applicable” in column B if there is no information to include for the Base and Options.

• Fill out all columns on the Materials/Supplies Tab for each item.

• Add additional lines if needed.

• Include backup for each entry. Backup may consist of a vendor quote, information from a website, or a detailed explanation of labor and material costs for custom made items.

• Clearly label Materials/Supplies backup with a Supporting Documentation Reference Number and place the Supporting Documentation Reference Number in the upper right hand side of the supporting document. If there are several lines supported on a single page, make sure each desired item has a separate reference number placed to the left of the item on the backup page.

• Ensure that descriptions and vendors listed on the Materials/Supplies worksheet match information provided in the backup.

• Number Supporting Documentation Reference Number so they match the Item number in column M.

Note 1: Material is property that may be incorporated into or attached to a deliverable end item or that may be consumed or expended in performing a contract. It includes assemblies, components, parts, raw and processed materials, and small tools and supplies that may be consumed in normal use in performing a contract. Material should be proposed separately from Equipment (see Equipment tab for definitions).

Note 2: Include a separate section in the above table for each CLIN, including any Options. Add additional lines labeled with the CLIN number and Options if needed.

Note 3: In an attachment, provide all supporting documentation to support your price basis, e.g. copy of quote, page from catalog, or method used for deriving engineering estimates.

ODC Equipment EQUIPMENT (Note 1)

Item
(Note 2)Description of Equipment (Note 1)Justification for why the equipment is neededWill the equipment be included as part of a deliverable item under the award? (Y/N)Type of Equipment (special test equipment, special tooling, general purpose equipment, or plant equipment)
(Note 3)QtyUnit of IssueUnit PriceTotal PriceYear AppliedVendor/SourceBasis of Estimate (Note 4)Supporting documentation has been provided (Y/N)
(Note 4)Supporting Documentation Reference Number
CLIN 0001
1Sample: Drill PressTo drill holesNoSpecial Tooling1Each$560.00$560.00Year ASearsCatalogYesCatalog 123 page 6
$0.00
SubTotal:$560.00
Option X
Sample: Not applicable$0.00
SubTotal:$0.00
TOTAL$560.00
Instructions:• Indicate “Not Applicable” in column A if there is no information to include for the Base and Options.

• Fill out all columns on the Equipment Tab for each item.

• Add additional lines if needed.

• Provide justification for equipment. Be sure to indicate the benefit(s) to the Government. Expand on any statements along the lines of “It is needed to support the project deliverables”. Link the justification to the type of equipment purchase, i.e. special test equipment, special tooling, or plant equipment.

• Include backup for each entry. Backup may consist of a vendor quote, information from a website, or a detailed explanation of labor and material costs for custom made items.

• Label equipment backup clearly with a Supporting Documentation Reference Number and place the Supporting Documentation Reference Number in the upper right hand side of the supporting document. If there are several lines supported on a single page, make sure each desired item has a separate reference number placed to the left of the item on the backup page.

• Ensure that descriptions and vendors listed on the Equipment worksheet match information provided in the backup.

• Number Supporting Documentation Reference Number so they match the Item number in column M.

Note 1: Contractors are normally required to furnish all equipment and/or facilities necessary to perform Government contracts (see FAR 45.102(a)). The Government may allow equipment and/or facilities only under special circumstances. If equipment and/or facilities are proposed, the specific description should identify the component, nomenclature, and configuration of the equipment/hardware that it proposes to purchase for this effort. The purchase on a direct reimbursement basis of equipment that is not included in a deliverable item will be evaluated for allowability on a case-by-case basis.

Note 2: Include a separate section in the above table for each CLIN, including any Options. Add additional lines labeled with the CLIN number and Options if needed.

Note 3: Definitions:

Special Test Equipment is defined as either single or multipurpose integrated test units engineered, designed, fabricated, or modified to accomplish special purpose testing in performing a contract. It consists of items or assemblies of equipment including standard or general purpose items or components that are interconnected and interdependent so as to become a new functional entity for special testing purposes.

Special tooling is defined as jigs, dies, fixtures, molds, patterns, taps, gauges, and all components of these items, including foundations and similar improvements necessary for installing special test equipment, and which are of such a specialized nature that without substantial modification or alteration their use is limited to the development or production of particular supplies or parts thereof or to the performance of particular services.

Plant equipment means personal property of a capital nature (including equipment, machine tools, test equipment, furniture, vehicles, and accessory and auxiliary items) for use in manufacturing supplies, in performing services, or for any administrative or general plant purpose. It does not include special tooling or special test equipment.

Note 4: In an attachment, provide all supporting documentation to support your price basis, e.g. copy of quote, page from catalog, or method used for deriving engineering estimates.

ODC Travel

TRAVEL

CLINTripNumberNumberNumberNumberAir/RailPer DiemPer DiemCarParkingMileageTaxiOther
City, StateWhen: MM/YR to MM/YRPurposeof TripsTravelersof Daysof NightsFareMealsLODGINGRentalMisc.TOTALRationale
From:Sample City A0001AALearn something new2432Fare Base:$350$45$210$50$20$0$0$50Commercially available airfare, Gov't per diem, parking at hotel, other is hotel tax
To:Sample City B04/Year B to 05/Year BTrip Cost:$2,800$1,080$3,360$300$120$0$0$400$8,060
From:Fare Base:
To:Trip Cost:$0$0$0$0$0$0$0$0$0
From:Fare Base:
To:Trip Cost:$0$0$0$0$0$0$0$0$0
From:Fare Base:
To:Trip Cost:$0$0$0$0$0$0$0$0$0
From:Fare Base:
To:Trip Cost:$0$0$0$0$0$0$0$0$0
From:Fare Base:
To:Trip Cost:$0$0$0$0$0$0$0$0$0
From:Fare Base:
To:Trip Cost:$0$0$0$0$0$0$0$0$0
From:Fare Base:
To:Trip Cost:$0$0$0$0$0$0$0$0$0
TOTAL$0

Instructions: • When completing the “From” and “To” information, enter the city and state where travel will originate and end. For example, from Seattle WA to Washington DC. Do not list airport codes.

• Ordinarily, you cannot stay overnight the same number of days that you travel. There will usually be one more day than night.

• Do not combine any categories.

• For lodging and M&IE, use federal Per Diem Rates found at http://www.gsa.gov.

• Submit backup for airfare and rental cars. Price airfare at economy rates; indicate if the airfare is refundable.

Note 1: If there are miscellaneous expenses associated with the trip, provide description and rationale.

Misc ODC Details MISCELLANEOUS OTHER DIRECT COSTS (Note 1)

Description
(Note 2)QtyUnit of IssueUnit PriceTotal PriceYear AppliedBasis of Estimate (Note 3)Supporting documentation has been provided (Y/N) (Note 3)Supporting Documentation Reference Number
CLIN 0001
Sample: FOB Destination Shipping1Each$5,000.00$5,000.00Year CQuoteYesQ#23456
$0.00
SubTotal:$5,000.00
Option X
Sample: Not Applicable$0.00
$0.00
$0.00
SubTotal:$0.00
TOTAL$5,000.00

Instructions: • Indicate “Not Applicable” in column A if there is no information to include.

• If you have any ODC entries, be sure to fill out all columns.

• Label ODC backup clearly with a Supporting Documentation Reference Number and place the Supporting Documentation Reference Number in the upper right hand side of the supporting document. If there are several lines supported on a single page, make sure each desired item has a separate reference number placed to the left of the item on the backup page.

• Ensure that descriptions and vendors listed on the ODC Details worksheet match information provided in the backup.

Note 1: Examples include rental fees, shipping costs, license fees

Note 2: Include a separate section in the above table for each CLIN, including any Options. Add additional lines labeled with the CLIN number and Options if needed.

Note 3: In an attachment, provide all supporting documentation to support your price basis, e.g. copy of quote, page from catalog, or method used for deriving engineering estimates.

File details come from the government source that posted it. Updated .