This file contains three technical scenario-based questions that offerors must respond to as part of solicitation 80JSC025R7001 for NASA's Human Health and Performance Contract 2 (HHPC2).
Technical Approach 1 presents a hurricane scenario impacting Johnson Space Center, with extensive facility damage assessments and requires offerors to address priorities for hurricane preparation, post-hurricane work priorities, staffing plans given 30% workforce loss, and approaches for handling damaged critical flight hardware. Technical Approach 2 focuses on data management, requiring offerors to describe their approach for developing a data system architecture that can handle diverse medical and research datasets while maintaining security and privacy controls. Technical Approach 3 presents a scenario involving corrupted ISS medical software systems and requires offerors to provide project management approaches for both near-term mitigation and long-term solutions within key timeline constraints including an upcoming crew handover in 3 months and system software update in 2.5 months.
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 220: There is significant roof and water damage. Estimated Time to Repair (ETR): 6 months except for CHAPEA which is considered a total loss. No apparent damage to HERA structure however detailed assessment has not been made of the functionality pending return of HERA personnel onsite.
Building 9, Roof damage. ETR: 3 months however the mockups require extensive reconditioning. ETR: 4 months.
Building 21, Roof damage, water intrusion. ETR varies by laboratory.
Operational laboratories and facilities will take precedence; ETR: 1 month. All other areas ETR: 3 months.
Building 45N: Windows blown out east side with water damage. 70% of the facility is functional immediately. Employee Assistance Program offices and 3 physician offices are not usable. ETR 1 month.
Building 45 (tower): Blown out windows and water damage to many of the Flight Surgeon Offices. HMS Lab is functional.
Building 26: Roof damage with water intrusion. Roof ETR: 1 month however much of the exercise equipment has severe water damage and outside consultants can’t assess equipment functionality for 1 month. Repairs/refurbishment may take longer.
Building 30: Roof damage with water intrusion. MCC and other FCR’s as well as SRAG and Med Ops MPSR expected to be operational in 2 weeks.
Building 15: Severe roof and water damage. Electric transformer is a total loss. ETR: 6 months.
Building 241: Roof and water damage. ETR: 6 months.
Building 14: Extensive flooding in the tunnel. ETR: 2 months however much of the test equipment has been ruined.
Building 17: Severe roof and water damage. ETR: 3 months.
Building 4N/4S: Some window damage and blown in rain plus roof damage. ETR: 4 months.
Building 421 Bond Room: Roof damage, flooding, and loss of power.
ETR: 1 month for roof and 2 months for damage caused by flooding.
• The condition of the Flow Condenser Crit-1 flight unit is assumed to be damaged. The status of the full spare flight unit has not been evaluated. Additionally, there are spare piece parts for the Flow Condenser in bond. Both units and piece parts are housed in the Bond Room in Building 421. The flight unit is scheduled for shipment to SpaceX next week to fly on SpaceX-34. This human-rated complex hardware is safety-critical for the ISS flight crew. Estimated time to rebuild a unit is 2 months.
Ellington Airport: Severe damage to the hangars, however most aircraft were flown to El Paso in advance of the storm. The priority for airport is to support recovery operations for the community.
Neutral Buoyancy Laboratory. Severe roof damage. Falling debris has caused extensive damage to both the hyperbaric and hypobaric chambers. Facility ETR: 2 months however additional outside assessments of the chambers need to be made. Due to travel conditions that assessment cannot be made for approximately 2 weeks.
• TA1 QUESTIONS FOR OFFERORS: The Offeror shall address the following, identifying additional assumptions, technical challenges, risks, and significant trades. Do NOT comment on the feasibility and reality of the scenario:
1. What are your priorities for preparing for the hurricane? Address personnel, hardware, science, research, and mission priorities.
2. In the aftermath of the hurricane, what sections of the Statement of Work take priority? What is your rationale?
3. Based on those priorities, describe your staffing plan for those priority areas given the 30% loss of the workforce. How does your staffing and critical skills plan address these types of contingencies?
4. What is your plan to address the critical tasks associated with the workforce and laboratories/equipment impacted by the damage to Building 21?
5. What is your approach to assess the potential impacts of the flight readiness plan of the damaged Flow Condenser hardware, and what are the potential options available to still make the SpX-34 launch?
TECHNICAL APPROACH 2 (TA2): DATA TO DECISIONS (D2D)
• HH&P maintains databases for medical data, ground and flight research data, and other data sets related to human spaceflight. There are established policies and guidelines regarding access to each of them. Specific requirements must be met to allow access to and use of the data for analysis and publications. Astronaut data is carefully managed and controlled such that the information will not be combined with other database information that may lead to the accidental identification of the individual without their prior consent. These rules and regulations will need to be accounted for as future data to decision and curation processes are considered. A new system architecture may be required in the future to identify, access, and provide tools to analyze and visualize all the data within the system and ensure policies and regulations are strictly enforced.
• TA2 QUESTIONS FOR OFFERORS: The Offeror shall address the following, identifying additional assumptions, technical challenges, risks, and significant trades.
1. Describe your project approach needed to design and develop a data system architecture to accommodate diverse data sets, ready access, and various analytical tools for an end-to-end D2D solution for HHPC2.
2. Describe your recommended approach/strategy for ensuring key steps for data acquisition, storage, analysis, and use are efficient and secure.
3. Provide your recommendations on the curation of diverse medical and research data for both internal NASA purposes and use by the broader human spaceflight community.
4. Provide your recommendations on tools for visualization, modelling, statistical analysis, and cutting-edge decision-making support for your recommended D2D system.
5. What skillsets and resources would you anticipate are needed for the design and development of your recommended D2D architecture? Include your assumptions with your response.
6. What policy and administrative barriers must be overcome to establish a successful evolvable D2D product with broad access/availability?
7. Provide an outline of a project management plan to carry out the D2D challenge and include lines of communication and other key aspects including risks and mitigation strategies.
TECHNICAL APPROACH 3 (TA3): PROJECT MANAGEMENT SCENARIO
• BACKGROUND: Work performed in the HH&P Directorate includes system management and project management of Directorate led activities in support of NASA human spaceflight programs such as ISS, Orion, Gateway, Human Landing System (HLS), EVA and Human Surface Mobility Program (EHP), and Moon-to- Mars. These projects range from non-flight ground-based design and development projects to Government Furnished Equipment (GFE) flight projects. The projects often contain hardware, firmware, and/or software that require complex design and analysis, contain multiple stakeholders, and can have aggressive schedules.
• SCENARIO: The medical and research teams at JSC rely on software to gather timely data on exercise, nutrition, research experiments, and the medical status (mental and physical) of crewmembers. The functionality of the medical software on board ISS has become corrupted unexpectedly following associated hardware and software updates/modifications. The medical system user interface has been rendered inoperable, only showing a static display. The ISS crew is willing to call down to the ground to provide the data for a short period of time, but a long-term solution needs to be implemented. The Flight Director (FD) has engaged HH&P to take the lead in providing the solution. The software is owned by HH&P but uploaded by the Flight Operations Directorate (FOD). HH&P will utilize expertise within the contractor team to manage and resolve the anomaly with the medical system software. The primary issues to be addressed include:
1. User Interface performance
2. System stability and functionality verification
• ASSUMPTIONS: The HH&P Director would like a plan within the next 2 days. The FD has not put a timeframe on when the medical software issues need to be resolved, but crew time is limited. There is an upcoming ISS Expedition crew handover in 3 months, and an ISS service pack (major system software update) upload is in 2.5 months.
• TA3 QUESTIONS FOR OFFERORS: The Offeror shall address the following, identifying additional assumptions, technical challenges, risks, and significant trades.
1. What are the options in your plan for the HH&P Director to address the near-term aspects to consider based on the current anomaly situation?
2. How would you, at minimum, describe your project management plan for addressing the ISS medical software issues and regaining full system functionality including user interface operability in a timely manner to mitigate the impact to the crew’s workload and mission objectives?