KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf

PDF 209 KB Posted

Attached to
Concourse A Apron Reconstruction - Bid Package 2 State and local contract opportunity
Solicitation number
25-075-ITB
Issued by
Kenton County, Kentucky

About this file

KCAB RSVP Instructional Guide Summary

This document is an instructional guide provided by the Kenton County Airport Board (KCAB) to vendors participating in the Concourse A Apron Reconstruction - Bid Package 2 procurement. The guide establishes mandatory pre-registration requirements for all attendees of pre-bid and pre-proposal meetings, which must be completed through the OpenGov online system at least 24 hours in advance of the scheduled meeting. The pre-bid meeting is scheduled for Thursday, January 8, 2026, at 10:00 am at CVG Centre in Erlanger, Kentucky. The RSVP process requires that company administrators add individual attendees to their organizational account, after which each attending representative must independently complete the RSVP registration by accessing the Events RSVP dropdown menu and selecting "Attending" for the applicable meeting. Multiple employees from the same company may register, but each person must complete their own individual RSVP registration.

KCAB implements the 24-hour advance RSVP requirement to facilitate necessary security clearances and arrange adequate transportation for site visits. The guide emphasizes that the actual person attending the meeting must personally complete the RSVP to ensure an accurate attendee roster. Vendors requiring additional guidance on account management and system navigation are directed to the OpenGov online Help Center at https://opengov.my.site.com/support/s/procurement. The RSVP system allows individuals to modify their status by clicking the "Attending" checkbox again if they are unable to attend the scheduled meeting.

View the file

Other files for this state and local contract opportunity

Other files attached to Concourse A Apron Reconstruction - Bid Package 2, newest first.
File Type Posted
Concourse_A_Apron_Reconstruction_-_Bid_Package_2_(Addendum_#5_Revision).pdf PDF
25-075-ITB_Conc_A_Apron-BP2_-_Exh_A-Prop_Forms_(AIP)-Add_#5_02.10.26.pdf PDF
25-075-ITB_Conc_A_Apron-BP2_-_Exh_B-Contract&Bonds-Add#5_02.10.26.pdf PDF
25-075-ITB_Conc_A_Apron_Reconstr-BP2_-_Tech_Specs_-_Add_#5_02.10.26.pdf PDF
25-075-ITB_Conc_A_Apron_Reconstr-BP2_Dwgs_Add_#5_02.10.26.pdf PDF
25-075-ITB_Davis-Bacon_Wage_Rates_-_Highway_01.02.2026.pdf PDF
Concourse_A_Apron_Reconstruction_-_Bid_Package_2_(Addendum_#1_Revision).pdf PDF
25-075-ITB_Conc_A_Apron_Reconst-Bid_Pkg_2-Exh_A_-_Proposal_Forms_(AIP)_01.16.26.pdf PDF
25-075-ITB_Conc_A_Apron_Reconst-Bid_Pkg_2_-_Exh_B-Contract_&_Bonds_01.16.26.pdf PDF
25-075-ITB_Conc_A_Apron_Reconstr-Bid_Pkg_2_-_Addendum_#1_Tech_Specs_01.16.26.pdf PDF
25-075-ITB_Conc_A_Apron_Reconstr-Bid_Pkg_2_-_Addendum_#1_Drawings_01.16.26.pdf PDF
25-075-ITB_Pre-Bid_Meeting_Sign-In_Sheets.pdf PDF
25-075-ITB_Pre-Bid_Meeting_Presentation.pptx PPTX presentation
25-075-ITB_Pre-Bid_Meeting_Sign-In_Sheets.pdf PDF
25-075-ITB_Pre-Bid_Meeting_-_Teams_Attendance_01.08.26.pdf PDF
25-075-ITB_Pre-Bid_Meeting_Presentation.pptx PPTX presentation
25-075-ITB_Pre-Bid_Meeting_-_Teams_Attendance_01.08.26.pdf PDF
25-075-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
25-075-ITB_Pre-Bid_Meeting_Agenda.pdf PDF
Concourse_A_Apron_Reconstruction_-_Bid_Package_2.pdf PDF
25-075-ITB_Conc_A_Apron_Reconst-Bid_Pkg_2_-_Ad.pdf PDF
25-075-ITB_Conc_A_Apron_Reconst-Bid_Pkg_2_-_Ad.pdf PDF
25-075-ITB_Conc_A_Apron_Reconst-Bid_Pkg_2_-_Ad.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
KCAB_-_RSVP_Instructional_Guide_for_OpenGov.pdf PDF
25-075-ITB_Conc_A_Apron_Reconst-Bid_Pkg_2_-_Exhibit_A_-_Proposal_Forms_(AIP).pdf PDF
CVG_Concourse_A_BP_2_IFB_Bid_Schedule.xlsx XLSX spreadsheet
CVG_Concourse_A_BP_2_IFB_Bid_Schedule.xlsx XLSX spreadsheet
CVG_Concourse_A_BP_2_IFB_Bid_Schedule.xlsx XLSX spreadsheet
CVG_Concourse_A_BP2_IFB_Technical_Specifications_R1.pdf PDF
CVG_Concourse_A_BP2_IFB_Technical_Specifications_R1.pdf PDF
25-075-ITB_Conc_A_Apron_Reconstruction_-_Bid_Pkg_2_-_Tech_Specifications.pdf PDF
CVG_Concourse_A_BP2_IFB_Technical_Specifications_R1.pdf PDF
25-075-ITB_Conc_A_Apron_Reconst-Bid_Pkg_2_-_Exhibit_B_-_Contract_&_Bonds.pdf PDF
Davis_Bacon_Wage_Rates_-_Heavy.pdf PDF
Davis_Bacon_Wage_Rates_-_Heavy.pdf PDF
25-075-ITB_Conc_A_Apron_Reconstruction_-_Bid_Pkg_2_-_Drawings.pdf PDF
CVG_CONCOURSE_A_BP2_IFB_Plans_FINAL.pdf PDF
CVG_CONCOURSE_A_BP2_IFB_Plans_FINAL.pdf PDF
CVG_CONCOURSE_A_BP2_IFB_Plans_FINAL.pdf PDF
Q4_2025_-_Business_Case_-_Concourse_A_Apron_Reconstruction_-_Construction_Phase_2_-_signed.pdf PDF
CVG_Concourse_A_BP2_IFB_Technical_Specifications.pdf PDF
Q4_2025_-_Business_Case_-_Concourse_A_Apron_Reconstruction_-_Construction_Phase_2_-_signed.pdf PDF
CVG_Concourse_A_BP2_IFB_Technical_Specifications.pdf PDF
Q4_2025_-_Business_Case_-_Concourse_A_Apron_Reconstruction_-_Construction_Phase_2_-_signed.pdf PDF
CVG_Concourse_A_BP2_IFB_Technical_Specifications.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kenton County Airport Board Instructional Guide for Vendors to RSVP to PreBid/PreProposal Meetings

KCAB requires all attendees for all pre-bid and pre-proposal meetings to pre-register using the RSVP function in OpenGov at least 24 hours in advance of the meeting. Properly completing this RSVP process ensures that KCAB can perform all required security clearances prior to the site visit and ensures that adequate transportation is arranged.

The person attending the meeting must be the one to RSVP so that we have an accurate list of attendee names.

This document is being provided as a brief overview of the RSVP process. Bidders are encouraged to review the online Help Center provided by OpenGov, accessible at this link:

https://opengov.my.site.com/support/s/procurement for more in depth instructions pertaining to accounts and system navigation.

Adding users to your account

Admin is available for users with an admin role, and it allows them to add and disable users as part of their company account. An admin for your company must add every individual who is attending the meeting.

Then the individual attending the meeting must complete the RSVP. Multiple people from the same company can register, but each must complete the RSVP individually.

https://opengov.my.site.com/support/s/procurement

RSVP

Each person attending the pre-bid or pre-proposal meeting must log into their OpenGov account and follow these steps to RSVP for the meeting.

1. Click the Events RSVP drop down located next to Draft Response.

2. Find the meeting you will be attending (Prebid Meeting or Pre-Proposal Meeting) and click the Not Attending option to flip it to Attending.

An individual can click the Attending box again to remove the RSVP if they decide they can no longer attend.

File details come from the government source that posted it. Updated .