JA - Chicago Faucets_Redacted.pdf
PDF 126 KB Posted
- Solicitation number
- 36C25020B0078
About this file
This document contains a Justification and Approval for Other Than Full and Open Competition and a related federal contract opportunity notice. The justification document provides details for a planned renovation project at the Dayton VA Medical Center requiring new "Chicago Faucets" electronic faucets to reduce water consumption and bacteria growth. The project includes construction of a new laboratory building. The justification cites only one responsible source and need for product integration and compatibility. The related opportunity notice is for solicitation of renovation services for the Dayton VA Medical Center's Laboratory Building 310, with an estimated budget between $5-10 million. The renovation includes boiler and control system upgrades. The 100% small business set-aside opportunity is for Service-Disabled Veteran-Owned Small Businesses only. The North American Industry Classification System code is 236220, with proposals due approximately 30 days after the August 21, 2020 posting date.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFOC SOP Revision 09 Page 1 of 2 Original Date: 03/22/11 Revision 09 Date: 04/17/2020
DEPARTMENT OF VETERANS AFFAIRS
Justification and Approval (J&A) For
Other Than Full and Open Competition (>SAT)
Acquisition Plan Action ID: 36C250-20-AP-1390
1. Contracting Activity: Department of Veterans Affairs, NCO 10, Dayton VA Medical Center 2237: 552-20-2-6932-0006
2. Nature and/or Description of the Action Being Processed:
Requirement of the contractor to use “Chicago Faucets” Electronic -AC Faucets. This project is named “Renovate Laboratory Building 310” and the purpose is to construct a new building on the Dayton VA campus at which legionella infection is a major concern. The project includes the construction of a new building with architectural walls and finishes, roofing heating, plumbing and electrical work to support the proposed renovation.
3. Description of Supplies/Services Required to Meet the Agency’s Needs:
As part of a project to renovate the B310 Laboratory at the Dayton VAMC, the building will be receiving new infrastructure. This will require providing a plumbing system compatible with the campus existing systems. The“Chicago Faucets”, Electronic -AC Faucet, with internal temperature control mixer is required to reduce water consumption, as well as the potential for transmission of bacteria, viruses, and other microbes by minimizing contact with the faucet. Therefore, the system, when properly integrated, can significantly reduce or eliminate the potential for bacteria growth.
4. Statutory Authority Permitting Other than Full and Open Competition:
41 USC §3304(a)(1), as implemented by FAR 6.302-1.
( X ) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per 41 USC §3304(a)(1) as implemented by FAR 6.302-1
5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority):
The medical center needs to have an effective way of limiting the potential for bacteria growth inside their plumbing fixtures. This product provides the solution of a thermal disinfection, at the dispenser which is currently not available from other manufacturers.
6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable:
This procurement will be competed/synopsized on Contract Opportunities and will indicate the requirement for brand name specification regarding the Automated Water Dispensers. Since the construction contract is being awarded as a firm fixed price contract through competitive sealed bidding, the bidders are incentivized to locate the supplier that will provide the item at the most economical price. Other faucet manufacturers do not provide the availability and compatibility needed at the Dayton VAMC, full integration and compatibility cannot be achieved through other available manufacturers.
OFOC SOP Revision 09 Page 2 of 2 Original Date: 03/22/11 Revision 09 Date: 04/17/2020
7. Determination by the CO that the Anticipated Cost to the Government will be Fair and Reasonable:
It is in the best interest of the government to use this product.
8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted:
The Chicago Faucet system has been established and maintained here at Dayton VAMC. This facility has multiple devices and each one must be standardized to function properly for patient safety and facility maintenance efficiency. A system of this size would be unmanageable without standardization.
9. Any Other Facts Supporting the Use of Other than Full and Open Competition:
This manufacturer is the only one that will provide integration to the existing faucet and water distribution system and reasonable delivery time at this location. The availability of this type of system has been an issue with other manufacturers.
10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition:
N/A
11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required:
N/A
12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.
Ravindra R. Wani Date Project Engineer/COR Dayton VAMC - Engineering
13. Approvals in accordance with the VHAPM Part 806.3 OFOC SOP:
a. Contracting Officer or Designee’s Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.
Diana J. Pittman Date Contracting Officer
NCO 10
Ravindra R.
Wani 344872
Digitally signed by Ravindra R. Wani 344872 Date: 2020.07 08 07:49 32 -04'00'
Diana J.
Pittman 251505
Digitally signed by Diana J.
Pittman 251505 Date: 2020.08 07 13:31:14 -04'00'
8/7/20
File details come from the government source that posted it. Updated .