Addendum 1.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25020B0078
About this file
This is a pre-solicitation notice for a construction project to renovate the laboratory in Building 310 at the Dayton VA Medical Center. The Department of Veterans Affairs Network Contracting Office 10 is seeking proposals for phased removal and replacement of systems to upgrade the laboratory. Work includes close coordination with the VA Contracting Officer and Contracting Officer's Representative. The project duration is 925 calendar days from notice to proceed.
The solicitation will be posted on August 21, 2020 at beta.sam.gov with proposals due approximately 30 days later. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 with a small business size standard of $39.5 million. The SDVOSB prime or subcontractor must perform a minimum of 15% of construction work. Bid, payment and performance bonds will be required. A mandatory site visit will be scheduled. Amendments will be posted to beta.sam.gov and questions shall be emailed to the point of contact provided. The project magnitude is between $5-10 million.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: 04/13/2021
Addendum No. 1
PROJECT NAME:
This Addendum supplements and amends the original Drawings and Specifications for the above referenced project. This Addendum shall be forwarded to all Prime Bidders.
This Addendum shall be taken into account in the preparation of bids and shall become a part of the Contract Documents.
Receipt of this Addendum must be acknowledged on the Form of Proposal.
This addendum consists of 5 revised sheets and 0 Specification sections.
General
1. N/A
Specifications
1.N/A
Drawings
1. SHEET A002 COMPOSITE DEMOLITION PLAN- Sheet resubmitted
a. Equipment #118 shown as moved in future phase.
2. SHEET A003 COMPOSITE FLOOR PLAN- Sheet Resubmitted
a. The location of Equipment #118 & #119 revised.
3. SHEET A121 PHASE 2 DEMOLITION PLAN- Sheet Resubmitted
a. Equipment #118 shown as moved in future phase.
b. Keynote revised.
4. SHEET A122 PHASE 2 PLAN- Sheet Resubmitted
a. The location of Equipment #118 & #119 revised.
b. Sheet A123 PHASE 2 RCP- Sheet Resubmitted
c. Ceiling shown as being adjusted to accommodate equipment.
d. Keynote added.
5. Sheet A123 PHASE 2 RCP- Sheet Resubmitted
a. Ceiling shown as being adjusted to accommodate equipment.
b. Keynote added.
End of Addendum No. 1
145A
2-2
A-2
158A
145C
B-2
116A
C2-6B116B
C-2
134133
D-2
SUITE
2E101
SPECIMEN
RESTROOM
2E102
BIO-MED
OFFICE
2E103
SPECIMEN
RESTROOM
2E104
CLEAN
ROOM
2E105
WAITING
AREA
C2-2
TOILET,
FEMALE
2E107
TOILET,
MALE
2E108
STORAGE,
GENERAL
2E109
STORAGE,
GENERAL
2E110
GLASS
WASHING
LAB.
2E111
ELECTRIC
ROOM
2E112
CORRIDOR
C2-5
CORRIDOR
C2-3
LOBBY
C2-1
CORRIDOR
C2-4
CORRIDOR
C2-6
HOUSEKEEPING
AID CLOSET
2E143
MECHANICAL
ROOM
2E145
HOUSEKEEPING
AID CLOSET
2E144
DRAW
STATION 1
2E101C
DRAW
STATION 2
2E101D
DRAW
STATION 3
2E101E
DRAW
STATION 4
2E101F
DRAW
STATION 5
2E101G
PHLEBOTOMY
SUPERVISOR
2E101B
LAB SUITE
2E116
STORAGE,
GENERAL
2E115
HEMATOLOGY
2E116E
OFFICE
2E116A
TOXICOLOGY
2E116B
BLOOD
BANK
2E116C
ELECTRICAL
CLOSET
2E117
COMM
CLOSET
2E118
STORAGE,
GENERAL
2E119
MICROBIOLOGY
SUPERVISOR
2E120
REFRIGERATOR
2E121
CLOSET
2E122
INCUBATOR
2E123
MEDIA
PREPARATIONS
2E124
MICROBIOLOGY/SEROLOGY
UNIT
2E125
BSL 3
2E125A
OFFICE
2E116D
CORRIDOR
C2-7
STAFF
LOUNGE
2E126
SLIDE AND
BLOCK FILE
2E127
HISTOLOGY/
CYTOLOGY
CUTTING
ROOM
2E128
LABORATORY
MANAGER
2E129
TISSUE
PROCESSING
2E130
CHIEF
LABORATORY
SERVICE
2E131
OFFICE
2E132 OFFICE
2E133
OFFICE
2E134
OFFICE
2E135STAFF
PATHOLOGIST
2E136
CONFERENCE
ROOM
2E137
STORAGE,
GENERAL
2E138
TOILET,
MALE
2E139
TOILET,
FEMALE
2E140
LABORATORY
INFORMATION
MANAGER
2E141
MORGUE
2E142
OPEN
OFFICE
2E131A
OFFICE
2E128A
CORRIDOR
C2-11
COMM
CLOSET
2E179
CORRIDOR
C2-9
COMM
CLOSET
2E146
CLOSET
2E147
VAULT
MORGUE
2E142A
TOILET,
MALE
2E142B
TOILET,
FEMALE
2E142C
MORGUE
2E142D
MORGUE
2E142E
STORAGE
2E142F
VESTIBULE
C2-15
CORRIDOR
C2-8
CORRIDOR
C2-14
STAIR
SWD-2
STAIR
SWA-2
STAIR
SWC-2
STAIR
SWB-2
BSL 3
VESTIBULE
2E125B
ELECT.
ROOM
2E-115A
RECEPTIONIST
2E101A
Wall to be Demolished
Existing Wall to Remain
Door and Frame to be Demolished. Contractor may reuse as temporary doors.
DEMOLITION LEGEND
All work in this area to occur during nights and weekend hours.
Coordinate activities with COR.
Existing to be Removed
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
/1
/2
:2
:0
A
M
Renovate Laboratory
02/19/2021
COMPOSITE DEMOLITION PLAN
A002
DWKR
17006.00
552-18-101
Dayton, OH
310STATION
PHILIP KIRK, PE
BID SET
N Scale: 1/8" = 1'-0"
COMPOSITE DEMOLITION PLAN
*SEE PHASING PLANS FOR DETAILED DESIGN INFORMATION
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.johnpoe.com| 937.461.3290
GENERAL DEMOLITION NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or provide new surfaces.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Remove complete assemblies U.N.O. Unused hardware shall be turned over to Owner. Box hardware before giving to Owner.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc.
are shown to be removed.
G. Prepare walls and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
I Construct temporary partitions prior to demo work. Provide doors with closers and locks as required for access to construction.
Revisions Date
5 Addendum #1 04.13.2021
LOGISTICS
STORAGE
2E171
STAIR
SWD-2
146A
OFFICE
2E171A
312611
28 90
76 76
10551 51
94 94
78 77 72
78 77 72
8283 110
A154
51 91
ELECTRICAL
2E124
STORAGE
2E166
120 120
137A
CTU
2E145
WALK-IN
COOLER
2E116
IT CLOSET
2E114
ELECTRICAL
2E113
EQUIPMENT
CLOSET
2E115
STORAGE
2E178
ELECTRICAL
2E177
BLOOD
BANK
2E145A
51 51
101104
104A 118
A144
OFFICE
TECH
2E121
DRAW 1
2E120
DRAW 2
2E117
STAFF
DRUG
SCREEN
2E112
STAFF
TOILET
2E108
OFFICE DR.
WOOTEN
2E107TOILET
2E106
TOILET
2E109
DRAW 3
2E119
DRAW 4
2E110
DRAW 5
2E105
DRAW 6
STRETCHER
2E104
WAITING
C2-2
HOUSEKEEPING
2E173
HOUSEKEEPING
2E175
STORAGE
2E176
SPECIMEN
DROP-OFF
2E101
RECEPTION
2E122
MECHANICAL
2E174
CORRIDOR
C2-1
CORRIDOR
2E118
VESTIBULE
2E111
149 151
159A
A144
OFFICE JILL
+ 1
2E148
CONFERENCE
ROOM
2E152
STAFF
TOILET
2E150
CHIEF
OFFICE
2E156
OFFICE
2E151
OFFICE
2E149
CLERICAL
AREA
2E157
OFFICE
2E154
OFFICE
2E155
OFFICE
2E153
CONFERENCE
ROOM
2E158
COMM
CLOSET
2E164
CLOSET
2E163
COPY
2E151A
TISSUE
STORAGE
2E159
22 22
55 55
168 167
171A
A124
2-1A
NON-LAB
STORAGE
2E172
STAFF
LOUNGE
2E170
LOCKERS
2E169
STAFF
TOILET
2E167
STAFF
TOILET
2E168
FORMALIN
RECYCLE
2E160
HISTOLOGY
& TISSUE
PROCESSING
2E146
IT CLOSET
2E143
OFFICE
ANITA
2E144
2ND & 3RD
SHIFT
SUPERVISORS
C2-8
FILE
STORAGE
C2-9
2ND & 3RD
SHIFT
SUPERVISOR
C2-10
51 51
45 44
71 70 66
47 47
95 41
54 53
44 54
145B
127126
2-3A
137B 139
136130A
A124
D N
127123
116C
COMM
CLOSET
2E179
PUBLIC
TOILET
2E126
PUBLIC
TOILET
2E125
STORAGE
2E128
BSL 3 LAB
2E133
BSL 3
VESTIBULE
2E134
MICROBIOLOGY
2E137
OFFICE
DANA
2E136
OFFICE
DAWN
2E130
FLUORO
MICRO
2E129
BIO-MED
WORKROOM
2E127
FAMILY
VIEWING
2E138
MORGUE
VAULT
2E141
EQUIPMENT
CLOSET
2E140
VESTIBULE
2E139
CORRIDOR
C2-4
REFRIGERATOR
2E135
INCUBATOR
2E131
BIOLOGICAL
SPECIMEN
2E130A
DI WATER
2E123
OFFICE
MONICA
C2-6
BLOCK &
SLIDE
C2-7
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
/1
/2
:2
:0
A
M
Renovate Laboratory
02/19/2021
COMPOSITE FLOOR PLAN
A003
DWKR
17006.00
552-18-101
Dayton, OH
310STATION
PHILIP KIRK, PE
BID SET
N Scale: 1/8" = 1'-0"
COMPOSITE FLOOR PLAN
*SEE PHASING PLANS FOR DETAILED DESIGN INFORMATION
EQUIPMENT SCHEDULE
Tag Type
Installed by Supplied by
C o n tr a c to r
O w n e r
C o n tr a c to r
O w n e r (N e w
O w n e r (E x is t.
01 Isotemp Refrigerator R2 X X
03 Kelvinator Scientific BT50FS-7 Freezer X X X
04 Magic Chef Refrigerator Freezer CTB2112AR X X
05 Thermo-Scientific Revco ExF 8928 -70 Deg C Freezer X X
07 FORMA Freezer X X
09 Thermo-Scientific ULT5030A Freezer X X
10 True Refrigerator TS-72 X X
11 Thermo-Scientific Legend XFR Cold Centrifuge X X
12 Revco Freezer UFP1230A X X
13 Thermo Scientific BBR25-1B Refrigerator X X
14 Thermo Scientific JBB3004A Refrigerator X X
15 Thermo Scientific JBB3004A23 Refrigerator X X
16 Fisher Scientific CAP-TDX15SNSBRAD Refrigrator/Freezer X X
17 Flammable Storage Cabinet X X
18 Refrigerator Revco Double Door X X
19 Ventana Bench Mark Special Stains (Roche) X X
20 Ventana Ultra X X
22 Leica CM1860 UV Cryostat Ag Protect X X
23 Processor Leica ASP 6025 X X
25 Siemens AUWI Pro Mobile table X X
26 Siemens Aptio Automation X X
27 Siemens Advia Centaur XP X X
28 Siemens Dimension Vista 1500 X X
31 Siemens Aptio Automation B X X
32 GeneExpert Infinity-48s X X
33 Biohazard Bin X X
34 Bulk Trash Bin X X
36 Procycler BR Instrument Corp. Formelyn Recycle Unit X X
37 Tissue Embedding Station A X X
38 Tissue Embedding Station B X X
39 Mopec Freestanding Gross Lab X X
40 Cart - Large X X
41 Mass Spectrometer X X
42 Computer Cart w/ Printer X X
43 BD-FX X X
44 Refrigerator 28" x 35" X X
45 Bio Safety Cabinet X X
46 Bio Safety Cabinet (Class II A2) X X
47 Incubator X X
48 Thermo-Scientific Refrigerator X X
49 Incubator - 40 X X
50 Incubator - 35 CO2 X X
51 Computer Workstation X X
52 Floor Copier/Printer X X
53 -20 Freezer X X
54 -70 Freezer X X
55 Omnicell Cabinet X X
56 Beckman Colter Slide Stainer X X
57 Centralink Command Center X X
58 Stainer A X X
59 Stainer B X X
60 Isotemp Oven (Large) X X
61 Dehydration Station X X
62 Centrifuge X X
63 Cytocentrifuge X X
64 Microtome X X
65 Vitek 2 Smart Carrier X X
66 Printer - Small X X
67 Cold Centrifuge X X
68 Label Printer X X
69 Beckman Dickinson BD Affirm X X
70 DS2 - Processing System X X
71 Biofire Molecular Testing X X
72 Heat Block X X
73 Cytospin Centrifuge X X
74 BACT/ Alert 3D X X
75 Dual Side Viewing Microscope X X
76 Centrifuge - Small X X
77 Cell Washer X X
78 Saline Box X X
79 Osmometer 3320 X X
80 Cobas Blood Gas Analyzer X X
81 OC-80 Analyzer X X
82 PH Meter 240 X X
83 Barnstead Aquabath X X
84 Sebia Hydrasis 2 Electrophoresis X X
85 A/C Analyzer Hemoglobin Testing X X
86 Sysmex UP-1000i & Siemens Clinitek Urinalysis Analyzer X X
87 Centrifuge Rotofix 32 A X X
88 Roche Cobas U411 X X
89 Sediment Terminal Keypad/ Reader X X
90 6420 QQQ LC/MS System X X
91 Biomerieux Vidas 3 X X
92 PFA-100 Analyzer X X
93 Sysmex Cellavision DM96 X X
94 Sysmex CS-2500 X X
95 Vitek 2 X X
96 U-C Refrigerator X X
97 Cart - Small X X
98 Cart - Medium X X
99 U-C Freezer X X
100 Omnicell Main X X
102 Desktop Printer X X
103 Fume Hood - New X X
104 Custom Downdraft Table X X
105 Single Microscope X X
106 Bio-Med Workroom Desk X X
107 Anti-Vibration Marble Slab X X
108 Plasma Thawing Bath X X
109 Dishwasher_15404 X X
110 Water Filtration System (Existing to Remain) X
111 Cart - Extra Large X X
112 Shredder Box X X
113 Side-by-Side Refrigerator X X
114 Microwave X X
118 High Density Slide Storage X X
119 High Density Parafin Block Storage X X
120 Coag Table X X
121 LCMS X X
122 Table - 84" x 36" X X
123 Table - 60" x 30" X X
124 Table - 36" x 32" X X
125 Fume Hood X X
126 Water Filtration System (Temporary) X X
127 35" x 24" Marble Anti-Vibration Table X X
128 Airfuge X X
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.johnpoe.com| 937.461.3290
DEDUCT ALT #3
DEDUCT ALT #2
Revisions Date
2.42
2.45
2.42
2.45
2.42
2.45
2.42
2.42
2.45
2.44
2.46
2.44
2.46
2.42
2.45
2.42
2.45
2.42
2.45
2.42
2.45
2.42
2.45 2.42
2.45
2.42
2.45
2.42
2.45
2.41
2.45
2.42
2.45
2.42
2.45
2.43
2.43
2.45
2.42
2.45
2.39
2.45
2.39
2.46
2.39
2.46
2.39
2.45
2.39
2.45
2.39
2.45
2.49
2.502.50
2.502.50
2.51
2.492.492.492.492.492.49
2.51
2.49
2.49
2.52
2.53
2.52
2.49
2.52 2.502.50
2.542.54
1.03
T1.0
T1.0
T1.0
2.49
2.49 2.49
2.49
2.492.492.49
2.49
2.49
2.49
2.47
2.492.49
2.49
2.49
2.522.52 2.522.52
2.522.522.522.522.52
2.522.52
2.522.52
2.522.52
2.52
2.522.52
2.52
2.52
2.522.52
2.52
2.522.52
2.52
T1.0
T1.0
Align
2.52
1.04
1.04
2.52
2.49
2.56
T1.0
T1.0 T1.0 T1.0
T1.0
T1.0
T1.0 T1.0
T1.0
T1.0
T1.0
2.57
2.312.31
2.49
2.29 2.29
2.58
1.06
2.49 2.60
2.45
1.03
2.27
2.50
2.39
2.45
2.57
2.492.32 2.52
2.32
2.32
2.33
MAINTAIN MINIMUM
EGRESS WIDTH
MAINTAIN MINIMUM
EGRESS WIDTH
2.33
GLASS
WASHING
LAB.
2E111
ELECTRIC
ROOM
2E112
CORRIDOR
C2-5
CORRIDOR
C2-6
OFFICE
2E116A
BLOOD
BANK
2E116C
STORAGE,
GENERAL
2E119
MICROBIOLOGY
SUPERVISOR
2E120
REFRIGERATOR
2E121
CLOSET
2E122
INCUBATOR
2E123
MEDIA
PREPARATIONS
2E124
MICROBIOLOGY/SEROLOGY
UNIT
2E125
BSL 3
2E125A
OFFICE
2E116D
CORRIDOR
C2-7
STAFF
LOUNGE
2E126
SLIDE AND
BLOCK FILE
2E127
HISTOLOGY/
CYTOLOGY
CUTTING
ROOM
2E128
TISSUE
PROCESSING
2E130
STORAGE,
GENERAL
2E138
TOILET,
MALE
2E139
LABORATORY
INFORMATION
MANAGER
2E141
MORGUE
2E142
OFFICE
2E128A
COMM
CLOSET
2E179
CORRIDOR
C2-9
TOILET,
MALE
2E142B
TOILET,
FEMALE
2E142C
MORGUE
2E142D
MORGUE
2E142E
STORAGE
2E142F
CORRIDOR
C2-8
CORRIDOR
C2-14
STAIR
SWC-2
BSL 3
VESTIBULE
2E125B
Wall to be Demolished
Existing Wall to Remain
Door and Frame to be Demolished. Contractor may reuse as temporary doors.
DEMOLITION LEGEND
All work in this area to occur during nights and weekend hours.
Coordinate activities with COR.
Existing to be Removed
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
/1
/2
:0
:1
A
M
Renovate Laboratory
02/19/2021
PHASE 2 DEMOLITION PLAN
A121
DWKR
17006.00
552-18-101
Dayton, OH
310STATION
PHILIP KIRK, PE
BID SET
GENERAL DEMOLITION NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or provide new surfaces.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Remove complete assemblies U.N.O. Unused hardware shall be turned over to Owner. Box hardware before giving to Owner.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc.
are shown to be removed.
G. Prepare walls and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
I Construct temporary partitions prior to demo work. Provide doors with closers and locks as required for access to construction.
N Scale: 1/8" = 1'-0"
PHASE 2 DEMOLITION PLAN
PLAN NOTES
1.03 All work in this area to occur during nights and weekend hours. Coordinate activities with COR.
1.04 Build new wall partition prior to demo work.
1.06 Extend partition to deck prior to demo work.
2.27 Relocate existing furniture as shown on new plans.
2.29 Relocate existing Bio Safety Cabinet for reuse.
2.31 Relocate existing hood. See Mechanical Drawings.
2.32 Relocate metal lockers. Coordinate temporary placement with owner. Demolish at end of project.
2.33 Owner will unload product from this high-density storage carousel. Contractor shall relocate storage carousel as indicated. Coordinate work with COR.
2.39 Remove existing ceramic wall tile. Remove tile flooring and setting bed, approximately 4" total depth. Prepare subfloor for new scheduled finish this area.
2.41 Remove existing carpet flooring and rubber base. Prepare subfloor for new scheduled finish this area.
2.42 Remove existing VCT flooring and rubber base. Prepare subfloor for new scheduled finish this area.
2.43 Remove existing ceramic tile flooring and wall tile. Prepare subfloor for new scheduled finish this area.
2.44 Remove existing welded sheet flooring and integral base. Prepare subfloor for new scheduled finish this area.
2.45 Remove existing acoustic ceiling tile, grid, lights and all ceiling mounted accessories this area.
2.46 Remove existing gypsum board ceiling, lights and all ceiling mounted accessories this area.
2.47 Remove existing compartment sink.
2.49 Remove existing plumbing fixture and all associated accessories. See Plumbing Drawings.
2.50 Remove existing storage shelving and salvage for use in new layout as needed.
2.51 Remove existing lockers.
2.52 Remove existing countertop and cabinets.
2.53 Remove existing folding partition and support structures.
2.54 Remove existing shower and curb. Repair slab as required for new work.
2.56 Remove section of exterior wall as required for new window. See details.
2.57 Remove existing hood. See Mechanical Drawings.
2.58 Remove autopsy table. See Plumbing, Mechanical, and Electrical Drawings.
2.60 Remove existing walk-in cooler.
PHASE 2 KEY PLAN
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.johnpoe.com| 937.461.3290 Revisions Date
A
A601
A124
A124
1.03
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
+/- 9'-3 1/4"
S2.0S2.0S2.0S2.0
8' - 0"+/- 5' - 11 3/8"
/4
/4
9' - 7 1/8"
0' - 4 7/8"
5' - 0" 5' - 6 5/8" +/- 13' - 3 7/8"
S3.0
T1.0
+/- 29' - 6 7/8"
A lig n
S2.0
S2.0
Align
S2.0S2.0S2.0S2.0
S2.0S2.0
126 127
145B
2-3A
139137B
136130A
146A
171A
S3.0
T1.0T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0T1.0
A401
C
A401
B
11.19
2'-0"
S2.0 S2.0
S2.0
A
A
2-1A
3.09
3.09
3.09
3.09
3.09
3.09
3.09
3.09 S2.0
S2.0
1'-6"
A
4' - 6 1/4"
C
D N
:1
11.02
Align
10.51
A lig n
A401
A
A401
SIM
A401
2.11
2.11
S2.0S2.0
S2.0
S1.1
S1.1
S1.1
S2.0
137A
T1.0T1.0
116C
T5
COMM
CLOSET
2E179
C L
E A
R
M A
IN
T
A
IN
11.0211.0211.02
11.0211.0211.0211.02
T1.0T1.0T1.0
10.40
S1.1 10.40
14.05
2.04
11' - 9 1/4"
0' - 4 7/8"
6' - 11 3/8"
0' - 4 7/8"
5' - 0"
0' - 4 7/8"
9' - 0"
/8
/4
NON-LAB
STORAGE
2E172
STAFF
LOUNGE
2E170
LOCKERS
2E169
STAFF
TOILET
2E168
STAFF
TOILET
2E167
OFFICE
2E171A
STORAGE
2E166
FORMALIN
RECYCLE
2E160
HISTOLOGY
& TISSUE
PROCESSING
2E146
BLOCK &
SLIDE
C2-7
OFFICE
ANITA
2E144
IT CLOSET
2E143
OFFICE
MONICA
C2-6
MORGUE
VAULT
2E141
VESTIBULE
2E139
FAMILY
VIEWING
2E138
MICROBIOLOGY
2E137
CORRIDOR
C2-4
CORRIDOR
C2-4
STORAGE
2E128
BSL 3 LAB
2E133
FLUORO
MICRO
2E129
INCUBATOR
2E131
REFRIGERATOR
2E135
OFFICE
DANA
2E136
BIOLOGICAL
SPECIMEN
2E130A
OFFICE
DAWN
2E130
2ND & 3RD
SHIFT
SUPERVISORS
C2-8
FILE
STORAGE
C2-9
2ND & 3RD
SHIFT
SUPERVISOR
C2-10
EQUIPMENT
CLOSET
2E140
BSL 3
VESTIBULE
2E134
DI WATER
2E123
ELECTRICAL
2E124
BIO-MED
WORKROOM
2E127
PUBLIC
TOILET
2E126
PUBLIC
TOILET
2E125
EQUIPMENT
CLOSET
2E132
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
/1
/2
:2
:2
A
M
Renovate Laboratory
02/19/2021
PHASE 2 PLAN
A122
DWKR
17006.00
552-18-101
Dayton, OH
310STATION
PHILIP KIRK, PE
BID SET
N Scale: 1/8" = 1'-0"
PHASE 2 DIMENSION & NOTE PLAN
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
1.03 All work in this area to occur during nights and weekend hours. Coordinate activities with COR.
2.04 Existing dumbwaiter to remain.
2.11 Existing recessed fire extinguisher cabinet to remain.
3.09 Patch slab, approximately 4", with normal weight concrete.
10.40 Recessed fire extinguisher cabinet.
10.51 (42) 1 Tier metal lockers, 12"W x 18"D, sloped tops, locking, resilient base at toe kick. Refer to specifications for details. Provide fillers where needed.
11.02 Walk-in cooler panel wall.
11.19 New walk-in morgue cooler.
14.05 New pneumatic tube station.
GENERAL REFLECTED CEILING PLAN NOTES
EQUIPMENT SCHEDULE
Tag Type
Installed by Supplied by
C o n tr a c to r
O w n e r
C o n tr a c to r
O w n e r (N e w
O w n e r (E x is t.
01 Isotemp Refrigerator R2 X X
03 Kelvinator Scientific BT50FS-7 Freezer X X X
04 Magic Chef Refrigerator Freezer CTB2112AR X X
05 Thermo-Scientific Revco ExF 8928 -70 Deg C Freezer X X
07 FORMA Freezer X X
09 Thermo-Scientific ULT5030A Freezer X X
10 True Refrigerator TS-72 X X
11 Thermo-Scientific Legend XFR Cold Centrifuge X X
12 Revco Freezer UFP1230A X X
13 Thermo Scientific BBR25-1B Refrigerator X X
14 Thermo Scientific JBB3004A Refrigerator X X
15 Thermo Scientific JBB3004A23 Refrigerator X X
16 Fisher Scientific CAP-TDX15SNSBRAD Refrigrator/Freezer X X
17 Flammable Storage Cabinet X X
18 Refrigerator Revco Double Door X X
19 Ventana Bench Mark Special Stains (Roche) X X
20 Ventana Ultra X X
22 Leica CM1860 UV Cryostat Ag Protect X X
23 Processor Leica ASP 6025 X X
25 Siemens AUWI Pro Mobile table X X
26 Siemens Aptio Automation X X
27 Siemens Advia Centaur XP X X
28 Siemens Dimension Vista 1500 X X
31 Siemens Aptio Automation B X X
32 GeneExpert Infinity-48s X X
33 Biohazard Bin X X
34 Bulk Trash Bin X X
36 Procycler BR Instrument Corp. Formelyn Recycle Unit X X
37 Tissue Embedding Station A X X
38 Tissue Embedding Station B X X
39 Mopec Freestanding Gross Lab X X
40 Cart - Large X X
41 Mass Spectrometer X X
42 Computer Cart w/ Printer X X
43 BD-FX X X
44 Refrigerator 28" x 35" X X
45 Bio Safety Cabinet X X
46 Bio Safety Cabinet (Class II A2) X X
47 Incubator X X
48 Thermo-Scientific Refrigerator X X
49 Incubator - 40 X X
50 Incubator - 35 CO2 X X
51 Computer Workstation X X
52 Floor Copier/Printer X X
53 -20 Freezer X X
54 -70 Freezer X X
55 Omnicell Cabinet X X
56 Beckman Colter Slide Stainer X X
57 Centralink Command Center X X
58 Stainer A X X
59 Stainer B X X
60 Isotemp Oven (Large) X X
61 Dehydration Station X X
62 Centrifuge X X
63 Cytocentrifuge X X
64 Microtome X X
65 Vitek 2 Smart Carrier X X
66 Printer - Small X X
67 Cold Centrifuge X X
68 Label Printer X X
69 Beckman Dickinson BD Affirm X X
70 DS2 - Processing System X X
71 Biofire Molecular Testing X X
72 Heat Block X X
73 Cytospin Centrifuge X X
74 BACT/ Alert 3D X X
75 Dual Side Viewing Microscope X X
76 Centrifuge - Small X X
77 Cell Washer X X
78 Saline Box X X
79 Osmometer 3320 X X
80 Cobas Blood Gas Analyzer X X
81 OC-80 Analyzer X X
82 PH Meter 240 X X
83 Barnstead Aquabath X X
84 Sebia Hydrasis 2 Electrophoresis X X
85 A/C Analyzer Hemoglobin Testing X X
86 Sysmex UP-1000i & Siemens Clinitek Urinalysis Analyzer X X
87 Centrifuge Rotofix 32 A X X
88 Roche Cobas U411 X X
89 Sediment Terminal Keypad/ Reader X X
90 6420 QQQ LC/MS System X X
91 Biomerieux Vidas 3 X X
92 PFA-100 Analyzer X X
93 Sysmex Cellavision DM96 X X
94 Sysmex CS-2500 X X
95 Vitek 2 X X
96 U-C Refrigerator X X
97 Cart - Small X X
98 Cart - Medium X X
99 U-C Freezer X X
100 Omnicell Main X X
102 Desktop Printer X X
103 Fume Hood - New X X
104 Custom Downdraft Table X X
105 Single Microscope X X
106 Bio-Med Workroom Desk X X
107 Anti-Vibration Marble Slab X X
108 Plasma Thawing Bath X X
109 Dishwasher_15404 X X
110 Water Filtration System (Existing to Remain) X
111 Cart - Extra Large X X
112 Shredder Box X X
113 Side-by-Side Refrigerator X X
114 Microwave X X
117 Canopy Hood (Existing to be Removed) - - X
118 High Density Slide Storage X X
119 High Density Parafin Block Storage X X
120 Coag Table X X
121 LCMS X X
122 Table - 84" x 36" X X
123 Table - 60" x 30" X X
124 Table - 36" x 32" X X
125 Fume Hood X X
126 Water Filtration System (Temporary) X X
127 35" x 24" Marble Anti-Vibration Table X X
128 Airfuge X X
PHASE 2 KEY PLAN
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.johnpoe.com| 937.461.3290
PLAN NOTES
Revisions Date
Recessed downlight fixture
Supply air diffuser
Return air grille2' x 4' lay-in light fixture
2' x 2' acoustical tile ceiling
Gypsum board ceiling / soffit - painted
Access panel
Surface-mounted linear light fixture
2' x 2' lay-in light fixture
2' x 4' acoustical tile ceiling
Acoustical wood ceiling planks
Chain hung light fixture
Recessed linear light fixture
Exhsuat grille
REFLECTED CEILING PLAN LEGEND
9' - 0"
7' - 10"
7' - 6"
8' - 10"
1.03
8' - 4"
8' - 4"
7' - 10"
7' - 10"
2' - 2 1/4"
7' - 10"
8' - 4"
8' - 4"
8' - 6"
8' - 6"
8' - 6"
8' - 0"
7' - 10"
7' - 6"
7' - 10"
7' - 10"
12.01
9.19
9.19
9.13
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 10"
8' - 6"
8' - 0"
8' - 0"
8' - 0"
8' - 9"
8' - 10"
8' - 0"
8' - 0"
9' - 0"
8' - 6"
8' - 6"
8' - 6"
8' - 6" 8' - 6"
7' - 10"
9.209.13
9.19
9.20
1.03
9.13
9.20
9.19
9.20
8' - 5" 8' - 5" 8' - 5"8' - 5"
8' - 0"
ACT-2
8' - 0"
9.76 9.76
9.76
9.76
A112
A112
9.19
7' - 6"
A112
Sim
2E179
8' - 0"
ACT-2
ACT-2
ACT-2
ACT-2
ACT-2
ACT-2
ACT-2
8' - 0"
8' - 5"
ACT-3
ACT-2
ACT-1
ACT-3
ACT-3
ACT-3
ACT-3
ACT-1
ACT-1
ACT-3
ACT-3
ACT-1
ACT-1
ACT-1
ACT-3
ACT-1
ACT-3
ACT-3
ACT-3
ACT-1
ACT-3
ACT-3
ACT-1ACT-1
ACT-2
8' - 6"
2E1672E168
2E169
2E1702E172
2E171A
2E126
2E125
2E128
2E133
2E134
2E137
2E144
2E143
2E146
2E136
2E130
2E129
2E127
2E138
2E141
2E160
2E166
2E140 2E139
C2-4
2E1352E131
2E130A
2E124
2E123
C2-6
C2-7
C2-8 C2-9
C2-10
C2-4
C2-4
2E132
2E137
C2-11
8' - 0"
2'-0"
8' - 0"
C2-12
C2-13
1' - 3"
9.62 9.62
8' - 5"
9.77
9.77
9.43
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
/1
/2
:2
:2
A
M
Renovate Laboratory
02/19/2021
PHASE 2 RCP
A123
DWKR
17006.00
552-18-101
Dayton, OH
310STATION
PHILIP KIRK, PE
BID SET
GENERAL NOTES
A. All wood blocking shall be fire retardant. Refer to life and safety plans for specific location of rated/floor ceiling assemblies.
B. Light fixtures, sprinkler heads, speakers, and HVAC devices shall be located as close as possible to the center of acoustical ceiling panels. Confirm any deviation from this with the Project Engineer.
C. See P, M, E and FP drawings for additional information regarding final information and quantites of fixtures/devices to be installed in ceiling.
D. See Electrical Drawings for lighting specifications. Final locations of lighting and diffusers indicated on Architectural Reflected Ceiling Plans.
E Ceiling and soffit heights are noted from their respective floor elevations.
E. All gyp. ceilings to be painted P-5;unless noted otherwise. All undersides of soffits shall be painted P-5, faces of soffit shall be painted the same color as adjacent wall; unless noted otherwise.
PLAN NOTES
N Scale: 1/8" = 1'-0"
PHASE 2 REFLECTED CEILING PLAN
1.03 All work in this area to occur during nights and weekend hours. Coordinate activities with COR.
9.13 Existing ceiling and ligthing to remain.
9.19 No ceiling work this area, this phase.
9.20 Cooler ceiling.
9.43 Modify ceiling as required to accomidate heights of equipment.
9.62 Align face of bulkhead with the corner of wall.
9.76 No ceiling. Open to structure.
9.77 Face of bulkhead to be P-1
12.01 Manual roller window shades.
PHASE 2 KEY PLAN
3131 Newmark Drive, Suite 200 Miamisburg, Ohio 45342 |www.johnpoe.com| 937.461.3290 Revisions Date
| 17006 |
| A002 - COMPOSITE DEMOLITION PLAN |
| A003 - COMPOSITE FLOOR PLAN |
| A122 - PHASE 2 PLAN |
| A123 - PHASE 2 RCP |
File details come from the government source that posted it. Updated .