This document is a Statement of Work (SOW) for snow and ice removal services. The Contractor shall perform snow and ice removal services including clearing snow and ice from entrances, sidewalks, parking areas, and other designated areas before and during normal building operating hours. The Contractor must submit a detailed snow removal plan that covers equipment, personnel, locations, removal methods, approved materials, safety, and notification procedures. The Contractor shall use EPA-certified, environmentally-friendly chemicals and materials to reduce safety hazards. This SOW is related to a Request for Proposals (RFP) for Combined Boiler Chiller Plant Maintenance and Other Related Services, Solicitation Number 47PM0024R0010. This is a 100% Small Business Set-Aside for NAICS code 561210, with a contract value between $13,000,000 - $16,000,000 for the base and option years. The anticipated period of performance is October 1, 2024 through March 31, 2025. Proposals are due by 3:00 pm EST on July 10, 2024.

View the file

Other files

File Type Posted
Chiller Preventive Maintenance Pricing Tables .xlsx XLSX spreadsheet
Solicitation Amendment 47PM0024R0010_0003 2024 07 10.pdf PDF
Solicitation Amendment 47PM0024R0010_0002.pdf PDF
Answers to RFIs questions.pdf PDF
HOTD combined boiler chiller site visit attendance sheet 2024 06 11.pdf PDF
Revised Boiler Rental Pricing Sheet.xlsx XLSX spreadsheet
Revised Equipment List - Boiler Chiller.xlsx XLSX spreadsheet
Solicitation Amendment 47PM0024R0010_0001 2024 06 25.pdf PDF
Revised Pricing Table - Boiler Chiller Plant Maintenance.xlsx XLSX spreadsheet
Revised SOW - Electric Motor Maintenance.pdf PDF
Revised RFP Combined Boiler Chiller Plant SOW_for_2024 06 25.pdf PDF
Revised SOW - Chiller Preventive Maintenance.pdf PDF
SCA Wage Determination 2015-4281 Rev 29 2024 04 11.pdf PDF
Electric Motor Maintenance Pricing Tables.xlsx XLSX spreadsheet
CBA Local 602 and MCAMW 08 2022 - 07 2025.pdf PDF
Current vendor list for boiler chiller plant maintenance.pdf PDF
Revised Electric Motor Maintenance Pricing Tables.xlsx XLSX spreadsheet
J24 SOW - Electric Motor Maintenance.pdf PDF
J20 - Small Business Socioeconomic Category Designation Form.pdf PDF
J23 SOW - Chiller Preventive Maintenance.pdf PDF
J22 SOW - Boiler Rental.pdf PDF
J21 - Past Performance Questionaire.pdf PDF
J26 SOW - Gas Compressors .pdf PDF
J28 SOW - Reverse Osmosis System Membrane Replacement and Cleaning Service.pdf PDF
PM Guide Cards.pdf PDF
Pricing Table - Boiler Chiller Plant Maintenance.xlsx XLSX spreadsheet
SF 1449 - 47PM0024R0010.pdf PDF
J27 SOW - Plant Air Compressor Preventive Maintenance Services.pdf PDF
RFP Solicitation 47PM0024R0010 Boiler Chiller Plant Maintance and Other Related Services.pdf PDF
J25 SOW - Emergency Eyewash Stations.pdf PDF
HOTD Equipment List.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

Snow and Ice Removal

The Contractor shall perform snow and ice removal services including removing snow and ice from entrances, steps, landings, sidewalks, vehicular courts, driveways, plaza areas, roadways, parking areas, handicapped accessibility areas and approaches as part of the standard service.

This also includes application of snow melt or sand, as necessary. This does not include snow and ice removal requiring snowplows or other heavy equipment such as front-end loaders, backhoes, bobcats. Services requiring this equipment are Above Standard and will be ordered as needed using line-item pricing.

• The Contractor shall clear snow and ice before the normal building operating hours.

Furthermore, the Contractor shall clear snow and ice during normal building operating hours and is authorized to divert work to accomplish the task as approved by the

COR. The Contractor shall notify the CO or their designee of the diversion within one

(1) hour. The CO or their designee retains the right to determine what type of services and the duration of diverted services for the removal of snow and ice.

• The GSA Ordering Official may order additional snow and ice removal services outside of normal building operating hours (i.e., weekends, holidays). The task order shall reflect the days and hours required for snow and ice removal.

• The Contractor shall submit a detailed snow removal plan that meets the needs of the

GSA. At a minimum, the snow removal plan shall include the following items:

o Equipment o Personnel o Snow and Ice removal locations including priority, removal method and event triggers o Approved materials and chemicals o Safety plan o Notification procedures

Chemicals and/or sand shall be used to reduce safety hazards due to ice and snow. All chemicals used shall be certified by EPA’s ‘Safer Choice.’ Products with no comparable substitute shall comply with Federal specifications and local codes and be approved by the CO or their designee prior to the first inclement weather event. No sodium chloride or calcium chloride salt shall be used due to environmental risk. Less disruptive chemicals such as magnesium chloride, potassium acetate, and potassium chloride are viable alternatives. The Contractor shall ensure there is an adequate supply of chemicals and sand on site or readily available to cover unexpected snow and ice occurrences. Materials shall be stored in a secondary containment and the area around the storage is to be kept clean of spillage. The snow removal plan shall be submitted in accordance with the requirements in C.18 Contractor Submittals/Deliverables Chart.