This document is a Statement of Work (SOW) for Reverse Osmosis (RO) System Membrane Replacement and Cleaning Service. The objective is to provide RO system membrane replacement and cleaning service for two RO systems at the Central Heating & Refrigeration Plant (CHRP). The contractor shall clean the membranes four times per year for each of the two RO systems, which have a total of 72 membranes. The contractor shall remove the dirty/fouled membranes, transport them offsite for cleaning, and replace them with cleaned membranes within 24 hours of the service call. The offsite cleaning shall include pre-testing, high and low pH cleaning, post-testing, and treating the membranes with sodium bisulfite before transporting them back to the CHRP facility. The contractor shall also help start up the RO system after membrane replacement and confirm the effectiveness of the offsite cleaning.

This SOW is related to a federal contract opportunity for Combined Boiler Chiller Plant Maintenance and Other Related Services, Solicitation Number 47PM0024R0010. This is a 100% Total Small Business Set-Aside solicitation under NAICS 561210, with an anticipated period of performance from October 1, 2024 to March 31, 2025, including four one-year option periods. The competitive range for this procurement is between $13,000,000 and $16,000,000. The evaluation factors include Technical/Management Approach, Key Personnel and Qualifications, Past Performance, and Socio-economic Status.

View the file

Other files

File Type Posted
Chiller Preventive Maintenance Pricing Tables .xlsx XLSX spreadsheet
Solicitation Amendment 47PM0024R0010_0003 2024 07 10.pdf PDF
Solicitation Amendment 47PM0024R0010_0002.pdf PDF
Answers to RFIs questions.pdf PDF
HOTD combined boiler chiller site visit attendance sheet 2024 06 11.pdf PDF
Revised Boiler Rental Pricing Sheet.xlsx XLSX spreadsheet
Revised Equipment List - Boiler Chiller.xlsx XLSX spreadsheet
Solicitation Amendment 47PM0024R0010_0001 2024 06 25.pdf PDF
Revised Pricing Table - Boiler Chiller Plant Maintenance.xlsx XLSX spreadsheet
Revised SOW - Electric Motor Maintenance.pdf PDF
Revised RFP Combined Boiler Chiller Plant SOW_for_2024 06 25.pdf PDF
Revised SOW - Chiller Preventive Maintenance.pdf PDF
SCA Wage Determination 2015-4281 Rev 29 2024 04 11.pdf PDF
Electric Motor Maintenance Pricing Tables.xlsx XLSX spreadsheet
CBA Local 602 and MCAMW 08 2022 - 07 2025.pdf PDF
Current vendor list for boiler chiller plant maintenance.pdf PDF
Revised Electric Motor Maintenance Pricing Tables.xlsx XLSX spreadsheet
J24 SOW - Electric Motor Maintenance.pdf PDF
J20 - Small Business Socioeconomic Category Designation Form.pdf PDF
J23 SOW - Chiller Preventive Maintenance.pdf PDF
J22 SOW - Boiler Rental.pdf PDF
J21 - Past Performance Questionaire.pdf PDF
J26 SOW - Gas Compressors .pdf PDF
PM Guide Cards.pdf PDF
Pricing Table - Boiler Chiller Plant Maintenance.xlsx XLSX spreadsheet
SF 1449 - 47PM0024R0010.pdf PDF
J27 SOW - Plant Air Compressor Preventive Maintenance Services.pdf PDF
RFP Solicitation 47PM0024R0010 Boiler Chiller Plant Maintance and Other Related Services.pdf PDF
J25 SOW - Emergency Eyewash Stations.pdf PDF
J29 SOW - Snow and Ice Removal.pdf PDF
HOTD Equipment List.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for

Reverse Osmosis (RO) System Membrane Replacement and Cleaning Service

1. PROJECT SUMMARY DESCRIPTION

The objective of this contract is to provide Reverse Osmosis (RO) system membrane replacement and cleaning service. The Central Heating & Refrigeration Plant (CHRP) has two (2) ROs, which clean the used equipment cooling water into clean boiler make-up water by using the reverse osmosis process. The used water, which is from various bearing cooler, heat exchangers, and blowdowns, is collected and reprocessed thru the ROs.

2. SCOPE OF WORK

The Contractor shall perform all services described in this Scope of Services in accordance with applicable requirements and provisions set forth in this Statement of Work.

RO Membrane Replacement and Cleaning Service:

• Contractor shall clean the membranes four (4) times per year for each of the two RO systems. Each system has 36 membranes housed in it for a total of 72 membranes for the two systems.

• The contractor shall provide labor to remove dirty/fouled membranes from the system(s) and replace with the same number of cleaned membranes when called by CHRP project manager. This service shall be completed with 24 hours of service call.

• Contractor shall pick up the dirty membrane and transport to off-site contractor’s facility for cleaning. It shall be the responsibility of the contractor to safely remove the membranes from the

RO system(s) without affecting the daily activity of other plant personnel working in proximity.

This membrane exchange shall be performed four (4) times a year for each RO system.

• The offsite membrane shall include the following steps

a) Individual pre-testing of all membranes includes visual inspection, salt rejection % and flow testing.

b) High and Low pH cleaning on all membranes.

c) Individual post-testing of all membranes includes visual inspection, salt rejection % and flow testing.

d) Treat cleaned membranes with Sodium Bisulfite before transporting to the CHRP.

e) Report generation to document performance of each membrane.

f) Complete data spreadsheet provided,

• Contractor shall provide temporary set of RO membranes while the fouled ones are being cleaned, only if there is a shortage of cleaned membranes on-site facility at the time of replacement.

• Contractor shall help start up the RO system with CHRP PM after membrane replacement is completed and shall make sure that all the replaced membranes are firmly secured in the pressure vessels and no leaks or dramatic pressure drops are observed across stages between the pressure vessels.

• It shall be the contractor’s responsibility to confirm the effectiveness of the off-site cleaning by testing, cleaning, and testing membranes again before delivering them to the CHRP facility.

• If required, contractor shall keep the membranes in membrane plastic bags and deliver to the CHRP facility for future use after cleaning and treating with Sodium Bisulfite.

File details come from the government source that posted it. Updated .