SECTION J - 1502000
FACILITY INVESTMENT
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER ATTACHMENT TITLE
J-1502000-01 DEFINITIONS AND ACRONYMS
J-1502000-02 REFERENCES AND TECHNICAL DOCUMENTS
J-1502000-03 FACILITIES DESCRIPTION
J-1502000-04 MAPS
J-1502000-05 ANTICIPATED SERVICE ORDERS
J-1502000-06 PREVENTIVE MAINTENANCE (PM) PROGRAM SERVICES MATRIX
J-1502000-07 AUXILIARY GENERATORS
J-1502000-08 ROLL-UP DOORS SYSTEMS
J-1502000-09 BACKFLOW PREVENTION DEVICES
J-1502000-10 BOILERS AND UNFIRED PRESSURE VESSELS (UPVS) EQUIPMENT AND
SYSTEMS
J-1502000-11 CATHODIC PROTECTION SYSTEMS
J-1502000-12 COMPRESSED AIR SYSTEMS
J-1502000-13 FIRE PROTECTION SYSTEMS
J-1502000-14 HVAC AND REFRIGERATION SYSTEMS
J-1502000-15 TEMPERATURE STANDARDS FOR HVAC AND REFRIGERATION SYSTEMS
J-1502000-16 INTERIOR AND EXTERIOR LIGHTING SYSTEMS
J-1502000-17 ROOF DRAINS, SCUPPERS AND GUTTER SYSTEMS
J-1502000-18 EXHAUST HOODS AND DUCTS
J-1502000-19 SOLAR PANELS CLEANING
J-1502000-20 ENTRY GATES (MOTORIZED AND MANUAL)
ATTACHMENT J-1502000-01
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes
(YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
Equipment, Personal Property
Personal property equipment includes all equipment other than collateral equipment.
Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
Facilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Maintenance, Preventive
Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
Management Information Systems- Maintenance
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term
DEFINITION DESCRIPTION
also applies to replacement of the entire unit or system if beyond economical repair.
The intent of repair is to have the equipment at normal working condition.
Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.
Replacement is performed when the equipment has reached the end of its useful life;
when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
ACRONYM TITLE
ACO Administrative Contracting Officer BPVC Boiler and Pressure Vessel Code BW Biweekly CDR Contract Discrepancy Report CIA Controlled Industrial Area CMMS Computerized Maintenance Management System COR Condition of Readiness DBH Diameter at Breast Height DoD Department of Defense DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials GPWS Guide Performance Work Statements HCA Head Contracting Agency HVAC Heating, Ventilation, and Air Conditioning ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity IFLOLS Improved Fresnel Lens Optical Landing System IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MSDS Material Safety Data Sheets NFPA National Fire Protection Association NAVFAC Naval Facilities Engineering Command NMCI Navy Marine Corps Intranet NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative PAW Performance Assessment Worksheet PEO Program Executive Officer PM Project Manager PRCSP Permit Required Confined Space Program PWS Performance Work Statement Q Quarterly QC Quality Control RPIE Real Property Inventory Equipment SC Security Clearances
SCADA Supervisory Control And Data Acquisition SM Semimonthly SOP Standard Operating Procedures SPAR Senior Performance Assessment Representative SRM Sustainment, Restoration and Modernization TE Technical Evaluation UFC Unified Facilities Criteria UPV Unfired Pressure Vessel VIQ Variation in Quantity WBS Work Breakdown Structure BPVC Boiler and Pressure Vessel Code HVAC Heating, Ventilation, and Air Conditioning RPIE Real Property Inventory Equipment SCADA Supervisory Control And Data Acquisition SRM Sustainment, Restoration and Modernization UFC Unified Facilities Criteria UPV Unfired Pressure Vessel VTE Vertical Transportation Equipment
ATTACHMENT J-1502000-02
REFERENCES AND TECHNICAL DOCUMENTS
29 CFR 1910.151 Medical Services And First Aid 40 CFR 60 Standards Of Performance For New Stationary Sources (NSPS) 40 CFR 63 National Emission Standards For Hazardous Air Pollutants For Source Categories 40 CFR 89 Control Of Emissions From New And In-Use Nonroad Compression-Ignition Engines
40 CFR 280 Technical Standards And Corrective Action Requirements For Owners And Operators Of Underground Storage Tanks (UST)
40 CFR Part 112 Oil Pollution Prevention
9 VAC 25-91-10 VA AST REGS
API 570 Piping Inspection Code API 653 Aboveground Storage Tank Inspector API 1631 Interior Lining Of Underground Storage Tanks ANSI Z358.1-2009 American National Standard For Emergency Eyewash And Shower Equipment ASTM E 1990 Standard Guide For Performing Evaluations Of Underground Storage Tank Systems MIL-HDBK-419A Grounding, Bonding, And Shielding For Electronic Equipments And Facilities
MIL-STD-188-124B
Grounding, Bonding And Shielding For Common Long Haul/Tactical Communication Systems Including Ground Based Communications-Electronics Facilities And Equipments
NLPA 631 Entry, Cleaning, Interior Inspection, Repair And Lining Of Underground Storage Tanks
NAVFACINST
11230.1 Inspection, Certification And Audit Of Crane And Railroad Trackage-
NAVFACINST
11300.37 Energy And Utilities Policy Manual
NAVFAC MO-200 Facilities Engineering Electrical Exterior Facilities NAVFAC MO-201 Electric Power Distribution Systems Operations NAVFAC MO-206 Maintenance And Operation Of Air Compressor Plants NAVFAC MO-209 Maintenance Of Steam, Hot Water And Compressed Air NAVFAC MO-210 Maintenance And Operation Of Water Supply, Treatment, And Distribution Systems NAVFAC MO-230 Petroleum Fuel Facilities NAVFAC MO-912 Auxiliary Generators NAVFAC MO-322 Inspection Of Shore Facilities, Volume I And II NAVFAC P-307 Management Of Weight Handling Equipment NAVFAC MO-230 Petroleum Fuel Facilities NAVFAC MO-102 Maintenance And Repair Of Surface Areas NAVMED P-5010-4 Manual Of Naval Preventive Medicine Swimming Pools And Bathing Places NAVSEA OP-5 Ammunition And Explosives Safety Ashore NFPA 30 Flammable And Combustible Liquids Code NFPA 30A Code For Motor Fuel Dispensing Facilities And Repair Garages NFPA 780 Standard For The Installation Of Lightning Protection Systems NFPA 99 Health Care Facilities Code NFPA Standard 96 National Fire Protection Association, NAVSUP P-558 Fuel Management Ashore NAVSUPINST 4750.1 Automated Fuel Maintenance System OPNAVINST 5090.1 Environmental Readiness Program Manual
TM 5-693
Uninterruptible Power Supply System Selection, Installation, And Maintenance For Command, Control, Communications, Computer, Intelligence, Surveillance, And Reconnaissance (C4ISR) Facilities
STI SP001 Inspection Of Aboveground Storage Tanks (ASTS) UFC 3-230-02 Operation And Maintenance: Water Supply Systems UFC 3-240-13FN Industrial Water Treatment Operation And Maintenance
ATTACHMENT J-1502000-02
REFERENCES AND TECHNICAL DOCUMENTS
UFC 3-250-08FA Standard Practice For Sealing Joints And Cracks In Rigid And Flexible Pavements UFC 3-270-01 Asphalt Maintenance And Repair Of Surface Areas UFC 3-270-01 Asphalt Maintenance And Repair UFC 3-270-02 Asphalt Crack Repair UFC 3-410-01 Design: Petroleum Fuel Facilities UFC 3-410-06N Central Heating Plants Operation And Maintenance
UFC 3-430-07 Operations And Maintenance: Inspection And Certification Of Boilers And Unfired Pressure Vessels
UFC 3-460-03 O&M: Maintenance Of Petroleum Systems UFC 3-540-07 Operation And Maintenance (O&M): Generators UFC 3-570-06 O&M: Cathodic Protection Systems UFC 3-560-01 Operation And Maintenance: Electrical Safety UFC 4-010-06 Cybersecurity Of Facility-Related Control Systems
UFC 3-600-02 Operations And Maintenance: Inspection, Testing, And Maintenance Of Fire Protection Systems
UG-2029-ENV Cross-Connection Control And Backflow Prevention Program Implementation At Navy Shore Facilities
UL 58 Standard For Steel Underground Tanks For Flammable And Combustible Liquids 29 CFR 1910.151 Medical Services And First Aid 40 CFR 60 Standards Of Performance For New Stationary Sources (NSPS) 40 CFR 63 National Emission Standards For Hazardous Air Pollutants For Source Categories 40 CFR 89 Control Of Emissions From New And In-Use Nonroad Compression-Ignition Engines
40 CFR 280 Technical Standards And Corrective Action Requirements For Owners And Operators Of Underground Storage Tanks (UST)
40 CFR Part 112 Oil Pollution Prevention
9 VAC 25-91-10 VA AST REGS
API 570 Piping Inspection Code API 653 Aboveground Storage Tank Inspector
Facilities description is provided as a separate file. Refer to Excel file “J-1502000-03 NRL Facilities Description”.
ATTACHMENT J-1502000-03
FACILITIES DESCRIPTION
ATTACHMENT J-1502000-04
MAPS
Naval Research Lab Chesapeake Beach
ATTACHMENT J-1502000-05
ANTICIPATED SERVICE ORDERS
ANNUAL ANTICIPATED SERVICE ORDERS
EMERGENCY URGENT ROUTINE
25 50 350
ATTACHMENT J-1502000-06
PREVENTIVE MAINTENANCE (PM) PROGRAM SERVICES MATRIX
Preventive maintenance program services matrix is provided as a separate attachment. Refer to Excel file “J- 1502000-06 Preventive Maintenance (PM) Program Services Matrix”.
ATTACHMENT J-1502000-07
AUXILIARY GENERATOR SYSTEMS
Auxiliary Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Auxiliary Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Auxiliary Generator Systems, such as:
batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
BLDG LOCATION SYSTEM
C6 EXTERIOR
SOUTHSIDE
Emergency Generator up to 15 KVA
C50 WEST SIDE Emergency Generator up to 15 KVA
C75 WEST SIDE
Emergency Diesel generator, over 15
KVA
C84 SOUTH SIDE
Emergency Diesel generator, over 15
KVA
ATTACHMENT J-1502000-08
ROLL-UP DOORS SYSTEMS
The Contractor shall develop and implement a PM program for Roll-Up Doors Support Systems both manual and motorized, and all mechanically and electrically interlocked ancillary parts, equipment, and components of Roll- Up Door Systems. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
BLDG LOCATION TYPE
C4 NORTH WALL Door, Overhead, manual, up to 24’ high x 25’ wide C4 137 Overhead, manual, up to 24’ high x 25’ wide
C29 WEST WALL Overhead, manual, up to 24’ high x 25’ wide C47 EAST WALL Door, overheard, roll-up, electric, up to 24’ high x 35’ wide C49 SOUTH WALL Door, overheard, roll-up, electric, up to 24’ high x 35’ wide C50 NORTH WALL Door, overheard, roll-up, electric, up to 24’ high x 35’ wide C50 SOUTH WALL Door, overheard, roll-up, electric, up to 24’ high x 35’ wide C75 EAST WALL Door, overheard, roll-up, electric, up to 24’ high x 35’ wide C76 WEST WALL Door, overheard, roll-up, electric, up to 24’ high x 35’ wide C76 SOUTH WALL Overhead, manual, up to 24’ high x 25’ wide C76 SOUTH WALL Overhead, manual, up to 24’ high x 25’ wide C76 EAST WALL Overhead, manual, up to 24’ high x 25’ wide
C218 WEST WALL Overhead, manual, up to 24’ high x 25’ wide C243 SOUTH WALL Overhead, manual, up to 24’ high x 25’ wide C243 SOUTH WALL Overhead, manual, up to 24’ high x 25’ wide C243 SOUTH WALL Overhead, manual, up to 24’ high x 25’ wide C244 EAST WALL Door, overheard, roll-up, electric, up to 24’ high x 35’ wide C250 NORTH WALL Overhead, manual, up to 24’ high x 25’ wide C286 NORTH WALL Overhead, manual, up to 24’ high x 25’ wide C309 EAST WALL Overhead, manual, up to 24’ high x 25’ wide C309 NORTH WALL Overhead, manual, up to 24’ high x 25’ wide C313 WEST WALL Overhead, manual, up to 24’ high x 25’ wide C314 SOUTH WALL Overhead, manual, up to 24’ high x 25’ wide C335 EAST WALL Door, overheard, roll-up, electric, up to 24’ high x 35’ wide
ATTACHMENT J-1502000-09
BACKFLOW PREVENTION DEVICES
Backflow Prevention Devices commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Preventive Maintenance (PM) Program to maintain, inspect, test and certify, and make all necessary repairs to the Backflow Prevention Devices and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Backflow Prevention Devices, such as: bleeders, regulators, valves, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
BLDG LOCATION TYPE
C75 B1 Backflow prevention device, up to 4” C76 124 Backflow prevention device, up to 4” C81 INTERIOR Backflow prevention device, over 4” C84 PUMP ROOM Backflow prevention device, up to 4” C313 EXTERIOR Backflow prevention device, over 4” C314 100 Backflow prevention device, over 4”
ATTACHMENT J-1502000-10
BOILER AND UPV SYSTEMS
Boiler and UPV Systems commence at, and includes the utility isolation point of connection and terminate at the steam/hot water point of delivery. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Boiler and UPV Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Boiler and UPV Systems, such as: burners, heat exchangers, flash tanks, meters, pressure vessel, pumps, piping, valves, steam regulating valves, steam traps, distribution lines, insulation, chemical feed system, condensation return lines, condensate meters, monitoring and controls systems, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
BLDG LOCATION SYSTEM BLDG LOCATION SYSTEM
C1 B1 Domestic Water Heater C75 B 10 Expansion Tank / Hot Water
C1 200 Instant Hot C75 B1 Expansion Tank / Hot Water
C2 B2 Boiler / Hot Water C75 B1 Expansion Tank / Cold Water
C2 B2 Expansion Tank / Hot Water C75 B1 Heat Exchanger
C2 B2 Expansion Tank / Hot Water C75 B12 Domestic Water Heater
C2 206 Instant Hot C76 124 Boiler / Hot Water
C2 B2 Domestic Water Heater C76 124 Expansion Tank / Hot Water
C4 130 Domestic Water Heater C76 106 Domestic Water Heater
C4 119 Domestic Water Heater C84 Basement Boiler / Hot Water
C5 B4 Boiler / Hot Water C84 Pump Room Expansion Tank / Hot Water
C5 B4 Expansion Tank / Hot Water C84 Pump Room Heat Exchanger
C5 B4 Expansion Tank / Hot Water C84 102 Domestic Water Heater
C5 B4 Domestic Water Heater C244 101 Domestic Water Heater
C6 B1 Domestic Water Heater C249 103 Domestic Water Heater
C6 110 Instant Hot C301 107 Domestic Water Heater
C35 100 Domestic Water Heater C307 Mech Rm Domestic Water Heater
C47 102 Domestic Water Heater C309 Mech Rm Domestic Water Heater
C49 Closet Domestic Water Heater C310 100 Domestic Water Heater C59 (TI) Restroom Instant Hot C314 Mech Rm Domestic Water Heater
C75 B10 Boiler / Hot Water
ATTACHMENT J-1502000-11
CATHODIC PROTECTION SYSTEMS
Cathodic Protection Systems commence at, and includes the utility isolation point of connection and terminate at and includes the anode. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Cathodic Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Cathodic Protection Systems, such as: anodes, cathodes, rectifiers, wiring, monitoring and controls systems, etc.
C80 STAND PIPE RECTIFER/ANOID
ATTACHMENT J-1502000-12
COMPRESSED AIR SYSTEMS
Compressed Air Systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement a PM program for the Compressed Air Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Compressed Air Systems, such as: compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be
C4 137 Air Compressor C4 137 Air Compressor C75 B3 Air Compressor C75 107 Air Compressor C75 ROOM B3 Compressed Air Dryer C76 124 Air Compressor C242 Air Compressor C309 Bay Air Compressor C313 High Bay Air Compressor C313 High Bay Air Compressor C314 Mech Room Air Compressor
ATTACHMENT J-1502000-13
FIRE PROTECTION SYSTEMS
Fire Protection Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Fire Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment and components of the Fire Protection Systems; such as: AFFF Foam, air compressors, alarm devices, alarm valves, annunciators, antennas, backflow prevention devices, Dry Chemicals, batteries, connections, control panels, detectors, diesel engines, electric motors, fuses, gauges, initiating devices, meters, notification appliances, nozzles, piping, pumps, receivers, sensors, sprinkler heads, tanks, transmitters, voice communication devices, valves (including post indicator valves), Wet Chemicals, monitoring and controls systems, emergency lights, modems, pull stations, smoke detectors, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
***Informational Note: AFFF drainage trenches shall be maintained clear and automatic valves, which close the sanitary drain and divert AFFF to a storage tank in event of activation.
FIRE ALARM LOCATIONS
C1 MISSILE AND SPACE RDT&E FACILITY
C2 ELECTRONIC AND COMMUNICATION RDT&E FACILITY
C4 ELECTRONIC AND COMMUNICATION MAINTENANCE SHOP
C5 ELECTRONIC AND COMMUNICATION RDT&E FACILITY
C6 GENERAL ADMINISTRATIVE BUILDING
C49 MISCELLANEOUS ITEM AND EQUIPMENT RDT&E FACILITY
C50 FACILITY ENGINEER MAINTENANCE SHOP
C75 ELECTRONIC AND COMMUNICATION RDT&E FACILITY
C76 MISCELLANEOUS ITEM AND EQUIPMENT RDT&E FACILITY
C79 UTILITY BUILDING
C250 RDT&E LABORATORY
C301 ELECTRONIC AND COMMUNICATION RDT&E FACILITY
C307 RDT&E LABORATORY
C309 MISCELLANEOUS ITEM AND EQUIPMENT RDT&E FACILITY
C310 RDT&E LABORATORY
C314 RDT&E LABORATORY
C501 MISCELLANEOUS ITEM AND EQUIPMENT RDT&E FACILITY
SPRINLER AND STANDPIPE LOCATIONS
C4 ELECTRONIC AND COMMUNICATION MAINTENANCE SHOP
C6 GENERAL ADMINISTRATIVE BUILDING
C49 MISCELLANEOUS ITEM AND EQUIPMENT RDT&E FACILITY
C75 ELECTRONIC AND COMMUNICATION RDT&E FACILITY
C76 MISCELLANEOUS ITEM AND EQUIPMENT RDT&E FACILITY
C250 RDT&E LABORATORY
ATTACHMENT J-1502000-14
HVAC AND REFRIGERATION SYSTEMS
HVAC and Refrigeration Systems commence at, and includes the utility isolation point of connection and terminate at the conditioned air point of delivery. The Contractor shall develop and implement an Preventive Maintenance (PM) Program for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the HVAC and Refrigeration Systems such as: air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heaters, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, monitoring and control systems.
ATTACHMENT J-1502000-15
TEMPERATURE STANDARDS FOR HVAC AND REFRIGERATION SYSTEMS
HVAC Systems
Degrees Fahrenheit dry bulb Area Cooling Season Heating Season
Living & Admin. Areas (Inactive Employment) 73 68 Working Areas (Active Employment) 78 68 Storage Areas 78 40 Computer Areas 70 68 Training Areas 75 68
Refrigeration Systems Type Degrees Fahrenheit
Frozen Meat -5 to 0 Fresh Meat 30 to 34 Ice Storage 28 to 30 Dairy Products 32 to 34 Ice Cream 0 to -5 Beer 35 to 39 Fruits and Vegetables 36 to 42 Chill Room 35 to 39
ATTACHMENT J-1502000-16
INTERIOR AND EXTERIOR LIGHTING SYSTEMS
Interior and Exterior Lighting Systems commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Lighting Systems Preventive Maintenance (PM) Program to clean, re-lamp, and make all necessary repairs to the Interior and Exterior Lighting Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Lighting Systems, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc. Lighting Systems types include but may not be limited to florescent, incandescent, halide, LED, CFL, flood, wall pack, areal, entrance and perimeter.
Contractor shall clean, re-lamp and repair interior and exterior lights for all C series facilities listed on the NRL Facilities Description J-1502000-03 except those in the C500 series.
ATTACHMENT J-1502000-17
ROOF DRAINS, SCUPPERS AND GUTTER SYSTEMS
The Contractor shall develop and implement other recurring services for the Roof Drains, Scuppers, and Gutter Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components such as:
baffles, gaskets, seals, pipes, gutters, drains, downspouts, aprons, hangers, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
FACILITY
NUMBER FACILITY NAME
C1 LABORATORY BLDG/COMM CTR CBD
C2 LABORATORY BLDG
C4 RD&T LAB
C5 ELEC RD-TEST FAC
C6 ADMINISTRATIVE BUILDING
C21 DIESEL GENERATOR HOUSE
C27 GATE HOUSE NO 2
C29 FORMER CHEMISTRY BLDG
C35 RD-TEST, OTHER
C55 LABORATORY STORAGE
C75 E. R&D TEST BUILDING
C79 CENTRAL HEATING PLANT
C84 SEWAGE TREATMENT PLANT
C87 SS PUMP STATION C CBD BLDG
C88 RADAR TOWER BUILDING
C231 BLDG N.OF BLDG C75
C242 RD TEST BUILDING
C244 CRF STORAGE BUILDING
C246 SENTRY BOOTH
C249 HIGH ENERGY FACILITY
C250 EQUIP & LIGHTING BLDG-HEF
C273 FUEL PUMP HOUSE FTF
C286 MULTI MEDIA FILTER BUILDING
C301 CRF BUILDING
C302 FIRE II CHAMBER
C303 WASTEWATER PUMPHOUSE
C307 CHEMISTRY LABORATORY BLDG.
C309 CHEMISTRY LAB/STORAGE BLDG.
C310 CHEMISTRY LABORATORY
C313 FIRE TEST BURN BLDG.
C314 HYDRALIC LABORATORY
C333 T65 ENCLOSURE CBD
ATTACHMENT J-1502000-18
EXHAUST HOODS AND DUCTS
The Contractor shall develop and implement other recurring services for the Exhaust Hoods and Ducts and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: filters, fans, fan housing, plenums, grease removal devices, waterproof covers, access panels, motors, cable, retainers, ducts, baffles, full length of ventilation ducts, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
4 142 Dryer Duct 84 201 Dryer Duct
307 Interior Exhaust Fan Fume Hood 309 Mech Room Dryer Duct
ATTACHMENT J-1502000-19
SOLAR PANELS CLEANING
The Contractor shall develop and implement other recurring services for the solar panel systems and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: panels, inverters, breakers, meters, batteries, controllers, combiner boxes, disconnects, cables, connectors, conduit, brackets, etc.
C100 Dam Solar Panel System
ATTACHMENT J-1502000-20
ENTRY GATES (MOTORIZED AND MANUAL)
The Contractor shall develop and implement other recurring services for the entry gates systems and all mechanically and electrically interlocked ancillary parts, equipment, and components such as: panels, inverters, breakers, batteries, controllers, combiner boxes, disconnects, cables, connectors, conduit, brackets, etc. The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be
SITE LOCATION SIZE TYPE ELECTRICAL
Tilghman Island WEST FENCE
LINE
50’ Rolling No
Tilghman Island WEST FENCE
LINE
50’ Rolling No
Tilghman Island 229 Up to 4’ Swing Safety No Tilghman Island 229 Up to 4’ Swing Safety No Tilghman Island 229 Up to 4’ Swing Safety No Tilghman Island 229 Up to 4’ Swing Safety No Tilghman Island 229 Up to 4’ Swing Safety No Tilghman Island 229 Up to 4’ Swing Safety No
CBD Gate 1 @246 22’ Rolling Yes CBD Gate 3 West Field 36’ Rolling Yes CBD 76 22’ Rolling Yes CBD 76 22” Rolling No CBD Gate 5 @ 27 42’ Rolling No CBD Gate 6 @ 88 42’ Rolling No