J-0200000-05-02 Contractor Incident Report System. docx.pdf

PDF 516 KB Posted

Attached to
Naval Station Norfolk Custodial Services
Solicitation number
N4008526R0065
Issued by

About this file

The Contractor Incident Report System (CIRS) is a comprehensive multi-page form designed for contractors to document workplace accidents, injuries, property damage, and related incident details. The form requires detailed reporting across several key sections, including contract information, incident type, general incident details, direct and indirect causes, contributing factors, and specific data about injured personnel or property damage.

The form guides contractors to provide extensive information such as the date and time of incident, exact location, hazardous materials involvement, personal protective equipment used, direct and indirect causes of the incident, and actions taken to prevent future occurrences. It includes sections for reporting on injured individuals (age, gender, company, injury specifics) and property damage, with spaces to document licensing, training, and attach supporting documentation. The form is meant to be submitted within specific timeframes: an initial report within 4 hours of a serious accident, with follow-up and final reports due within 5 days, and is intended to help federal contracting officers track and analyze workplace safety incidents.

View the file

Other files

File Type Posted
Solicitation Amendment N4008526R00650015 SF 30.pdf PDF
Amendment 0015 Revised Section J-0200000-09 ELIN.xlsx XLSX spreadsheet
Amendment 0015 Revised J-0200000 Management and Administration.pdf PDF
Solicitation Amendment N4008526R00650014 SF 30.pdf PDF
Amendment 0014 Revised Section J-0200000-09 ELIN.xlsx XLSX spreadsheet
Solicitation Amendment N4008526R00650013 SF 30.pdf PDF
Amendment 0013 Revised Section J-0200000-09 ELIN .xlsx XLSX spreadsheet
Amendment 0013 Revised Section J-1503010-09 Inventory.xlsx XLSX spreadsheet
Solicitation Amendment N4008526R00650012 SF 30.pdf PDF
Amendment 0012 Revised J-0200000 Management and Administration.pdf PDF
Amendment 0012 Revised C-1503010 Custodial.pdf PDF
Amendment 0012 Revised J-1503010 Custodial .pdf PDF
Amendment 0012 Revised Section J-0200000-09 ELINs .xlsx XLSX spreadsheet
Amendment 0012 Revised F-1503010 Custodial .pdf PDF
Amendment 0011 Revised Section J-1503010-09 Inventory.xlsx XLSX spreadsheet
Amendment 0011 Revised Section J-0200000-09 ELINS.xlsx XLSX spreadsheet
Amendment 0011 Revised J-0200000 Management and Administration.pdf PDF
Amendment 0011 Revised C-0200000 Management and Administration.pdf PDF
Solicitation Amendment N4008526R00650011 SF 30.pdf PDF
Solicitation Amendment N4008526R00650010 SF 30.pdf PDF
Solicitation Amendment N4008526R00650009 SF 30.pdf PDF
Solicitation Amendment N4008526R00650008 SF 30.pdf PDF
Solicitation Amendment N4008526R00650007 .pdf PDF
Solicitation Amendment N4008526R00650006 SF 30.pdf PDF
Amendment 0005 Revised J-0200000-02 CBA.pdf PDF
Amendment 0005 Revised Section C 1503010 Custodial.pdf PDF
Amendment 0005 Revised J-0200000-06 Government Furnished Property.pdf PDF
Solicitation Amendment N4008526R00650005.pdf PDF
Amendment 0005 Revised J-1503010-03 Custodial Sevice Level Standards.pdf PDF
Site Visit Sign-In Sheet_Redacted.pdf PDF
Amendment 0004.pdf PDF
Solicitation Amendment N4008526R00650003 SF 30 .pdf PDF
Revised J-0200000.pdf PDF
Solicitation Amendment N4008526R00650002 SF 30.pdf PDF
revised C-0200000 Management and Administration.pdf PDF
revised J-1503010-09 Inventory.xlsx XLSX spreadsheet
revised J-0200000 Management and Administration.pdf PDF
revised J-0200000-09 ELINS.xlsx XLSX spreadsheet
Solicitation Amendment N4008526R00650001 SF 30.pdf PDF
Solicitation - N4008526R0065.pdf PDF
N4008525R2574 J-0200000 Attachments.pdf PDF
N4008525R2574 Section F ANNEXES.pdf PDF
N4008525R2574 J-0200000-09 ELINs.xlsx XLSX spreadsheet
J-1503010-09 Inventory.xlsx XLSX spreadsheet
N4008525R2574 Section C ANNEXES.pdf PDF
N4008525R2574 J-1503010 Attachments.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Incident Report System (CIRS) 1

Contractor Incident Report System (CIRS)

Initial Report

Follow-up Report

Final Report

Date / _/ _

1. Contract Information Incident Information Prime Contractor: Cage Code:

Contract Number: Installation of Incident:

Task Order #: Contracting Activity/ROICC Office:

Contractor Contact Information Name (Last, First): Phone #:

Email Address: Date Notified:

2. Incident Type (Please Check/Bold All That Apply)

Assault/Violent Act Extreme Environmental Exposure Man over the side (No water entry)

Diving Falls, slip, trip, or bodily exertion Man Overboard - Water Entry

Electrical Shock/Burns Fires - All Types Material Handling Equipment

Equipment Installation/Repair

Hazardous Material (any type) Ordnance-Related (Explosive)

Explosion, Non-Ordnance Industrial Vehicle (Government or Private) (Select Additional Below)

Industrial Incident Additional Information (Please Check/Bold All That Apply)

Confined Space Hand and Power Tools Work Platforms and Scaffolding

Demolition/Renovation Rigging Underground Construction, Shafts, and Caissons

Trenching/Entrapment Cranes and Hoisting Equipment Concrete, Masonry, Steel Erection and

Residential Construction

Traffic Control Floating Plant and Marine Activities Tree Maintenance and Removal

Welding and Cutting Pressurized Equipment and System Airfield and Aircraft Operations

Control of Hazardous Energy Fall Protection

Contractor Incident Report System (CIRS) 2

3. General Information Incident Information Date of Accident: Time of Accident:

Describe the accident in detail in your words: (Use the back of page if you need additional space)

Exact Location of Accident:

Were Hazardous Material(s) Involved Yes No

If Yes, Explain What Hazardous Materials Were Involved and Why:

Who Provided Clean-up? Onsite Base Public

Activity of the injured person at the time of incident:

Personal Protective Equipment: (Check/Bold Response)

Available and used Available and not used Not Required

Not related to Mishap Wrong PPE for job

List PPE Used:

Contractor Incident Report System (CIRS) 3

4. Fully Explain What Allowed or Caused the Incident: Incident Information

Direct Cause:

Indirect Cause:

Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description)

Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description) (Use the back of page if you need additional space)

5. Contributing Factors:

Was Visibility Restricted? Yes No Distance Visibility was restricted:

Unit of Measure (Check/Bold): Feet Yards Meters Miles Nautical Miles

Visibility Restricted By: (Check/Bold all that apply)

Fog Smoke Rain Sleet Snow

Mist Dust Sandstorm Unknown Object Other:

Lighting Conditions at Site of Mishap:

(Please Check)

Adequate Inadequate Unknown

Was Noise Level a Factor:

(Please Check)

Yes No Unknown

Was Carbon Monoxide (CO) a Factor:(Please Check)

Yes No

If Yes CO Alarm Manufacturer:

Contractor Incident Report System (CIRS) 4

5. Contributing Factors: Continued Incident Information

Other Contributing Factors:

6. Attached Documents Attached Documents/Files Name/Description:

Date Added:

Uploaded By:

Contractor Incident Report System (CIRS) 5

1. Injured Data (if applicable) Person #

Age: Gender:

(Check/Bold)

Male Female

Prime Contractor Company Name: Subcontractor Company Name:

2. General Information Drug or Alcohol Involved: (Check/Bold all that apply)

None Unknown Alcohol Drugs Alcohol and Drugs

Who Provided First Aid? Onsite Base Public

Was Ergonomics a Factor: (Check/Bold) Yes No

Type of Ergonomic Injury: (Check/Bold All That Apply)

Lifting Positioning Bending Equipment Placement Office

Equipment Placement Industrial Repetitive Motion Impact Strain

3. Injury Illness/Fatality Information

Severity of Injury/Illness: (Check/Bold)

Fatality Lost Workday Case Involving Days Away From Work

Temporary Disability Recordable Workday Case Involving Restricted Duty

Permanent Total Disability Other Recordable Case Recordable First Aid Case

Permanent Partial Disability Non-Recordable Case No Injury

Where There Days Lost:

(Check/Bold)

Yes No

Where There Days Hospitalized:

(Check/Bold)

Yes No

Where There Days Restricted Duty:

(Check/Bold)

Yes No

Part of Body Affected:

Nature of Injury or Illness:

Event or Exposure:

Source of Injury or Illness:

General Location Description:

Injury Activity Code:

Contractor Incident Report System (CIRS) 6

4. License (if applicable) Person #

Are Appropriate License and Certification/Medical Current: (Check/Bold) Yes No

Describe or Explain:

Attach Image of License or Certification

5. Training

Was all the contract-required training provided to the employee: (Check/Bold) Yes No

Explain:

6. Attached Documents

Attached Documents

Contractor Incident Report System (CIRS) 7

1. Involved Person Data (if applicable) Property Damage

Age: Gender:

Male Female

Contractor: Contractor:

2. Attached Documents

Attached Documents

3. Property Damaged

Was Anyone Injured: Yes No Was A Government Motor Vehicle Involved: Yes No

Property Type

Property ID #

Detailed Description

Property

Owned By

Estimated Cost USD

Lost Use

Days

Contractor Incident Report System (CIRS) 8

4. License (if applicable) Property Damage

Are Appropriate License and Certification/Medical Current: (Check/Bold) Yes No

Describe or Explain:

Attach Image of License or Certification

5. Training

Was all the contract-required training provided to the employee? (Check/Bold) Yes No

Explain:

Contractor Incident Report System (CIRS) 9

CONTRACTOR INCIDENT REPORT SYSTEM (CIRS) INSTRUCTIONS

Complete Only Sections Appropriate to Incident (Rev. 03/11).

NOTE: THE ATTACHED CIRS FORM IS TO BE USED BY CONTRACTORS TO RECORD THE RESULTS OF THEIR ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED TO THE CONTRACTING OFFICER WITHIN

THE REQUIRED TIMEFRAMES.

GENERAL. Complete a separate report for each person who was injured in the accident pages 5-6. A report needs to be completed for all OSHA recordable accidents and property damage cases. Please type or print legibly. Appropriate items shall be Checkd/Bolded, non-applicable sections shall be marked “N/A”. If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.

Mark the report: (Check/Bold) Initial: If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.

Follow-Up: If you are providing additional information on a report previously submitted.

Final: If you are providing a completed report and expect no changes.

Incident Information Section 1 Contract Information – Incident Information Prime Contractor: Name as it appears on contract documents.

Cage Code: If known.

Contract Number: Number as it appears on the contract documents.

Installation: Name of installation where incident occurred.

Task Order #: Insert number if applicable.

Contracting Activity/ROICC Office: Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).

Contractor Contact Information: (Contractor point of contact information for the individual responsible for completing the form) Self Explanatory

Section 2 Incident Type: Check/Bold most applicable category, if you select Industrial you must Check/Bold at least one additional category from the Industrial Incident Additional Information Section.

Section 3 General Information Incident Information Date of Accident: Enter the month, day, and year of accident.

Time of Accident: Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).

Describe the Accident in Detail in your words: Fully describe the accident in the space provided. If property damage involved, give estimated dollar amount of damage and/or repair costs involved. If additional space is needed continue on a separate sheet and attach to this report. Give the sequence of events that describe what happened leading up to and including the accident. Fully identify personnel and equipment involved and their role(s) in the accident. Ensure that relationships between personnel and equipment are clearly specified. Ensure questions below regarding direct cause(s), indirect cause(s), and actions taken are answered. NOTE! Review questions in Section 4 (Fully Explain What Allowed or Caused the Incident - Incident Information) below before completing.

Exact Location of Accident: Enter facts needed to locate the accident scene (e.g. installation/project name, building/room number, street, direction and distance from closest landmark, etc.).

Were Hazardous Material(s) Involved Yes No

Contractor Incident Report System (CIRS) 10

If Yes, Explain What Hazardous Materials Were Involved and Why: Check or Bold appropriate block and list name(s) and quantities of hazardous materials spilled/released during the mishap. List why the hazardous chemicals were being used.

Activity at the time of incident: What type of work/task was being performed by the injured when the injury took place or property damage occurred.

Personal Protective Equipment– Check/Bold appropriate items and list PPE which was being used by the injured person at the time of the accident (e.g. protective clothing, shoes, glasses, goggles, respirator, safety belt, harness, etc.)

Section 4 Fully Explain What Allowed or Caused the Incident - Incident Information Direct Cause(s): The direct cause is that single factor which most directly lead to the accident. See examples below.

Indirect Cause(s): Indirect cause are those factors, which contributed to, but did not directly initiate the occurrence of the accident.

Examples for Direct and Indirect Cause:

1. Employee was dismantling scaffold and fell 12 feet from unguarded opening.

Direct cause: Failure to provide fall protection at elevation Indirect causes: Failure to enforce safety requirements: improper training/motivation of employee (possibility that employee was not knowledgeable of fall protection requirements or was lax in his attitude toward safety); failure to ensure provision of positive fall protection whenever elevated; failure to address fall protection during scaffold dismantling in phase hazard analysis.

2. Private citizen had stopped his vehicle at intersection for red light when vehicle was struck in rear by contractor vehicle. (note contractor vehicles was in proper safe working condition.)

Direct cause: Failure of contractor driver to maintain control of and stop contractor vehicle within safe distance.

Indirect cause: Failure of employee to pay attention to driving (defensive driving).

Additional Action Taken: Fully describe all the actions taken, anticipated, and recommended to eliminate the cause(s) and prevent reoccurrence of similar accidents/illnesses. Continue in the additional box and or on additional sheets of paper if necessary to fully explain and attach to the completed report form.

Please Include a Begin Date and Estimated Completion Date in Description

(1) Begin: Enter the date when the corrective action(s) identified above will begin.

(2) Est. End Date - Enter the date when the corrective action(s) identified above will be completed.

Section 5 Contributing Factors Incident Information: Check/Bold appropriate items fill in information where required Other Contributing Factors: Describe in detail any additional contributing factors not listed in previous information provided.

Section 6 Attached Documents: Provide the appropriate information for each document/file attached or uploaded.

Injured Data Person # Complete Pages 5 and 6 for each injured person At the upper right hand corner of page 5 and 6 differentiate between each person by using a numerical value (e.g. Person #1, Person #, Person #3, etc.)

Section 1 Injured Data: Fill in all applicable information, Check/bold appropriate responses.

Section 2 General Information:

Check/bold appropriate responses

Section 3 Injury/Illness Fatality Information: Check/bold appropriate responses Part of Body Affected: Enter the most appropriate primary and when applicable, secondary, etc. body part(s) affected (e.g. arm: wrist: abdomen: single eye; jaw: both elbows: second finger: great toe: collar bone: kidney, etc.).

Contractor Incident Report System (CIRS) 11

Nature of Injury/Illness: Describes the manner in which the injury or illness was inflicted or produced. It attempts to answer the broad question of “how” work injuries and illnesses occurred. (e.g. Fall, Struck By, Caught By, Repetitive Motion, Rubbed or Abraded By, etc.)

Event or Exposure: Describes what was produced by the injury or illness was produced or inflicted. (e.g. Infectious Parasitic Diseases, Traumatic Injuries and Disorders, Open Wounds, Burns, Intracranial Injuries, etc.)

Source of Injury Illness: Identifies the object, substance, bodily motion, or exposure, which directly produced or inflicted the previously identified injury or illness. (e.g. Acids, Chemical Products, Furniture and Fixtures, Machinery, Structures and Surfaces, Tools Instruments and Equipment, etc.)

General Location Description: Describes where the injury occurred (e.g. Industrial Facilities, Operational Industrial Building Plant , Roadway, etc.)

Injury Activity Code: Describes what the injured person was doing when the injury occurred. (e.g. Operating Type of Equipment, Construction Activity Being Performed, Industrial Operation Being Conducted, etc.)

Section 4 License:

Are Appropriate License and Certification/Medical Current: Did the injured employee have the appropriate license/certification or medical evaluations completed to conduct the work/task being performed.

Describe/Explain: Describe the required (licensing/certification/medical evaluation) for job/task being performed, date when license was issued, and expiration date. (e.g. “Powdered Actuated Tools, Hilti DX-350, License issued 11/29/2011, expires 3-years from issue date.” “Respirator Semi Annual Medical Evaluation, conducted 12/30/2011, expires on 12/30/2013”, etc.)

Attach Image of License or Certification: Self-Explanatory

Section 5 Training:

Was all the contract-required training provided to the employee: Self-Explanatory

Explain: If no, to the previous questions explain why the employee was not trained.

Section 6 Attached Documents:

Self-Explanatory use this for photos, drawings, diagrams, or other relevant documents.

Property Damage Section 1 Involved Person Data: Fill in all applicable information, Check/bold appropriate responses.

Section 2 Attached Documents:

Self-Explanatory use this for photos, drawings, diagrams, or other relevant documents.

Section 3 Property Damaged:

Check/bold appropriate responses. Other Headings Self-Explanatory.

Section 4 License:

Are Appropriate License and Certification/Medical Current: Did the equipment operator have the appropriate license/certification or medical evaluations completed to conduct the work/task being performed.

Describe/Explain: Describe the required (licensing/certification/medical evaluation) for job/task being performed, date when license was issued, and expiration date. (e.g. “State Issued Driver, License issued 11/29/2011, expires on MM/DD/YYY)” “Scissor Lift, JLG Model 260MRT conducted 12/30/2011, does not expire.”)

Attach Image of License or Certification: Self-Explanatory

Section 5 Training:

Was all the contract-required training provided to the employee: Self-Explanatory

File details come from the government source that posted it. Updated .