International Falls Modernization IRA Project Submittal_ Reporting Form.xlsx

XLSX spreadsheet 7 MB Posted

Attached to
Construction Manager as Constructor (CMc) for the International Falls Land Port of Entry Project
Solicitation number
47PF0023R0049
Issued by

About this file

This document is a federal contract opportunity announcement for Construction Manager as Constructor (CMc) services for the International Falls Land Port of Entry project in International Falls, MN.

The solicitation seeks a CMc to provide design phase and construction phase services for a new land port of entry facility. The project aims to transform the existing obsolete border facility into a state-of-the-art commercial port of entry to improve safety, security, and efficiency for vehicular and pedestrian traffic. The total construction cost is estimated between $175-195 million. The CMc services will be contracted using a firm-fixed price design phase and a guaranteed maximum price (GMP) construction phase option. A pre-proposal conference is scheduled for May 14, 2024 and proposals are due on June 5, 2024. The award is anticipated in October 2024. The government is also seeking suppliers and manufacturers of low embodied carbon construction materials, including asphalt, concrete, glass, and steel, to submit expressions of interest by May 24, 2024.

View the file

Other files

File Type Posted
47PF0023R0049 Amend 03 SF30.pdf PDF
47PF0023R0049 Supplemental 1442 Pricing Sheet 6 12 2024.pdf PDF
47PF0023R0049 Supplemental 1442 Pricing Sheet 6 12 2024.docx DOCX document
C2.01B SITE DEMOLITION PLAN - AREA B.pdf PDF
47PF0023R0049 Supplemental 1442 Pricing Sheet 6 4 2024.pdf PDF
47PF0023R0049 Amend 02 RFIs.pdf PDF
47PF0023R0049 Amend 02 SF30.pdf PDF
C2.01C SITE DEMOLITION PLAN - AREA C.pdf PDF
C2.01A SITE DEMOLITION PLAN - AREA A.pdf PDF
47PF0023R0049 Amend 01 RFIs.pdf PDF
IFalls LPOE CMc Pre-Proposal Meeting.pdf PDF
724 International Falls LPOE Modernization IRA Project Submittal_ Reporting Form.pdf PDF
2024_05_20 Trusted Traveler Options_fl.pdf PDF
I. Falls LPOE PreProposal Agenda.pdf PDF
47PF0023R0049 PreProposal Sign in sheet.pdf PDF
47PF0023R0049 Amend 01 SF30.pdf PDF
IFalls Master Schedule_240520.pdf PDF
PRE-PROPOSAL CONFERENCE ATTENDANCE REQUEST FORM.pdf PDF
2024_04_19 I FALLS_FINAL CONCEPT NARRATIVE.pdf PDF
Concept Appendix.zip ZIP file
Past Performance Questionnaire.docx DOCX document
AWARD ALLOCATION FORM IRA .xlsx XLSX spreadsheet
47PF0023R0049 I Falls LPOE CMc SoW.pdf PDF
47PF0023R0049 SF1442.pdf PDF
IFalls Master Schedule_240429 for CMc solicitation.pdf PDF
Individual Model_Subk_Plan - Apr 2024 - 508 Compliant.docx DOCX document
47PF0023R0049 Sol_CMc_April 2024.pdf PDF
IFalls LPOE - IRA Sustainability Factor Table.xlsx XLSX spreadsheet
47PF0023R0049 Reps and Certs CMc April 2024.pdf PDF
47FP0023R0049 Supplemental 1442 Pricing Sheet.pdf PDF
47PF0024R0049 Agr_CMc_April 2024.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

User Workflow Workflow chart with links located here https://docs.google.com/drawings/d/1oaECGj2-wo5r56G18gN6DX_vNrEJccTXl9yWmAqIlkI/edit LEC Instructions

Further Resources
IRA Input Database SOP
IRA Project Submittal and Tracking Best Practices

https://docs.google.com/document/d/15LxjBYRIwx3KETSbu7u6tWa5RKNEi3ocKsBp7MqUzZw/edithttps://docs.google.com/document/d/1_Nv6MUEU-ew_-mqsU2SvKkzoEzzQIRTlEM84f70alOA/edit E&ST and HPGB Instructions

Further Resources
IRA Input Database SOP
IRA Project Submittal and Tracking Best Practices

https://docs.google.com/document/d/15LxjBYRIwx3KETSbu7u6tWa5RKNEi3ocKsBp7MqUzZw/edithttps://docs.google.com/document/d/1_Nv6MUEU-ew_-mqsU2SvKkzoEzzQIRTlEM84f70alOA/edit Low Embodied Carbon Materials

Region5Contractor NameProject Manager Name
Project Number (in Kahua)Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date
Enter Work Item Information Below:Design-Build or Construction Team: Enter LEC Installation Information & OutcomesConstruction Manager as Advisor (CMa) or Commissioning Provider (CxP)

Certify information below:

Combined WI IDRow Has Any ValueMin Requirements MetRow NumberRegionFirst Column AddressDuplicate CheckContractor NameContractor Email AddressProject Manager NameProject Manager Email AddressEnter your email addressMilestone StatusBuilding Number
: Location Code (from REXUS)Building NameProject # (Kahua)Accounting String ID (ASID)
: (8-digit alphanumeric string)Work Item (WI) #
: 4 digit numeric stringBudget Activity Code
: PG Code for LEC projects: PG24LEC Identifier
: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleLEC Material CategoryLEC Material SubcategoryDeclared UnitGWP Limit Specified in the Contract
: Top 20% of Contract Limits by Material SubcategoryNew GWP Limit Specified in the Contract (if Different than Previous Column)Reported Threshold TargetCalculated Threshold AcheivedProvide link for Material EPDDescription of Material Installed

: Brief description of what material was used for on the project, supplier, mix type etc.

: Location Code (from REXUS) : (8-digit alphanumeric string) : 4 digit numeric string : PG Code for LEC projects: PG24

: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleQuantityQuantity Reporting UnitProduct Category Rule (PCR)Product Specific GWPConversion Factor AConversion Factor A UnitsConversion Factor BEmbodied Carbon Reduction (Calculated)
Upstream Scope 3Upstream Plant's ENERGY STAR Energy Performance Score

: For glass, upstream cement plant, and steel from integrated mills, ask manufacturer to generate and report their ENERGY STAR Energy Performance Score per: http://www.energystar.gov/epis

Any cement, glass, or integrated steel plant based in the U.S. can use the free ENERGY STAR Energy Performance Indicator tool to generate a score, even if the plant is not ENERGY STAR certified.

: Top 20% of Contract Limits by Material SubcategoryYear of plant's ENERGY STAR Energy Performance ScoreCertify information for this row is accurateCertify the embodied carbon calculations
: Certify that the quantity is accurate, and reported product-specific GWP matches the identified EPDEmail of Certifier
|||FALSEFALSE65L6FALSEFALSEFALSE
|||FALSEFALSE75L7FALSEFALSEFALSE
|||FALSEFALSE85L8FALSEFALSEFALSE
|||FALSEFALSE95L9FALSEFALSEFALSE
|||FALSEFALSE105L10FALSEFALSEFALSE
|||FALSEFALSE115L11FALSEFALSEFALSE
|||FALSEFALSE125L12FALSEFALSEFALSE
|||FALSEFALSE135L13FALSEFALSEFALSE
|||FALSEFALSE145L14FALSEFALSEFALSE
|||FALSEFALSE155L15FALSEFALSEFALSE
|||FALSEFALSE165L16FALSEFALSEFALSE
|||FALSEFALSE175L17FALSEFALSEFALSE
|||FALSEFALSE185L18FALSEFALSEFALSE
|||FALSEFALSE195L19FALSEFALSEFALSE
|||FALSEFALSE205L20FALSEFALSEFALSE

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit EPD Compliance

Source:How to assess EPD compliance
**LEC Material Category**LEC Example **Select LEC Material Subcategory**Helper ColumnDeclared UnitQuantity Reporting UnitBetter Than Average Limit (kgCO2e/Declared Unit)Top 40% Limit (kgCO2e/Declared Unit)Top 20% Limit (kgCO2e/Declared Unit)Conversion Factors (To Metric)
Concrete (and cement or CMUs)**Select LEC Material Subcategory below**Concrete (and cement or CMUs)-**Select LEC Material Subcategory below**metric ton1
Concrete (and cement or CMUs)≤2499Concrete (and cement or CMUs)-≤2499cubic metercubic yard277261228cubic meter1
Concrete (and cement or CMUs)3000Concrete (and cement or CMUs)-3000cubic metercubic yard318291257U.S. ton0.907185
Concrete (and cement or CMUs)4000Concrete (and cement or CMUs)-4000cubic metercubic yard352326284cubic yard0.764555
Concrete (and cement or CMUs)5000Concrete (and cement or CMUs)-5000cubic metercubic yard382357305
Concrete (and cement or CMUs)6000Concrete (and cement or CMUs)-6000cubic metercubic yard407374319
Concrete (and cement or CMUs)≥7200Concrete (and cement or CMUs)-≥7200cubic metercubic yard402362321
Concrete (and cement or CMUs)HESC≤2499
: High early strength concrete should be avoided where possible. Is there a need for it in this project?Concrete (and cement or CMUs)-HESC≤2499cubic metercubic yard360.1339.3296.4
Concrete (and cement or CMUs)HESC3000
: HESC4000Concrete (and cement or CMUs)-HESC3000cubic metercubic yard413.4378.3334.1
Concrete (and cement or CMUs)HESC4000
: HESC4000Concrete (and cement or CMUs)-HESC4000cubic metercubic yard457.6423.8369.2
Concrete (and cement or CMUs)HESC5000
: HESC4000Concrete (and cement or CMUs)-HESC5000cubic metercubic yard496.6464.1396.5
Concrete (and cement or CMUs)HESC6000
: HESC4000Concrete (and cement or CMUs)-HESC6000cubic metercubic yard529.1486.2414.7
Concrete (and cement or CMUs)HESC≥7200
: HESC4000Concrete (and cement or CMUs)-HESC≥7200cubic metercubic yard522.6470.6417.3
Concrete (and cement or CMUs)Cement

: Cement may only be used where provision of qualifying concrete is impractical.

: High early strength concrete should be avoided where possible. Is there a need for it in this project?

: HESC4000

: HESC4000

: HESC4000

: HESC4000

: HESC4000Concrete (and cement or CMUs)-Cementmetric tonmetric ton858819751
Concrete (and cement or CMUs)Concrete Masonry UnitsConcrete (and cement or CMUs)-Concrete Masonry Unitscubic metercubic meter290256217
Asphalt**Select LEC Material Subcategory below**Asphalt-**Select LEC Material Subcategory below**
AsphaltAsphaltAsphalt-Asphaltmetric tonU.S. ton72.664.855.4
Steel**Select LEC Material Subcategory below**Steel-**Select LEC Material Subcategory below**
SteelRebar (fabricated)Steel-Rebar (fabricated)metric tonmetric ton850794728
SteelRebar (unfabricated)Steel-Rebar (unfabricated)metric tonmetric ton760716611
SteelHollow Structural Sections (fabricated)Steel-Hollow Structural Sections (fabricated)metric tonmetric ton1,89818541778
SteelHollow Structural Sections from Electric Arc Furnaces (unfabricated)Steel-Hollow Structural Sections from Electric Arc Furnaces (unfabricated)metric tonmetric ton1,65216201580
SteelHot-Rolled Sections (fabricated)Steel-Hot-Rolled Sections (fabricated)metric tonmetric ton1,16311281022
SteelHot-Rolled Sections (unfabricated)Steel-Hot-Rolled Sections (unfabricated)metric tonmetric ton869713686
SteelCold-Formed and Galvanized (stud, track, framing, etc.)Steel-Cold-Formed and Galvanized (stud, track, framing, etc.)metric tonmetric ton2,40823242228
SteelStructural Steel Plate from Electric Arc Furnaces (unfabricated)Steel-Structural Steel Plate from Electric Arc Furnaces (unfabricated)metric tonmetric ton1,1901152987
Glass**Select LEC Material Subcategory below**Glass-**Select LEC Material Subcategory below**
GlassFlat GlassGlass-Flat Glassmetric tonmetric ton1,40113701331

https://docs.google.com/presentation/d/10JM8-LF0kUJwtvaxAisV-IeyoZzLveKlUtMwCflCRQM/edit Emerging & Sustainable Tech and

Region5Contractor NameProject Manager Name
Project Number (in Kahua)Contractor Email AddressProject Manager Email Address
Project Type (non-ESPC or ESPC?)Project Manager Approval Date
Enter Work Item Information Below:Design-Build or Construction Team: Enter E&ST / HPGB Installation Information and OutcomesConstruction Manager as Advisor (CMa) or Commissioning Provider (CxP): Validate technology Installation
Combined WI IDRow Has Any ValueMin Requirements MetRow NumberRegionFirst Column AddressDuplicate CheckContractor NameContractor Email AddressProject Manager NameProject Manager Email AddressEnter your email addressMilestone StatusBuilding Number
: Location Code (from REXUS)Building NameProject # (Kahua)Accounting String ID (ASID)
: 8-digit alphanumeric stringWork Item (WI) #
: 4 digit numeric stringBudget Activity Code

: PG Code for HPGB Projects: PG21

PG Code for E&ST Projects: PG27IRA Program (E&ST, HPGB)Select the guiding principle for the material or technologyDeep Energy RetrofitAll Electric BuildingNet Zero EnergySustainable BuildingEnergy Conservation Measure /Water Conservation Measure (ECM/WCM) Identifier
: Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO ScheduleECM/WCM Category
: AoA DropdownECM/WCM Technology
: AoA DropdownQuantity InstalledTO Schedule Technology
: Auto populates based on ECM Category and Technology SelectedEmerging & Sustainable Technology
: Auto populates based on ECM Category and Technology SelectedECM/WCM Default Design Life
: In yearsAlternative ECM Design Life
: In years. If different than default. Max of 30 year design lifePrimary Building Cooling FuelPrimary Building Heating FuelRefrigerant Involved in ECM?Refrigerant TypeRefrigerant Capacity (lbs)Initial ECM/WCM implementation cost ($)Estimated initial savings associated with ECM/WCM installation ($)

: ESPC estimated year one savings e.g. If you install a new high efficiency chiller instead of spending $10,000 to repair the old one, enter $10,000 here. Annual O&M Cost ($/year) : (Enter cost if O&M contracts will change due to ECM Implementation)

Enter negative value if there will be confirmed O&M savingsElectric Savings (kWh/year)
: Enter negative value if there will be an increase in energy useNatural Gas Savings (scf/year)

: Enter negative value if there will be an increase in energy use

1 mmBtu = 974.66 scf Fuel Oil Savings (gal/year) : Enter negative value if there will be an increase in energy use

1 mmBtu = 7.246376812 gal Steam Savings (mmBtu/year) : Enter negative value if there will be an increase in energy use

: Location Code (from REXUS)Chilled Water Savings (mmBtu/year)
: Enter negative value if there will be an increase in energy usePropane Fuel Savings (mmBtu/year)
: Enter negative value if there will be an increase in energy useWater Savings (gal/year)

: Enter negative value if there will be an increase in energy use : 8-digit alphanumeric string : 4 digit numeric string : PG Code for HPGB Projects: PG21 PG Code for E&ST Projects: PG27 : Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule : AoA Dropdown

: AoA DropdownAdditional notes about ECM/WCMCertify technology is installed and working properlyEmail of Certifier
#REF!#REF!#REF!65L6#REF!#REF!#REF!#REF!FALSEFALSEFALSEFALSEFALSE#REF!
724|MN0300IF|NMN00005|TRUEFALSE75L7FALSEseth.larocque@gsa.govSubmittal 2 - Commissioner's Concept Design Approval - Milestone 4.271 - Commissioner's Concept Design ApprovalMN0300IFINTERNATIONAL FALLS MN U.S. BORDER STATION724NMN00005PG21E&STOptimize Energy PerformanceFALSETRUETRUETRUEECMRenewable Energy SystemsInstall photovoltaic systemTC.11 - Renewable Energy SystemsRenewables - Bi-facial and Building Integrated Photovoltaics30 year(s)ElectricityN/ANoN/A
|||FALSEFALSE85L8FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE95L9FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE105L10FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE115L11FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE125L12FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE135L13FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE145L14FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE155L15FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE165L16FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE175L17FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE185L18FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE195L19FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE205L20FALSEFALSEFALSEFALSEFALSE
|||FALSEFALSE215L21FALSEFALSEFALSEFALSEFALSE

https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit E&ST_HPGB Dropdowns Region Picklist IRA Milestones non-ESPC Region Location Code Building Name Filtered Region Filtered Location Code Filtered Building Name Funding Stream ECM List : Import range from ECM Design life tab. Any updates to E&S / TO alignment can be made in that sheet (https://docs.google.com/spreadsheets/d/1a_41ZddtVfM_VrZU2vYW7gQQUAp5gPwEolsrFzwPUTQ/edit#gid=339106882)

ECM type/category list aligns with CTS ECM Category Dropdown : Arrayformula used to populate ECM technology dropdown based on ECM category selected.

ECM type/category list aligns with CTSECM TechnologyFiltered IRA Milestones
1Submittal 1 - Project AgreementPlanningPlanningPhase Start3.091Initial Financial Agreement w CustomerSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w Customer1CT0013ZZWILLIAM R. COTTER FB5IL0032ZZCUSTOMHOUSEPG21**ECM Type Category**ECM Example **Select ECM Type Category**Helper ColumnDesign LifeEmerging & Sustainable Technology AlignmentTO AlignmentSubmittal 7 - Final Performance Submittal - Milestone 4.691 - Substantial Completion
2Submittal 2 - Commissioner's Concept Design ApprovalPlanningPhase End4.271Commissioner's Concept Design ApprovalSubmittal 2 - Commissioner's Concept Design Approval - Milestone 4.271 - Commissioner's Concept Design Approval1CT0024ZZRichard C. Lee U S Courthouse5IL0033ZZWILLIAM O. LIPINSKI FED. BLDG.PG27Boiler Plant Improvements**Select ECM Technology below**Boiler Plant Improvements-**Select ECM Technology below**Select Emerging & Sustainable Technology AlignmentSelect TO AlignmentRenewable Energy SystemsInstall landfill gas, wastewater treatment plant digester gas, or coal bed methane power plantInstall photovoltaic systemInstall wind energy systemInstall wood waste or other organic waste stream heating or power plantClean and/or repairImplement training and/or documentationUpgrade operating protocols, calibration, and/or sequencingInstall electrical storageSubmittal 6 - Hand-off/Turnover - Milestone 4.691 - Substantial Completion
3PlanningPhase End4.101Design or Bridging RFP Issued4.101 - Design or Bridging RFP Issued1CT0047ZZWATERBURY MAIN POST OFFICE5IL0054ZZ536 S. CLARK CHICAGO IL FEDERAL BUILDINGBoiler Plant ImprovementsAdd energy recoveryBoiler Plant Improvements-Add energy recovery25HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 5 - 90% CD - Milestone 4.361 - Design Complete
4PlanningPhase End4.421Construction or Design/Build or CMC RFP Issued4.421 - Construction or Design/Build or CMC RFP Issued1CT0053ZZAA RIBICOFF FB&CTHS5IL0069ESMELVIN PRICE FEDERAL COURTHOUSEBoiler Plant ImprovementsDecentralize boilerBoiler Plant Improvements-Decentralize boiler25HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 4 - 65% DD Review/ 50% CD - Milestone 4.251 - Design Start / NTP
5Design ProcurementDesign ProcurementPhase Start4.101Design or Bridging RFP Issued4.101 - Design or Bridging RFP Issued1CT0055ZZNew US Courthouse - Hartford5IL0154ZZPEORIA IL FED BLDG & US CTHSEBoiler Plant ImprovementsInsulate boiler roomBoiler Plant Improvements-Insulate boiler room24HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 3 - 35% DD - Milestone 4.251 - Design Start / NTP
6Design ProcurementPhase End4.221Design or Bridging Award4.221 - Design or Bridging Award1CT0059ZZBRIEN MCMAHON USCH&FB5IL0173ZZPAUL FINDLEY BUILDINGBoiler Plant ImprovementsConvert gas-fired unit to boiler loopBoiler Plant Improvements-Convert gas-fired unit to boiler loop25HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 2 - Commissioner's Concept Design Approval - Milestone 4.271 - Commissioner's Concept Design Approval
7Submittal 3 - 35% DDDesignDesignPhase Start4.251Design Start / NTPSubmittal 3 - 35% DD - Milestone 4.251 - Design Start / NTP1CT0060ZZSSA - TORRINGTON5IL0195ZZUSPS-DOWNTOWN STATIONBoiler Plant ImprovementsClean and/or repairBoiler Plant Improvements-Clean and/or repair1HVAC - Electric BoilersTC.1 - Boiler Plant ImprovementsSubmittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w Customer
8Submittal 5 - 90% CDDesignPhase End4.361Design CompleteSubmittal 5 - 90% CD - Milestone 4.361 - Design Complete1CT0061ZZROBERT N GIAIMO FB5IL0200ZZFED BLDG-PO-US CTHSEBoiler Plant ImprovementsUpgrade operating protocols, calibration, and/or sequencingBoiler Plant Improvements-Upgrade operating protocols, calibration, and/or sequencing25HVAC - Sequence of OperationsTC.1 - Boiler Plant Improvements6.011 - Project Closeout
9Construction ProcurementConstruction ProcurementPhase Start4.421Construction or Design/Build or CMC RFP Issued4.421 - Construction or Design/Build or CMC RFP Issued1CT3316ZZ130 DARLIN STREET5IL0205ZZEVERETT M. DIRKSENBoiler Plant ImprovementsReplace boilerBoiler Plant Improvements-Replace boiler25HVAC - Electric BoilersTC.1 - Boiler Plant Improvements4.581 - Construction Start/NTP
10Construction ProcurementPhase End4.491Construction or Design/Build Contract Award or CMc Award4.491 - Construction or Design/Build Contract Award or CMc Award1CT3319ZZTWO LANDMARK SQUARE5IL0206ZZWILLIAM L. BEATTY FB & CTHSEBoiler Plant ImprovementsReplace burnerBoiler Plant Improvements-Replace burner18HVAC - Electric BoilersTC.1 - Boiler Plant Improvements4.575 - CMc GMP Option Excercised
11ConstructionConstructionPhase Start4.581Construction Start/NTP4.581 - Construction Start/NTP1CT3322ZZ425 MAIN STREET5IL0209CFFEDERAL ARCHIVES RECORDS CTR.Boiler Plant ImprovementsConvert system from steam to hot waterBoiler Plant Improvements-Convert system from steam to hot water22HVAC - Electric BoilersTC.1 - Boiler Plant Improvements4.511 - CXa Award
Submittal 6 - Hand-off/TurnoverConstructionPhase End4.691Substantial CompletionSubmittal 6 - Hand-off/Turnover - Milestone 4.691 - Substantial Completion1CT3323ZZCOMMERCE CENTER - EAST HARTFORD5IL0214ZZQUINCY IL SSA DIST OFF BLDGBoiler Plant ImprovementsImplement training and/or documentationBoiler Plant Improvements-Implement training and/or documentation5HVAC - Electric BoilersTC.1 - Boiler Plant Improvements4.491 - Construction or Design/Build Contract Award or CMc Award
Submittal 7 - Final Performance SubmittalClose OutClose OutPhase Start4.691Substantial CompletionSubmittal 7 - Final Performance Submittal - Milestone 4.691 - Substantial Completion1CT3331ZZCT FINANCIAL CENTER5IL0220ZZEAST SAINT LOUIS IL FEDERAL BUILDINGBoiler Plant ImprovementsConvert to cleaner fuelsBoiler Plant Improvements-Convert to cleaner fuels25HVAC - Electric BoilersTC.1 - Boiler Plant Improvements4.421 - Construction or Design/Build or CMC RFP Issued
Close OutPhase End6.011Project Closeout6.011 - Project Closeout1CT3341ZZ265 CHURCH STREET5IL0222ZZMOUNT VERNON IL FEDERAL BUILDINGChiller Plant Improvements**Select ECM Technology below**Chiller Plant Improvements-**Select ECM Technology below**Select Emerging & Sustainable Technology AlignmentSelect TO Alignment4.421 - Construction or Design/Build or CMC RFP Issued
OtherOtherAward4.511CXa Award4.511 - CXa Award1CT3354ZZMERIDEN EXECUTIVE PARK, BLDG 15IL0231ZZ450 S FEDERAL CHICAGO IL FEDERAL PARKING FACILITYChiller Plant ImprovementsAdd energy recoveryChiller Plant Improvements-Add energy recovery23HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.245 - CMa Award
OtherAward4.245CMa Award4.245 - CMa Award1CT3358ZZNO. 2 SHAW'S COVE5IL0233ZZH WASHINGTON CENTERChiller Plant ImprovementsInstall VSD on electric centrifugal chillersChiller Plant Improvements-Install VSD on electric centrifugal chillers25HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.221 - Design or Bridging Award
OtherAward4.575CMc GMP Option Excercised4.575 - CMc GMP Option Excercised1CT3360ZZLAFAYETTE BLVD.5IL0235FCUSPO LOOP STATIONChiller Plant ImprovementsReplace chillerChiller Plant Improvements-Replace chiller23HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.101 - Design or Bridging RFP Issued
Submittal 4 - 65% DD Review/ 50% CDSubmittal 4 - 65% DD Review/ 50% CD - Milestone 4.251 - Design Start / NTP1CT3362ZZMIIDLESEX CORP. CTR.5IL0236FCJOHN C. KLUCZYNSKI FED. BLDG.Chiller Plant ImprovementsInstall gas coolingChiller Plant Improvements-Install gas cooling23HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements4.101 - Design or Bridging RFP Issued
Cancelled1CT3369ZZCORPORATE CENTER - HARTFORD5IL0240ZZSENATOR PAUL SIMON FEDERAL BUILDINGChiller Plant ImprovementsAdd or repair economizer cycleChiller Plant Improvements-Add or repair economizer cycleHVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant ImprovementsDeferred
AoA Submittal1CT3373ZZ101 PITKIN STREET5IL0300ZZGSA INTERAG MTR POOLChiller Plant ImprovementsAdd or replace cooling towerChiller Plant Improvements-Add or replace cooling tower25HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant ImprovementsCancelled
Deferred1CT3375ZZ600 STATE STREET5IL0301ESMELVIN PRICE FEDERAL BUILDINGChiller Plant ImprovementsClean and/or repairChiller Plant Improvements-Clean and/or repair1HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant ImprovementsAoA Submittal
IRA MilestonesESPC1CT3376ZZ131 WEST STREET5IL0302ZZURBANA IL U.S. COURTHOUSEChiller Plant ImprovementsImplement training and/or documentationChiller Plant Improvements-Implement training and/or documentation5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements
PlanningPlanningPhase Start10.021ESPC / ENABLE - Notice of Opportunity (NOO) Issued10.021 - ESPC / ENABLE - Notice of Opportunity (NOO) Issued1CT3389ZZCNC BUILDING5IL0303ZZMETCALFE BUILDINGChiller Plant ImprovementsUpgrade operating protocols, calibration, and/or sequencingChiller Plant Improvements-Upgrade operating protocols, calibration, and/or sequencing5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.2 - Chiller Plant Improvements
PlanningPhase Start10.031UESC - Letters of Interest (LOIs) Issued10.031 - UESC - Letters of Interest (LOIs) Issued1CT3393ZZHARTFORD SQUARE NORTH5IL0311ZZSTANLEY J. ROSZKOWSKI U.S. COURTHOUSEBuilding Automation Systems/EMCS**Select ECM Technology below**Building Automation Systems/EMCS-**Select ECM Technology below**Select Emerging & Sustainable Technology AlignmentSelect TO Alignment
Submittal 1 - Project AgreementPlanningInterval10.061Preliminary Assessment (PA) StartSubmittal 1 - Project Agreement - Milestone 10.061 - Preliminary Assessment (PA) Start1CT3395ZZAIR EXCHANGE BUILDING5IL0313ZZ208-212 S. STATE ST.Building Automation Systems/EMCSAdd or upgrade BAS/EMS/EMCSBuilding Automation Systems/EMCS-Add or upgrade BAS/EMS/EMCS7Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & SubmetersTC.3 - Building Automation Systems (BAS) / Energy Management Control Systems (EMCS)
PlanningInterval10.071Preliminary Assessment (PA) Complete10.071 - Preliminary Assessment (PA) Complete1CT3398ZZTYLER SQUARE5IL0314ZZ214 S. STATE ST.Building Automation Systems/EMCSAdd or upgrade controlsBuilding Automation Systems/EMCS-Add or upgrade controls15Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & SubmetersTC.3 - Building Automation Systems (BAS) / Energy Management Control Systems (EMCS)
PlanningInterval3.091Initial Financial Agreement w Customer3.091 - Initial Financial Agreement w Customer1CT3400ZZSHAW'S COVE5IL0315ZZ220 S. STATE ST.Building Automation Systems/EMCSUpgrade operating protocols, calibration, and/or sequencingBuilding Automation Systems/EMCS-Upgrade operating protocols, calibration, and/or sequencing5Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & SubmetersTC.3 - Building Automation Systems (BAS) / Energy Management Control Systems (EMCS)
Submittal 2 - 35% DDPlanningPhase End10.041Notice of Intent to Award (NOITA) IssuedSubmittal 2 - 35% DD - Milestone 10.041 - Notice of Intent to Award (NOITA) Issued1CT3402ZZCJ FORT TRUMBULL5IL0316ZZ230 S. STATE ST.Building Automation Systems/EMCSConvert pneumatic controls to direct digital controls (DDC)Building Automation Systems/EMCS-Convert pneumatic controls to direct digital controls (DDC)15Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & SubmetersTC.3 - Building Automation Systems (BAS) / Energy Management Control Systems (EMCS)
Construction ProcurementConstruction ProcurementPhase Start10.091Investment Grade Audit (IGA) Start10.091 - Investment Grade Audit (IGA) Start1CT3409ZZTWEED-NEW HAVEN AIRPORT5IL0317ZZ18 W. JACKSONHeating, Ventilating, and Air Conditioning**Select ECM Technology below**Heating, Ventilating, and Air Conditioning-**Select ECM Technology below**Select Emerging & Sustainable Technology AlignmentSelect TO Alignment
Submittal 3 - 65% DD Review/ 50% CDConstruction ProcurementInterval10.101Investment Grade Audit (IGA) CompleteSubmittal 3 - 65% DD Review/ 50% CD - Milestone 10.101 - Investment Grade Audit (IGA) Complete1CT3410ZZ36 BUFF CAP ROAD5IL0318ZZ202 S. STATE STREETHeating, Ventilating, and Air ConditioningAdd duct insulationHeating, Ventilating, and Air Conditioning-Add duct insulation22HVAC - Duct SealingTC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
Construction ProcurementPhase End10.121Award Design & Construction10.121 - Award Design & Construction1CT3412ZZCAPITOL PLACE5IL0543CFFSS PUMPHOUSEHeating, Ventilating, and Air ConditioningAdd or replace cooling towerHeating, Ventilating, and Air Conditioning-Add or replace cooling tower25HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
ConstructionConstructionPhase Start4.581Construction Start/NTP4.581 - Construction Start/NTP1CT3413ZZ15 MARNE STREET5IL1406ZZMILLIKIN COURT BLDGHeating, Ventilating, and Air ConditioningConvert CV system to VAV systemHeating, Ventilating, and Air Conditioning-Convert CV system to VAV system20HVAC - Smart Circulator PumpsTC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
ConstructionInterval10.171All ECMs Commissioned10.171 - All ECMs Commissioned1CT3414ZZ2 UNION PLAZA5IL1886ZZPARK RIDGE OFC CTRHeating, Ventilating, and Air ConditioningAdd energy recoveryHeating, Ventilating, and Air Conditioning-Add energy recovery20HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
Submittal 5 - Hand-off/TurnoverConstructionPhase End10.181All ECMs 30 Day Proof of Performance CompleteSubmittal 5 - Hand-off/Turnover - Milestone 10.181 - All ECMs 30 Day Proof of Performance Complete1CT3416ZZ716 BROOK STREET5IL1889ZZO'HARE LAKE 2300-A LLCHeating, Ventilating, and Air ConditioningOther coolingHeating, Ventilating, and Air Conditioning-Other cooling20.5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
Close OutClose OutPhase Start10.181All ECMs 30 Day Proof of Performance Complete10.181 - All ECMs 30 Day Proof of Performance Complete1CT3418ZZ55 CHURCH STREET5IL1894ZZ55 East MonroeHeating, Ventilating, and Air ConditioningBalance ventilation/distribution systemHeating, Ventilating, and Air Conditioning-Balance ventilation/distribution system15HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
Submittal 6 - Final Performance SubmittalClose OutInterval10.211Full Project Acceptance IssuedSubmittal 6 - Final Performance Submittal - Milestone 10.211 - Full Project Acceptance Issued1CT3421ZZSTAMFORD GOVERNMENT CENTER5IL1914ZZTHE MIDWEST BUILDINGHeating, Ventilating, and Air ConditioningImprove distribution fansHeating, Ventilating, and Air Conditioning-Improve distribution fans19HVAC - Cogged and Synchronous Fan BeltsTC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
Close OutPhase End10.221Performance Year 1 Commences10.221 - Performance Year 1 Commences1CT3425ZZ474-484 BURNSIDE AVENUE5IL1921ZZ175 JACKSON LLCHeating, Ventilating, and Air ConditioningAdd or repair economizerHeating, Ventilating, and Air Conditioning-Add or repair economizer5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
Submittal 4 - 90% CD - Milestone 10.101 - Investment Grade Audit (IGA) Complete1CT3429ZZANSONIA SHOPPING CENTER5IL1943ZZMID CITY NATIONAL BANKHeating, Ventilating, and Air ConditioningOther distributionHeating, Ventilating, and Air Conditioning-Other distribution20.5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
Submittal 4 - 90% CDCancelled1CT3433ZZ97 BARNES ROAD5IL2062ZZGLEN HILL NORTH BG AHeating, Ventilating, and Air ConditioningClean and/or repairHeating, Ventilating, and Air Conditioning-Clean and/or repair5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
AoA Submittal1CT3435ZZ291 South Lambert Road5IL2114ZZST REGIS OFFICE CNTRHeating, Ventilating, and Air ConditioningImplement training and/or documentationHeating, Ventilating, and Air Conditioning-Implement training and/or documentation5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
Deferred1CT3438ZZIPARK5IL2125ZZ11 W QUINCY COURTHeating, Ventilating, and Air ConditioningRepair or replace HVAC damper and controllerHeating, Ventilating, and Air Conditioning-Repair or replace HVAC damper and controller21.5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3441ZZ51 N ELM ST5IL2160ZZO'HARE LAKE OFFICE PARKHeating, Ventilating, and Air ConditioningRepair leaks in ductsHeating, Ventilating, and Air Conditioning-Repair leaks in ducts30HVAC - Duct SealingTC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3444ZZ280 Trumbull5IL2177ZZCHICAGO IL (200 W ADAMS ST) BANK OF AMERICAHeating, Ventilating, and Air ConditioningSeal ductsHeating, Ventilating, and Air Conditioning-Seal ducts30HVAC - Duct SealingTC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3446ZZ850 Canal Street5IL2178ZZ901 WARRENVILLE ROADHeating, Ventilating, and Air ConditioningReplace package unitsHeating, Ventilating, and Air Conditioning-Replace package units20.5HVAC - High-performing Rooftop Units (RTUS)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3448ZZ15 Thames Street5IL2194ZZIL VALLEY OFFICE PKHeating, Ventilating, and Air ConditioningReplace packaged terminal unitsHeating, Ventilating, and Air Conditioning-Replace packaged terminal units20.5HVAC - High-performing Rooftop Units (RTUS)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3450ZZSSA Bridgeport, CT5IL2201ZZ310-312 W CHURCH STHeating, Ventilating, and Air ConditioningReplace or modify AHUHeating, Ventilating, and Air Conditioning-Replace or modify AHU27.25HVAC - High-performing Rooftop Units (RTUS)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3451ZZ55 Main Street5IL2209ZZ301 SOUTH PROSPECT RHeating, Ventilating, and Air ConditioningOther ventilationHeating, Ventilating, and Air Conditioning-Other ventilation20.5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3453ZZBDL Airport Terminal A5IL2216ZZSHUTT HOUSEHeating, Ventilating, and Air ConditioningImprove ventilation fansHeating, Ventilating, and Air Conditioning-Improve ventilation fans19HVAC - Cogged and Synchronous Fan BeltsTC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3457ZZ321 Research Parkway5IL2220ZZEXECUTIVE PLAZA IHeating, Ventilating, and Air ConditioningUpgrade operating protocols, calibration, and/or sequencingHeating, Ventilating, and Air Conditioning-Upgrade operating protocols, calibration, and/or sequencing5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3458ZZ380 Sheldon St.5IL2223ZZWILLOWBROOK CENTERHeating, Ventilating, and Air ConditioningReplace burnerHeating, Ventilating, and Air Conditioning-Replace burner18HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3459ZZ99 E. Main St.5IL2225ZZCOOK HOUSEHeating, Ventilating, and Air ConditioningInstall passive solar heating (i.e., solar wall)Heating, Ventilating, and Air Conditioning-Install passive solar heating (i.e., solar wall)15HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3460ZZSalame Plaza, Building B5IL2232ZZ3250 EXECUTIVE & PARHeating, Ventilating, and Air ConditioningReplace AC and heating units with ground coupled heat pump systemsHeating, Ventilating, and Air Conditioning-Replace AC and heating units with ground coupled heat pump systems15HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3462ZZIRS Waterbury5IL2233ZZCHICAGO IL CITIGROUP CENTERHeating, Ventilating, and Air ConditioningInstall gas coolingHeating, Ventilating, and Air Conditioning-Install gas cooling15HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3463ZZOne Herald Square5IL2242ZZMOFFETT TECH CTRHeating, Ventilating, and Air ConditioningAdd enhanced dehumidificationHeating, Ventilating, and Air Conditioning-Add enhanced dehumidification8HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3466ZZ6 Shaw's Cove5IL2246ZZSTEWART SQUAREHeating, Ventilating, and Air ConditioningInstall solar ventilation preheating systemHeating, Ventilating, and Air Conditioning-Install solar ventilation preheating system20HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3467ZZ195 Church5IL2251ZZCHICAGO IL (5353 S LARAMIE AVE) MIDWAY BUSINESS CENTERHeating, Ventilating, and Air ConditioningOther heatingHeating, Ventilating, and Air Conditioning-Other heating23.2HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3468ZZCPB Middletown5IL2252ZZFAIRVIEW HEIGHTS IL CORPORATE CENTREHeating, Ventilating, and Air ConditioningInstall air source heat pumpHeating, Ventilating, and Air Conditioning-Install air source heat pump15HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1CT3469ZZAmerican Thread Mill5IL2255ZZ402 W MAIN STREETHeating, Ventilating, and Air ConditioningInstall variable refrigerant flow systemHeating, Ventilating, and Air Conditioning-Install variable refrigerant flow system15HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1MA0011ZZCPT JF WILLIAMS CG BLDG.5IL2260ZZHAWTHORNE CENTREHeating, Ventilating, and Air ConditioningCapture and return condensateHeating, Ventilating, and Air Conditioning-Capture and return condensate20.5HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1MA0013ZZJOHN W. MCCORMACK BUILDING5IL2263ZZ2410-16 S PULASKIHeating, Ventilating, and Air ConditioningInstall demand control ventilationHeating, Ventilating, and Air Conditioning-Install demand control ventilation20.5Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & SubmetersTC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1MA0050ZZJOHN J. MOAKLEY COURTHOUSE5IL2271ZZSOMERSET OFFICE BUILDINGHeating, Ventilating, and Air ConditioningInstall thermal destratification fansHeating, Ventilating, and Air Conditioning-Install thermal destratification fans19HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery)TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS)
1MA0051ZZSPRINGFIELD FEDERAL COURT HOUSE5IL2272ZZBECKER BLDGLighting Improvements**Select ECM Technology below**Lighting Improvements-**Select ECM Technology below**Select Emerging & Sustainable Technology AlignmentSelect TO Alignment
1MA0076ZZUS CUSTOM HOUSE - NEW BEDFORD5IL2274ZZNORTHWESTERN BLDGLighting ImprovementsAdd daylight controlsLighting Improvements-Add daylight controls20Lighting - LED Retrofit Kits with Integrated ControlsTC.5 - Lighting Improvements
1MA0113ZZHarold D. Donohue Federal Building & Courthouse5IL2275ZZTHE ROOKERYLighting ImprovementsAdd occupancy sensorsLighting Improvements-Add occupancy sensors10Lighting - LED Retrofit Kits with Integrated ControlsTC.5 - Lighting Improvements
1MA0129ZZPHILIP J PHILBIN FOB5IL2279ZZMOLINE IL HERITAGE PLACELighting ImprovementsRetrofit with fiber optic lighting technologiesLighting Improvements-Retrofit with fiber optic lighting technologies4.8Lighting - LED Retrofit Kits with Integrated ControlsTC.5 - Lighting Improvements

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .