International Falls Modernization IRA Project Submittal_ Reporting Form.xlsx
XLSX spreadsheet 7 MB Posted
- Attached to
- Construction Manager as Constructor (CMc) for the International Falls Land Port of Entry Project
- Solicitation number
- 47PF0023R0049
About this file
This document is a federal contract opportunity announcement for Construction Manager as Constructor (CMc) services for the International Falls Land Port of Entry project in International Falls, MN.
The solicitation seeks a CMc to provide design phase and construction phase services for a new land port of entry facility. The project aims to transform the existing obsolete border facility into a state-of-the-art commercial port of entry to improve safety, security, and efficiency for vehicular and pedestrian traffic. The total construction cost is estimated between $175-195 million. The CMc services will be contracted using a firm-fixed price design phase and a guaranteed maximum price (GMP) construction phase option. A pre-proposal conference is scheduled for May 14, 2024 and proposals are due on June 5, 2024. The award is anticipated in October 2024. The government is also seeking suppliers and manufacturers of low embodied carbon construction materials, including asphalt, concrete, glass, and steel, to submit expressions of interest by May 24, 2024.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
User Workflow Workflow chart with links located here https://docs.google.com/drawings/d/1oaECGj2-wo5r56G18gN6DX_vNrEJccTXl9yWmAqIlkI/edit LEC Instructions
| Further Resources |
| IRA Input Database SOP |
| IRA Project Submittal and Tracking Best Practices |
https://docs.google.com/document/d/15LxjBYRIwx3KETSbu7u6tWa5RKNEi3ocKsBp7MqUzZw/edithttps://docs.google.com/document/d/1_Nv6MUEU-ew_-mqsU2SvKkzoEzzQIRTlEM84f70alOA/edit E&ST and HPGB Instructions
| Further Resources |
| IRA Input Database SOP |
| IRA Project Submittal and Tracking Best Practices |
https://docs.google.com/document/d/15LxjBYRIwx3KETSbu7u6tWa5RKNEi3ocKsBp7MqUzZw/edithttps://docs.google.com/document/d/1_Nv6MUEU-ew_-mqsU2SvKkzoEzzQIRTlEM84f70alOA/edit Low Embodied Carbon Materials
| Region | 5 | Contractor Name | Project Manager Name | ||
| Project Number (in Kahua) | Contractor Email Address | Project Manager Email Address | |||
| Project Type (non-ESPC or ESPC?) | Project Manager Approval Date | ||||
| Enter Work Item Information Below: | Design-Build or Construction Team: Enter LEC Installation Information & Outcomes | Construction Manager as Advisor (CMa) or Commissioning Provider (CxP) |
Certify information below:
| Combined WI ID | Row Has Any Value | Min Requirements Met | Row Number | Region | First Column Address | Duplicate Check | Contractor Name | Contractor Email Address | Project Manager Name | Project Manager Email Address | Enter your email address | Milestone Status | Building Number | |
| : Location Code (from REXUS) | Building Name | Project # (Kahua) | Accounting String ID (ASID) | |||||||||||
| : (8-digit alphanumeric string) | Work Item (WI) # | |||||||||||||
| : 4 digit numeric string | Budget Activity Code | |||||||||||||
| : PG Code for LEC projects: PG24 | LEC Identifier | |||||||||||||
| : Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule | LEC Material Category | LEC Material Subcategory | Declared Unit | GWP Limit Specified in the Contract | ||||||||||
| : Top 20% of Contract Limits by Material Subcategory | New GWP Limit Specified in the Contract (if Different than Previous Column) | Reported Threshold Target | Calculated Threshold Acheived | Provide link for Material EPD | Description of Material Installed |
: Brief description of what material was used for on the project, supplier, mix type etc.
: Location Code (from REXUS) : (8-digit alphanumeric string) : 4 digit numeric string : PG Code for LEC projects: PG24
| : Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule | Quantity | Quantity Reporting Unit | Product Category Rule (PCR) | Product Specific GWP | Conversion Factor A | Conversion Factor A Units | Conversion Factor B | Embodied Carbon Reduction (Calculated) | |
| Upstream Scope 3 | Upstream Plant's ENERGY STAR Energy Performance Score |
: For glass, upstream cement plant, and steel from integrated mills, ask manufacturer to generate and report their ENERGY STAR Energy Performance Score per: http://www.energystar.gov/epis
Any cement, glass, or integrated steel plant based in the U.S. can use the free ENERGY STAR Energy Performance Indicator tool to generate a score, even if the plant is not ENERGY STAR certified.
| : Top 20% of Contract Limits by Material Subcategory | Year of plant's ENERGY STAR Energy Performance Score | Certify information for this row is accurate | Certify the embodied carbon calculations | |||||||||
| : Certify that the quantity is accurate, and reported product-specific GWP matches the identified EPD | Email of Certifier | |||||||||||
| ||| | FALSE | FALSE | 6 | 5 | L6 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 7 | 5 | L7 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 8 | 5 | L8 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 9 | 5 | L9 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 10 | 5 | L10 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 11 | 5 | L11 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 12 | 5 | L12 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 13 | 5 | L13 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 14 | 5 | L14 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 15 | 5 | L15 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 16 | 5 | L16 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 17 | 5 | L17 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 18 | 5 | L18 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 19 | 5 | L19 | FALSE | FALSE | FALSE | ||||
| ||| | FALSE | FALSE | 20 | 5 | L20 | FALSE | FALSE | FALSE |
https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit EPD Compliance
| Source: | How to assess EPD compliance | |||||||||
| **LEC Material Category** | LEC Example **Select LEC Material Subcategory** | Helper Column | Declared Unit | Quantity Reporting Unit | Better Than Average Limit (kgCO2e/Declared Unit) | Top 40% Limit (kgCO2e/Declared Unit) | Top 20% Limit (kgCO2e/Declared Unit) | Conversion Factors (To Metric) | ||
| Concrete (and cement or CMUs) | **Select LEC Material Subcategory below** | Concrete (and cement or CMUs)-**Select LEC Material Subcategory below** | metric ton | 1 | ||||||
| Concrete (and cement or CMUs) | ≤2499 | Concrete (and cement or CMUs)-≤2499 | cubic meter | cubic yard | 277 | 261 | 228 | cubic meter | 1 | |
| Concrete (and cement or CMUs) | 3000 | Concrete (and cement or CMUs)-3000 | cubic meter | cubic yard | 318 | 291 | 257 | U.S. ton | 0.907185 | |
| Concrete (and cement or CMUs) | 4000 | Concrete (and cement or CMUs)-4000 | cubic meter | cubic yard | 352 | 326 | 284 | cubic yard | 0.764555 | |
| Concrete (and cement or CMUs) | 5000 | Concrete (and cement or CMUs)-5000 | cubic meter | cubic yard | 382 | 357 | 305 | |||
| Concrete (and cement or CMUs) | 6000 | Concrete (and cement or CMUs)-6000 | cubic meter | cubic yard | 407 | 374 | 319 | |||
| Concrete (and cement or CMUs) | ≥7200 | Concrete (and cement or CMUs)-≥7200 | cubic meter | cubic yard | 402 | 362 | 321 | |||
| Concrete (and cement or CMUs) | HESC≤2499 | |||||||||
| : High early strength concrete should be avoided where possible. Is there a need for it in this project? | Concrete (and cement or CMUs)-HESC≤2499 | cubic meter | cubic yard | 360.1 | 339.3 | 296.4 | ||||
| Concrete (and cement or CMUs) | HESC3000 | |||||||||
| : HESC4000 | Concrete (and cement or CMUs)-HESC3000 | cubic meter | cubic yard | 413.4 | 378.3 | 334.1 | ||||
| Concrete (and cement or CMUs) | HESC4000 | |||||||||
| : HESC4000 | Concrete (and cement or CMUs)-HESC4000 | cubic meter | cubic yard | 457.6 | 423.8 | 369.2 | ||||
| Concrete (and cement or CMUs) | HESC5000 | |||||||||
| : HESC4000 | Concrete (and cement or CMUs)-HESC5000 | cubic meter | cubic yard | 496.6 | 464.1 | 396.5 | ||||
| Concrete (and cement or CMUs) | HESC6000 | |||||||||
| : HESC4000 | Concrete (and cement or CMUs)-HESC6000 | cubic meter | cubic yard | 529.1 | 486.2 | 414.7 | ||||
| Concrete (and cement or CMUs) | HESC≥7200 | |||||||||
| : HESC4000 | Concrete (and cement or CMUs)-HESC≥7200 | cubic meter | cubic yard | 522.6 | 470.6 | 417.3 | ||||
| Concrete (and cement or CMUs) | Cement |
: Cement may only be used where provision of qualifying concrete is impractical.
: High early strength concrete should be avoided where possible. Is there a need for it in this project?
: HESC4000
: HESC4000
: HESC4000
: HESC4000
| : HESC4000 | Concrete (and cement or CMUs)-Cement | metric ton | metric ton | 858 | 819 | 751 | ||
| Concrete (and cement or CMUs) | Concrete Masonry Units | Concrete (and cement or CMUs)-Concrete Masonry Units | cubic meter | cubic meter | 290 | 256 | 217 | |
| Asphalt | **Select LEC Material Subcategory below** | Asphalt-**Select LEC Material Subcategory below** | ||||||
| Asphalt | Asphalt | Asphalt-Asphalt | metric ton | U.S. ton | 72.6 | 64.8 | 55.4 | |
| Steel | **Select LEC Material Subcategory below** | Steel-**Select LEC Material Subcategory below** | ||||||
| Steel | Rebar (fabricated) | Steel-Rebar (fabricated) | metric ton | metric ton | 850 | 794 | 728 | |
| Steel | Rebar (unfabricated) | Steel-Rebar (unfabricated) | metric ton | metric ton | 760 | 716 | 611 | |
| Steel | Hollow Structural Sections (fabricated) | Steel-Hollow Structural Sections (fabricated) | metric ton | metric ton | 1,898 | 1854 | 1778 | |
| Steel | Hollow Structural Sections from Electric Arc Furnaces (unfabricated) | Steel-Hollow Structural Sections from Electric Arc Furnaces (unfabricated) | metric ton | metric ton | 1,652 | 1620 | 1580 | |
| Steel | Hot-Rolled Sections (fabricated) | Steel-Hot-Rolled Sections (fabricated) | metric ton | metric ton | 1,163 | 1128 | 1022 | |
| Steel | Hot-Rolled Sections (unfabricated) | Steel-Hot-Rolled Sections (unfabricated) | metric ton | metric ton | 869 | 713 | 686 | |
| Steel | Cold-Formed and Galvanized (stud, track, framing, etc.) | Steel-Cold-Formed and Galvanized (stud, track, framing, etc.) | metric ton | metric ton | 2,408 | 2324 | 2228 | |
| Steel | Structural Steel Plate from Electric Arc Furnaces (unfabricated) | Steel-Structural Steel Plate from Electric Arc Furnaces (unfabricated) | metric ton | metric ton | 1,190 | 1152 | 987 | |
| Glass | **Select LEC Material Subcategory below** | Glass-**Select LEC Material Subcategory below** | ||||||
| Glass | Flat Glass | Glass-Flat Glass | metric ton | metric ton | 1,401 | 1370 | 1331 |
https://docs.google.com/presentation/d/10JM8-LF0kUJwtvaxAisV-IeyoZzLveKlUtMwCflCRQM/edit Emerging & Sustainable Tech and
| Region | 5 | Contractor Name | Project Manager Name | |||||||||||||||
| Project Number (in Kahua) | Contractor Email Address | Project Manager Email Address | ||||||||||||||||
| Project Type (non-ESPC or ESPC?) | Project Manager Approval Date | |||||||||||||||||
| Enter Work Item Information Below: | Design-Build or Construction Team: Enter E&ST / HPGB Installation Information and Outcomes | Construction Manager as Advisor (CMa) or Commissioning Provider (CxP): Validate technology Installation | ||||||||||||||||
| Combined WI ID | Row Has Any Value | Min Requirements Met | Row Number | Region | First Column Address | Duplicate Check | Contractor Name | Contractor Email Address | Project Manager Name | Project Manager Email Address | Enter your email address | Milestone Status | Building Number | |||||
| : Location Code (from REXUS) | Building Name | Project # (Kahua) | Accounting String ID (ASID) | |||||||||||||||
| : 8-digit alphanumeric string | Work Item (WI) # | |||||||||||||||||
| : 4 digit numeric string | Budget Activity Code |
: PG Code for HPGB Projects: PG21
| PG Code for E&ST Projects: PG27 | IRA Program (E&ST, HPGB) | Select the guiding principle for the material or technology | Deep Energy Retrofit | All Electric Building | Net Zero Energy | Sustainable Building | Energy Conservation Measure /Water Conservation Measure (ECM/WCM) Identifier |
| : Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule | ECM/WCM Category | ||||||
| : AoA Dropdown | ECM/WCM Technology | ||||||
| : AoA Dropdown | Quantity Installed | TO Schedule Technology | |||||
| : Auto populates based on ECM Category and Technology Selected | Emerging & Sustainable Technology | ||||||
| : Auto populates based on ECM Category and Technology Selected | ECM/WCM Default Design Life | ||||||
| : In years | Alternative ECM Design Life | ||||||
| : In years. If different than default. Max of 30 year design life | Primary Building Cooling Fuel | Primary Building Heating Fuel | Refrigerant Involved in ECM? | Refrigerant Type | Refrigerant Capacity (lbs) | Initial ECM/WCM implementation cost ($) | Estimated initial savings associated with ECM/WCM installation ($) |
: ESPC estimated year one savings e.g. If you install a new high efficiency chiller instead of spending $10,000 to repair the old one, enter $10,000 here. Annual O&M Cost ($/year) : (Enter cost if O&M contracts will change due to ECM Implementation)
| Enter negative value if there will be confirmed O&M savings | Electric Savings (kWh/year) |
| : Enter negative value if there will be an increase in energy use | Natural Gas Savings (scf/year) |
: Enter negative value if there will be an increase in energy use
1 mmBtu = 974.66 scf Fuel Oil Savings (gal/year) : Enter negative value if there will be an increase in energy use
1 mmBtu = 7.246376812 gal Steam Savings (mmBtu/year) : Enter negative value if there will be an increase in energy use
| : Location Code (from REXUS) | Chilled Water Savings (mmBtu/year) | |
| : Enter negative value if there will be an increase in energy use | Propane Fuel Savings (mmBtu/year) | |
| : Enter negative value if there will be an increase in energy use | Water Savings (gal/year) |
: Enter negative value if there will be an increase in energy use : 8-digit alphanumeric string : 4 digit numeric string : PG Code for HPGB Projects: PG21 PG Code for E&ST Projects: PG27 : Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule : AoA Dropdown
| : AoA Dropdown | Additional notes about ECM/WCM | Certify technology is installed and working properly | Email of Certifier | |||||||||||||||||||||||||||
| #REF! | #REF! | #REF! | 6 | 5 | L6 | #REF! | #REF! | #REF! | #REF! | FALSE | FALSE | FALSE | FALSE | FALSE | #REF! | |||||||||||||||
| 724|MN0300IF|NMN00005| | TRUE | FALSE | 7 | 5 | L7 | FALSE | seth.larocque@gsa.gov | Submittal 2 - Commissioner's Concept Design Approval - Milestone 4.271 - Commissioner's Concept Design Approval | MN0300IF | INTERNATIONAL FALLS MN U.S. BORDER STATION | 724 | NMN00005 | PG21 | E&ST | Optimize Energy Performance | FALSE | TRUE | TRUE | TRUE | ECM | Renewable Energy Systems | Install photovoltaic system | TC.11 - Renewable Energy Systems | Renewables - Bi-facial and Building Integrated Photovoltaics | 30 year(s) | Electricity | N/A | No | N/A | |
| ||| | FALSE | FALSE | 8 | 5 | L8 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 9 | 5 | L9 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 10 | 5 | L10 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 11 | 5 | L11 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 12 | 5 | L12 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 13 | 5 | L13 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 14 | 5 | L14 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 15 | 5 | L15 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 16 | 5 | L16 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 17 | 5 | L17 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 18 | 5 | L18 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 19 | 5 | L19 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 20 | 5 | L20 | FALSE | FALSE | FALSE | FALSE | FALSE | ||||||||||||||||||||
| ||| | FALSE | FALSE | 21 | 5 | L21 | FALSE | FALSE | FALSE | FALSE | FALSE |
https://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edithttps://docs.google.com/spreadsheets/d/1MJEtPhdIBy6lPkyIYQELfS-xBIID2VCvaaRLlZzoWGg/edit E&ST_HPGB Dropdowns Region Picklist IRA Milestones non-ESPC Region Location Code Building Name Filtered Region Filtered Location Code Filtered Building Name Funding Stream ECM List : Import range from ECM Design life tab. Any updates to E&S / TO alignment can be made in that sheet (https://docs.google.com/spreadsheets/d/1a_41ZddtVfM_VrZU2vYW7gQQUAp5gPwEolsrFzwPUTQ/edit#gid=339106882)
ECM type/category list aligns with CTS ECM Category Dropdown : Arrayformula used to populate ECM technology dropdown based on ECM category selected.
| ECM type/category list aligns with CTS | ECM Technology | Filtered IRA Milestones | |||||||||||||||||||||||||||||
| 1 | Submittal 1 - Project Agreement | Planning | Planning | Phase Start | 3.091 | Initial Financial Agreement w Customer | Submittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w Customer | 1 | CT0013ZZ | WILLIAM R. COTTER FB | 5 | IL0032ZZ | CUSTOMHOUSE | PG21 | **ECM Type Category** | ECM Example **Select ECM Type Category** | Helper Column | Design Life | Emerging & Sustainable Technology Alignment | TO Alignment | Submittal 7 - Final Performance Submittal - Milestone 4.691 - Substantial Completion | ||||||||||
| 2 | Submittal 2 - Commissioner's Concept Design Approval | Planning | Phase End | 4.271 | Commissioner's Concept Design Approval | Submittal 2 - Commissioner's Concept Design Approval - Milestone 4.271 - Commissioner's Concept Design Approval | 1 | CT0024ZZ | Richard C. Lee U S Courthouse | 5 | IL0033ZZ | WILLIAM O. LIPINSKI FED. BLDG. | PG27 | Boiler Plant Improvements | **Select ECM Technology below** | Boiler Plant Improvements-**Select ECM Technology below** | Select Emerging & Sustainable Technology Alignment | Select TO Alignment | Renewable Energy Systems | Install landfill gas, wastewater treatment plant digester gas, or coal bed methane power plant | Install photovoltaic system | Install wind energy system | Install wood waste or other organic waste stream heating or power plant | Clean and/or repair | Implement training and/or documentation | Upgrade operating protocols, calibration, and/or sequencing | Install electrical storage | Submittal 6 - Hand-off/Turnover - Milestone 4.691 - Substantial Completion | |||
| 3 | Planning | Phase End | 4.101 | Design or Bridging RFP Issued | 4.101 - Design or Bridging RFP Issued | 1 | CT0047ZZ | WATERBURY MAIN POST OFFICE | 5 | IL0054ZZ | 536 S. CLARK CHICAGO IL FEDERAL BUILDING | Boiler Plant Improvements | Add energy recovery | Boiler Plant Improvements-Add energy recovery | 25 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | Submittal 5 - 90% CD - Milestone 4.361 - Design Complete | |||||||||||||
| 4 | Planning | Phase End | 4.421 | Construction or Design/Build or CMC RFP Issued | 4.421 - Construction or Design/Build or CMC RFP Issued | 1 | CT0053ZZ | AA RIBICOFF FB&CTHS | 5 | IL0069ES | MELVIN PRICE FEDERAL COURTHOUSE | Boiler Plant Improvements | Decentralize boiler | Boiler Plant Improvements-Decentralize boiler | 25 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | Submittal 4 - 65% DD Review/ 50% CD - Milestone 4.251 - Design Start / NTP | |||||||||||||
| 5 | Design Procurement | Design Procurement | Phase Start | 4.101 | Design or Bridging RFP Issued | 4.101 - Design or Bridging RFP Issued | 1 | CT0055ZZ | New US Courthouse - Hartford | 5 | IL0154ZZ | PEORIA IL FED BLDG & US CTHSE | Boiler Plant Improvements | Insulate boiler room | Boiler Plant Improvements-Insulate boiler room | 24 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | Submittal 3 - 35% DD - Milestone 4.251 - Design Start / NTP | ||||||||||||
| 6 | Design Procurement | Phase End | 4.221 | Design or Bridging Award | 4.221 - Design or Bridging Award | 1 | CT0059ZZ | BRIEN MCMAHON USCH&FB | 5 | IL0173ZZ | PAUL FINDLEY BUILDING | Boiler Plant Improvements | Convert gas-fired unit to boiler loop | Boiler Plant Improvements-Convert gas-fired unit to boiler loop | 25 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | Submittal 2 - Commissioner's Concept Design Approval - Milestone 4.271 - Commissioner's Concept Design Approval | |||||||||||||
| 7 | Submittal 3 - 35% DD | Design | Design | Phase Start | 4.251 | Design Start / NTP | Submittal 3 - 35% DD - Milestone 4.251 - Design Start / NTP | 1 | CT0060ZZ | SSA - TORRINGTON | 5 | IL0195ZZ | USPS-DOWNTOWN STATION | Boiler Plant Improvements | Clean and/or repair | Boiler Plant Improvements-Clean and/or repair | 1 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | Submittal 1 - Project Agreement - Milestone 3.091 - Initial Financial Agreement w Customer | |||||||||||
| 8 | Submittal 5 - 90% CD | Design | Phase End | 4.361 | Design Complete | Submittal 5 - 90% CD - Milestone 4.361 - Design Complete | 1 | CT0061ZZ | ROBERT N GIAIMO FB | 5 | IL0200ZZ | FED BLDG-PO-US CTHSE | Boiler Plant Improvements | Upgrade operating protocols, calibration, and/or sequencing | Boiler Plant Improvements-Upgrade operating protocols, calibration, and/or sequencing | 25 | HVAC - Sequence of Operations | TC.1 - Boiler Plant Improvements | 6.011 - Project Closeout | ||||||||||||
| 9 | Construction Procurement | Construction Procurement | Phase Start | 4.421 | Construction or Design/Build or CMC RFP Issued | 4.421 - Construction or Design/Build or CMC RFP Issued | 1 | CT3316ZZ | 130 DARLIN STREET | 5 | IL0205ZZ | EVERETT M. DIRKSEN | Boiler Plant Improvements | Replace boiler | Boiler Plant Improvements-Replace boiler | 25 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | 4.581 - Construction Start/NTP | ||||||||||||
| 10 | Construction Procurement | Phase End | 4.491 | Construction or Design/Build Contract Award or CMc Award | 4.491 - Construction or Design/Build Contract Award or CMc Award | 1 | CT3319ZZ | TWO LANDMARK SQUARE | 5 | IL0206ZZ | WILLIAM L. BEATTY FB & CTHSE | Boiler Plant Improvements | Replace burner | Boiler Plant Improvements-Replace burner | 18 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | 4.575 - CMc GMP Option Excercised | |||||||||||||
| 11 | Construction | Construction | Phase Start | 4.581 | Construction Start/NTP | 4.581 - Construction Start/NTP | 1 | CT3322ZZ | 425 MAIN STREET | 5 | IL0209CF | FEDERAL ARCHIVES RECORDS CTR. | Boiler Plant Improvements | Convert system from steam to hot water | Boiler Plant Improvements-Convert system from steam to hot water | 22 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | 4.511 - CXa Award | ||||||||||||
| Submittal 6 - Hand-off/Turnover | Construction | Phase End | 4.691 | Substantial Completion | Submittal 6 - Hand-off/Turnover - Milestone 4.691 - Substantial Completion | 1 | CT3323ZZ | COMMERCE CENTER - EAST HARTFORD | 5 | IL0214ZZ | QUINCY IL SSA DIST OFF BLDG | Boiler Plant Improvements | Implement training and/or documentation | Boiler Plant Improvements-Implement training and/or documentation | 5 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | 4.491 - Construction or Design/Build Contract Award or CMc Award | |||||||||||||
| Submittal 7 - Final Performance Submittal | Close Out | Close Out | Phase Start | 4.691 | Substantial Completion | Submittal 7 - Final Performance Submittal - Milestone 4.691 - Substantial Completion | 1 | CT3331ZZ | CT FINANCIAL CENTER | 5 | IL0220ZZ | EAST SAINT LOUIS IL FEDERAL BUILDING | Boiler Plant Improvements | Convert to cleaner fuels | Boiler Plant Improvements-Convert to cleaner fuels | 25 | HVAC - Electric Boilers | TC.1 - Boiler Plant Improvements | 4.421 - Construction or Design/Build or CMC RFP Issued | ||||||||||||
| Close Out | Phase End | 6.011 | Project Closeout | 6.011 - Project Closeout | 1 | CT3341ZZ | 265 CHURCH STREET | 5 | IL0222ZZ | MOUNT VERNON IL FEDERAL BUILDING | Chiller Plant Improvements | **Select ECM Technology below** | Chiller Plant Improvements-**Select ECM Technology below** | Select Emerging & Sustainable Technology Alignment | Select TO Alignment | 4.421 - Construction or Design/Build or CMC RFP Issued | |||||||||||||||
| Other | Other | Award | 4.511 | CXa Award | 4.511 - CXa Award | 1 | CT3354ZZ | MERIDEN EXECUTIVE PARK, BLDG 1 | 5 | IL0231ZZ | 450 S FEDERAL CHICAGO IL FEDERAL PARKING FACILITY | Chiller Plant Improvements | Add energy recovery | Chiller Plant Improvements-Add energy recovery | 23 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | 4.245 - CMa Award | |||||||||||||
| Other | Award | 4.245 | CMa Award | 4.245 - CMa Award | 1 | CT3358ZZ | NO. 2 SHAW'S COVE | 5 | IL0233ZZ | H WASHINGTON CENTER | Chiller Plant Improvements | Install VSD on electric centrifugal chillers | Chiller Plant Improvements-Install VSD on electric centrifugal chillers | 25 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | 4.221 - Design or Bridging Award | ||||||||||||||
| Other | Award | 4.575 | CMc GMP Option Excercised | 4.575 - CMc GMP Option Excercised | 1 | CT3360ZZ | LAFAYETTE BLVD. | 5 | IL0235FC | USPO LOOP STATION | Chiller Plant Improvements | Replace chiller | Chiller Plant Improvements-Replace chiller | 23 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | 4.101 - Design or Bridging RFP Issued | ||||||||||||||
| Submittal 4 - 65% DD Review/ 50% CD | Submittal 4 - 65% DD Review/ 50% CD - Milestone 4.251 - Design Start / NTP | 1 | CT3362ZZ | MIIDLESEX CORP. CTR. | 5 | IL0236FC | JOHN C. KLUCZYNSKI FED. BLDG. | Chiller Plant Improvements | Install gas cooling | Chiller Plant Improvements-Install gas cooling | 23 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | 4.101 - Design or Bridging RFP Issued | |||||||||||||||||
| Cancelled | 1 | CT3369ZZ | CORPORATE CENTER - HARTFORD | 5 | IL0240ZZ | SENATOR PAUL SIMON FEDERAL BUILDING | Chiller Plant Improvements | Add or repair economizer cycle | Chiller Plant Improvements-Add or repair economizer cycle | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | Deferred | |||||||||||||||||||
| AoA Submittal | 1 | CT3373ZZ | 101 PITKIN STREET | 5 | IL0300ZZ | GSA INTERAG MTR POOL | Chiller Plant Improvements | Add or replace cooling tower | Chiller Plant Improvements-Add or replace cooling tower | 25 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | Cancelled | ||||||||||||||||||
| Deferred | 1 | CT3375ZZ | 600 STATE STREET | 5 | IL0301ES | MELVIN PRICE FEDERAL BUILDING | Chiller Plant Improvements | Clean and/or repair | Chiller Plant Improvements-Clean and/or repair | 1 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | AoA Submittal | ||||||||||||||||||
| IRA Milestones | ESPC | 1 | CT3376ZZ | 131 WEST STREET | 5 | IL0302ZZ | URBANA IL U.S. COURTHOUSE | Chiller Plant Improvements | Implement training and/or documentation | Chiller Plant Improvements-Implement training and/or documentation | 5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | ||||||||||||||||||
| Planning | Planning | Phase Start | 10.021 | ESPC / ENABLE - Notice of Opportunity (NOO) Issued | 10.021 - ESPC / ENABLE - Notice of Opportunity (NOO) Issued | 1 | CT3389ZZ | CNC BUILDING | 5 | IL0303ZZ | METCALFE BUILDING | Chiller Plant Improvements | Upgrade operating protocols, calibration, and/or sequencing | Chiller Plant Improvements-Upgrade operating protocols, calibration, and/or sequencing | 5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.2 - Chiller Plant Improvements | ||||||||||||||
| Planning | Phase Start | 10.031 | UESC - Letters of Interest (LOIs) Issued | 10.031 - UESC - Letters of Interest (LOIs) Issued | 1 | CT3393ZZ | HARTFORD SQUARE NORTH | 5 | IL0311ZZ | STANLEY J. ROSZKOWSKI U.S. COURTHOUSE | Building Automation Systems/EMCS | **Select ECM Technology below** | Building Automation Systems/EMCS-**Select ECM Technology below** | Select Emerging & Sustainable Technology Alignment | Select TO Alignment | ||||||||||||||||
| Submittal 1 - Project Agreement | Planning | Interval | 10.061 | Preliminary Assessment (PA) Start | Submittal 1 - Project Agreement - Milestone 10.061 - Preliminary Assessment (PA) Start | 1 | CT3395ZZ | AIR EXCHANGE BUILDING | 5 | IL0313ZZ | 208-212 S. STATE ST. | Building Automation Systems/EMCS | Add or upgrade BAS/EMS/EMCS | Building Automation Systems/EMCS-Add or upgrade BAS/EMS/EMCS | 7 | Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & Submeters | TC.3 - Building Automation Systems (BAS) / Energy Management Control Systems (EMCS) | ||||||||||||||
| Planning | Interval | 10.071 | Preliminary Assessment (PA) Complete | 10.071 - Preliminary Assessment (PA) Complete | 1 | CT3398ZZ | TYLER SQUARE | 5 | IL0314ZZ | 214 S. STATE ST. | Building Automation Systems/EMCS | Add or upgrade controls | Building Automation Systems/EMCS-Add or upgrade controls | 15 | Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & Submeters | TC.3 - Building Automation Systems (BAS) / Energy Management Control Systems (EMCS) | |||||||||||||||
| Planning | Interval | 3.091 | Initial Financial Agreement w Customer | 3.091 - Initial Financial Agreement w Customer | 1 | CT3400ZZ | SHAW'S COVE | 5 | IL0315ZZ | 220 S. STATE ST. | Building Automation Systems/EMCS | Upgrade operating protocols, calibration, and/or sequencing | Building Automation Systems/EMCS-Upgrade operating protocols, calibration, and/or sequencing | 5 | Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & Submeters | TC.3 - Building Automation Systems (BAS) / Energy Management Control Systems (EMCS) | |||||||||||||||
| Submittal 2 - 35% DD | Planning | Phase End | 10.041 | Notice of Intent to Award (NOITA) Issued | Submittal 2 - 35% DD - Milestone 10.041 - Notice of Intent to Award (NOITA) Issued | 1 | CT3402ZZ | CJ FORT TRUMBULL | 5 | IL0316ZZ | 230 S. STATE ST. | Building Automation Systems/EMCS | Convert pneumatic controls to direct digital controls (DDC) | Building Automation Systems/EMCS-Convert pneumatic controls to direct digital controls (DDC) | 15 | Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & Submeters | TC.3 - Building Automation Systems (BAS) / Energy Management Control Systems (EMCS) | ||||||||||||||
| Construction Procurement | Construction Procurement | Phase Start | 10.091 | Investment Grade Audit (IGA) Start | 10.091 - Investment Grade Audit (IGA) Start | 1 | CT3409ZZ | TWEED-NEW HAVEN AIRPORT | 5 | IL0317ZZ | 18 W. JACKSON | Heating, Ventilating, and Air Conditioning | **Select ECM Technology below** | Heating, Ventilating, and Air Conditioning-**Select ECM Technology below** | Select Emerging & Sustainable Technology Alignment | Select TO Alignment | |||||||||||||||
| Submittal 3 - 65% DD Review/ 50% CD | Construction Procurement | Interval | 10.101 | Investment Grade Audit (IGA) Complete | Submittal 3 - 65% DD Review/ 50% CD - Milestone 10.101 - Investment Grade Audit (IGA) Complete | 1 | CT3410ZZ | 36 BUFF CAP ROAD | 5 | IL0318ZZ | 202 S. STATE STREET | Heating, Ventilating, and Air Conditioning | Add duct insulation | Heating, Ventilating, and Air Conditioning-Add duct insulation | 22 | HVAC - Duct Sealing | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||
| Construction Procurement | Phase End | 10.121 | Award Design & Construction | 10.121 - Award Design & Construction | 1 | CT3412ZZ | CAPITOL PLACE | 5 | IL0543CF | FSS PUMPHOUSE | Heating, Ventilating, and Air Conditioning | Add or replace cooling tower | Heating, Ventilating, and Air Conditioning-Add or replace cooling tower | 25 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | |||||||||||||||
| Construction | Construction | Phase Start | 4.581 | Construction Start/NTP | 4.581 - Construction Start/NTP | 1 | CT3413ZZ | 15 MARNE STREET | 5 | IL1406ZZ | MILLIKIN COURT BLDG | Heating, Ventilating, and Air Conditioning | Convert CV system to VAV system | Heating, Ventilating, and Air Conditioning-Convert CV system to VAV system | 20 | HVAC - Smart Circulator Pumps | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||
| Construction | Interval | 10.171 | All ECMs Commissioned | 10.171 - All ECMs Commissioned | 1 | CT3414ZZ | 2 UNION PLAZA | 5 | IL1886ZZ | PARK RIDGE OFC CTR | Heating, Ventilating, and Air Conditioning | Add energy recovery | Heating, Ventilating, and Air Conditioning-Add energy recovery | 20 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | |||||||||||||||
| Submittal 5 - Hand-off/Turnover | Construction | Phase End | 10.181 | All ECMs 30 Day Proof of Performance Complete | Submittal 5 - Hand-off/Turnover - Milestone 10.181 - All ECMs 30 Day Proof of Performance Complete | 1 | CT3416ZZ | 716 BROOK STREET | 5 | IL1889ZZ | O'HARE LAKE 2300-A LLC | Heating, Ventilating, and Air Conditioning | Other cooling | Heating, Ventilating, and Air Conditioning-Other cooling | 20.5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||
| Close Out | Close Out | Phase Start | 10.181 | All ECMs 30 Day Proof of Performance Complete | 10.181 - All ECMs 30 Day Proof of Performance Complete | 1 | CT3418ZZ | 55 CHURCH STREET | 5 | IL1894ZZ | 55 East Monroe | Heating, Ventilating, and Air Conditioning | Balance ventilation/distribution system | Heating, Ventilating, and Air Conditioning-Balance ventilation/distribution system | 15 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||
| Submittal 6 - Final Performance Submittal | Close Out | Interval | 10.211 | Full Project Acceptance Issued | Submittal 6 - Final Performance Submittal - Milestone 10.211 - Full Project Acceptance Issued | 1 | CT3421ZZ | STAMFORD GOVERNMENT CENTER | 5 | IL1914ZZ | THE MIDWEST BUILDING | Heating, Ventilating, and Air Conditioning | Improve distribution fans | Heating, Ventilating, and Air Conditioning-Improve distribution fans | 19 | HVAC - Cogged and Synchronous Fan Belts | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||
| Close Out | Phase End | 10.221 | Performance Year 1 Commences | 10.221 - Performance Year 1 Commences | 1 | CT3425ZZ | 474-484 BURNSIDE AVENUE | 5 | IL1921ZZ | 175 JACKSON LLC | Heating, Ventilating, and Air Conditioning | Add or repair economizer | Heating, Ventilating, and Air Conditioning-Add or repair economizer | 5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | |||||||||||||||
| Submittal 4 - 90% CD - Milestone 10.101 - Investment Grade Audit (IGA) Complete | 1 | CT3429ZZ | ANSONIA SHOPPING CENTER | 5 | IL1943ZZ | MID CITY NATIONAL BANK | Heating, Ventilating, and Air Conditioning | Other distribution | Heating, Ventilating, and Air Conditioning-Other distribution | 20.5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | |||||||||||||||||||
| Submittal 4 - 90% CD | Cancelled | 1 | CT3433ZZ | 97 BARNES ROAD | 5 | IL2062ZZ | GLEN HILL NORTH BG A | Heating, Ventilating, and Air Conditioning | Clean and/or repair | Heating, Ventilating, and Air Conditioning-Clean and/or repair | 5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||
| AoA Submittal | 1 | CT3435ZZ | 291 South Lambert Road | 5 | IL2114ZZ | ST REGIS OFFICE CNTR | Heating, Ventilating, and Air Conditioning | Implement training and/or documentation | Heating, Ventilating, and Air Conditioning-Implement training and/or documentation | 5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | |||||||||||||||||||
| Deferred | 1 | CT3438ZZ | IPARK | 5 | IL2125ZZ | 11 W QUINCY COURT | Heating, Ventilating, and Air Conditioning | Repair or replace HVAC damper and controller | Heating, Ventilating, and Air Conditioning-Repair or replace HVAC damper and controller | 21.5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | |||||||||||||||||||
| 1 | CT3441ZZ | 51 N ELM ST | 5 | IL2160ZZ | O'HARE LAKE OFFICE PARK | Heating, Ventilating, and Air Conditioning | Repair leaks in ducts | Heating, Ventilating, and Air Conditioning-Repair leaks in ducts | 30 | HVAC - Duct Sealing | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3444ZZ | 280 Trumbull | 5 | IL2177ZZ | CHICAGO IL (200 W ADAMS ST) BANK OF AMERICA | Heating, Ventilating, and Air Conditioning | Seal ducts | Heating, Ventilating, and Air Conditioning-Seal ducts | 30 | HVAC - Duct Sealing | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3446ZZ | 850 Canal Street | 5 | IL2178ZZ | 901 WARRENVILLE ROAD | Heating, Ventilating, and Air Conditioning | Replace package units | Heating, Ventilating, and Air Conditioning-Replace package units | 20.5 | HVAC - High-performing Rooftop Units (RTUS) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3448ZZ | 15 Thames Street | 5 | IL2194ZZ | IL VALLEY OFFICE PK | Heating, Ventilating, and Air Conditioning | Replace packaged terminal units | Heating, Ventilating, and Air Conditioning-Replace packaged terminal units | 20.5 | HVAC - High-performing Rooftop Units (RTUS) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3450ZZ | SSA Bridgeport, CT | 5 | IL2201ZZ | 310-312 W CHURCH ST | Heating, Ventilating, and Air Conditioning | Replace or modify AHU | Heating, Ventilating, and Air Conditioning-Replace or modify AHU | 27.25 | HVAC - High-performing Rooftop Units (RTUS) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3451ZZ | 55 Main Street | 5 | IL2209ZZ | 301 SOUTH PROSPECT R | Heating, Ventilating, and Air Conditioning | Other ventilation | Heating, Ventilating, and Air Conditioning-Other ventilation | 20.5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3453ZZ | BDL Airport Terminal A | 5 | IL2216ZZ | SHUTT HOUSE | Heating, Ventilating, and Air Conditioning | Improve ventilation fans | Heating, Ventilating, and Air Conditioning-Improve ventilation fans | 19 | HVAC - Cogged and Synchronous Fan Belts | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3457ZZ | 321 Research Parkway | 5 | IL2220ZZ | EXECUTIVE PLAZA I | Heating, Ventilating, and Air Conditioning | Upgrade operating protocols, calibration, and/or sequencing | Heating, Ventilating, and Air Conditioning-Upgrade operating protocols, calibration, and/or sequencing | 5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3458ZZ | 380 Sheldon St. | 5 | IL2223ZZ | WILLOWBROOK CENTER | Heating, Ventilating, and Air Conditioning | Replace burner | Heating, Ventilating, and Air Conditioning-Replace burner | 18 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3459ZZ | 99 E. Main St. | 5 | IL2225ZZ | COOK HOUSE | Heating, Ventilating, and Air Conditioning | Install passive solar heating (i.e., solar wall) | Heating, Ventilating, and Air Conditioning-Install passive solar heating (i.e., solar wall) | 15 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3460ZZ | Salame Plaza, Building B | 5 | IL2232ZZ | 3250 EXECUTIVE & PAR | Heating, Ventilating, and Air Conditioning | Replace AC and heating units with ground coupled heat pump systems | Heating, Ventilating, and Air Conditioning-Replace AC and heating units with ground coupled heat pump systems | 15 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3462ZZ | IRS Waterbury | 5 | IL2233ZZ | CHICAGO IL CITIGROUP CENTER | Heating, Ventilating, and Air Conditioning | Install gas cooling | Heating, Ventilating, and Air Conditioning-Install gas cooling | 15 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3463ZZ | One Herald Square | 5 | IL2242ZZ | MOFFETT TECH CTR | Heating, Ventilating, and Air Conditioning | Add enhanced dehumidification | Heating, Ventilating, and Air Conditioning-Add enhanced dehumidification | 8 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3466ZZ | 6 Shaw's Cove | 5 | IL2246ZZ | STEWART SQUARE | Heating, Ventilating, and Air Conditioning | Install solar ventilation preheating system | Heating, Ventilating, and Air Conditioning-Install solar ventilation preheating system | 20 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3467ZZ | 195 Church | 5 | IL2251ZZ | CHICAGO IL (5353 S LARAMIE AVE) MIDWAY BUSINESS CENTER | Heating, Ventilating, and Air Conditioning | Other heating | Heating, Ventilating, and Air Conditioning-Other heating | 23.2 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3468ZZ | CPB Middletown | 5 | IL2252ZZ | FAIRVIEW HEIGHTS IL CORPORATE CENTRE | Heating, Ventilating, and Air Conditioning | Install air source heat pump | Heating, Ventilating, and Air Conditioning-Install air source heat pump | 15 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | CT3469ZZ | American Thread Mill | 5 | IL2255ZZ | 402 W MAIN STREET | Heating, Ventilating, and Air Conditioning | Install variable refrigerant flow system | Heating, Ventilating, and Air Conditioning-Install variable refrigerant flow system | 15 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | MA0011ZZ | CPT JF WILLIAMS CG BLDG. | 5 | IL2260ZZ | HAWTHORNE CENTRE | Heating, Ventilating, and Air Conditioning | Capture and return condensate | Heating, Ventilating, and Air Conditioning-Capture and return condensate | 20.5 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | MA0013ZZ | JOHN W. MCCORMACK BUILDING | 5 | IL2263ZZ | 2410-16 S PULASKI | Heating, Ventilating, and Air Conditioning | Install demand control ventilation | Heating, Ventilating, and Air Conditioning-Install demand control ventilation | 20.5 | Smart Buildings & Operational Technology (Controls, Advanced Metering, Edge Devices) - Advanced Meters & Submeters | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | MA0050ZZ | JOHN J. MOAKLEY COURTHOUSE | 5 | IL2271ZZ | SOMERSET OFFICE BUILDING | Heating, Ventilating, and Air Conditioning | Install thermal destratification fans | Heating, Ventilating, and Air Conditioning-Install thermal destratification fans | 19 | HVAC - High-Performance/Low GWP Refrigerant Chillers (Maglev, Variable Speed Screw, Heat Recovery) | TC.4 - Heating, Ventilating, and Air Conditioning (HVAC) Improvements (not including boilers, chillers, and BAS/EMCS) | ||||||||||||||||||||
| 1 | MA0051ZZ | SPRINGFIELD FEDERAL COURT HOUSE | 5 | IL2272ZZ | BECKER BLDG | Lighting Improvements | **Select ECM Technology below** | Lighting Improvements-**Select ECM Technology below** | Select Emerging & Sustainable Technology Alignment | Select TO Alignment | |||||||||||||||||||||
| 1 | MA0076ZZ | US CUSTOM HOUSE - NEW BEDFORD | 5 | IL2274ZZ | NORTHWESTERN BLDG | Lighting Improvements | Add daylight controls | Lighting Improvements-Add daylight controls | 20 | Lighting - LED Retrofit Kits with Integrated Controls | TC.5 - Lighting Improvements | ||||||||||||||||||||
| 1 | MA0113ZZ | Harold D. Donohue Federal Building & Courthouse | 5 | IL2275ZZ | THE ROOKERY | Lighting Improvements | Add occupancy sensors | Lighting Improvements-Add occupancy sensors | 10 | Lighting - LED Retrofit Kits with Integrated Controls | TC.5 - Lighting Improvements | ||||||||||||||||||||
| 1 | MA0129ZZ | PHILIP J PHILBIN FOB | 5 | IL2279ZZ | MOLINE IL HERITAGE PLACE | Lighting Improvements | Retrofit with fiber optic lighting technologies | Lighting Improvements-Retrofit with fiber optic lighting technologies | 4.8 | Lighting - LED Retrofit Kits with Integrated Controls | TC.5 - Lighting Improvements |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .