47PF0023R0049 Supplemental 1442 Pricing Sheet 6 12 2024.pdf
PDF 200 KB Posted
- Attached to
- Construction Manager as Constructor (CMc) for the International Falls Land Port of Entry Project
- Solicitation number
- 47PF0023R0049
About this file
This document is a Supplemental 1442 Pricing Sheet for RFP 47PF0023R0049 for Construction Manager as Constructor (CMc) services for the International Falls Land Port of Entry project in International Falls, MN.
The RFP is seeking a CMc to provide design phase and construction phase services for this $175-195 million project, which will redesign and expand the existing land port of entry to increase vehicle and pedestrian processing efficiency and capacity, reduce traffic delays, and accommodate future demand. The CMc will be selected using trade-off source selection procedures, with technical factors being significantly more important than price. Key technical factors include experience, project management approach, key personnel qualifications, and past performance, with sustainability and small business participation also evaluated. The design phase services are anticipated to commence in October 2024, with the optional construction phase starting in February 2026 for a 1,085-day performance period. The project is funded under the Bipartisan Infrastructure Law and Inflation Reduction Act, with the government seeking suppliers of low embodied carbon asphalt, concrete, glass, and steel materials. Offerors must submit a Project Labor Agreement after contract award prior to construction NTP.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 47PF0023R0049 - Supplemental 1442 Pricing Sheet Updated 6/12/2024
CLIN ITEM PRICE
1 Design/PreConstruction Phase Services (Firm Fixed
Price)
2 Target Estimated Cost of Work (ECW) (Sum of 2.A, 2.B, and 2.C below)
2.A Non IRA Expenditures $ 2.B IRA Acquisition and installation of low embodied carbon materials (CLIN 2.B.a + 2.B.b + 2.B.c + 2.B.d)
2.B.a Acquisition and installation of low embodied carbon steel and associated expenses
2.B.b Acquisition and installation of low embodied carbon asphalt and associated expenses
2.B.c Acquisition and installation of low embodied carbon glass and associated expenses
2.B.d Acquisition and installation of low embodied carbon concrete and associated expenses
2.C IRA emerging and sustainable Technologies $ 3 CMc Contingency Allowance (CCA) Percentage 3% 4 CCA (CLIN 2 x CLIN 3) $ 5 Fee Percentage % 6 Fee (CLIN 2 x CLIN 5) $ 7 Option 1: Guaranteed Maximum Price (GMP) for
Construction Services (CLIN 2+4+6)
8 Option 2: Firearms Range 8.A Non IRA Expenditures 8.B IRA Acquisition and installation of low embodied carbon materials (CLIN 2.B.a + 2.B.b + 2.B.c + 2.B.d) 8.B.a Acquisition and installation of low embodied carbon steel and associated expenses 8.B.b Acquisition and installation of low embodied carbon asphalt and associated expenses 8.B.c Acquisition and installation of low embodied carbon glass and associated expenses 8.B.d Acquisition and installation of low embodied carbon concrete and associated expenses 9 Total Evaluated Price (CLIN 1+7+8) $
Environmental Remediation Unit Pricing:
International Falls LPOE Project - Environmental Remediation Unit Cost Items
ITEM Unit Unit Cost (Add)
Unit Cost (Deduct)
Remove & Dispose of Rubble or Debris CY $ $ Excavate Dioxin Contaminated Soil Material (Off Site Landfill Disposal) CY $ $ Excavate Metal Contaminated Soil Material (Off Site Landfill Disposal) CY $ $ Excavate Petroleum Contaminated Soil Material (Off Site Landfill Disposal) CY $ $ Dispose of Dioxin Contaminated Soil Material (Off Site Landfill Disposal) TON $ $
Dispose of Metal Contaminated Soil Material (Off Site Landfill Disposal) TON $ $ Dispose of Petroleum Contaminated Soil Material (Off Site Landfill Disposal) TON $ $ Clean General Fill Borrow Soil (Compacted Volume) CY $ $ Clean Select Suitable Borrow Soil (Compacted Volume) CY $ $ Clean Granular Borrow Soil (Compacted Volume) CY $ $ Clean Topsoil Borrow Soil (Compacted Volume) CY $ $