47PF0023R0049 Supplemental 1442 Pricing Sheet 6 12 2024.pdf

PDF 200 KB Posted

Attached to
Construction Manager as Constructor (CMc) for the International Falls Land Port of Entry Project
Solicitation number
47PF0023R0049
Issued by

About this file

This document is a Supplemental 1442 Pricing Sheet for RFP 47PF0023R0049 for Construction Manager as Constructor (CMc) services for the International Falls Land Port of Entry project in International Falls, MN.

The RFP is seeking a CMc to provide design phase and construction phase services for this $175-195 million project, which will redesign and expand the existing land port of entry to increase vehicle and pedestrian processing efficiency and capacity, reduce traffic delays, and accommodate future demand. The CMc will be selected using trade-off source selection procedures, with technical factors being significantly more important than price. Key technical factors include experience, project management approach, key personnel qualifications, and past performance, with sustainability and small business participation also evaluated. The design phase services are anticipated to commence in October 2024, with the optional construction phase starting in February 2026 for a 1,085-day performance period. The project is funded under the Bipartisan Infrastructure Law and Inflation Reduction Act, with the government seeking suppliers of low embodied carbon asphalt, concrete, glass, and steel materials. Offerors must submit a Project Labor Agreement after contract award prior to construction NTP.

View the file

Other files

File Type Posted
47PF0023R0049 Amend 03 SF30.pdf PDF
47PF0023R0049 Supplemental 1442 Pricing Sheet 6 12 2024.docx DOCX document
C2.01B SITE DEMOLITION PLAN - AREA B.pdf PDF
47PF0023R0049 Supplemental 1442 Pricing Sheet 6 4 2024.pdf PDF
47PF0023R0049 Amend 02 RFIs.pdf PDF
47PF0023R0049 Amend 02 SF30.pdf PDF
C2.01C SITE DEMOLITION PLAN - AREA C.pdf PDF
C2.01A SITE DEMOLITION PLAN - AREA A.pdf PDF
47PF0023R0049 Amend 01 RFIs.pdf PDF
IFalls LPOE CMc Pre-Proposal Meeting.pdf PDF
724 International Falls LPOE Modernization IRA Project Submittal_ Reporting Form.pdf PDF
2024_05_20 Trusted Traveler Options_fl.pdf PDF
I. Falls LPOE PreProposal Agenda.pdf PDF
47PF0023R0049 PreProposal Sign in sheet.pdf PDF
47PF0023R0049 Amend 01 SF30.pdf PDF
IFalls Master Schedule_240520.pdf PDF
PRE-PROPOSAL CONFERENCE ATTENDANCE REQUEST FORM.pdf PDF
2024_04_19 I FALLS_FINAL CONCEPT NARRATIVE.pdf PDF
Concept Appendix.zip ZIP file
Past Performance Questionnaire.docx DOCX document
International Falls Modernization IRA Project Submittal_ Reporting Form.xlsx XLSX spreadsheet
AWARD ALLOCATION FORM IRA .xlsx XLSX spreadsheet
47PF0023R0049 I Falls LPOE CMc SoW.pdf PDF
47PF0023R0049 SF1442.pdf PDF
IFalls Master Schedule_240429 for CMc solicitation.pdf PDF
Individual Model_Subk_Plan - Apr 2024 - 508 Compliant.docx DOCX document
47PF0023R0049 Sol_CMc_April 2024.pdf PDF
IFalls LPOE - IRA Sustainability Factor Table.xlsx XLSX spreadsheet
47PF0023R0049 Reps and Certs CMc April 2024.pdf PDF
47FP0023R0049 Supplemental 1442 Pricing Sheet.pdf PDF
47PF0024R0049 Agr_CMc_April 2024.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 47PF0023R0049 - Supplemental 1442 Pricing Sheet Updated 6/12/2024

CLIN ITEM PRICE

1 Design/PreConstruction Phase Services (Firm Fixed

Price)

2 Target Estimated Cost of Work (ECW) (Sum of 2.A, 2.B, and 2.C below)

2.A Non IRA Expenditures $ 2.B IRA Acquisition and installation of low embodied carbon materials (CLIN 2.B.a + 2.B.b + 2.B.c + 2.B.d)

2.B.a Acquisition and installation of low embodied carbon steel and associated expenses

2.B.b Acquisition and installation of low embodied carbon asphalt and associated expenses

2.B.c Acquisition and installation of low embodied carbon glass and associated expenses

2.B.d Acquisition and installation of low embodied carbon concrete and associated expenses

2.C IRA emerging and sustainable Technologies $ 3 CMc Contingency Allowance (CCA) Percentage 3% 4 CCA (CLIN 2 x CLIN 3) $ 5 Fee Percentage % 6 Fee (CLIN 2 x CLIN 5) $ 7 Option 1: Guaranteed Maximum Price (GMP) for

Construction Services (CLIN 2+4+6)

8 Option 2: Firearms Range 8.A Non IRA Expenditures 8.B IRA Acquisition and installation of low embodied carbon materials (CLIN 2.B.a + 2.B.b + 2.B.c + 2.B.d) 8.B.a Acquisition and installation of low embodied carbon steel and associated expenses 8.B.b Acquisition and installation of low embodied carbon asphalt and associated expenses 8.B.c Acquisition and installation of low embodied carbon glass and associated expenses 8.B.d Acquisition and installation of low embodied carbon concrete and associated expenses 9 Total Evaluated Price (CLIN 1+7+8) $

Environmental Remediation Unit Pricing:

International Falls LPOE Project - Environmental Remediation Unit Cost Items

ITEM Unit Unit Cost (Add)

Unit Cost (Deduct)

Remove & Dispose of Rubble or Debris CY $ $ Excavate Dioxin Contaminated Soil Material (Off Site Landfill Disposal) CY $ $ Excavate Metal Contaminated Soil Material (Off Site Landfill Disposal) CY $ $ Excavate Petroleum Contaminated Soil Material (Off Site Landfill Disposal) CY $ $ Dispose of Dioxin Contaminated Soil Material (Off Site Landfill Disposal) TON $ $

Dispose of Metal Contaminated Soil Material (Off Site Landfill Disposal) TON $ $ Dispose of Petroleum Contaminated Soil Material (Off Site Landfill Disposal) TON $ $ Clean General Fill Borrow Soil (Compacted Volume) CY $ $ Clean Select Suitable Borrow Soil (Compacted Volume) CY $ $ Clean Granular Borrow Soil (Compacted Volume) CY $ $ Clean Topsoil Borrow Soil (Compacted Volume) CY $ $

File details come from the government source that posted it. Updated .