47FP0023R0049 Supplemental 1442 Pricing Sheet.pdf
PDF 49 KB Posted
- Attached to
- Construction Manager as Constructor (CMc) for the International Falls Land Port of Entry Project
- Solicitation number
- 47PF0023R0049
About this file
This document is a Supplemental 1442 Pricing Sheet for RFP 47PF0023R0049 for Construction Manager as Constructor (CMc) services for the International Falls Land Port of Entry project. The pricing sheet provides a breakdown of the contract line items, including Design/Pre-Construction Phase Services, Target Estimated Cost of Work (with separate line items for IRA expenditures on low embodied carbon materials), CMc Contingency Allowance, Fee, Guaranteed Maximum Price for Construction Services, and an Option for Firearms Range. The total evaluated price for the contract opportunity is provided.
The related federal contract opportunity is for CMc services to design and construct a new land port of entry facility in International Falls, Minnesota. The Government is seeking a CMc to provide design and construction phase services, with the objective of selecting the proposal that represents the best value. The technical factors, including experience, project management approach, key personnel, and past performance, are significantly more important than price. The project is funded under the Bipartisan Infrastructure Law and Inflation Reduction Act, and the Government is seeking suppliers and manufacturers of low embodied carbon materials to support this effort. The solicitation is subject to a Project Labor Agreement requirement, and a pre-proposal conference is scheduled for May 14, 2024. Proposals are due on June 5, 2024, and an award is anticipated in October 2024.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 47PF0023R0049 - Supplemental 1442 Pricing Sheet
CLIN ITEM PRICE
1 Design/PreConstruction Phase Services (Firm Fixed
Price)
2 Target Estimated Cost of Work (ECW) (Sum of 2.A and 2.B below)
2.A Non IRA Expenditures $ 2.B IRA Acquisition and installation of low embodied carbon materials (CLIN 2.B.a + 2.B.b + 2.B.c + 2.B.d)
2.B.a Acquisition and installation of low embodied carbon steel and associated expenses
2.B.b Acquisition and installation of low embodied carbon asphalt and associated expenses
2.B.c Acquisition and installation of low embodied carbon glass and associated expenses
2.B.d Acquisition and installation of low embodied carbon concrete and associated expenses
2.C IRA emerging and sustainable Technologies $ 3 CMc Contingency Allowance (CCA) Percentage 3% 4 CCA (CLIN 2 x CLIN 3) $ 5 Fee Percentage % 6 Fee (CLIN 2 x CLIN 5) $ 7 Option 1: Guaranteed Maximum Price (GMP) for
Construction Services (CLIN 2+4+6)
8 Option 2: Firearms Range 8.A Non IRA Expenditures 8.B IRA Acquisition and installation of low embodied carbon materials (CLIN 2.B.a + 2.B.b + 2.B.c + 2.B.d) 8.B.a Acquisition and installation of low embodied carbon steel and associated expenses 8.B.b Acquisition and installation of low embodied carbon asphalt and associated expenses 8.B.c Acquisition and installation of low embodied carbon glass and associated expenses 8.B.d Acquisition and installation of low embodied carbon concrete and associated expenses 9 Total Evaluated Price (CLIN 1+7+8) $