INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED.pdf

PDF 665 KB Posted

Attached to
Open Channel Debris and Sediment Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
Solicitation number
26-B-01JS
Issued by
Volusia County, Florida

About this file

This document is a Notice of Grant and Agreement Award from the U.S. Department of Agriculture's Natural Resources Conservation Service (NRCS) to Volusia County, Florida for an Emergency Watershed Protection (EWP) program project related to damage recovery from Hurricane Milton. The cooperative agreement, with an award number of NR254209XXXXC008, provides $687,885.00 in federal funding for three specific damage survey reports involving debris removal and bank stabilization in Volusia County. The project includes three separate components: MIL-VOL-001 for debris removal ($134,200), MIL-VOL-002 for bank stabilization ($107,250), and MIL-VOL-003 for combined debris removal and bank stabilization ($383,900), with a total estimated construction cost of $625,350.00.

The funding is 100% federal, with no required local cost-share, and will be used to implement recovery measures that pose a risk to life and/or property if left unaddressed. The agreement allows for full reimbursement of eligible construction costs and up to 10% technical assistance costs, which covers engineering, design, contract administration, and quality assurance activities. The project will be administered through a cooperative agreement with specific milestones including a pre-design conference, permit acquisition, survey and design, bid solicitation, contract award, construction administration, and project completion certification. The agreement includes provisions for periodic site visits by NRCS, progress reporting, and requires the county to follow federal procurement regulations and maintain appropriate documentation.

View the file

Other files

File Type Posted
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton_(Addendum_#5_Revision).pdf PDF
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton.pdf PDF
Exhibit_C,_Bid_Documents,_26-B-01JS_(Must_Complete_and_Submit).pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_L._Location_Maps_NRCS_Huricane_Milton,_26-B-01JS_.pdf PDF
Exhibit_D,_Contract,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_F,_C36_Samsula_Canal_Stream_Debris_Removal_Specs_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_G,_C36_Samsula_Canal_New_Smyrna_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_H,_FEDERAL_CONTRACT_PROVISIONS_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_E,_B19_Sweetwater_Creek_Port_Orange,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_#794072,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Stream_Debris_Removal_Specs_MIL-VOL-002_B-19,_25-B-01JS.pdf PDF
Exhibit_F,_C36_Samsula_Canal_QAP_Debris_Removal_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_QAP_Structural_Work_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_G,_A10_Groover_Branch_Canal_Ormond_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_E,_A10_Groover_Branch_Canal_Ormond_Beach,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_E,_C36_Samsula_Canal_New_Symrna,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_G,_B19_Sweetwater_Creek_Port_Orange,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Stream_Debris_Removal_Specs_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_B,_INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_C,_Bid_Price_Sheet_NRCS_Hurricane_Milton_26-B-01JS_(MUST_COMPLTE_AND_SUBMIT)_.xls XLS spreadsheet
Exhibit_B,_General_Notes_Supplement_NRCS_Hurricane_Milton_,26-B-01JS.pdf PDF
Exhibit_C_PRIME-SUB_FOR_for_Contractors_26-B-01JS_(MUST_COMPLETE_AND_SUBMIT).xls XLS spreadsheet
Exhibit_B,_Project_Specifications_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Exhibit_C,_Insurance_Requirements,_26-B-01JS_(Must_Submit).pdf PDF
Exhibit_B,_Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Volusia_Human_Trafficking_Affidavit_08-07-2024_Solicitation_Document.docx DOCX document
B19_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
C36_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_FDOT_Standard_Spec_MIL-VOL-002.pdf PDF
A10_FDOT_Standard_Spec_MIL-VOL-003.pdf PDF
C36_FDOT_Standard_Spec_MIL-VOL-001.pdf PDF
A10_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_QAP_Structural_Work_MIL-VOL-002_B-19.pdf PDF
1._Scope_of_Work_NRCS_Hurricane_Milton_Projects.pdf PDF
C36_Stream_Debris_Removal__Specs_MIL-VOL-001_C-36.pdf PDF
C36_QAP_Debris_Removal_MIL-VOL-001_C-36.pdf PDF
B19_Stream_Debris_Removal__Specs_MIL-VOL-002_B-19.pdf PDF
5._Construction_Bid_Request_NRCS_projects_Milton.pdf PDF
6._Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton.pdf PDF
B19_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19.pdf PDF
3._Location_Maps_NRCS_Huricane_Milton.pdf PDF
2._Project_Specifications_NRCS_Hurricane_Milton.pdf PDF
A10_Stream_Debris_Removal__Specs_MIL-VOL-003_A-10.pdf PDF
A10_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_794072.pdf PDF
7._General_Notes_Supplement_NRCS_Hurricane_Milton.pdf PDF
A10_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10.pdf PDF
Exhibit_C_PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NRCS-ADS-093

U.S. Department of Agriculture Natural Resources Conservation Service

NOTICE OF GRANT AND AGREEMENT AWARD

1. Award Identifying Number

NR254209XXXXC008

2. Amendment Number 3. Award /Project Period

Date of NRCS signature - 04/10/2026

4. Type of award instrument:

Cooperative Agreement

5. Agency (Name and Address)

Natural Resources Conservation Service P. O. Box 141510 Gainesville, FL 32614-1510

6. Recipient Organization (Name and Address)

COUNTY OF VOLUSIA

123 W INDIANA AVE ROOM 300

DELAND FL 32720-4608

UEI Number / DUNS Number: VY9UEK86CVW3 / 067849901

EIN:

7. NRCS Program Contact

Name: Jason Strenth Phone: (352) 338-9559 Email: jason.strenth@usda.

gov

8. NRCS Administrative Contact

Name: MOIRA SANFORD Phone: (614) 255-2495 Email:

moira.sanford@usda.gov

9. Recipient Program Contact

Name: Lori Koontz Phone: (386) 822-6422 Email: lkoontz@volusia.org

10. Recipient Administrative Contact

Name: Ben Walter Phone: (386) 822-6422 Email: bwalter@volusia.org

11. CFDA

10.923

12. Authority

33 U.S.C. 701b-1

13. Type of Action

New Agreement

14. Program Director

Name: Benjamin Bartlett Phone: (386) 736-5965 Email: bbartlett@volusia.org

15. Project Title/ Description: Damage Survey Reports 12-07-24-5084-024 MIL-VOL-001, -025 MIL-VOL-002, -026 MIL- VOL-003, debris removal and bank stabilization in Volusia County, FL, due to Hurricane Milton, 6000035025

16. Entity Type: B = County Government

17. Select Funding Type

Select funding type: Federal Non-Federal

Original funds total $687,885.00 $0.00

Additional funds total $0.00 $0.00

Grand total $687,885.00 $0.00

18. Approved Budget

Docusign Envelope ID: 7085784A-603B-41E4-A1E6-C0F24D7E40A1

Personnel $0.00

Travel $0.00

Supplies $0.00

Construction $625,350.00

Total Direct Cost $687,885.00

Fringe Benefits $0.00

Equipment $0.00

Contractual $0.00

Other $62,535.00

Total Indirect Cost $0.00

Total Non-Federal Funds $0.00

Total Federal Funds Awarded $687,885.00

Total Approved Budget $687,885.00

This agreement is subject to applicable USDA NRCS statutory provisions and Financial Assistance Regulations. In accepting this award or amendment and any payments made pursuant thereto, the undersigned represents that he or she is duly authorized to act on behalf of the awardee organization, agrees that the award is subject to the applicable provisions of this agreement (and all attachments), and agrees that acceptance of any payments constitutes an agreement by the payee that the amounts, if any, found by NRCS to have been overpaid, will be refunded or credited in full to NRCS.

Name and Title of Authorized Government Representative Signature Date

Name and Title of Authorized Recipient Representative

Signature Date

NONDISCRIMINATION STATEMENT

The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination write to

USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW., Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

PRIVACY ACT STATEMENT

The above statements are made in accordance with the Privacy Act of 1974 (5 U.S.C. Section 522a).

Juan Hernandez State Conservationist

Jeffrey S Brower, County Chair ATTEST: George Recktenwald, County Manager Signature Date

Docusign Envelope ID: 7085784A-603B-41E4-A1E6-C0F24D7E40A1

5/11/2025 | 09:46:49 EDT

5/12/2025 | 20:47:00 EDT

Statement of Work

The purpose of this agreement is for the United States Department of Agriculture, Natural Resources Conservation Service, hereinafter referred to as the “NRCS”, to provide technical and financial assistance to the County of Volusia, hereinafter referred to as the “Sponsor”, for EWP Project # 5084 (Hurricane Milton) in Volusia County, Florida for implementation of recovery measures, that, if left undone, pose a risk to life and/or property.

Purpose

The design and installation of EWP measures as detailed in the individual Damage Survey Reports (DSR) and described here:

DSR MIL-VOL-001 (12-07-24-5084-024) - Debris removal in Volusia County, Florida: $134,200 DSR MIL-VOL-002 (12-07-24-5084-025) - Bank stabilization in Volusia County, Florida: $107,250 DSR MIL-VOL-003 (12-07-24-5084-026) - Debris removal and bank stabilization in Volusia County, Florida: $383,900

Total Estimated construction cost: $625,350.00

Objectives

The official budget described in this Budget Narrative will be considered the total budget as last approved by the Federal awarding agency for this award.

Amounts included in this budget narrative are estimates. Reimbursement will be based on actual expenditures, not to exceed the amount obligated.

Total Estimated Project Budget: $687,885.00

The budget includes:

Financial Assistance (FA) Costs:

Construction Costs (100% NRCS $625,350.00 + 0% Sponsor $0.00): $625,350.00

Technical Assistance (TA) Costs:

100% NRCS (10.0% of total construction cost): $62,535.00

1. NRCS pays up to 100 percent of eligible construction costs and Sponsor pays 0 percent of construction costs. NRCS will contribute up to 10.0 percent of the total construction cost for contract administration and construction management costs. It is possible that technical and administrative costs will exceed this amount, requiring the Sponsor to contribute resources to complete technical and administrative work.

2. NRCS funding for this project is provided to the Sponsor in two separate NRCS funding accounts, one for financial assistance (FA) and one for technical assistance (TA). FA costs are associated with construction activities; TA costs are associated with services. These expenditures shall be accounted for separately in order for expenses to be eligible for reimbursement.

3. NRCS will provide FA for actual costs as reimbursement to the Sponsor for approved on-the-ground construction costs, subject to above limits. If costs are reduced, reimbursement will be reduced accordingly. Construction costs are associated with the installation of the project measures including labor, equipment and materials.

4. NRCS will provide TA reimbursement to the Sponsor for technical and administrative costs directly charged to the project, subject to the above limits. If costs are reduced, reimbursement will be reduced accordingly. These costs include

a. engineering costs include, but not limited to, developing a project design that includes construction drawings and specifications, an operation and maintenance plan, a quality assurance/inspection plan and an engineer’s estimate of the project installation costs in addition to providing necessary quality assurance during construction.

b. contract administration costs include, but not limited to, soliciting, evaluating, awarding and administering contracts for construction and engineering services, including project management, verifying invoices and record keeping.

Budget Narrative

5. The Sponsor will contribute funds toward the total construction costs in either direct cash expenditures, the value of non-cash materials or services, or in-kind contributions. The value of any in-kind contribution shall be agreed to in writing prior to implementation.

SPONSOR RESPONSIBILITIES

If inconsistencies arise between the language in the Statement of Work (SOW) in the agreement and the general terms and conditions, the language in the SOW takes precedence.

1. Perform the work and produce the deliverables as outlined in this Statement of Work.

2. Comply with the applicable version of the General Terms and Conditions.

3. Accomplish construction of the EWP project measures by contracting, in-kind construction services, or a combination of both.

4. Ensure and certify by signing this agreement that its cost share obligation is from a non-Federal source.

5. Acquire adequate real property rights (land and water), permits and licenses in accordance with local, state, and Federal laws necessary for the installation of EWP project measures at no cost to NRCS prior to construction. This includes any rights associated with required environmental mitigation. Costs related to land rights and permits are the Sponsor’s responsibility and are ineligible for reimbursement.

6. Accept all financial and other responsibility for excess costs resulting from their failure to obtain, or their delay in obtaining, adequate land and water rights, permits and licenses needed for the Project.

7. Provide the agreed-to portion of the actual, eligible and approved construction cost. These costs may be in the form of cash, in-kind construction services, or a combination of both. Final construction items that are eligible construction costs will be agreed upon during the pre-design conference. These costs consist of costs from contracts awarded to contractors and eligible Sponsor in-kind construction costs for materials, labor, and equipment. The Sponsor shall provide NRCS documentation to support all eligible construction costs. Construction costs incurred prior to the Sponsor and NRCS signing this agreement are ineligible and will not be reimbursed.

8. Be responsible for 100 percent of all ineligible construction costs and 100 percent of any unapproved upgrade to increase the level of protection over and above that described in the DSR.

9. Account for and report FA and TA expenditures separately in order for expenses to be eligible for reimbursement.

NRCS funding for this project is provided to the Sponsor in two separate NRCS funding accounts, one for TA and one for FA, requiring this separation.

10. The contracts for design services and construction described in this Agreement shall not be awarded to the Sponsor or to any firm in which any Sponsor’s official or any member of such official’s immediate family has direct or indirect interest in the pecuniary profits or contracts of such firms. Reference 2 CFR § 200.318 regarding standards of conduct covering conflicts of interest and governing the performance of its employees engaged in the selection, award, and administration of contracts.

11. For in-kind construction services (materials, labor, and/or equipment supplied by the Sponsor), develop a Plan of Operations describing the construction services to be performed including estimated quantities and values. The Plan of Operations shall be concurred in by NRCS prior to construction. In-kind construction services for equipment shall not exceed published FEMA equipment rates unless otherwise documented and concurred in advance by NRCS.

12. The following documentation is required to support the Sponsor's request for reimbursement of in-kind construction services:

a. Invoices covering actual costs of materials used in constructing the eligible EWP project measures.

b. Records documenting the type, quality, and quantities of materials actually used in constructing the eligible EWP project measures.

c. Daily time records for each employee showing name, classification, wage rate, hours, and dates actually employed for constructing the eligible EWP project measures.

d. Equipment operating records showing the type and size of equipment, hourly rate, actual hours of operation and dates

Responsibilities of the Parties:

used to install the eligible EWP project measures. Equipment idle time is not eligible in-kind construction services, even if on the job site, and should not be included in the equipment operating records.

13. Ensure that any special requirements for compliance with environmental and/or cultural resource laws are incorporated into the project.

14. The Sponsor must secure at its own expense all Federal, State, and local permits and licenses necessary for completion of the work described in this agreement as well as any necessary natural resource rights and provide copies of all permits and licenses obtained to NRCS.

15. Will arrange and pay for any necessary location, removal, or relocation of utilities, including temporary utilities. EWP program regulations prohibit NRCS from reimbursing the Sponsor or otherwise paying for any such costs; nor do the costs qualify as a Sponsor cost-share contribution.

16. Ensure that technical and engineering standards and specifications of NRCS are adhered to during construction of the Project, as interpreted by NRCS Program/Technical Contact. Provide NRCS Government Representative progress reports every two weeks after execution of the agreement. Progress reports should include design status, permitting status, technical on-site inspections of work accomplished for the period, work planned, results of material tests, deficient work products and/or tests with corrective actions taken, modifications anticipated, technical problems encountered, contractual issues and other relevant information for each damage survey report. Failure to provide timely progress reports may jeopardize the sponsor’s opportunity for a time extension, if needed.

17. Ensure that all contractors on NRCS assisted projects are performing their work in accordance with OSHA regulations and the Contract Work Hours and Safety Standards Act (40 USC 3701-3708) as supplemented by Department of Labor regulations (29 CFR Part 5). The Sponsor is responsible for periodically checking the contractor’s compliance with safety requirements.

18. Provide PE-certified as-built drawings and quantities for the project. A copy of the as-built drawings will be submitted to the NRCS Government Representative. A PE certification is not required for debris removal only sites.

19. Submit a SF 270, “Request for Advance and Reimbursement,” with all documentation to support the request.

Payments will be withheld until all required documentation is submitted and complete.

20. Ensure that information in the System for Award Management (SAM) is current and accurate until the final financial report (SF-425) under this award or final payment is received, whichever is later.

21. Take reasonable and necessary actions to dispose of all contractual and administrative issues arising out of the contract(s) awarded under this Agreement. This includes, but is not limited to disputes, claims, protests of award, source evaluation, and litigation that may result from the Project. Such actions will be at the expense of the Sponsor, including any legal expenses. The Sponsor will advise, consult with, and obtain prior written concurrence of NRCS on any litigation matters in which NRCS could have a financial interest.

22. Sponsor must indemnify and hold NRCS harmless to the extent permitted by State law for any costs, damages, claims, liabilities, and judgments arising from past, present, and future acts or omissions of the Sponsor in connection with its acquisition and management of the Emergency Watershed Protection Program pursuant to this agreement.

Further, the Sponsor agrees that NRCS will have no responsibility for acts and omissions of the Sponsor, its agents, successors, assigns, employees, contractors, or lessees in connection with the acquisition and management of the Emergency Watershed Protection Program pursuant to this agreement that result in violation of any laws and regulations that are now or that may in the future become applicable.

23. Retain all records dealing with the award and administration of the contract(s) for 3 years from the date of the Sponsor’s submission of the final request for reimbursement or until final audit findings have been resolved, whichever is longer. If any litigation is started before the expiration of the 3-year period, records are to be retained until the litigation is resolved or the end of the 3-year period, whichever is longer. Make such records available to the Comptroller General of the United States or his or her duly authorized representative and accredited representatives of the Department of Agriculture or cognizant audit agency for the purpose of making audit, examination, excerpts, and transcriptions.

24. Submit requests for a time extension to the agreement (if necessary) in writing no less than forty-five (45) days prior to the expiration date of the agreement. The time extension request shall provide a justification for the time extension and be supported by a revised schedule showing the work completed by the requested date. Submit the written and signed request to the NRCS Program/Technical Contact.

25. Submit reports and payment requests to the Government Representative as outlined in the applicable version of the General Terms and Conditions. Reporting frequency is as follows:

Performance reports: annually

SF425 Financial Reports: annually

NRCS RESPONSIBILITIES

1. Assist Sponsor in establishing design parameters; determine eligible construction costs during the pre-design conference.

2. Designate a Government Representative (GR) to serve as liaison with the Sponsor and identify that person’s contact information with this executed agreement.

3. Review, comment and concur in preliminary and final plans, specifications, O&M Plan, Plan of Operations (if applicable) and QAP.

4. Make periodic site visits during the installation of the EWP project measures to review construction progress, document conformance to engineering plans and specifications, and provide any necessary clarification on the Sponsor’s responsibilities.

5. Upon notification of the completion of the EWP project measures, NRCS shall promptly review the performance of the Sponsor to determine if the requirements of this agreement and fund expenditures as agreed have been met.

6. Make payment to the Sponsor covering NRCS’ share of the cost upon receipt and approval of Form SF-270 and supporting documentation. In the event there are questions regarding the SF 270 and supporting documentation, NRCS will contact the Sponsor in a timely manner to resolve concerns.

SPECIAL PROVISIONS

1. The furnishing of financial, administrative, and/or technical assistance above the original funding amount by NRCS is contingent on there being sufficient unobligated and uncommitted funding in the Emergency Watershed Protection Program that is available for obligation in the year in which the assistance will be provided. NRCS may not make commitments in excess of funds authorized by law or made administratively available. Congress may impose obligational limits on program funding that constrains NRCS’s ability to provide such assistance.

2. In the event of default of a construction contract awarded pursuant to this agreement, any additional funds properly allocable as construction costs required to ensure completion of the job are to be provided in the same ratio as construction funds are contributed by the parties under the terms of this agreement. Any excess costs including interest resulting from a judgment collected from the defaulting contractor, or his or her surety, will be prorated between the Sponsor and NRCS in the same ratio as construction funds are contributed under the terms of the agreement.

3. Additional funds, including interest properly allocable as construction costs as determined by NRCS, required as a result of decision of the CO or a court judgment in favor of a claimant will be provided in the same ratio as construction funds are contributed under the terms of this agreement. NRCS will not be obligated to contribute funds under any agreement or commitment made by the Sponsor without prior concurrence of NRCS.

4. The State Conservationist may make adjustments in the estimated cost to NRCS set forth in this agreement for constructing the EWP measures. Such adjustments may increase or decrease the amount of estimated funds that are related to differences between such estimated cost and the amount of the awarded contract or to changes, differing site conditions, quantity variations, or other actions taken under the provisions of the contract. No adjustment will be made to change the cost sharing assistance provided by NRCS as set forth in this agreement, nor reduce funds below the amount required to carry out NRCS' share of the contract.

5. NRCS, at its sole discretion, may refuse to cost share should the Sponsor, in administering the contract, elect to proceed without obtaining concurrence as set out in this agreement.

6. Once the project is completed and all requests for reimbursement submitted, any excess funding remaining in the agreement will be de-obligated from the agreement.

1. Prepare design, construction specifications, and drawings in accordance with standard engineering principles that comply with NRCS programmatic requirements; and/or contract/install the designed construction. Any design services will be by a professional registered engineer, except debris removal only sites. Sponsor will obtain NRCS review and

Expected Accomplishments and Deliverables concurrence on the design, construction plans, and specifications, prior to construction. The Sponsor must ensure description of work is reviewed, concurred, and approved by NRCS. A copy of the final signed and sealed plans and specifications shall be provided to NRCS.

2. Contract for services and construction in accordance with the Code of Federal Regulations (CFR), 2 CFR § 200.317 through 200.327, applicable State regulations, and the Sponsor’s procurement regulations, as appropriate. (See general terms and conditions attached to this agreement for a link to the CFR.) In accordance with 2 CFR § 200.327, contracts must contain the applicable provisions described in Appendix II to Part 200. Davis-Bacon Act would not apply under this Federal program legislation.

3. Provide copies of site maps to appropriate Federal and State agencies for environmental review. Sponsor will notify NRCS of environmental clearance, modification of construction plans, or any unresolved concerns as well as copies of all permits, licenses, and other documents required by Federal, state, and local statutes and ordinances prior to solicitation for installation of the EWP project measures. All modifications to the plans and specifications shall be reviewed and concurred on by NRCS.

4. Prepare and submit for NRCS concurrence an Operation and Maintenance (O&M) Plan, if applicable, prior to construction. The O&M Plan shall describe the activities the Sponsor will do, for a minimum of 10 years, to ensure the project performs as designed. Upon completion of the project measures, the Sponsor shall assume responsibility for O&M. An O&M plan is not required for debris removal only sites.

5. Prior to commencement of work and/or solicitation of bids, submit for NRCS review and concurrence a Quality Assurance Plan (QAP). The QAP shall outline technical and administrative expertise required to ensure the EWP project measures are installed in accordance with the plans and specifications, identify individuals with the expertise, describe items to be inspected, list equipment required for inspection, outline the frequency and timing of inspection (continuous or periodic), outline inspection procedures, and record keeping requirements. A copy of the final QAP shall be provided to NRCS prior to commencement of construction.

6. Provide construction inspection in accordance with the QAP.

7. Arrange for and conduct final inspection of completed project with NRCS to determine whether all work has been performed in accordance with contractual requirements. Provide certification that the Project was installed in accordance with approved plans and specifications. For sites other than debris removal only, the certification must be from a Professional Engineer.

See the Responsibilities of the Parties section for required resources, if applicable.

Resources Required

Milestones shall include, but not limited to, the following items:

1. Hold pre-design conference: within 30 calendar days of agreement execution

2. Provide schedule to GR: within 14 calendar days of pre-design conference

3. Obtain permits

4. Survey and design

5. Complete quality assurance and operation and maintenance plans

6. Solicit bids

7. Award contract

8. Administer construction contract, including providing construction inspection

9. Provide completion certification, to include As-Built Drawings

10. Complete close-out activities

Milestones

GENERAL TERMS AND CONDITIONS

Please reference the below link(s) for the General Terms and Conditions pertaining to this award:

https://www.fpacbc.usda.gov/about/grants-and-agreements/award-terms-and-conditions/index.html

Certificate Of Completion Envelope Id: 7085784A-603B-41E4-A1E6-C0F24D7E40A1 Status: Completed

Subject: Request for Signatures - Agenda Item #12645 County of Volusia, NRCS cooperative agreement

Source Envelope:

Document Pages: 8 Signatures: 2 Envelope Originator:

Certificate Pages: 5 Initials: 0 Lori Koontz

AutoNav: Enabled

EnvelopeId Stamping: Enabled

Time Zone: (UTC-05:00) Eastern Time (US & Canada)

119 W. Indiana Ave.

DeLand, FL 32720

LKoontz@volusia.org

IP Address: 10.101.81.73

Record Tracking Status: Original

5/7/2025 1:32:00 PM

Holder: Lori Koontz

LKoontz@volusia.org

Location: DocuSign

Security Appliance Status: Connected Pool: StateLocal

Storage Appliance Status: Connected Pool: County of Volusia Location: Docusign

Signer Events Signature Timestamp Jeffrey S. Brower jbrower@volusia.org

Volusia County Council Chair

Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device

Using IP Address: 174.211.239.37

Signed using mobile

Sent: 5/8/2025 5:06:52 PM

Viewed: 5/11/2025 9:46:40 AM

Signed: 5/11/2025 9:46:49 AM

Electronic Record and Signature Disclosure:

Accepted: 10/9/2024 11:22:04 AM ID: 0b83e125-0f42-41a8-92bb-7aecb14af064

George Recktenwald grecktenwald@volusia.org

County Manager

County of Volusia

Security Level: Email, Account Authentication (None)

Signature Adoption: Pre-selected Style

Using IP Address: 50.88.33.230

Signed using mobile

Sent: 5/12/2025 2:46:52 PM

Viewed: 5/12/2025 4:05:39 PM

Signed: 5/12/2025 8:47:00 PM

Electronic Record and Signature Disclosure:

Not Offered via Docusign

In Person Signer Events Signature Timestamp

Editor Delivery Events Status Timestamp

Agent Delivery Events Status Timestamp

Intermediary Delivery Events Status Timestamp

Certified Delivery Events Status Timestamp County Manager's Office docusign-clerk@volusia.org

County Clerk

Volusia County County Manager's Office

Security Level: Email, Account Authentication (None)

Using IP Address: 74.191.71.218

Sent: 5/7/2025 1:59:11 PM

Viewed: 5/8/2025 5:06:51 PM

Electronic Record and Signature Disclosure:

Not Offered via Docusign

Certified Delivery Events Status Timestamp Dana Rhymes-Jones drhymes@volusia.org

Sr. Administrative Assistant

County of Volusia

Security Level: Email, Account Authentication (None)

Using IP Address: 74.191.71.218

Sent: 5/11/2025 9:46:51 AM

Viewed: 5/12/2025 2:46:51 PM

Electronic Record and Signature Disclosure:

Not Offered via Docusign

Carbon Copy Events Status Timestamp County Manager's Office docusign-clerk@volusia.org

County Clerk

Volusia County County Manager's Office

Security Level: Email, Account Authentication (None)

Sent: 5/12/2025 8:47:01 PM

Electronic Record and Signature Disclosure:

Not Offered via Docusign

Legal docusign-legal@volusia.org

County Legal

Volusia County County Manager's Office

Security Level: Email, Account Authentication (None)

Sent: 5/12/2025 8:47:02 PM

Electronic Record and Signature Disclosure:

Not Offered via Docusign

EJ Bunzick ebunzick@volusia.org

Administrative Specialist

Volusia County Road & Bridge

Security Level: Email, Account Authentication (None)

Sent: 5/12/2025 8:47:02 PM

Viewed: 5/13/2025 7:38:46 AM

Electronic Record and Signature Disclosure:

Not Offered via Docusign

Witness Events Signature Timestamp

Notary Events Signature Timestamp

Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 5/7/2025 1:59:11 PM

Certified Delivered Security Checked 5/12/2025 4:05:39 PM

Signing Complete Security Checked 5/12/2025 8:47:00 PM

Completed Security Checked 5/12/2025 8:47:02 PM

Payment Events Status Timestamps

Electronic Record and Signature Disclosure

ELECTRONIC RECORD AND SIGNATURE DISCLOSURE

From time to time, County of Volusia (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system.

Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature

Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

Getting paper copies

At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time

(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a

$0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.

Withdrawing your consent

If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.

Consequences of changing your mind

If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.

All notices and disclosures will be sent to you electronically

Electronic Record and Signature Disclosure created on: 9/29/2020 9:12:03 AM Parties agreed to: Jeffrey S. Brower

Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given

us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us.

How to contact County of Volusia:

You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:

To contact us by phone call: 386-736-5922

To contact us by email send messages to: cbarber@volusia.org

To contact us by paper mail, please send correspondence to:

County of Volusia

119 W. Indiana Ave.

c/o Christine Barber

DeLand, FL 32720

To advise County of Volusia of your new email address

To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at cbarber@volusia.org and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address.

If you created a DocuSign account, you may update it with your new email address through your account preferences.

To request paper copies from County of Volusia

To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to cbarber@volusia.org and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any.

To withdraw your consent with County of Volusia

To inform us that you no longer wish to receive future notices and disclosures in electronic format you may:

i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may;

ii. send us an email to cbarber@volusia.org and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..

Required hardware and software

The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide-signing-system-requirements.

Acknowledging your access and consent to receive and sign documents electronically

To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:

You can access and read this Electronic Record and Signature Disclosure; and

You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and

Until or unless you notify County of Volusia as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by County of Volusia during the course of your relationship with County of Volusia.

https://support.docusign.com/guides/signer-guide-signing-system-requirements https://support.docusign.com/guides/signer-guide-signing-system-requirements

2025-05-20T07:27:50-0700
Digitally verifiable PDF exported from www.docusign.com
2025-06-09T08:37:26-0400
JUAN HERNANDEZ

File details come from the government source that posted it. Updated .