This document is a General Notes Supplement from the Volusia County Public Works Department's Road & Bridge Division, detailing the specifications for an Open Channel Debris Removal and Bank Stabilization project related to damages caused by Hurricane Milton. The contract is a lump sum arrangement for comprehensive debris removal and bank stabilization work, with the contractor responsible for estimating all quantities, materials, labor, and equipment needed to complete the project. The contract will be paid on a percentage complete basis, with individual items tracked through the Contractor's Schedule of Values.
The payment terms specify that no separate payments will be made for numerous ancillary activities, including permit applications, utility coordination, field engineering, survey and layout, dewatering, trench excavation, cleanup, testing, and close-out documentation. These costs must be integrated into the overall project pricing. All work must be included in the bid schedule, and any items not specifically listed but required for a complete installation must be furnished and installed by the contractor at no additional cost to Volusia County. The contract emphasizes that all quantities provided are for contractor convenience and are not guaranteed to be complete, placing the responsibility for accurate estimation squarely on the contractor.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Open Channel Debris Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton General Notes - Supplement, Page 1 of 2
Public Works Department Road & Bridge Division Open Channel Debris Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
General Notes – Supplement
I. Measurement and Payment
A. Lump Sum Contract
1. The quantities of work to be done and materials to be furnished, including all labor, equipment and incidentals required to complete the work, are specified in the Contract Documents. Payment to the Contractor of the lump sum price bid for the work will be made and shall fully compensate the Contractor for the construction of the work, completed and ready for continuous operation and use, in the manner contemplated by the Contract Documents.
2. All quantities are given for the convenience of the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for estimating the size, kind, and quantity of materials and equipment included in work to be done under this Contract.
3. Where utility fittings are noted on the Drawings, such notation is for the
Contractor's convenience and does not relieve him from laying and jointing different or additional items where required.
4. All Contracts shall be subject to retainage as defined in the General Conditions and the Agreement.
B. Methods of Payment
Payment will be made for each individual item on a percentage complete basis as estimated by the Contractor and approved by the County. Quantities provided in the Contractor’s Schedule of Values are for the purpose of estimating the completion status for progress payments. Adjustments to costs provided in the accepted Schedule of Values may be made only by Change Order.
Open Channel Debris Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton General Notes - Supplement, Page 2 of 2
C. Methods of Measurement
1. Units of measurement shall be defined in general terms as follows:
a. Linear Feet (LF) f. Each (EA) k. Each Day (ED)
b. Square Feet (SF) g. Sacks (SK)
c. Square Yards (SY) h. Lump Sum (LS)
d. Cubic Feet (CF) i. Ton (TN)
e. Cubic Yards (CY) j. Allowance (AL)
2. Lump Sum Contracts/Items
The Measurement of Work for lump sum contracts and/or items shall be based on the information provided in the Contract Documents and compiled through the Contractor's own field verifications, investigations and testing prior to Bidding.
D. No separate payment will be made for the following work, and its cost shall be included in the appropriate payment item.
1. Applications and pulling of all utility and construction permits.
2. Shop drawings, working drawings and samples.
3. Pre‐construction video and photographs.
4. Survey and construction layout.
5. Permits.
6. Field engineering, including utility coordination, locates and conflict identification.
7. Dewatering, flow diversion and temporary shoring.
8. Trench excavation, sheeting, shoring and bracing.
9. Structural fill, backfill, compaction and grading.
10. Restraining devices for utility pipe fittings and bends.
11. Cleanup.
12. Testing materials and apparatus.
13. Maintenance of utility service.
14. Appurtenant work.
15. CCTV inspection of installed storm pipes.
16. Close‐out documentation, including as‐built surveys, record drawings, etc.
II. Pay Items
All work under this Contract shall be included in the pay items listed on the bid schedule (bid form). Any items for which a specific pay item is not included shall be included in the price of the item to which it pertains or is associated. Any items not shown or omitted that are required for a complete installation shall be furnished and installed by the Contractor at no additional cost to the Owner.