Exhibit_E,_B19_Sweetwater_Creek_Port_Orange,_Construction_Plans,_26-B-01JS.pdf

PDF 42 MB Posted

Attached to
Open Channel Debris and Sediment Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
Solicitation number
26-B-01JS
Issued by
Volusia County, Florida

About this file

The document appears to be Exhibit E related to a construction project for Sweetwater Creek in Port Orange, Florida, specifically associated with a Volusia County Department of Public Works solicitation for open channel debris and sediment removal and bank stabilization resulting from Hurricane Milton damage. The project seeks a single responsive and responsible bidder to complete comprehensive channel restoration work, requiring the selected contractor to provide all necessary labor, materials, equipment, tools, transportation, services, and applicable permitting to execute the full scope of work as specified in the solicitation documents.

The solicitation indicates the project is focused on addressing hurricane-related environmental damage, with the county seeking a contractor capable of performing complete channel rehabilitation services. While specific pricing details are not clearly presented in the provided documentation, the opportunity appears to be competitively bid with an emphasis on selecting a contractor who can comprehensively address the storm-related infrastructure damage. The project is located in Volusia County, Florida, and is directly tied to recovery efforts following Hurricane Milton, suggesting potential federal emergency or disaster recovery funding may be involved in the project's financial framework.

View the file

Other files

File Type Posted
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton_(Addendum_#5_Revision).pdf PDF
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton.pdf PDF
Exhibit_C,_Bid_Documents,_26-B-01JS_(Must_Complete_and_Submit).pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_L._Location_Maps_NRCS_Huricane_Milton,_26-B-01JS_.pdf PDF
Exhibit_D,_Contract,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_F,_C36_Samsula_Canal_Stream_Debris_Removal_Specs_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_G,_C36_Samsula_Canal_New_Smyrna_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_H,_FEDERAL_CONTRACT_PROVISIONS_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_#794072,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Stream_Debris_Removal_Specs_MIL-VOL-002_B-19,_25-B-01JS.pdf PDF
Exhibit_F,_C36_Samsula_Canal_QAP_Debris_Removal_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_QAP_Structural_Work_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_G,_A10_Groover_Branch_Canal_Ormond_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_E,_A10_Groover_Branch_Canal_Ormond_Beach,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_E,_C36_Samsula_Canal_New_Symrna,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_G,_B19_Sweetwater_Creek_Port_Orange,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Stream_Debris_Removal_Specs_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_B,_INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_C,_Bid_Price_Sheet_NRCS_Hurricane_Milton_26-B-01JS_(MUST_COMPLTE_AND_SUBMIT)_.xls XLS spreadsheet
Exhibit_B,_General_Notes_Supplement_NRCS_Hurricane_Milton_,26-B-01JS.pdf PDF
Exhibit_C_PRIME-SUB_FOR_for_Contractors_26-B-01JS_(MUST_COMPLETE_AND_SUBMIT).xls XLS spreadsheet
Exhibit_B,_Project_Specifications_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Exhibit_C,_Insurance_Requirements,_26-B-01JS_(Must_Submit).pdf PDF
Exhibit_B,_Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Volusia_Human_Trafficking_Affidavit_08-07-2024_Solicitation_Document.docx DOCX document
B19_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
C36_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_FDOT_Standard_Spec_MIL-VOL-002.pdf PDF
A10_FDOT_Standard_Spec_MIL-VOL-003.pdf PDF
C36_FDOT_Standard_Spec_MIL-VOL-001.pdf PDF
A10_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_QAP_Structural_Work_MIL-VOL-002_B-19.pdf PDF
1._Scope_of_Work_NRCS_Hurricane_Milton_Projects.pdf PDF
C36_Stream_Debris_Removal__Specs_MIL-VOL-001_C-36.pdf PDF
C36_QAP_Debris_Removal_MIL-VOL-001_C-36.pdf PDF
B19_Stream_Debris_Removal__Specs_MIL-VOL-002_B-19.pdf PDF
5._Construction_Bid_Request_NRCS_projects_Milton.pdf PDF
6._Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton.pdf PDF
B19_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19.pdf PDF
3._Location_Maps_NRCS_Huricane_Milton.pdf PDF
2._Project_Specifications_NRCS_Hurricane_Milton.pdf PDF
A10_Stream_Debris_Removal__Specs_MIL-VOL-003_A-10.pdf PDF
A10_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_794072.pdf PDF
7._General_Notes_Supplement_NRCS_Hurricane_Milton.pdf PDF
INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED.pdf PDF
A10_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10.pdf PDF
Exhibit_C_PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit E 25-B-XXJS

File details come from the government source that posted it. Updated .