Exhibit_C,_Bid_Price_Sheet_NRCS_Hurricane_Milton_26-B-01JS_(MUST_COMPLTE_AND_SUBMIT)_.xls

XLS spreadsheet 52 KB Posted

Attached to
Open Channel Debris and Sediment Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
Solicitation number
26-B-01JS
Issued by
Volusia County, Florida

About this file

This document is a Bid Price Sheet for the Volusia County, Florida Department of Public Works, Road & Bridge Division, soliciting bids for open channel debris removal and bank stabilization related to damages caused by Hurricane Milton. The invitation to bid (ITB No. 26-B-01JS) covers three specific project locations: Open Channel A-10 and Bridge #794072 over Groover Creek, Open Channel B-19 in Port Orange (Sweetwater Creek), and Open Channel C-36 in New Smyrna Beach (Samsula Canal). The bid includes line items for mobilization, maintenance of traffic, debris and sediment removal, riprap ditch lining, filter fabric installation, bedding stone placement, performance turf, and vegetative restoration measures across these sites.

The bid price sheet provides detailed quantities for each location, with estimated quantities for items such as rock rubble (900 tons for A-10, 250 tons for B-19), filter fabric (2,000 square yards for A-10, 556 square yards for B-19), and performance turf (500 square yards for A-10, 139 square yards for B-19). The contractor is responsible for all labor, materials, equipment, tools, transportation, services, and permitting necessary to complete the work. Currently, all unit prices are marked as zero, indicating this is a template for bidders to fill in their proposed pricing. The solicitation seeks a single responsive and responsible bidder to provide a complete solution for addressing hurricane-related damage to these open channel and bank areas.

View the file

Other files

File Type Posted
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton_(Addendum_#5_Revision).pdf PDF
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton.pdf PDF
Exhibit_C,_Bid_Documents,_26-B-01JS_(Must_Complete_and_Submit).pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_L._Location_Maps_NRCS_Huricane_Milton,_26-B-01JS_.pdf PDF
Exhibit_D,_Contract,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_F,_C36_Samsula_Canal_Stream_Debris_Removal_Specs_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_G,_C36_Samsula_Canal_New_Smyrna_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_H,_FEDERAL_CONTRACT_PROVISIONS_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_E,_B19_Sweetwater_Creek_Port_Orange,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_#794072,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Stream_Debris_Removal_Specs_MIL-VOL-002_B-19,_25-B-01JS.pdf PDF
Exhibit_F,_C36_Samsula_Canal_QAP_Debris_Removal_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_QAP_Structural_Work_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_G,_A10_Groover_Branch_Canal_Ormond_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_E,_A10_Groover_Branch_Canal_Ormond_Beach,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_E,_C36_Samsula_Canal_New_Symrna,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_G,_B19_Sweetwater_Creek_Port_Orange,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Stream_Debris_Removal_Specs_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_B,_INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_B,_General_Notes_Supplement_NRCS_Hurricane_Milton_,26-B-01JS.pdf PDF
Exhibit_C_PRIME-SUB_FOR_for_Contractors_26-B-01JS_(MUST_COMPLETE_AND_SUBMIT).xls XLS spreadsheet
Exhibit_B,_Project_Specifications_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Exhibit_C,_Insurance_Requirements,_26-B-01JS_(Must_Submit).pdf PDF
Exhibit_B,_Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Volusia_Human_Trafficking_Affidavit_08-07-2024_Solicitation_Document.docx DOCX document
B19_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
C36_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_FDOT_Standard_Spec_MIL-VOL-002.pdf PDF
A10_FDOT_Standard_Spec_MIL-VOL-003.pdf PDF
C36_FDOT_Standard_Spec_MIL-VOL-001.pdf PDF
A10_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_QAP_Structural_Work_MIL-VOL-002_B-19.pdf PDF
1._Scope_of_Work_NRCS_Hurricane_Milton_Projects.pdf PDF
C36_Stream_Debris_Removal__Specs_MIL-VOL-001_C-36.pdf PDF
C36_QAP_Debris_Removal_MIL-VOL-001_C-36.pdf PDF
B19_Stream_Debris_Removal__Specs_MIL-VOL-002_B-19.pdf PDF
5._Construction_Bid_Request_NRCS_projects_Milton.pdf PDF
6._Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton.pdf PDF
B19_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19.pdf PDF
3._Location_Maps_NRCS_Huricane_Milton.pdf PDF
2._Project_Specifications_NRCS_Hurricane_Milton.pdf PDF
A10_Stream_Debris_Removal__Specs_MIL-VOL-003_A-10.pdf PDF
A10_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_794072.pdf PDF
7._General_Notes_Supplement_NRCS_Hurricane_Milton.pdf PDF
INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED.pdf PDF
A10_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10.pdf PDF
Exhibit_C_PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITB No. 26-B-01JS
Open Channel Debris Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
Bid Price Sheet
LINE ITEMFDOT ITEM NUMBERITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICETOTAL
Open Channel A-10 & Bridge #794072 over Groover Creek Box Culvert: SEDIMENT AND DEBRIS REMOVAL AND BANK STABILIZATION
1101MobilizationLS1$ - 0
2102Maintenance of TrafficLS1$ - 0
3110, 400Debris/Obstruction/Tree Removal, Hauling, & DisposalLS1$ - 0
4530Riprap Ditch Lining - Rock RubbleTN900$ - 0
5514, 985Filter Fabric - Type D-2 GeotextileSY2000$ - 0
6530Bedding Stone #57 - Beneath RiprapTN450$ - 0
7570Performance Turf - Bahia SodSY500$ - 0
8981,982, 983Vegetative Restoration MeasuresSY300$ - 0
9Sediment Removal, Hauling, & DisposalCY300$ - 0
SUBTOTAL for Open Channel A-10 and Bridge #794072$ - 0
Open Channel B-19 in Port Orange (Sweetwater Creek): BANK STABILIZATION
1101MobilizationLS1$ - 0
2102Maintenance of TrafficLS1$ - 0
3110, 400Debris Removal, Hauling, & DisposalLS1$ - 0
4530Riprap Ditch Lining - Rock RubbleTN250$ - 0
5514, 985Filter Fabric - Type D-2 GeotextileSY556$ - 0
6530Bedding Stone #57 - Beneath RiprapTN125$ - 0
7570Performance Turf - Bahia SodSY139$ - 0
8981,982, 983Vegetative Restoration MeasuresSY100$ - 0
SUBTOTAL for Open Channel B-19$ - 0
Open Channel C-36 in New Smyrna Beach (Samsula Canal): DEBRIS REMOVAL
1101MobilizationLS1$ - 0
2102Maintenance of TrafficLS1$ - 0
3110, 400Debris Removal, Hauling, & DisposalLS1$ - 0
4981,982, 983Vegetative Restoration MeasuresSY200$ - 0
SUBTOTAL for Open Channel C-36$ - 0
Total Base Bid for All Project Locations:$ - 0
Performance and Payment Bond:$ - 0
TOTAL LUMP SUM BID$ - 0
Notes: All quantities are given for the convenience of the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for estimating the size, kind, and quantity of materials and equipment included in work to be done under the terms of the Contract.

&C&"Arial,Bold"&14 &L&"Times New Roman,Regular"&11&F&C&"Times New Roman,Regular"&11______ - &P

File details come from the government source that posted it. Updated .