3._Location_Maps_NRCS_Huricane_Milton.pdf
PDF 2 MB Posted
- Solicitation number
- 26-B-01JS
- Issued by
- Volusia County, Florida
About this file
The documents are aerial maps from Volusia County, Florida, depicting three different waterway maintenance and improvement projects: A-10 Open Channel, Grover Creek Canal Box Culvert (Bridge #794072), and Sweetwater Creek and Samsula Canal. These maps outline specific erosion control and debris removal projects in various locations within Volusia County.
Each map highlights specific infrastructure and environmental improvement scopes. The A-10 Open Channel map indicates approximately 900 feet of riprap for erosion control and debris removal. The Grover Creek Canal Box Culvert map shows a plan to remove approximately 300 cubic yards of sediment from Bridge #794072 on N. Tymber Creek Road. The Sweetwater Creek map details approximately 250 feet of riprap for erosion control, while the Samsula Canal (C-36) map identifies approximately 2.75 miles of debris removal along the canal. These projects appear to be part of a comprehensive county-wide waterway maintenance and environmental preservation initiative, focusing on infrastructure integrity, flood prevention, and ecological management.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LKoontz Callout Approx. 900 feet of riprap for erosion control and debris removal
Bridge #794072 on N. Tymber Creek Road over Groover Creek
Volusia County Property Appraiser
Bridges
Road Maintenance
County Maint, Thoroughfare
In City Limits, Local Rd
County Boundary
2024 Aerial
Red: Band_1
Green: Band_2
Blue: Band_3
7/11/2025, 9:16:41 AM
0 0.01 0.030.01 mi
0 0.03 0.060.01 km
1:1,127
Public Works Portal
Volusia GIS | VCPA | Volusia County Property Appraiser |
Robert Falk Callout
GROVER CANAL BOX CULVERT BRIDGE NO. 794072
REMOVE APPROX. 300 CY OF SEDIMENT
Sweetwater Creek bwalter Line bwalter
Approx. 250 feet of riprap for erosion control
Samsula Canal
LKoontz
Approx. 2.75 miles of debris removal
| Location Map_A-10 Open Channel.pdf |
| Location Map_B-19 Sweetwater Creek.pdf |
| Location Map_C-36 Samsula Canal.pdf |
File details come from the government source that posted it. Updated .