Exhibit_F,_C36_Samsula_Canal_QAP_Debris_Removal_MIL-VOL-001_C-36,_26-B-01JS.pdf

PDF 272 KB Posted

Attached to
Open Channel Debris and Sediment Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
Solicitation number
26-B-01JS
Issued by
Volusia County, Florida

About this file

This document is a Quality Assurance Plan (QAP) for the Volusia County, Florida, involving debris removal and site restoration at the MIL-VOL-001 / C-36 Samsula Canal Site. The project scope includes removing debris from waterways and canals and vegetating disturbed areas, with inspections varying from periodic to continuous based on work complexity and potential risk. The County of Volusia will designate an inspector to ensure compliance with project plans and specifications, with Louis Trivett as the primary inspector and Jason Goodnoe as backup.

The quality assurance process requires daily documentation, including a job diary, quantity computations, and digital photo documentation. Upon project completion, the engineer will provide a certification to the NRCS (Natural Resources Conservation Service), including a sealed set of as-built drawings and a list of installed items with quantities. No testing equipment is required, and the documentation must be submitted within 15 work days of project completion. The project will be overseen by Robert Falk, who will conduct periodic reviews and assist with any potential modifications or contractual issues.

View the file

Other files

File Type Posted
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton_(Addendum_#5_Revision).pdf PDF
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton.pdf PDF
Exhibit_C,_Bid_Documents,_26-B-01JS_(Must_Complete_and_Submit).pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_L._Location_Maps_NRCS_Huricane_Milton,_26-B-01JS_.pdf PDF
Exhibit_D,_Contract,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_F,_C36_Samsula_Canal_Stream_Debris_Removal_Specs_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_G,_C36_Samsula_Canal_New_Smyrna_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_H,_FEDERAL_CONTRACT_PROVISIONS_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_E,_B19_Sweetwater_Creek_Port_Orange,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_#794072,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Stream_Debris_Removal_Specs_MIL-VOL-002_B-19,_25-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_QAP_Structural_Work_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_G,_A10_Groover_Branch_Canal_Ormond_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_E,_A10_Groover_Branch_Canal_Ormond_Beach,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_E,_C36_Samsula_Canal_New_Symrna,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_G,_B19_Sweetwater_Creek_Port_Orange,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Stream_Debris_Removal_Specs_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_B,_INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_C,_Bid_Price_Sheet_NRCS_Hurricane_Milton_26-B-01JS_(MUST_COMPLTE_AND_SUBMIT)_.xls XLS spreadsheet
Exhibit_B,_General_Notes_Supplement_NRCS_Hurricane_Milton_,26-B-01JS.pdf PDF
Exhibit_C_PRIME-SUB_FOR_for_Contractors_26-B-01JS_(MUST_COMPLETE_AND_SUBMIT).xls XLS spreadsheet
Exhibit_B,_Project_Specifications_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Exhibit_C,_Insurance_Requirements,_26-B-01JS_(Must_Submit).pdf PDF
Exhibit_B,_Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Volusia_Human_Trafficking_Affidavit_08-07-2024_Solicitation_Document.docx DOCX document
B19_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
C36_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_FDOT_Standard_Spec_MIL-VOL-002.pdf PDF
A10_FDOT_Standard_Spec_MIL-VOL-003.pdf PDF
C36_FDOT_Standard_Spec_MIL-VOL-001.pdf PDF
A10_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_QAP_Structural_Work_MIL-VOL-002_B-19.pdf PDF
1._Scope_of_Work_NRCS_Hurricane_Milton_Projects.pdf PDF
C36_Stream_Debris_Removal__Specs_MIL-VOL-001_C-36.pdf PDF
C36_QAP_Debris_Removal_MIL-VOL-001_C-36.pdf PDF
B19_Stream_Debris_Removal__Specs_MIL-VOL-002_B-19.pdf PDF
5._Construction_Bid_Request_NRCS_projects_Milton.pdf PDF
6._Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton.pdf PDF
B19_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19.pdf PDF
3._Location_Maps_NRCS_Huricane_Milton.pdf PDF
2._Project_Specifications_NRCS_Hurricane_Milton.pdf PDF
A10_Stream_Debris_Removal__Specs_MIL-VOL-003_A-10.pdf PDF
A10_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_794072.pdf PDF
7._General_Notes_Supplement_NRCS_Hurricane_Milton.pdf PDF
INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED.pdf PDF
A10_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10.pdf PDF
Exhibit_C_PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE PLAN

FOR

MIL-VOL-001 / C-36 SAMSULA CANAL SITE

VOLUSIA, FLORIDA

The Quality Assurance Plan (QAP) outlines the responsibilities of the County of Volusia to ensure that the debris is removed in accordance with the plans and specifications. The County of Volusia will designate a person to fullfill the inspection responsibilities.

I. ITEMS OF WORK TO BE INSPECTED

The work to be accomplished under this contract consists of removing debris from waterways and canals and vegetating disturbed areas..

The intensity of the inspection of these items will vary from periodic to continuous. The intensity of the inspection will depend on the complexity of the work item and what the damaging results would be should that portion of the installation fail.

The timing and intensity of the required inspection is shown in Table 1. Support personnel should be provided as needed to assist the assigned inspector.

Other type work items may be encountered during construction. The intensity of the inspection will be determined by the Inspector or Engineer.

A. Debris Removal

Periodic inspection will be required on debris removal. The inspector will check the site to verify that the debris has been removed to the extent as shown on the plans and described in the specifications. Inspections shall verify that the debris was disposed of in accordance with the plans and specifications.

B. Vegetative Measures

Periodic inspection will be required on all areas to be vegetated. The inspector will need to stake all areas to be vegetated and the type of vegetative requirement at each area. Performance sod will be installed at areas called out by the plans Inspection will require that the sod be checked as to the quality and specified type. All other disturbed areas shall be vegetated in accordance with the plans and specifications. The quantity and type of seed, fertilizer and lime will be verified by the inspector. Vegetated areas will be measured and the inspector will need to compute quantities.

Table 1

Item Inspector Volusia County Engineer

Debris Removal P P/F

Vegetative Measures C F Legend: C - Continuous

P - Periodic F – Final

II. SKILLS NEEDED TO PERFORM THE REQUIRED INSPECTIONS

Inspector

A. Ability to manage an inspection program effectively.

B. Must understand the scope and limits of the job and an understanding of the requirements of plans and specifications.

C. Must be familiar with quality assurance and inspection needed for debris removal and vegetative measures.

D. Ability to establish and maintain effective working relationships and clear communications with the contractor and others involved or affected by the project.

E. Thorough understanding of all contract provisions.

F. Ability to recognize potential safety hazards and take the necessary actions to avoid them to the extent possible.

G. Ability to anticipate potential conflicts of work activities with existing utilities and fixed improvements and to take the necessary actions to resolve them in the most efficient manner.

Engineer

A. Must understand the scope and limits of the job and an understanding of the requirements of plans and specifications.

B. Must be familiar with quality assurance and inspection needed for debris removal and vegetative measures.

C. Ability to establish and maintain effective working relationships and clear communications with the contractor and others involved or affected by the project.

D. Thorough understanding of all contract provisions.

E. Ability to administer contract to include preparation of contract modifications and pay estimates on a timely basis.

III. STAFF NEEDED TO PERFORM REQUIRED INSPECTIONS

One inspector will be needed to inspect the construction progress at critical points during construction as shown in Table 1. The Inspector will ensure overall compliance with plans and specifications and recommend needed modifications

The Inspector will be needed for the duration of the contract. In addition, one additional person will be identified and on call to fill in if the Inspector is absent from work.

One engineer will periodically check on construction and review and approve modifications.

IV. TESTING EQUIPMENT AND FACILITIES NEEDED

No testing equipment or facilities will be needed by the Inspector.

V. NAMES OF QUALIFIED PERSONNEL

Louis Trivett will be responsible for providing inspection of the works of improvement.

Jason Goodnoe will serve as the backup inspector if Louis Trivett is not available.

Robert Falk will serve as the County of Volusia’s engineer to perform periodic reviews by visiting the work site and/or by verbal communications with the Inspector, to assist on problems that may develop requiring modifications, or contractual problems with the contractor.

VI. DOCUMENTATION AND REPORTS TO BE PREPARED

A daily job diary shall be kept by the Inspector and entries shall be completed daily for the duration of the contract.

Quantity computations for all materials shall be recorded including measurements. The computations shall be checked and initialed by a second person.

Digital photos shall be taken throughout the term of the contract to document the work.

The photos retained shall be printed and logged clearly identifying the job and what the photo is about. The log and photos shall be submitted along with the as-built drawings.

At the completion of the job, the Engineer shall furnish to NRCS a certification that the works of improvement meets all specifications. The Engineer shall also furnish a sealed set of AS BUILTS and a list of the items installed along with the quantity of each to NRCS. The AS-BUILT drawings shall be kept up to date during construction and the final AS-BUILT drawings shall be checked by the Engineer.

The above listed documentation shall be completed and mailed to the NRCS within 15 work days of the completion of the work.