This document is an Architectural Addendum (ASI #001) dated 7/29/2025 for the VA Portland Health Care System's Surgical Service Space Construction project. The addendum details multiple revisions across various architectural and electrical plans, including changes to the 4th Floor Demolition Plan, Renovation Roof Plan, Finish Schedules, Framing Details, Roof Details, Firestop Details, Electrical Panel Schedules, and Electrical Power Plan. Specific modifications include removing keynotes, revising roof assembly schedules to align with structural requirements, updating electrical panel schedules, and adding a new specification section for Commissioning of Electrical Systems. The project is located at 3710 SW US Veterans Hospital Rd. in Portland, OR, and is part of a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a construction magnitude between $10-20 million.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA|Architects, Inc.
Planning - Architecture - Interiors
385 Van Ness Ave., Suite 110, Torrance, CA 90501 | 316 Osuna Rd. NE, Suite 402, Albuquerque, NM 87107 www.ma-architects.net
MAA23045_48-349 (VAPHCS - Construct Space for Surgical Service) pg. 1
ARCHITECTURAL ADDENDUM
ASI #: 001 Date: 7/29/2025
Addendum 001:
PLANS
AD-141 - 4th FLOOR DEMOLITION PLAN
- Removed keynote 188.
AE-241 - RENOVATION ROOF PLAN
- Revised Roof assembly schedule to align with structural.
AE-241A - RENOVATION ROOF PLAN (DEDUCT ALTERNATE)
- Revised Roof assembly schedule to align with structural.
AE-800 - FINISH SCHEDULES
- Removed dashed line from back wall from gridline 14 to 11.
AE-900 - TYPICAL FRAMING DETAILS
- Revised detail 7.
AE-907 - ROOF DETAILS
- Revised details 1-3 to align with structural.
- Revised details 9 & 11 for clarification.
AE-1012 - FIRESTOP DETAILS
- Added UL P907.
E-000 GENERAL NOTES AND ABBREVIATIONS
- VFD 1-6 have been added to the mechanical schedule
Project # 648-349
Project:
VA Portland Health Care System Construct Space for Surgical Service 3710 SW US Veterans Hospital Rd.
Portland, OR 9739
To: John Carrier
Planning - Architecture - Interiors
385 Van Ness Ave., Suite 110, Torrance, CA 90501 | 316 Osuna Rd. NE, Suite 402, Albuquerque, NM 87107 www.ma-architects.net
MAA23045_48-349 (VAPHCS - Construct Space for Surgical Service) pg. 2
E-004 ELECTRICAL PANEL SCHEDULES
- The panel schedule for panel 3DEH1-E-17 has been updated.
EP-200 ELECTRICAL POWER PLAN - THIRD FLOOR
- Power for VFD1-6 has been provided. VFD 3-6 will be supplied with power from the existing panel
3DEH1-E-17 with new conduit and conductors. The new VFD 1 and 2 will utilize the existing circuits from the demolished VFD 1 and 2. The conductors and conduit will be extended as needed to reach the new location
Specifications
00 01 10 - Table of Contents
- Revised table of contents to include section 26 08 00.
26 08 00 Commissioning of Electrical Systems
- New included section.
Issued by the Architect:
Steven A. McCaslin | Architect
Date: 7.29.2025