Attachment 6 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 5.pdf

PDF 16 MB Posted

Attached to
Y1DA--648-349 Construct Space for the Surgical Service Minor Construction - Portland, OR VAMC
Solicitation number
IFB-36C77625B0017
Issued by

About this file

These architectural construction documents are detailed plans for renovating the Surgical Service space at the Portland VA Health Care Center. The drawings, prepared by MAI Architects, Inc., are issued for construction and include comprehensive floor plans for the 2nd, 3rd, and 4th floors, as well as renovation and roof plans. The documents are fully sprinklered and dated 02/28/2025 with an expiration of 12.31.2025.

The plans show a complex medical space renovation with multiple surgical areas, including detailed floor plans with numerous rooms such as operating rooms, support spaces, staff areas, and circulation zones. The drawings include key technical details like partition legends, demolition plans, department plans, and typical casework and toilet room elevation details. The project is part of a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a construction magnitude between $10-20 million, located at the Portland VA Medical Center in Oregon.

View the file

Other files

File Type Posted
Amendment 6 - 36C77625B0017 0006 8-12-2025.pdf PDF
20250811 - RFI TRACKING SHEET - SOLICITATION 36C77625B0017 - Project 648-349.pdf PDF
Amendment 5 - 36C77625B0017 0005 8-11-2025.pdf PDF
Wage rates Multnomah 8-8-2025.pdf PDF
20250807_RFI TRACKING SHEET - SOLICITATION 36C77625B0017 - Project 648-349.pdf PDF
Online Bid Opening Meeting Info.docx DOCX document
Amendment 4 - 36C77625B0017 0004 8-7-2025.pdf PDF
00 01 10 - Table of Contents.pdf PDF
Amendment 3 - 36C77625B0017 0003 7-30-25.pdf PDF
20250729_PVAMC Surgical Suite Expansion_Add001.pdf PDF
Wage rates Multnomah 7-25-2025.pdf PDF
As-Built Plan Roof Details.pdf PDF
RFI TRACKING SHEET - SOLICITATION 36C77625B0017 - Project 648-349.pdf PDF
100-SF-33 fan data.pdf PDF
Addendum 001 - MA Architects.pdf PDF
AHU 33 Terminal unit report.pdf PDF
26 08 00 Commissioning of Electrical Systems.pdf PDF
Wage rates Multnomah 7-11-2025.pdf PDF
Amendment 2 - 36C77625B0017 0002 7-21-25.pdf PDF
Amendment 1 - 36C77625B0017 0001 7-10-25.pdf PDF
Wage rates Multnomah 7-4-2025.pdf PDF
Contractor sign in.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 4 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 3.pdf PDF
Attachment 1 - 648-349 VAPHCS Specs 100Pct BID Set REV 3.pdf PDF
Attachment 7 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 6.pdf PDF
Attachment 10 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 9.pdf PDF
Attachment 2 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 1.pdf PDF
Attachment 14 - Infection Control Risk Assessement - ICRA 648-349.pdf PDF
Attachment 11 - Brand Name Justification - Portland_Redacted.pdf PDF
Attachment 8 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 7.pdf PDF
Attachment 17 - RFI TRACKING SHEET - SOLICITATION 36C77625B0017 - Project 648-349.xlsx XLSX spreadsheet
Attachment 12 - Wage rates Multnomah 5-30-2025.pdf PDF
Attachment 5 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 4.pdf PDF
IFB 36C77625B0017.pdf PDF
Attachment 13 - PreConstruction Risk Assessment - PCRA 648-349.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 15 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 9 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 8.pdf PDF
Attachment 3 - 648-349 VAPHCS - Space for Surgical Service Plans BID Set Part 2.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2.28.2025

Issue for Bid 02/28/2025

Exp. 12.31.2025

Issue for Construction

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

02/28/2025

File details come from the government source that posted it. Updated .