00 01 10 - Table of Contents.pdf
PDF 34 KB Posted
- Attached to
- Y1DA--648-349 Construct Space for the Surgical Service Minor Construction - Portland, OR VAMC
- Solicitation number
- IFB-36C77625B0017
About this file
This document is a Table of Contents for a 100% Construction Documents set for the VA Portland Healthcare System's Project No. 648-349 to Construct Space for Surgical Service. The comprehensive document spans four pages and details specifications across 28 divisions, including Special Sections, General Requirements, Existing Conditions, Concrete, Metals, Wood, Thermal and Moisture Protection, Openings, Finishes, Specialties, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, Communications, and Electronic Safety and Security.
The project is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside with a construction magnitude between $10-20 million, located at the Portland VA Health Care Center. All specifications are dated 07-25, indicating a recent update, and cover detailed requirements for comprehensive construction services including structural elements, mechanical systems, electrical installations, communication infrastructure, and safety components. The project involves providing all necessary tools, equipment, materials, labor, and supervision to complete the surgical service space construction in accordance with the attached specifications and drawings.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
VA PORTLAND HEALTHCARE SYSTEM
PROJECT No: 648-349
CONSTRUCT SPACE FOR SURGICAL SERVICE
100% CONSTRUCTION DOCUMENTS
00 01 10 - 1
TABLE OF CONTENTS 100% CD
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 07-25
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 07-25
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 07-25
01 35 16.17 Network Analysis Schedules – Major Design/ Build
Projects
07-25
01 33 23 Shop Drawings, Product Data, and Samples 07-25
01 35 26 Safety Requirements 07-25
01 42 19 Reference Standards 07-25
01 45 00 Quality Control 07-25
01 45 29 Testing Laboratory Services 07-25
01 45 35 Special Inspections 07-25
01 57 19 Temporary Environmental Controls 07-25
01 58 16 Temporary Interior Signage 07-25
01 74 19 Construction Waste Management 07-25
01 91 00 General Commissioning Requirements 07-25
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 07-25
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 07-25
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 07-25
05 31 00 Steel Decking 07-25
05 36 00 Composite Metal Decking 07-25
05 40 00 Cold-Formed Metal Framing 07-25
05 50 00 Metal Fabrications 07-25
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 07-25
PROJECT No: 648-349
00 01 10 - 2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 52 Modified Bituminous Sheet Waterproofing 07-25
07 21 13 Thermal Insulation 07-25
07 22 00 Roof and Deck Insulation 07-25
07 42 13 Formed Metal Wall Panels 07-25
07 54 19 Polyvinyl Chloride Roofing 07-25
07 60 00 Flashing and Sheet Metal 07-25
07 72 00 Roof Accessories 07-25
07 81 00 Applied Fireproofing 07-25
07 84 00 Firestopping 07-25
07 92 00 Joint Sealants 07-25
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 07-25
08 32 13 ICU Sliding Glass Doors 07-25
08 51 13 Aluminum Windows 07-25
08 71 00 Door Hardware 07-25
08 71 13 Automatic Door Operators 07-25
08 80 00 Glazing 07-25
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 07-25
09 22 16 Non-Structural Metal Framing 07-25
09 29 00 Gypsum Board 07-25
09 30 13 Ceramic/Porcelain Tiling 07-25
09 51 00 Acoustical Ceilings 07-25
09 65 13 Resilient Base and Accessories 07-25
09 65 16 Resilient Sheet Flooring 07-25
09 65 19 Resilient Tile Flooring 07-25
09 91 00 Painting 07-25
DIVISION 10 – SPECIALTIES
10 14 00 Signage 07-25
10 21 23 Cubicle Curtain Tracks 07-25
10 25 13 Patient Bed Service Walls 07-25
10 28 00 Toilet, Bath, and Laundry Accessories 07-25
10 44 13 Fire Extinguisher Cabinets 07-25
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System
(VA provided, VA installed)
07-25
PROJECT No: 648-349
00 01 10 - 3
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades (VA provided, VA installed) 07-25
12 32 00 Manufactured Wood Casework 07-25
12 36 00 Countertops 07-25
DIVISION 13- SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
07-25
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 07-25
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-25
22 05 19 Meters and Gages for Plumbing Piping 07-25
22 05 23 General-Duty Valves for Plumbing Piping 07-25
22 07 11 Plumbing Insulation 07-25
22 08 00 Commissioning of Plumbing Systems 07-25
22 11 00 Facility Water Distribution 07-25
22 13 00 Facility Sanitary and Vent Piping 07-25
22 14 00 Facility Storm Drainage 07-25
22 40 00 Plumbing Fixtures 07-25
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 07-25
22 63 00 Gas Systems for Laboratory and Healthcare Facilities 07-25
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 07-25
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
07-25
23 05 93 Testing, Adjusting, and Balancing for HVAC 07-25
07-25
23 08 00 Commissioning of HVAC Systems 07-25
23 09 23 Direct-Digital Control System for HVAC 07-25
23 21 13 Hydronic Piping 07-25
23 31 00 HVAC Ducts and Casings 07-25
23 34 00 HVAC Fans 07-25
23 36 00 Air Terminal Units 07-25
23 37 00 Air Outlets and Inlets 07-25
PROJECT No: 648-349
00 01 10 - 4
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 07-25 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-25 26 05 26 Grounding and Bonding for Electrical Systems 07-25 26 05 33 Raceway and Boxes for Electrical Systems 07-25 26 05 73 Overcurrent Protective Device Coordination Study 07-25
26 24 16 Panelboards 07-25
26 25 11 Busways 07-25
26 27 26 Wiring Devices 07-25
26 08 00 Commissioning of Electrical Systems 07-25
26 29 21 Enclosed Switches and Circuit Breakers 07-25
26 43 13 Surge Protective Devices 07-25
26 51 00 Interior Lighting 07-25
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 07-25
27 05 26 Grounding and Bonding for Communications Systems 07-25
27 05 33 Raceways and Boxes for Communications Systems 07-25
27 08 00 Commissioning of Communications Systems 07-25
27 10 00 Control, Communication and Signal Wiring 07-25
27 51 16 Public Address and Mass Notification Systems 07-25
27 52 23 Nurse Call and Code Blue Systems 07-25
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 07-25
28 05 13 Conductors and Cables for Electronic Safety and
Security
07-25
28 05 26 Grounding and Bonding for Electronic Safety and
Security
07-25
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
07-25
28 08 00 Commissioning of Electronic Safety and Security Systems 07-25
28 31 00 Fire Detection and Alarm 07-25
File details come from the government source that posted it. Updated .