IFALLS LPOE_75_ CD DRAWINGS 6 Mechanical.pdf
PDF 39 MB Posted
- Solicitation number
- 47PF0024R0076
About this file
This file is a comprehensive mechanical drawing set for the International Falls Land Port of Entry project, detailing the HVAC, piping, and mechanical systems for multiple building sections. The drawings cover three primary building areas: the Main Building, Non-Commercial Secondary Building, and Secondary Commercial/NII Building, with detailed mechanical plans for Level One and Level Two, including underfloor air systems, air handling units, fan coil units, variable air volume boxes, and hydronic piping distribution.
Key technical specifications include multiple air handling units (AHU-M1E, AHU-M1W, AHU-M2, DOAS-M1) with capacities ranging from 2,600 to 15,000 CFM, energy recovery systems, chilled and heating water distribution networks, and specialized ventilation for areas like ag labs, firing ranges, and high-security zones. The mechanical systems are designed for complex environmental controls, featuring geothermal heat exchange, radiant floor heating, snow melt systems, and precise air pressure management for secure and specialized spaces. The drawings are part of the 75% Construction Documents stage for a project funded under the Infrastructure Investment and Jobs Act, with mechanical systems engineered to support U.S. Customs and Border Protection, USDA, and FDA operational requirements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
H
CO₂
CO
SP
S
P
P
D
O
NO₂
CH4
H2
DP
SD
PD
TH
M
SA
OA
MUA
COMB
EA
REF
FLUE
RA
(E) 20x8
HWR 6" HWR
HWS 6" HWS
CHWR 6" CHWR
CHWS 6" CHWS
CD 6" CD
PC 6" PC
CWR 6" CWR
CWS 6" CWS
FOF 6" FOF
FOT 6" FOT
FOV 6" FOV
RC 6" RC
RL 6" RL
RS 6" RS
6"
(E) 6"
SUPPLY AIR
20x8
20Ø
OUTSIDE AIR
MAKE UP AIR
COMBUSTION AIR
EXHAUST AIR
RELIEF AIR
FLUE
RETURN AIR
LINED DUCTWORK
EXISTING DUCT / TAG
RECTANGULAR DUCT SIZE
ROUND DUCT SIZE
CONCENTRIC TRANSITION
RECTANGULAR TO ROUND TRANSITION
ELBOW UP - SA, OA, MAU, COMB
RECTANGULAR ELBOW WITH
TURNING VANES
ECCENTRIC TRANSITION
ELBOW DN - SA, OA, MAU, COMB
ELBOW UP - RA
ELBOW DN - RA
ELBOW UP - EA, GRS, FLUE, RLF
ELBOW DN - EA, GRS, FLUE, RLF
RECTANGULAR ELBOW WITH
OUT TURNING VANES
RECTANGULAR OR ROUND
1.0 RADIUS ELBOW
RECTANGULAR OR ROUND
1.5 RADIUS ELBOW
SPIN-IN CONICAL TAP W/
VOLUME DAMPER
BEVELED BRANCH TAKEOFF
SPIN-IN CONICAL TAP
DUCT BREAK / CONTINUATION
ROUND FLEXIBLE DUCT - SINGLE LINE
VOLUME DAMPER
REMOTE VOLUME DAMPER
BACKDRAFT DAMPER
FIRE DAMPER
FIRE/SMOKE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
HEATING WATER RETURN
HEATING WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
FUEL OIL TRANSFER
FUEL OIL VENT
FUEL OIL FILL
CONDENSATE DRAIN
PUMPED CONDENSATE
REFRIGERANT CIRCUIT (SUCTION AND DISCHARGE)
REFRIGERANT LIQUID
REFRIGERANT SUCTION
PIPE TAG
EXISTING PIPE TAG
DEMOLISHED PIPE
FOR 6" FOR
FOS 6" FOS
FUEL OIL RETURN
FUEL OIL SUPPLY
MW 6" MW MAKE-UP WATER
PIPE ELBOW UP
PIPE ELBOW DN
PIPE TEE UP / TOP CONNECTION
PIPE TEE DN / BOTTOM CONNECTION
CAPPED PIPE
PIPE BREAK / CONTINUATION
► FLOW ARROW
SHUTOFF VALVE
BALANCE VALVE
2 WAY, MODULATING VALVE
2 WAY, 2 POSITION VALVE
CHECK VALVE
AUTOMATIC FLOW CONTROL
FLOW MEASURING DEVICE
PRESSURE REDUCING VALVE
3 WAY, 2 POSITION VALVE
3 WAY MODULATING VALVE
RISE OFFSET, IN DIRECTION OF AIR FLOW
DROP OFFSET, IN DIRECTION OF AIR FLOW
RISE
DROP
CONCENTRIC REDUCER
KEYNOTE
CONNECT TO EXISTING
POINT OF DISCONNECTION
REVISION TRIANGLE
DATUM
RETURN, RELIEF, OR EXHAUST AIRFLOW
DIRECTION ARROW
SUPPLY OR OUTSIDE AIRFLOW
DIRECTION ARROW
DIAMETER
ENLARGED PLAN AREA
RADIANT FLOOR / SLAB HEAT HEAT AREA
EXISTING BUILDING ARE NOT IN SCOPE
POTENTIAL MULTI TRADE RACK
CEILING SUPPLY GRILLE
CEILING RETURN GRILLE
CEILING EXHAUST GRILLE
LINEAR SLOT DIFFUSER
SIDEWALL SUPPLY GRILLE
SIDEWALL RETURN / EXHAUST GRILLE
QUANTITY (IF MORE THAN ONE)
TYPE
NECK OR CONNECTION SIZE
AIR VOLUME (EACH)
TYPE (VAV, EAV, RAV)
UNIT NUMBER
AHU / EF NUMBER
FLOOR
MECHANICAL EQUIPMENT
IDENTIFICATION
EQUIPMENT TYPE
UNIT NUMBER
FLOOR
FIN TUBE TAG
FIN TUBE ACTIVE LENGTH
FIN TUBE CAPACITY
FIN TUBE IDENTIFICATION
CFM AIRFLOW BALANCE TAG
THERMOSTAT OR TEMP SENSOR
HUMIDISTAT / HUMIDITY SENSOR
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
STATIC PRESSURE SENSOR
SWITCH
PRESSURE SENSOR
PRESSURE CONTROLLER & MONITOR
DISPLAY MONITOR
OCCUPANCY SENSOR
NITROGEN DIOXIDE SENSOR
METHANE SENSOR
HYDROGEN SENSOR
DEWPOINT SENSOR
SMOKE DETECTOR
SWITCH
PRESSURE DIFFERENTIAL SENSOR
PIPE GUIDE
PIPE ANCHOR
MECHANICAL GENERAL SHEET
ANNOTATIONS
GENERAL MECHANICAL SYMBOLSMECHANICAL PIPING SYMBOLSDUCTWORK SYMBOLS
SECTION SYMBOL
CALLOUT SYMBOL
3D VIEW ISOMETRIC
SYMBOL
SHT
SHT
VIEW NUMBER
SHEET LOCATION
VIEW NUMBER
SHEET LOCATION
VIEW NUMBER
SHEET LOCATION
SD-1:8Ø
0 CFM
(3)
X
X-XXX
X-XXX
M
B
F
FS
S
M
ABBREVIATIONS
DIFFUSER, REGISTER AND
GRILLE IDENTIFICATION
AIR TERMINAL UNIT
IDENTIFICATION
2.1 MBH
FTR: 3'-0"
S#
COMBINATION TEMP/HUMIDITY
6" GWS
6" GWR GEOTHERMAL WATER RETURN
GEOTHERMAL WATER SUPPLY
LINEAR TERMINAL UNIT TAG
AIR VALVE MAXIMUM AIRFLOW
HEATING CAPACITY
LINEAR TERMINAL UNIT
IDENTIFICATION
LTU M1.38: 100 CFM
1 MBH
LFC M1.38
1 MBH
LINEAR FAN COIL UNIT TAG
HEATING CAPACITY
LINEAR FAN COIL UNIT
IDENTIFICATION
UNION
REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
RELIEF OR SAFETY VALVE
FLEXIBLE CONNECTION
AIR VENT
SENSOR WELL
TEST PLUG
THERMOMETER
BUTTERFLY VALVE
STRAINER
STRAINER WITH BLOWDOWN VALVE
THERMAL DESIGN CONTROLS
OUTDOOR DESIGN CONDITIONS
WINTER OUTDOOR: -26.2° F
SUMMER OUTDOOR: 85.1°F DB / 69.8°F WB
INDOOR DESIGN CONDITIONS
GENERAL:
SUMMER: 75° F, 50% RH
WINTER: 72° F
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, SPECIFICATIONS, AND AS REQUIRED BY APPLICABLE CODES AND
STANDARDS.
INSTALL ALL MECHANICAL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURERS' RECOMMENDATIONS, CONTRACT
DOCUMENTS, AND APPLICABLE CODES AND STANDARDS.
CONTRACT DRAWINGS ARE DIAGRAMMATIC ONLY, AND ARE INTENDED TO PROVIDE SCOPE AND GENERAL ARRANGEMENT ONLY.
THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE EXACT ROUTING OF ALL SERVICES WITH ALL OTHER TRADES.
COORDINATE WITH CEILING CONTRACTOR FOR EXACT LOCATION OF ALL SUPPLY DIFFUSERS & RETURN GRILLES LOCATED IN CEILINGS. COORDINATE ROUTING AND ELEVATION OF ALL DUCTWORK WTIH LIGHTING & CEILING ELEVATIONS. PROVIDE ALL NECESSARY OFFSETS IN DUCTWORK TO MAINTAIN CEILING ELEVATIONS. SEE ARCHITECTURAL REFLECTIVE CEILING PLAN.
ACCESS PANELS ARE INDICATED ON ARCHITECTURAL DRAWINGS AND SPECIFICATIONS. ANY EQUIPMENT, VALVES, FIELD DEVICES, ETC. NEEDING AN ACCESS PANEL NOT INDICATED ON THE DRAWINGS SHALL ALSO BE PROVIDED, AND SUBMITTED TO THE ARCHITECT/ GENERAL CONTRACTOR FOR APPROVAL OF PANEL SIZE, DETAIL, AND PANEL LOCATION PRIOR TO, INSTALLATION OF ITEM REQUIRING ACCESS.
IN ALL AREAS WITH EXPOSED CEILINGS, SPECIAL CARE MUST BE TAKEN IN THE INSTALLATION OF PIPING AND ANY OTHER MECHANICAL / PLUMBING EQUIPMENT. LAYOUTS MUST BE ARRANGED TO COMPLIMENT THE AESTHETICS OF THE SPACE. REFER ALSO TO ARCHITECTURAL DRAWINGS, SPECIFICATIONS, AND COORDINATION REQUIREMENTS FOR FURTHER INFORMATION FOR
AESTHETIC INTENTS.
REFER TO ARCH FINISH SCHEDULE AND DIV. 09 SPECIFICATION FOR PAINTING REQUIREMENTS OF EXPOSED MECHANICAL
SYSTEMS, INCLUDING DUCTWORK, PIPING, EQUIPMENT, ETC.
CONTRACTOR SHALL NOT NOTCH, CUT, OR BORE ANY STRUCTURAL MEMBERS NOT SPECIFICALLY DETAILED ON THE APPROVED DRAWINGS WITHOUT PRIOR WRITTEN APPROVAL FROM THE ARCHITECT AND STRUCTURAL ENGINEER.
CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL REQUIRED CLEARANCES FOR ACCESS TO VAV BOX CONTROL PANELS & ACCESS DOORS, BALANCING DAMPERS, DAMPER & CONTROL VALVE ACTUATORS, AND ANY OTHER ITEM THAT REQUIRES
SERVICE ACCESS.
MAINTAIN A MINIMUM 6'-8" CLEARANCE TO THE UNDERSIDE OF ALL INSTALLED DUCTWORK, PIPING, CONDUITS, AND EQUIPMENT
IN ACCESS ROUTES IN MECHANICAL ROOMS UNLESS NOTED OTHERWISE ON DRAWINGS.
WHERE TWO OR MORE ITEMS OF THE SAME EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BE
USED.
REFER ALSO TO MECHANICAL / ELECTRICAL COORDINATION SCHEDULE FOR EQUIPMENT ELECTRICAL REQUIREMENTS.
ALL DUCT AND PIPE PENETRATIONS IN RATED WALLS SHALL BE SEALED AND/OR FIRESTOPPED AS REQUIRED.
REFER TO TYPICAL DETAILS FOR ALL DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
THERMOSTATS AND OTHER CONTROL DEVICES SHOWN ON MECHANICAL PLANS ARE GENERAL LOCATIONS ONLY. COORDINATE EXACT LOCATIONS WITH ARCHITECTURAL ELEVATIONS. INSTALL PER ADA REQUIREMENTS FOR ALL DEVICES THAT ARE
INTENDED TO BE OPERATED BY THE OCCUPANT.
PROVIDE INSULATED BACKPLATE FOR CONTROL SENSORS ON EXTERIOR WALLS OR COLUMNS.
DUCTWORK, HYDRONIC PIPING SHALL BE INSULATED TO AT LEAST MINIMUM INSULATION LEVELS REQUIRED IN ASHRAE
90.1-2019 AT THE TIME OF THE BIDDING.
MOTORIZED DAMPERS ARE REQUIRED AT ALL DUCTWORK PENETRATIONS TO EXTERIOR AND TO INTAKE / RELIEF PLENUMS.
DAMPERS SHALL BE INTERLOCKED WITH ASSOCIATED SYSTEM OPERATION. INSULATE DUCTWORK FROM EXTERIOR AS
DESCRIBED IN SPECIFICATIONS.
ALL MECHANICAL PIPING AND DUCTWORK SHALL HAVE SPRING ISOLATORS IN MECHANICAL ROOM.
MECHANICAL - GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
ALL PIPING DIMENSIONS SHOWN ARE NOMINAL PIPE SIZES. REFER TO SPECIFICATIONS FOR INSULATION
REQUIREMENTS.
UNLESS NOTED OTHERWISE, ALL CHILLED AND HEATING WATER PIPING SHALL BE MINIMUM 3/4" DIAMETER.
PIPE RUN-OUTS TO MECHANICAL EQUIPMENT ARE FOUND IN RESPECTIVE SCHEDULES.
CONDENSATE DRAIN PIPING TO BE 3/4" MINIMUM UNLESS NOTED OTHERWISE.
PIPE ELBOWS SHALL BE LONG RADIUS TYPE.
PROVIDE AIR VENTS AT ALL LOCAL HIGH POINTS AND DRAIN VALVES AT ALL SYSTEM LOW POINTS, INCLUDING
BOTTOMS OF RISERS.
INSTALL PIPING SUCH THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND ANY DEVICES REQUIRING ACCESS ARE ACCESSIBLE. INSTALL ALL DEVICES THAT REQUIRE VISUAL ACCESS (THERMOSTATS, CONTROL VALVES, ETC) SUCH THAT THEY MAY BE EASILY OBSERVED. ALL GAUGE ISOLATION VALVES SHOULD BE INSTALLED WITHIN 6'
OF FINISHED FLOOR.
ALL BALANCING AND BUTTERFLY VALVES SHALL HAVE POSITION INDICATORS AND MEMORY STOPS.
ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE THE FULL SIZE OF THE PIPE BEFORE REDUCING
IN SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROL VALVES.
PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS, CHILLERS, AND OTHER EQUIPMENT REQUIRING VIBRATION ISOLATION (EXCEPT COILS). PROVIDE CONNECTIONS AT EQUIPMENT TO BE
ISOLATED.
ALL PIPING CROSSING BUILDING EXPANSION JOINTS AND REQUIRING THERMAL EXPANSION COMPENSATION SHALL
BE PROVIDED WITH EXPANSION LOOPS PER SPECIFICATIONS.
PROVIDE AND EXTEND CONDENSATE DRAIN PIPING FROM ALL EQUIPMENT WITH CONDENSATE CONNECTIONS TO NEAREST SINK P-TRAP WITH WYE FITTING, NEAREST JANITOR CLOSET, OR FLOOR DRAIN. PROVIDE ACCESS COVER UNDER SINK FOR ACCESS. ROUTE ALL PIPING SO AS TO NOT INTERFERE WITH JANITOR CLOSET OR FLOOR DRAIN.
SLOPE CONDENSATE PIPING AT MIN 1/4" PER 1'-0".
MECHANICAL- PIPING NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
ALL DUCTWORK DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSIONS. CONTRACTOR SHALL UPSIZE DUCTWORK TO ACCOMMODATE INTERNAL LINER WHERE REQUIRED IN SPECIFICATIONS OR SHOWN ON DRAWINGS. REFER TO
SPECIFICATIONS FOR INSULATION REQUIREMENTS.
SUPPLY DUCT TO INLET OF VAV BOXES SHALL MATCH THE VAV BOX INLET FOR A MINIMUM OF THREE DUCT
DIAMETERS.
DUCT RUN-OUTS FROM VAV BOX TO DIFFUSERS ARE TO BE ROUND SPIN-IN TAKE-OFF COMPLETE WITH VOLUME DAMPER. RUN-OUT SIZE IS TO BE THE SAME AS THE INLET NECK SIZE OF THE DIFFUSER UNLESS NOTED OTHERWISE.
ALL DUCT CONNECTIONS TO VAV BOXES SHALL BE THE SIZE OF THE VAV BOX CONNECTION UNLESS NOTED
OTHERWISE.
PROVIDE MANUAL BALANCING DAMPERS AT ALL BRANCH TAKE-OFFS TO AND FROM GRILLES AND DIFFUSERS.
COORDINATE DIFFUSER AND GRILLE LOCATIONS WITH ARCHITECTURAL CEILING PLANS, LIGHTING, AND ALL OTHER
TRADES, MAKING MINOR DUCT MODIFICATIONS AS NEEDED.
PROVIDE ALL SUPPLY 90-DEGREE SQUARE ELBOWS WITH AIRFOIL TURNING VANES UNLESS NOTED OTHERWISE.
PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO EQUIPMENT THAT REQUIRES VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE
EQUIPMENT UNLESS NOTED OTHERWISE.
FLEXIBLE DUCTWORK RUN-OUTS TO DIFFUSERS SHALL NOT EXCEED FIVE FEET.
BOTTOMS OF ALL LOW EXHAUST/RETURN GRILLES SHALL BE MINIMUM 8" AFF. GRILLE BLADES SHALL RUN
HORIZONTAL.
OUTDOOR AIR INTAKES SHALL BE LOCATED A MINIMUM 10' FROM ANY EXHAUST DISCHARGE, PLUMBING VENT, OR
SIMILAR.
THE HVAC CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL OPEN ENDS OF BOTH INSTALLED AND UNINSTALLED
DUCTWORK.
ALL DUCTWORK CROSSING BUILDING EXPANSION JOINTS SHALL BE INSTALLED WITH FLEXIBLE CONNECTIONS PER
PROJECT DETAILS AND SPECIFICATIONS.
MECHANICAL - SHEET METAL NOTES
THE FOLLOWING 75% CONSTRUCTION DOCUMENTS PROGRESS PRINT IS ISSUED FOR THE PURPOSE OF GSA OBTAINING PROPOSALS FROM CONTRACTORS. THE INFORMATION ISSUED MAY NOT BE USED TO PREPARE SHOP DRAWINGS AND ARE NOT
FOR CONSTRUCTION.
THE LEVEL OF DOCUMENTATION, DETAILING, AND ANNOTATION ARE INDICATIVE OF AN IN-PROGRESS CONSTRUCTION DOCUMENT DRAWING SET. SUBSEQUENT DRAWING PACKAGES WILL REFINE THE DRAWING SET TO PROVIDE ADDITIONAL
CLARITY TO THE DESIGN INTENT WHICH MAY IMPACT COST.
75% CONSTRUCTION DOCUMENT PRINT:
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
SITE NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
CUI
CUI
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
U.S. CUSTOMS AND BORDER PROTECTION
INTERNATIONAL FALLS LAND PORT OF ENTRY
INTERNATIONAL FALLS, MN
SNOW KREILICH ARCHITECTS
HGA, TEN X TEN, STANTEC, ATELIER TEN, INTEGRAL RSG
MN0301IF
INTERNATIONAL FALLS, MN
INTERNATIONAL FALLS LAND PORT OF ENTRY
UNITED STATES LAND PORT OF ENTRY
INTERNATIONAL FALLS, MINNESOTA
SETH LAROCQUE
75% CONSTRUCTION DOCUMENTS
2025.05.23
ENGINEERING
HGA
420 NORTH 5TH STREET, MINNEAPOLIS, MN
(612) 758-4000
LANDSCAPE ARCHITECTURE
TEN X TEN
807 BROADWAY STREET NE, SUITE 221, MINNEAPOLIS, MN 55413
(612) 440-8369
RAIL AND TRAFFIC ENGINEERING
STANTEC
733 MARQUETTE AVENUE, SUITE 1000, MINNEAPOLIS, MN 55402
(612) 712-2000
SUSTAINABILITY
ATELIER TEN
104 WEST 29TH STREET, 8TH FLOOR, NEW YORK, NY 10001
(212) 254-4500
PHYSICAL SECURITY/BLAST DESIGN
INTEGRAL RSG
88 KEARNY STREET, SUITE 875, SAN FRANCISCO, CA 94108
(415) 329-0519
5/
/2
:1 4:
A
M
M0.01
MECHANICAL ABBREVIATIONS, SYMBOLS, AND SHEET
LIST
2024.08.28SK
BFuller
A
ABV ABOVE
AFF ABOVE FINISHED FLOOR
AFMS AIRFLOW MEASURING STATION
AFUE ANNUAL FUEL UTILIZATION
EFFICIENCY
AHJ AUTHORITY HAVING
JURISDICTION
ALT ALTERNATE
AMP AMPERE(S)
AP ACCESS PANEL(S)
APD AIR PRESSURE DROP
APPROX APPROXIMATE,
APPROXIMATELY
ARCH ARCHITECT(URAL)
AVG AVERAGE
B
BAS BUILDING AUTOMATION SYSTEM
BFF BELOW FINISHED FLOOR
BHP BRAKE HORSE POWER, BOILER
HORSE POWER
BMS BUILDING MANAGEMENT
SYSTEM
BOD BOTTOM OF DUCT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER
HOUR
C
CA COMPRESSED AIR
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CLG CEILING
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COMB COMBINATION
CONC CONCRETE
COND CONDENS(ATE)(ER)(ING)(ATION)
CONN CONNECTION
CONT CONTINU(E) (OUS) (ATION)
CONTR CONTRACT(OR)
COP CO-EFFICIENT OF
PERFORMANCE
CORR CORRIDOR
CPVC CHLORINATED POLYVINYL
CHLORIDE
CU FT CUBIC FOOT (FEET)
CU IN CUBIC INCH (ES)
D
DB DRY BULB
dBA A-WEIGHTED SOUND PRESSURE
DECIBELS
DDC DIRECT DIGITAL CONTROL
DEG DEGREE(S)
DEG-F DEGREES FAHRENHEIT
DIA DIAMETER
DMPR DAMPER
DN DOWN
DP DIFFERENTIAL PRESSURE
DWG(S) DRAWING(S)
DX DIRECT EXPANSION
E
(E) EXISTING
EAT ENTERING AIR TEMPERATURE
ECM ELECTRONICALLY
COMMUTATED MOTOR
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
EFT ENTERING FLUID TEMPERATURE
ELEC ELECTRIC(AL)
EMER EMERGENCY
EQ EQUAL
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER
TEMPERATURE
EXP EXPLOSION
EXT EXTERIOR
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
(TRAP)
FA FROM ABOVE
FB FROM BELOW
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
FFE FINISHED FLOOR ELEVATION
FLA FULL LOAD AMPERES
FLEX FLEXIBLE
FLR FLOOR
FM FACTORY MUTUAL
FPD FLUID PRESSURE DROP
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FREQ FREQUENCY
FT FOOT, FEET
FTG FOOTING
FUT FUTURE
G
GA GAUGE
GAL GALLON(S)
GALV GALVANIZED
GEN GENERATOR
GPD GALLON(S) PER DAY
GPH GALLON(S) PER HOUR
GPM GALLON(S) PER MINUTE
H
HDPE HIGH DENSITY POLYETHYLENE
HG MERCURY
HP HORSEPOWER
HR HOUR
HTG HEATING
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
HZ HERTZ (FREQUENCY)
I
ID INSIDE DIAMETER/DIMENSION
IEER INTEGRATED ENERGY
EFFICIENCY RATIO
IMP INSULATED METAL PANEL
IN INCH(ES)
INSUL INSULATION
ISOL ISOLATOR
K
KW KILOWATT
L
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LBS/HR POUNDS PER HOUR
LF LINEAL FOOT, FEET
LFT LEAVING FLUID TEMPERATURE
LPS LOW PRESSURE STEAM
LVR LOUVER
LwA A-WEIGHTED SOUND POWER
DECIBELS
LWT LEAVING WATER TEMPERATURE
M
MAX MAXIMUM
MBH 1,000 BTUH
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MECH MECHANICAL(LY)
MEZZ MEZZANINE
MFR MANUFACTURER
MFS MAXIMUM FUSE SIZE
MIN MINIMUM
MIN MINUTE
MISC MISCELLANEOUS
MOP,
MOCP
MAX OVER CURRENT
PROTECTION
MTR MOTOR
N
N/C NORMALLY CLOSED
N/O NORMALLY OPEN
NA, N/A NOT APPLICABLE
NC NOISE CRITERIA
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
NPS NOMINAL PIPE SIZE
NPT NATIONAL PIPE THREAD
TAPERED
NTS NOT TO SCALE
O
OD OUTSIDE DIAMETER/DIMENSION
ODP OPEN DRIP PROOF
P
PD PRESSURE DROP
PEX CROSS-LINKED POLYETHYLENE
PG PROPYLENE GLYCOL
PLBG PLUMBING
POC POINT OF CONNECTION
POD POINT OF DISCONNECTION
PPH POUNDS PER HOUR
PPM PARTS PER MILLION
PRES PRESSURE
PSI POUNDS PER SQUARE INCH
PSIG PSI GAUGE
PVC POLYVINYL CHLORIDE
R
R RADIUS
RCVR RECEIVER
RECIRC RECIRCULATE
REG REGISTER
REQD REQUIRED
REV REVOLUTION(S)
RFO ROOF OPENING
RH RELATIVE HUMIDITY
RM ROOM
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RPS REVOLUTIONS PER SECOND
RPZ REDUCED PRESSURE
BACKFLOW PREVENTER
S
SCCR SHORT CIRCUIT CURRENT
RATING
SCFM CFM AT STANDARD CONDITIONS
SCH SCHEDULE
SENS SENSIBLE
SF SQUARE FEET
SLV SLEEVE
SP STATIC PRESSURE
SPD SPEED
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
SSR SOLID-STATE RELAYS
STD STANDARD
STL STEEL
STRUC STRUCTURE(E) (AL)
T
T THERMOSTAT
TA TO ABOVE
TB TO BELOW
TCP TEMPERATURE CONTROL
PANEL
TEFC TOTALLY ENCLOSED, FAN
COOLED
TEMP TEMPERATURE
TENV TOTALLY ENCLOSED, NOT
VENTILATED
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
TOB TOP OF BEAM
TOD TOP OF DUCT
TOJ TOP OF JOIST
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
U
(U) UNDERGROUND PIPE-SPECIFIC
TYPE
UL UNDERWRITER LABORATORIES
UNO UNLESS NOTED OTHERWISE
V
V VOLTS
VB VACUUM BREAKER
VDC VOLTAGE DIRECT CURRENT
VENT VENTILAT(ION) (OR)
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W
W WATTS
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DROP
WTR WATER
NOTE:
REFER TO DUCTWORK AND PIPING SYSTEM DESIGNATIONS, CONTROL DRAWINGS, AND EQUIPMENT SCHEDULES FOR
ADDITIONAL ABBREVIATIONS.
ALL GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN THIS SET.
THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
MECHANICAL SHEET INDEX
SHEET NAME
M0.01 MECHANICAL ABBREVIATIONS, SYMBOLS, AND SHEET LIST
M1.M1B LEVEL ONE UNDER FLOOR HVAC & PIPING PLAN - MAIN
BUILDING - AREA B
M1.M1C LEVEL ONE UNDER FLOOR HVAC & PIPING PLAN - MAIN
BUILDING - AREA C
M1.M2B LEVEL TWO UNDER FLOOR HVAC & PIPING PLAN - MAIN
BUILDING - AREA B
M1.M2C LEVEL TWO UNDER FLOOR HVAC & PIPING PLAN - MAIN
BUILDING - AREA C
M2.M1 LEVEL ONE - PRESSURIZATION PLAN - MAIN BUILDING
M2.M1A LEVEL ONE HVAC PLAN - MAIN BUILDING - AREA A
M2.M1B LEVEL ONE HVAC PLAN - MAIN BUILDING - AREA B
M2.M1C LEVEL ONE HVAC PLAN - MAIN BUILDING - AREA C
M2.M2 LEVEL TWO - PRESSURIZATION PLAN - MAIN BUILDING
M2.M2A LEVEL TWO HVAC PLAN - MAIN BUILDING - AREA A
M2.M2B LEVEL TWO HVAC PLAN - MAIN BUILDING - AREA B
M2.M2C LEVEL TWO HVAC PLAN - MAIN BUILDING - AREA C
M2.MZ1 LEVEL ONE - ZONING PLAN - MAIN BUILDING
M2.MZ2 LEVEL TWO - ZONING PLAN - MAIN BUILDING
M2.N1 LEVEL ONE HVAC PLAN - NON-COMMERCIAL SECONDARY
M2.N2 LEVEL TWO HVAC PLAN - NON-COMMERCIAL SECONDARY
M2.N3 ZONING & PRESSURIZATION PLAN - NON-COMMERCIAL
SECONDARY
M2.S1 LEVEL ONE - ZONING & PRESSURIZATION PLAN -
SECONDARY COMMERCIAL/NII
M2.S1A LEVEL ONE HVAC PLAN - SECONDARY COMMERCIAL/NII -
AREA A
M2.S1B LEVEL ONE HVAC PLAN - SECONDARY COMMERCIAL/NII -
AREA B
M2.S1C LEVEL ONE HVAC PLAN - SECONDARY COMMERCIAL/NII -
AREA C
M2.S2 LEVEL TWO - ZONING & PRESSURIZATION PLAN -
SECONDARY COMMERCIAL/NII
M2.S2A LEVEL TWO HVAC PLAN - SECONDARY COMMERCIAL/NII -
AREA A
M2.S2B LEVEL TWO HVAC PLAN - SECONDARY COMMERCIAL/NII -
AREA B
M2.S2C LEVEL TWO HVAC PLAN - SECONDARY COMMERCIAL/NII -
AREA C
M3.M1A LEVEL ONE PIPING PLAN - MAIN BUILDING - AREA A
M3.M1B LEVEL ONE PIPING PLAN - MAIN BUILDING - AREA B
M3.M1C LEVEL ONE PIPING PLAN - MAIN BUILDING - AREA C
M3.M2A LEVEL TWO PIPING PLAN - MAIN BUILDING - AREA A
M3.M2B LEVEL TWO PIPING PLAN - MAIN BUILDING - AREA B
M3.M2C LEVEL TWO PIPING PLAN - MAIN BUILDING - AREA C
M3.M3C ROOF HVAC & PIPING PLAN - MAIN BUILDING - AREA C
M3.N1 LEVEL ONE PIPING PLAN - NON-COMMERCIAL SECONDARY
M3.N2 LEVEL TWO PIPING PLAN - NON-COMMERCIAL SECONDARY
M3.S1A LEVEL ONE PIPING PLAN - SECONDARY COMMERCIAL/NII -
AREA A
M3.S1B LEVEL ONE PIPING PLAN - SECONDARY COMMERCIAL/NII -
AREA B
M3.S1C LEVEL ONE PIPING PLAN - SECONDARY COMMERCIAL/NII -
AREA C
M3.S2C LEVEL TWO PIPING PLAN - SECONDARY COMMERCIAL/NII -
AREA C
M3.S3C ROOF HVAC & PIPING PLAN - SECONDARY COMMERCIAL/NII -
AREA C
M4.M1 ENLARGED PLANS - MAIN BUILDING
M4.M2 ENLARGED PLANS - MAIN BUILDING
M4.M3 ENLARGED PLANS - MAIN BUILDING
M4.N1 ENLARGED PLANS - NON-COMMERCIAL SECONDARY
M4.S1 ENLARGED PLANS - SECONDARY COMMERCIAL
M4.S2 ENLARGED PLANS - SECONDARY COMMERCIAL
M4.S3 ENLARGED PLANS - SECONDARY COMMERCIAL
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
MECHANICAL SHEET INDEX
SHEET NAME
M5.M1 MECHANICAL SECTIONS - MAIN BUILDING
M5.M2 MECHANICAL SECTIONS - MAIN BUILDING
M5.M3 MECHANICAL SECTIONS - MAIN BUILDING
M5.M4 MECHANICAL SECTIONS - MAIN BUILDING
M5.N1 MECHANICAL SECTIONS - NON-COMMERCIAL SECONDARY
M5.S1 MECHANICAL SECTIONS - SECONDARY COMMERCIAL/NII
M5.S2 MECHANICAL SECTIONS - SECONDARY COMMERCIAL/NII
M5.S3 MECHANICAL SECTIONS - SECONDARY COMMERCIAL/NII
M5.S4 MECHANICAL SECTIONS - SECONDARY COMMERCIAL/NII
M5.S5 MECHANICAL SECTIONS - SECONDARY COMMERCIAL/NII
M6.M1 MECHANICAL SCHEMATICS - MAIN BUILDING
M6.M2 MECHANICAL SCHEMATICS - MAIN BUILDING
M6.M3 MECHANICAL SCHEMATICS - MAIN BUILDING
M6.M4 MECHANICAL SCHEMATICS - MAIN BUILDING
M6.N1 MECHANICAL SCHEMATICS - NON-COMMERCIAL
SECONDARY
M6.S1 MECHANICAL SCHEMATICS - SECONDARY COMMERCIAL/NII
M6.S2 MECHANICAL SCHEMATICS - SECONDARY COMMERCIAL/NII
M6.S3 MECHANICAL SCHEMATICS - SECONDARY COMMERCIAL/NII
M6.S4 MECHANICAL SCHEMATICS - SECONDARY COMMERCIAL/NII
M7.01 MECHANICAL DETAILS
M7.02 MECHANICAL DETAILS
M7.03 MECHANICAL DETAILS
M7.04 MECHANICAL DETAILS
M7.05 MECHANICAL DETAILS
M7.06 MECHANICAL DETAILS
M8.M1 MECHANICAL SCHEDULES - MAIN BUILDING
M8.M2 MECHANICAL SCHEDULES - MAIN BUILDING
M8.M3 MECHANICAL SCHEDULES - MAIN BUILDING
M8.M4 MECHANICAL SCHEDULES - MAIN BUILDING
M8.M5 MECHANICAL SCHEDULES - MAIN BUILDING
M8.N1 MECHANICAL SCHEDULES - NON-COMMERCIAL SECONDARY
M8.N2 MECHANICAL SCHEDULES - NON-COMMERCIAL SECONDARY
M8.S1 MECHANICAL SCHEDULES - SECONDARY COMMERCIAL/NII
M8.S2 MECHANICAL SCHEDULES - SECONDARY COMMERCIAL/NII
M8.S3 MECHANICAL SCHEDULES - SECONDARY COMMERCIAL/NII
M8.S4 MECHANICAL SCHEDULES - SECONDARY COMMERCIAL/NII
M8.S5 MECHANICAL SCHEDULES - SECONDARY COMMERCIAL/NII
M9.01 CONTROL SCHEMATICS
M9.02 CONTROL SCHEMATICS
M9.03 CONTROL SCHEMATICS
M9.04 CONTROL SCHEMATICS
M9.05 CONTROL SCHEMATICS
M9.06 CONTROL SCHEMATICS
M9.07 CONTROL SCHEMATICS
M9.08 CONTROL SCHEMATICS
M9.09 CONTROL SCHEMATICS
M9.10 CONTROL SCHEMATICS
M9.11 CONTROL SCHEMATICS
M9.12 CONTROL SCHEMATICS
M9.13 CONTROL SCHEMATICS
M9.14 CONTROL SCHEMATICS
M9.15 CONTROL SCHEMATICS
M9.16 CONTROL SCHEMATICS
M9.17 CONTROL SCHEMATICS
M9.18 CONTROL SCHEMATICS
MS1.01 MECHANICAL SITE DRAWING - MAIN BUILDING
MS1.02 MECHANICAL SITE DRAWING - NON COMMERCIAL BUILDING
MS1.03 MECHANICAL SITE DRAWING - SECONDARY COMMERCIAL/NII
MS7.01 MECHANICAL DETAILS
MS7.02 MECHANICAL DETAILS
Grand total: 107
MARK DATE DESCRIPTION
P
P
P P
P
UNDERFLOOR AIR SYSTEM GENERAL NOTES
A.
B.
C.
REFER TO ARCHITECTURAL PLANS FOR ACCESS FLOOR PLAN AND ACCESS
FLOOR DETAILS FOR ADDITIONAL INFORMATION.
SPACE BENEATH THE ACCESS FLOOR WILL BE USED AS AN AIR DELIVERY
PLENUM AND CONTRACTORS ARE TO TAKE PRECAUTIONS WHEN
INSTALLING THEIR WORK SO AS NOT TO IMPACT THE INTEGRITY OF THE
PLENUM SPACE SPECIFIC TO AIR LEAKAGE AND CLEANLINESS.
ANY PENETRATIONS OR HOLES IN THE UNDERFLOOR PLENUM ARE
REQUIRED TO BE PROPERLY SEALED TO PREVENT AIR LEAKAGE.
1 2 3 4 5 6 7 8 9 10
A
B
C
D
0.4
0.5
0.6
B.1
A.1
M5.M4
M5.M4
2 1/2" HWS UP
2 1/2" CHWR UP
2 1/2" CHWS UP
2 1/2" HWR UP
46x22 SA UP
2" HWS
2" HWR
LTU M1.26: 220 CFM
3.3 MBH
2 1/2" CHWS
2 1/2" HWR
2 1/2" CHWR
2" HWS
2" HWR
4" HWS
4" HWR
2 1/2" HWS
2 1/2" CHWS
2 1/2" HWR
2 1/2" CHWR
1" HWR
3/4" HWS
1" HWS
1 1/2" HWR
1 1/2" HWR
1" HWR
1 1/2" HWS
2" HWS
1 1/2" HWR
1" HWS
1" HWR
2" HWS
2" HWR
4" HWS
2 1/2" CHWS
4" HWR
2 1/2" CHWR
LTU M1.2: 95 CFM
4.7 MBH
LTU M1.3: 95 CFM
4.7 MBH
LTU M1.4: 95 CFM
4.7 MBH
LTU M1.9: 120 CFM
4.8 MBH
LTU M1.10: 120 CFM
4.8 MBH
LTU M1.11: 120 CFM
4.8 MBH
LTU M1.12: 110 CFM
5.2 MBH
LTU M1.13: 110 CFM
5.2 MBH
LTU M1.14: 110 CFM
5.2 MBH
LTU M1.5: 90 CFM
3.9 MBH
LTU M1.6: 90 CFM
3.9 MBH
LTU M1.7: 90 CFM
3.9 MBH
LTU M1.8: 90 CFM
3.9 MBH
LTU M1.25: 270 CFM
10 MBH
LFC M1.3
4.5 MBHLFC M1.1
4.5 MBH
LFC M1.2
4.5 MBH
LTU M1.24: 270 CFM
LTU M1.23: 270 CFM
LFC M1.6
3.4 MBH
LFC M1.7
3.4 MBH
LTU M1.20: 270 CFM
LTU M1.18: 270 CFM
LTU M1.21: 270 CFM
LFC M1.5
2.5 MBH
LFC M1.21
2.5 MBH
20x14 RA UP
20x14 RA
20x20 SA
20x20 SA x2
0 S A 20 x2
0 S A
BREAK
M113
SUPERVISORS
M112
WATCH
COMMANDERS
M111
VESTIBULE
M100
JANITORIAL
SUPPORT
M121
STAFF RR
M114
POV BOOTH
M193
VESTIBULE
M108
LACTATION
SUPPORT
M105
PUBLIC
FAMILY/SINGLE
OCC. RR
M103
INTERVIEW
M150
PUBLIC
FAMILY/SINGLE
OCC. RR
M104
PUBLIC
FAMILY/SINGLE
OCC. RR
M106
SUMP PUMP
M123
ELEC CLOSET
M129
PEDESTRIAN /
OUTBOUND LOBBY
M107
POV /BUS LOBBY
M101
VESTIBULE
M102
HIGH-LOW BOOTH
M191
CORRIDOR
M109
DRINKING
FOUNTAIN
M101B
SERVICE
VESTIBULE
M136
POV BOOTH
M192
POV BOOTH
M139
LFC M1.4
2.1 MBH
LTU M1.15: 160 CFM LTU M1.16: 160 CFM
LTU M1.17: 160 CFM
2 1/2" HWS
LTU M1.1: 95 CFM
4.7 MBH
M
42x14 RA UP
M M
M
AG LAB
M127
VIOLATOR
WAITING
M152
IDENT
M151
OUTBOUND
BOOTH
M190
INTERVIEW
M148
INTERVIEW
M149
TTRT WAITING
ROOM
M147
AG DISPOSAL
M130
CORRIDOR
M119
STAIR
MA
CORRIDOR
M134
ELEV MA
M135
1" HWR UP
1" HWS UP
20x14 RA
1 1/2" HWS1 1/2" HWS
2" HWS
2" HWR
1 1/2" HWR UP
2" HWS
2" HWR
SAV
M1.1
M4 M1 M1
M1
M1
M1
M1
M2
M3
M5
M6
M7
M1
M9
UF-M1.1
UF-M1.2
20x8 20x8
LTU M1.22: 270 CFM
M1
M
LTU M1.19: 270 CFM
M26 M27
M11
14x2 SA UP F
M49
2" HWR
3/4" HWR
18x10
18x10 18x10
18x10 x8
R A x8
R A x8
R A x8
R A
20x14 RA
20x14 RA
20x8 SA
14x2 SA UP
1 1/2" HWS UP
12x12 SA
3/4" HWS
3/4" HWR
/1 M1
.M 1C
M53
M53
M53
M53
MB
0 8' 16' 1/8"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
SITE NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
CUI
CUI
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
U.S. CUSTOMS AND BORDER PROTECTION
INTERNATIONAL FALLS LAND PORT OF ENTRY
INTERNATIONAL FALLS, MN
SNOW KREILICH ARCHITECTS
HGA, TEN X TEN, STANTEC, ATELIER TEN, INTEGRAL RSG
MN0301IF
INTERNATIONAL FALLS, MN
INTERNATIONAL FALLS LAND PORT OF ENTRY
UNITED STATES LAND PORT OF ENTRY
INTERNATIONAL FALLS, MINNESOTA
SETH LAROCQUE
75% CONSTRUCTION DOCUMENTS
2025.05.23
ENGINEERING
HGA
420 NORTH 5TH STREET, MINNEAPOLIS, MN
(612) 758-4000
LANDSCAPE ARCHITECTURE
TEN X TEN
807 BROADWAY STREET NE, SUITE 221, MINNEAPOLIS, MN 55413
(612) 440-8369
RAIL AND TRAFFIC ENGINEERING
STANTEC
733 MARQUETTE AVENUE, SUITE 1000, MINNEAPOLIS, MN 55402
(612) 712-2000
SUSTAINABILITY
ATELIER TEN
104 WEST 29TH STREET, 8TH FLOOR, NEW YORK, NY 10001
(212) 254-4500
PHYSICAL SECURITY/BLAST DESIGN
INTEGRAL RSG
88 KEARNY STREET, SUITE 875, SAN FRANCISCO, CA 94108
(415) 329-0519
KEY PLAN - N.T.S.
5/
/2
:4 5:
A
M
M1.M1B
LEVEL ONE UNDER FLOOR HVAC & PIPING PLAN - MAIN
BUILDING - AREA B
2024.08.28SK
BFuller
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/8" = 1'-0"1 LEVEL ONE UNDERFLOOR HVAC PLAN - MAIN BUILDING - AREA B
KEYNOTES - THIS SHEET
# DESCRIPTION
M1 UNDERFLOOR PLENUM. SEAL PLENUM WALLS AT FLOOR AND BOTTOM OF ACCESS FLOORING.
M2 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON AVERAGE PLENUM PRESSURE
READING FROM SENSORS PS-1 AND PS-2.
M3 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON PLENUM PRESSURE READING FROM
SENSOR PS-3.
M4 PLENUM PRESSURE SENSOR, PS-1.
M5 PLENUM PRESSURE SENSOR, PS-2.
M6 PLENUM PRESSURE SENSOR, PS-3.
M7 DUCT STATIC PRESSURE SENSOR FOR AHU-M1W FAN CONTROL.
M9 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON PLENUM PRESSURE READING FROM
SENSOR PS-5
M11 PLENUM PRESSURE SENSOR, PS-5.
M26 PLENUM PRESSURE SENSOR, PS-4.
M27 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON PLENUM PRESSURE READING FROM
SENSOR PS-4.
M49 12X12 TRANSFER DUCT FROM UNDERFLOOR PLENUM TO ELEVATOR SHAFT. PROTECT DUCT PENETRATION THROUGH SHAFT WITH FIRE DAMPER. BALANCE
VOLUME DAMPER TO 250 CFM.
M53 PIPING SHALL BE ROUTED WITHIN TRENCH IN RAISED LAB.
P
P P
UNDERFLOOR AIR SYSTEM GENERAL NOTES
A.
B.
C.
REFER TO ARCHITECTURAL PLANS FOR ACCESS FLOOR PLAN AND ACCESS
FLOOR DETAILS FOR ADDITIONAL INFORMATION.
SPACE BENEATH THE ACCESS FLOOR WILL BE USED AS AN AIR DELIVERY
PLENUM AND CONTRACTORS ARE TO TAKE PRECAUTIONS WHEN
INSTALLING THEIR WORK SO AS NOT TO IMPACT THE INTEGRITY OF THE
PLENUM SPACE SPECIFIC TO AIR LEAKAGE AND CLEANLINESS.
ANY PENETRATIONS OR HOLES IN THE UNDERFLOOR PLENUM ARE
REQUIRED TO BE PROPERLY SEALED TO PREVENT AIR LEAKAGE.
10 11 12 13 14
A
B
C
D
15 16 17 18
B.1
A.1
/1 M1
.M 1B
2 1/2" CHWR
4" HWR
4" HWS
2 1/2" CHWS
SAV
M1.2
LTU M1.33: 100 CFM
4.7 MBH
LTU M1.32: 220 CFM
5.2 MBH
LTU M1.31: 220 CFM
5.2 MBH
LTU M1.30: 300 CFM
6.7 MBH
LTU M1.29: 180 CFM
4.9 MBH
LTU M1.28: 150 CFM
7.3 MBHLTU M1.26: 220 CFM
3.3 MBH
LTU M1.36: 110 CFM
4.2 MBH
LTU M1.35: 60 CFM
5.9 MBH
LTU M1.34: 60 CFM
5.9 MBH
LFC M1.8
8.9 MBH
1" HWR
1" HWS
1 1/2" HWR
1" HWR
1" HWS
1 1/2" HWS
1 1/2" HWS
1" HWR 1 1/2" HWR 1" HWS
20x20 SA
20x20 SA
20x18 SA x1
6 S A
LTU M1.27: 220 CFM
3.3 MBH
M
UPS
M169
VIOLATOR
PERSONAL
PROPERTY
STORAGE
M140
TEMPORARY
SEIZED
PROPERTY
STORAGE
M132
FRAUD/FORENSIC
LAB
M133
MPOE
M162
TRANSFORMER
YARD
M184
AG LAB
M127
FIRE ALARM
CONTROL
M161
AG SUPERVISOR
M126
AG WORK AREA
M125
ENFORCEMENT
WORK AREA (2)
M145
TRASH/RECYCLING
M174
VIOLATOR
WAITING
M152
IDENT
M151
SECURE
CORRIDOR
M120
TTRT INTERVIEW
M146
PLUMBING
ACCESS
M160
FOOD PREP
M131
ELEC CLOSET
M176
INTERVIEW
M148
INTERVIEW
M149
TECH OFFICE
M128
TTRT
SUPERVISOR
M164
SPECIAL
RESPONSE TEAM
M163
MECHANICAL
M171
SEARCH
M144
INTERVIEW
M141
INTERVIEW
M142SEARCH
M143
JUV HOLD
M154
HOLD
M155
HOLD
M156
HOLD
M157
HOLD
M158
FAMILY HOLD
M153
CBP STAFF RR
M172
CBP STAFF RR
M173
TTRT WAITING
ROOM
M147
IDF
M170
CONFERENCE/MUSTER
AREA/TRAINING
M167
TRAINING
STORAGE
M168
STAIR
MB
DIGITAL IMAGING
M124
FIRE/WATER
SERVICE
M159
TTRT
SUPERVISOR
M165
TT INTERVIEW
M181
TT INTERVIEW
M180
PUBLIC
FAMILY/SINGLE
OCC. RR
M178
TT WORK AREA
M179
TT WAITING
M177
VESTIBULE
M175
TT INTERVIEW
M182
CORRIDOR
M116
SERVICE
VESTIBULE
M117
CORRIDOR
M118
CORRIDOR
M134
ELEV MA
M135
SAV
M1.1
M28
M12
M9 M16
M13
UF-M1.4
UF-M1.5
UF-M1.6 UF-M1.7
UF-M1.9
UF-M1.10
UF-M1.11
LFC M1.24
8.4 MBH
LFC M1.23
8.9 MBH
LFC M1.22
8.9 MBH
MM
M15
M10
M14
M29
M4.M3
10x2 SA UP
1" HWS
14x2 SA UP
1" HWS
10x2 SA UP x8
S A
3/4" HWR UP
3/4" HWS
M53
M53
MC
0 8' 16' 1/8"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
SITE NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
CUI
CUI
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
U.S. CUSTOMS AND BORDER PROTECTION
INTERNATIONAL FALLS LAND PORT OF ENTRY
INTERNATIONAL FALLS, MN
SNOW KREILICH ARCHITECTS
HGA, TEN X TEN, STANTEC, ATELIER TEN, INTEGRAL RSG
MN0301IF
INTERNATIONAL FALLS, MN
INTERNATIONAL FALLS LAND PORT OF ENTRY
UNITED STATES LAND PORT OF ENTRY
INTERNATIONAL FALLS, MINNESOTA
SETH LAROCQUE
75% CONSTRUCTION DOCUMENTS
2025.05.23
ENGINEERING
HGA
420 NORTH 5TH STREET, MINNEAPOLIS, MN
(612) 758-4000
LANDSCAPE ARCHITECTURE
TEN X TEN
807 BROADWAY STREET NE, SUITE 221, MINNEAPOLIS, MN 55413
(612) 440-8369
RAIL AND TRAFFIC ENGINEERING
STANTEC
733 MARQUETTE AVENUE, SUITE 1000, MINNEAPOLIS, MN 55402
(612) 712-2000
SUSTAINABILITY
ATELIER TEN
104 WEST 29TH STREET, 8TH FLOOR, NEW YORK, NY 10001
(212) 254-4500
PHYSICAL SECURITY/BLAST DESIGN
INTEGRAL RSG
88 KEARNY STREET, SUITE 875, SAN FRANCISCO, CA 94108
(415) 329-0519
KEY PLAN - N.T.S.
5/
/2
:4 5:
A
M
M1.M1C
LEVEL ONE UNDER FLOOR HVAC & PIPING PLAN - MAIN
BUILDING - AREA C
2024.08.28SK
BFuller
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/8" = 1'-0"1 LEVEL ONE UNDERFLOOR HVAC PLAN - MAIN BUILDING - AREA C
KEYNOTES - THIS SHEET
# DESCRIPTION
M9 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON PLENUM PRESSURE READING FROM
SENSOR PS-5
M10 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON PLENUM PRESSURE READING FROM
SENSOR PS-6
M12 PLENUM PRESSURE SENSOR, PS-6.
M13 PLENUM PRESSURE SENSOR, PS-7.
M14 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON AVERAGE PLENUM PRESSURE
READING FROM SENSOR PS-7.
M15 PLENUM PRESSURE SENSOR, PS-8.
M16 DUCT STATIC PRESSURE SENSOR FOR AHU-M1E FAN CONTROL.
M28 PLENUM PRESSURE SENSOR, PS-9.
M29 MODULATING DAMPERS INSTALLED IN VERTICAL DUCT RISERS WITH AIR MEASURING STATIONS. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE
BASED ON AVERAGE PLENUM PRESSURE READING FROM SENSORS PS-8 AND PS-9.
M53 PIPING SHALL BE ROUTED WITHIN TRENCH IN RAISED LAB.
3'-7 5/16"
4'-0" LIVE TO
LIVE
P
P
P
UNDERFLOOR AIR SYSTEM GENERAL NOTES
A.
B.
C.
REFER TO ARCHITECTURAL PLANS FOR ACCESS FLOOR PLAN AND ACCESS
FLOOR DETAILS FOR ADDITIONAL INFORMATION.
SPACE BENEATH THE ACCESS FLOOR WILL BE USED AS AN AIR DELIVERY
PLENUM AND CONTRACTORS ARE TO TAKE PRECAUTIONS WHEN
INSTALLING THEIR WORK SO AS NOT TO IMPACT THE INTEGRITY OF THE
PLENUM SPACE SPECIFIC TO AIR LEAKAGE AND CLEANLINESS.
ANY PENETRATIONS OR HOLES IN THE UNDERFLOOR PLENUM ARE
REQUIRED TO BE PROPERLY SEALED TO PREVENT AIR LEAKAGE.
1 2 3 4 5 6 7 8 9 10
A
B
C
D
0.4
0.5
0.6
B.1
A.1
M5.M2
M5.M2
M5.M4
M5.M4
M5.M3
/1 M1
.M 2C
CONFERENCE RM
- PORT DIRECTOR
M205
AREA PORT
DIRECTOR
M206
MECHANICAL
M251
STAFF BREAK
M207
ROOF TERRACE
M250
STAIR
MA
VESTIBULE
M201
2ND LEVEL WORK
AREA
M200
IDF
M253
SERVICE
CORRIDOR
M252
CHIEF 01
M221
CHIEF 02
M222
CHIEF 03
M223
LAN ADMIN.
M213
HSDN
M212
PORT DIRECTOR'S
RECEPTION
M204
COMPUTER
TRAINING LAB
M209
M5.M4
12x8 EA DN
12x6 EA UP
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
2.5 MBH
FTR-M1: 5'-0"
AHU-M1W
2 1/2" HWS
LTU M2.4: 300 CFM
6.3 MBH
LTU M2.3: 300 CFM
6.3 MBH
2" HWR
2 1/2" HWS
2" HWR 6x8 EA UP
2 1/2" HWS
2" HWS
1 1/2" HWR
2" HWR
LFC M2.1: 185 CFM
3 MBH
LFC M2.2: 185 CFM
3 MBH
LTU M2.5: 270 CFM
5.5 MBH
LTU M2.6: 270 CFM
5.5 MBH
LTU M2.7: 270 CFM
5.5 MBH
LTU M2.8: 150 CFM
5.5 MBH
LTU M2.9: 150 CFM
5.5 MBH
LTU M2.10: 140 CFM
6.2 MBH
LTU M2.11: 140 CFM
6.2 MBH
LTU M2.2: 300 CFM
6.3 MBH
LTU M2.1: 300 CFM
6.3 MBH
LTU M2.12: 140 CFM
6.2 MBH
ELEV CONTROL
M255
STAFF RR
M208
STAFF LACTATION
SUPPORT
M217
UF-M2.2
UF-M2.3
UF-M2.4
UF-M2.8
UF-M2.9
UF-M2.10
M5.M3
M33
M32
M42
M52
M52
8x8 EA
6x8 EA
20x20 SA
2" HWR
2 1/2" HWS
LD-5:
2" HWR
2" HWS
MB
0 8' 16' 1/8"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
SITE NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
CUI
CUI
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
U.S. CUSTOMS AND BORDER PROTECTION
INTERNATIONAL FALLS LAND PORT OF ENTRY
INTERNATIONAL FALLS, MN
SNOW KREILICH ARCHITECTS
HGA, TEN X TEN, STANTEC, ATELIER TEN, INTEGRAL RSG
MN0301IF
INTERNATIONAL FALLS, MN
INTERNATIONAL FALLS LAND PORT OF ENTRY
UNITED STATES LAND PORT OF ENTRY
INTERNATIONAL FALLS, MINNESOTA
SETH LAROCQUE
75% CONSTRUCTION DOCUMENTS
2025.05.23
ENGINEERING
HGA
420 NORTH 5TH STREET, MINNEAPOLIS, MN
(612) 758-4000
LANDSCAPE ARCHITECTURE
TEN X TEN
807 BROADWAY STREET NE, SUITE 221, MINNEAPOLIS, MN 55413
(612) 440-8369
RAIL AND TRAFFIC ENGINEERING
STANTEC
733 MARQUETTE AVENUE, SUITE 1000, MINNEAPOLIS, MN 55402
(612) 712-2000
SUSTAINABILITY
ATELIER TEN
104 WEST 29TH STREET, 8TH FLOOR, NEW YORK, NY 10001
(212) 254-4500
PHYSICAL SECURITY/BLAST DESIGN
INTEGRAL RSG
88 KEARNY STREET, SUITE 875, SAN FRANCISCO, CA 94108
(415) 329-0519
KEY PLAN - N.T.S.
5/
/2
:4 5:
A
M
M1.M2B
LEVEL TWO UNDER FLOOR HVAC & PIPING PLAN - MAIN
BUILDING - AREA B
2024.08.28SK
BFuller
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/8" = 1'-0"1 LEVEL TWO UNDERFLOOR HVAC PLAN - MAIN BUILDING - AREA B
MARK DATE DESCRIPTION
KEYNOTES - THIS SHEET
# DESCRIPTION
M32 PLENUM PRESSURE SENSOR, PS-10.
M33 PLENUM PRESSURE SENSOR, PS-11.
M42 DUCT STATIC PRESSURE SENSOR FOR AHU-M2 FAN CONTROL.
M52 SHADED AREA INDICATES SPACES WITHOUT ACCESS FLOOR.
P
P
P
UNDERFLOOR AIR SYSTEM GENERAL NOTES
A.
B.
C.
REFER TO ARCHITECTURAL PLANS FOR ACCESS FLOOR PLAN AND ACCESS
FLOOR DETAILS FOR ADDITIONAL INFORMATION.
SPACE BENEATH THE ACCESS FLOOR WILL BE USED AS AN AIR DELIVERY
PLENUM AND CONTRACTORS ARE TO TAKE PRECAUTIONS WHEN
INSTALLING THEIR WORK SO AS NOT TO IMPACT THE INTEGRITY OF THE
PLENUM SPACE SPECIFIC TO AIR LEAKAGE AND CLEANLINESS.
ANY PENETRATIONS OR HOLES IN THE UNDERFLOOR PLENUM ARE
REQUIRED TO BE PROPERLY SEALED TO PREVENT AIR LEAKAGE.
10 11 12 13 14
A
B
C
D
15 16 17 18
B.1
A.1
M5.M1
M5.M1
M5.M3
24x10 EA DN
8x6 EA UP
JAN
M219
CHIEF 01
M221
CHIEF 02
M222
CHIEF 03
M223
CHIEF 04
M210
CHIEF 05
M211
LAN ADMIN.
M213
RADIO/RVS
M230
HSDN
M212 SLAN
M225
UNION OFFICE
M214
MECHANICAL
M246
MECHANICAL
M224
RESILIENCE &
WELLNESS
M218
ELEC CLOSET
M247
HEALTH &
FITNESS CENTER
M226
AMBULTORY RR
M236
ADA SHOWER
M239
MEN'S LOCKER
ROOM
M235
SHOWER
M238
ADA RR
M243
ELECTRICAL
ROOM
M229
LAN (MAIN DIST.)
M231
IDF
M232
COMPUTER
TRAINING LAB
M209
STAIR
MB
CORRIDOR
M220
TOILET
M241
ADA SHOWER
M244
SHOWER
M245
WOMEN'S LOCKER
ROOM
M240
AMBULATORY RR
M242
ADA RR
M237
2" CHWR UP2" HWR UP
2" HWS UP
2" CHWS UP
UNDERFLOOR
PLENUM. SEAL
PLENUM WALLS
AT FLOOR AND
BOTTOM OF
ACCESS
FLOORING.
1 1/2" CHWR UP
1 1/2" CHWS UP
1 1/2" CHWS UP
1 1/2" CHWR UP
1" CHWR UP
1" CHWS UP
12x30 EA DN
12x34 MUA DN
2 1/2" HWS
20x20 SA
20x20 SA
M
8x6 EA UP
2" HWS
20x20 SA
20x14 SA
1" CHWS UP
1" CHWR UP
1 1/2" CHWS
1 1/2" CHWR
1 1/2" HWR
2 1/2" HWS
1 1/2" HWS
2 1/2" HWR2 1/2" CHWS2 1/2" CHWR
20x20 SA
12Ø SA
M
M
M
LTU M2.11: 140 CFM
6.2 MBH
LTU M2.2: 300 CFM
6.3 MBH
LTU M2.1: 300 CFM
6.3 MBH
LTU M2.20: 150 CFM
4.5 MBH
LTU M2.23: 200 CFM
5.7 MBH
LTU M2.22: 200 CFM
5.7 MBH
LTU M2.24: 300 CFM
7.6 MBH
LTU M2.25: 70 CFM
1.8 MBH
LTU M2.27: 300 CFM
7 MBH
LTU M2.26: 300 CFM
7 MBH
LTU M2.12: 140 CFM
6.2 MBH
LTU M2.13: 140 CFM
6.2 MBH
LTU M2.14: 140 CFM
6.2 MBH
LTU M2.15: 150 CFM
6.4 MBH
LTU M2.16: 150 CFM
6.4 MBH
LTU M2.17: 150 CFM
8.1 MBH
LTU M2.18: 150 CFM
8.1 MBH
LTU M2.19: 150 CFM
8.1 MBH
STAFF RR
M208
STAFF LACTATION
SUPPORT
M217
URINAL
M227
1 1/2" HWR DN
1 1/2" HWS DN
UF-M2.3
UF-M2.4
UF-M2.9
UF-M2.10
UF-M2.11
UF-M2.12
UF-M2.13
UF-M2.5
UF-M2.6
UF-M2.7
LTU M2.21: 150 CFM
4.5 MBH
M33
M34
M35
M36
M38
M39
M40
M41
M42
M4.M2
20x20 SA
/1 M1
.M 2B
M52
2" CHWR
2" CHWS
2" HWR
2" HWR
2" HWS
MC
0 8' 16' 1/8"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
SITE NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
CUI
CUI
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
U.S. CUSTOMS AND BORDER PROTECTION
INTERNATIONAL FALLS LAND PORT OF ENTRY
INTERNATIONAL FALLS, MN
SNOW KREILICH ARCHITECTS
HGA, TEN X TEN, STANTEC, ATELIER TEN, INTEGRAL RSG
MN0301IF
INTERNATIONAL FALLS, MN
INTERNATIONAL FALLS LAND PORT OF ENTRY
UNITED STATES LAND PORT OF ENTRY
INTERNATIONAL FALLS, MINNESOTA
SETH LAROCQUE
75% CONSTRUCTION DOCUMENTS
2025.05.23
ENGINEERING
HGA
420 NORTH 5TH STREET, MINNEAPOLIS, MN
(612) 758-4000
LANDSCAPE ARCHITECTURE
TEN X TEN
807 BROADWAY STREET NE, SUITE 221, MINNEAPOLIS, MN 55413
(612) 440-8369
RAIL AND TRAFFIC ENGINEERING
STANTEC
733 MARQUETTE AVENUE, SUITE 1000, MINNEAPOLIS, MN 55402
(612) 712-2000
SUSTAINABILITY
ATELIER TEN
104 WEST 29TH STREET, 8TH FLOOR, NEW YORK, NY 10001
(212) 254-4500
PHYSICAL SECURITY/BLAST DESIGN
INTEGRAL RSG
88 KEARNY STREET, SUITE 875, SAN FRANCISCO, CA 94108
(415) 329-0519
KEY PLAN - N.T.S.
5/
/2
:4 6:
A
M
M1.M2C
LEVEL TWO UNDER FLOOR HVAC & PIPING PLAN - MAIN
BUILDING - AREA C
2024.08.28SK
BFuller
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/8" = 1'-0"1 LEVEL TWO UNDERFLOOR HVAC PLAN - MAIN BUILDING - AREA C
MARK DATE DESCRIPTION
KEYNOTES - THIS SHEET
# DESCRIPTION
M33 PLENUM PRESSURE SENSOR, PS-11.
M34 PLENUM PRESSURE SENSOR, PS-12.
M35 PLENUM PRESSURE SENSOR, PS-13.
M36 PLENUM PRESSURE SENSOR, PS-14.
M38 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON AVERAGE PLENUM PRESSURE
READING FROM SENSORS PS-10 AND PS-11.
M39 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON AVERAGE PLENUM PRESSURE
READING FROM SENSORS PS-11 AND PS-13.
M40 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON PLENUM PRESSURE READING FROM
SENSOR PS-12.
M41 MODULATING DAMPER W/ AIR MEASURING STATION. MODULATE TO MAINTAIN UNDER FLOOR PLENUM PRESSURE BASED ON PLENUM PRESSURE READING FROM
SENSOR PS-14.
M42 DUCT STATIC PRESSURE SENSOR FOR AHU-M2 FAN CONTROL.
M52 SHADED AREA INDICATES SPACES WITHOUT ACCESS FLOOR.
A
B
C
D
0.1
0.2 0.3
0.4 0.5
0.6
B.1
A.1
WATCH
COMMANDERS
M111
POV BOOTH
M193
POV BOOTH
M194
HIGH-LOW BOOTH
M195
HIGH-LOW BOOTH
M196
PO
S.
PO
S.
PO
S.PO
S.
PO
S.
POV BOOTH
M192
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A
B
C
D
15 16 17
0.5
0.6
B.1
A.1
M5.M4
BREAK
M113
UPS
M169
SUPERVISORS
M112
WATCH
COMMANDERS
M111
VESTIBULE
M100
JANITORIAL
SUPPORT
M121
VIOLATOR
PERSONAL
PROPERTY
STORAGE
M140
TEMPORARY
SEIZED
PROPERTY
STORAGE
M132
FRAUD/FORENSIC
LAB
M133
MPOE
M162
TRANSFORMER
YARD
M184
STAFF RR
M114
AG LAB
M127
FIRE ALARM
CONTROL
M161
AG SUPERVISOR
M126
AG WORK AREA
M125
ENFORCEMENT
WORK AREA (2)
M145
VESTIBULE
M108
LACTATION
SUPPORT
M105
PUBLIC
FAMILY/SINGLE
OCC. RR
M103
TRASH/RECYCLING
M174
VIOLATOR
WAITING
M152
IDENT
M151
SECURE
CORRIDOR
M120
TTRT INTERVIEW
M146
PLUMBING
ACCESS
M160
FOOD PREP
M131
OUTBOUND
BOOTH
M190
ELEC CLOSET
M176
INTERVIEW
M148
INTERVIEW
M149
INTERVIEW
M150
TECH OFFICE
M128
TTRT
SUPERVISOR
M164
SPECIAL
RESPONSE TEAM
M163
MECHANICAL
M171
SEARCH
M144
INTERVIEW
M141
INTERVIEW
M142
SEARCH
M143
JUV HOLD
M154 HOLD
M155
HOLD
M156
HOLD
M157
HOLD
M158
FAMILY HOLD
M153
CBP STAFF RR
M172
CBP STAFF RR
M173
TTRT WAITING
ROOM
M147
IDF
M170
CONFERENCE/MUSTER
AREA/TRAINING
M167
TRAINING
STORAGE
M168
AG DISPOSAL
M130
CORRIDOR
M119
STAIR
MA
STAIR
MB
DIGITAL IMAGING
M124
FIRE/WATER
SERVICE
M159
TTRT
SUPERVISOR
M165
TT INTERVIEW
M181
TT INTERVIEW
M180
PUBLIC
FAMILY/SINGLE
OCC. RR
M178
PUBLIC
FAMILY/SINGLE
OCC. RR
M104
PUBLIC
FAMILY/SINGLE
OCC. RR
M106
TT WORK AREA
M179
TT WAITING
M177
VESTIBULE
M175
ELEC CLOSET
M129
TT INTERVIEW
M182PEDESTRIAN /
OUTBOUND LOBBY
M107
HIGH-LOW BOOTH
M191
CORRIDOR
M109
CORRIDOR
M116
SERVICE
VESTIBULE
M117
CORRIDOR
M118
CORRIDOR
M134
ELEV MA
M135
NE
G.
NE
G.
PO
S.
NE
G.
NE
G.
NE
G.
NEG.
POS.
NE
G. NEG.
NEG.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NE
G.
NEG. 10%
NEG.
NEG.
NEG.
NEG.
AIRFLOW BALANCE GENERAL NOTES
A.
B.
ALL RETURN / EXHAUST AIRFLOW CFM'S IN PRESSURE
DEPENDANT ROOMS ARE STARTING POINTS. TAB CONTRACTOR
TO BALANCE ROOM TO MAINTAIN PROPER PRESSURE
RELATIONSHIP. FINAL CFM TO BE DETERMINED BY TAB AFTER
BALANCING.
ROOM PRESSURE TAG INDICATES THE DESIRED ROOM
PRESSURE RELATIONSHIP AND DIRECTION OF AIRFLOW IS
INDICATED BY THE ARROW.
POS. - POSITIVE, FINAL CFM TO BE DETERMINED DURING TAB.
NEG. - NEGATIVE, FINAL CFM TO BE DETERMINED DURING TAB.
NEG. 10% - NEGATIVE, BY 10% OF SUPPLY AIRFLOW
MA MB MC
0 10' 20' 1"=10'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
SITE NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
CUI
CUI
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
U.S. CUSTOMS AND BORDER PROTECTION
INTERNATIONAL FALLS LAND PORT OF ENTRY
INTERNATIONAL FALLS, MN
SNOW KREILICH ARCHITECTS
HGA, TEN X TEN, STANTEC, ATELIER TEN, INTEGRAL RSG
MN0301IF
INTERNATIONAL FALLS, MN
INTERNATIONAL FALLS LAND PORT OF ENTRY
UNITED STATES LAND PORT OF ENTRY
INTERNATIONAL FALLS, MINNESOTA
SETH LAROCQUE
75% CONSTRUCTION DOCUMENTS
2025.05.23
ENGINEERING
HGA
420 NORTH 5TH STREET, MINNEAPOLIS, MN
(612) 758-4000
LANDSCAPE ARCHITECTURE
TEN X TEN
807 BROADWAY STREET NE, SUITE 221, MINNEAPOLIS, MN 55413
(612) 440-8369
RAIL AND TRAFFIC ENGINEERING
STANTEC
733 MARQUETTE AVENUE, SUITE 1000, MINNEAPOLIS, MN 55402
(612) 712-2000
SUSTAINABILITY
ATELIER TEN
104 WEST 29TH STREET, 8TH FLOOR, NEW YORK, NY 10001
(212) 254-4500
PHYSICAL SECURITY/BLAST DESIGN
INTEGRAL RSG
88 KEARNY STREET, SUITE 875, SAN FRANCISCO, CA 94108
(415) 329-0519
KEY PLAN - N.T.S.
5/
/2
:4 6:
A
M
M2.M1
LEVEL ONE - PRESSURIZATION PLAN - MAIN BUILDING
04/17/2024Author
Checker
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1" = 10'-0"1 LEVEL ONE- AREA A - PRESSURIZATION PLAN - MAIN BUILDING
1" = 10'-0"2 LEVEL ONE - AREA B AND C - PRESSURIZATION PLAN - MAIN BUILDING
1 2 3
B
C
D
0.1
0.2 0.3
0.4 0.5
0.6
B.1
A.1
M5.M4
/1 M2.M1B
10" SA UP
12" SA UP
12" SA UP
12" SA UP 12" SA UP
12" SA UP
14X14 RA UP
ERH-M1.3
ECUH-M1.5
ECUH-M1.3
ERH-M1.2 ERH-M1.1
ECUH-M1.1
ECUH-M1.2
ECUH-M1.6
ECUH-M1.4
36x4 RA36x4 RA 34x4 RA 34x4 RA
POV BOOTH
M193
SUPERVISORS
M112
WATCH
COMMANDERS
M111
HIGH-LOW BOOTH
M191
12Ø RA UP
12Ø RA UP
12Ø RA UP 12Ø RA UP 12Ø RA UP
46x22 SA UP/DN
34x4 RA 34x4 RA 30x4 RA
46x18 RA UP
ECUH-M1.11
ERH-M1.5
ECUH-M1.9
ERH-M1.6
ERH-M1.4
ECUH-M1.7
ECUH-M1.12
ECUH-M1.10
ECUH-M1.8
36x84 RA
M5.M4
M5.M4
42x14 RA DN
HIGH-LOW BOOTH
M196
HIGH-LOW BOOTH
M195
POV BOOTH
M194
POV BOOTH
M192
LD-3:LD-3: LD-3:LD-3:
LD-3:LD-3:
LD-3:LD-3:
LD-3:LD-3:
M17 M17
M17
M17
M17
M18 M18
M20 M22
M20 M22
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
LD-2:8Ø
250 CFM
(2)
RG-2:12Ø
500 CFM
LD-2:8Ø
190 CFM
(2)
RG-2:12Ø
380 CFM
LD-2:8Ø
160 CFM
(2)
RG-2:12Ø
320 CFM
RG-2:12Ø
250 CFM
LD-2:8Ø
130 CFM
(2)
RG-2:12Ø
320 CFM
LD-2:8Ø
160 CFM
(2)
RG-2:12Ø
320 CFM
LD-2:8Ø
160 CFM
(2)
M44
M44
M44
M44
M44
M44
M44
M44
M44
M44
M44
M44
21x72 RA UP
MA
0 8' 16' 1/8"=1'-0"
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
SITE NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
CUI
CUI
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
U.S. CUSTOMS AND BORDER PROTECTION
INTERNATIONAL FALLS LAND PORT OF ENTRY
INTERNATIONAL FALLS, MN
SNOW KREILICH ARCHITECTS
HGA, TEN X TEN, STANTEC, ATELIER TEN, INTEGRAL RSG
MN0301IF
INTERNATIONAL FALLS, MN
INTERNATIONAL FALLS LAND PORT OF ENTRY
UNITED STATES LAND PORT OF ENTRY
INTERNATIONAL FALLS, MINNESOTA
SETH LAROCQUE
75% CONSTRUCTION DOCUMENTS
2025.05.23
ENGINEERING
HGA
420 NORTH 5TH STREET, MINNEAPOLIS, MN
(612) 758-4000
LANDSCAPE ARCHITECTURE
TEN X TEN
807 BROADWAY STREET NE, SUITE 221, MINNEAPOLIS, MN 55413
(612) 440-8369
RAIL AND TRAFFIC ENGINEERING
STANTEC
733 MARQUETTE AVENUE, SUITE 1000, MINNEAPOLIS, MN 55402
(612) 712-2000
SUSTAINABILITY
ATELIER TEN
104 WEST 29TH STREET, 8TH FLOOR, NEW YORK, NY 10001
(212) 254-4500
PHYSICAL SECURITY/BLAST DESIGN
INTEGRAL RSG
88 KEARNY STREET, SUITE 875, SAN FRANCISCO, CA 94108
(415) 329-0519
KEY PLAN - N.T.S.
5/
/2
:4 6:
A
M
M2.M1A
LEVEL ONE HVAC PLAN - MAIN BUILDING - AREA A
2024.08.28SK
BFuller
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
1/8" = 1'-0"1 LEVEL ONE HVAC PLAN - MAIN BUILDING - AREA A
MARK DATE DESCRIPTION
KEYNOTES - THIS SHEET
# DESCRIPTION
M17 PROVIDE ONE CONTINUOUS GRILLE WITH BLANKOFFS INSTALLED BETWEEN ACTIVE LINEAR FAN COIL/TERMINAL UNITS. COORDINATE LENGTH OF CONTINUOUS
LINEAR BAR GRILLE WITH ARCHITECTURAL PLANS. REFER TO M1.1B FOR LINEAR FAN COIL PERFORMANCE M18 TRANSFER AIR DUCT FOR ROOMS SERVED BY UFAD SHALL BE SIZED FOR MAXIMUM 200 FPM. TRANSFER DUCT CONCEALED IN ARCHITECTURAL SOFFIT. REFER TO
ARCH PLANS FOR DETAILS. PROVIDE 1" ACOUSTIC LINING. TAGS REPRESENT INTERNAL DIMENSIONS.
M20 DUCTWORK TO CONNECT TO PERFORATED METAL PANEL - SEE ARCHITECTURAL DRAWINGS.
M22 DUCTWORK, VOLUME DAMPER, AND ANY OTHER ELEMENT WITHIN EYESIGHT THROUGH THE PERFORATED GRILLE SHALL HAVE A BLACK FINISH.
M44 BOTTOM OF CABINET UNIT HEATER SHALL BE 10" AFF.
1 2 3 4 5 6 7 8 9 10
B
C
D
0.4
0.5
0.6
B.1
A.1
M5.M3
M5.M3
/1 M2
.M 1C
/ 1
M2.M1A
22"x12" EXHAUST
LOUVER
12" SA UP 12" SA UP
12" SA UP
14X14 RA UP
ERH-M1.3
ECUH-M1.5
ECUH-M1.3
ERH-M1.2
ECUH-M1.13
ERH-M1.7
ERH-M1.1
ECUH-M1.1
EF-M1.1
LFC M1.7
3.4 MBH EAV
M1.2
ECUH-M1.14
LFC M1.4
2.1 MBH
LFC M1.17
4.9 MBH
LFC M1.18
4.9 MBH
LFC M1.19
4.9 MBH
LFC M1.20
4.9 MBH
ECUH-M1.2
ECUH-M1.6
ECUH-M1.4
LFC M1.3
4.5 MBH
VAV
M-112
CUH-M1.6
LFC M1.1
4.5 MBH
LFC M1.2
4.5 MBH
12x8 EA UP
20x14 RA DN
24x8 EA
14x6Ø EA
14x12 MUA
12x10 EA
36x4 RA36x4 RA 34x4 RA 34x4 RA 30x4 RA
40x4 RA
10x10 EA
POV BOOTH
M193
BREAK
M113
SUPERVISORS
M112
WATCH
COMMANDERS
M111
VESTIBULE
M100
JANITORIAL
SUPPORT
M121
STAFF RR
M114
VESTIBULE
M108
LACTATION
SUPPORT
M105
PUBLIC
FAMILY/SINGLE
OCC. RR
M103
INTERVIEW
M150
STAIR
MA
PUBLIC
FAMILY/SINGLE
OCC. RR
M104
PUBLIC
FAMILY/SINGLE
OCC. RR
M106PEDESTRIAN /
OUTBOUND LOBBY
M107
POV /BUS LOBBY
M101
VESTIBULE
M102
HIGH-LOW BOOTH
M191
CORRIDOR
M109
AG DISPOSAL
M130
12Ø RA UP 12Ø RA UP
46x22 SA UP/DN
34x4 RA 34x4 RA 30x4 RA
46x18 RA UP
CUH-M1.1
VAV
M-111
EAV
M1.1
EAV
M1.3
24x8 EA
12x10 EA
12x8 MUA36x84 RA
58x50 RA
M5.M4
M5.M4
M5.M4
42x14 RA DN
SUMP PUMP
M123
SERVICE
VESTIBULE
M136
ELEC CLOSET
M129
POV BOOTH
M192
AG LAB
M127
AG SUPERVISOR
M126
AG WORK AREA
M125
VIOLATOR
WAITING
M152
IDENT
M151
OUTBOUND
BOOTH
M190
INTERVIEW
M148
INTERVIEW
M149
TTRT WAITING
ROOM
M147
CORRIDOR
M119
DIGITAL IMAGING
M124
FIRE/WATER
SERVICE
M159
CORRIDOR
M134
ELEV MA
M135
LD-3:LD-3: LD-3:LD-3:
LD-3:LD-3:
LD-3:LD-3:
LD-3:LD-3:
300 CFM
EG-1:EG-1: 12x8
LFC M1.10
4.2 MBH
LFC M1.11
4.2 MBH
LFC M1.12
4.2 MBH
LFC M1.13
4.2 MBH
LFC M1.14
4.2 MBH
LFC M1.15
4.2 MBH
LFC M1.16
4.2 MBH
M17 M17
M17
M17
M17
M17
M17
M17
M17
M17
M17
M17
M18 M18 M18
M20 M22 M20
M22
M18
M20 M22
450 CFM
EG-1:EG-1: 12x8
M25
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70 CFM
SD-5:8Ø
70 CFM
SD-8:10Ø
70 CFM
SD-8:10Ø
70 CFM
SD-8:10Ø
70 CFM
SD-8:10Ø
70 CFM
SD-6:8Ø
70 CFM
SD-6:8Ø
70…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .