Transmittal - 00086.pdf
PDF 73 KB Posted
- Solicitation number
- 47PF0024R0076
About this file
This transmittal document is from Snow Kreilich Architects, Inc. to the U.S. General Services Administration (GSA) regarding the International Falls Land Port of Entry (LPOE) project. The transmittal, dated 8/19/2025, includes several documents for review: General Commissioning Requirements, existing building CAD files, 75% Construction Documents (CD) drawing RFI markups, a final RFI list, and an asbestos inspection report. The transmission is directed to Anna Vanko and Seth LaRocque from GSA, with copies to additional team members from Jacobs, HGA, Stantec, Long Green Specs, and TEN X TEN. The documents are part of the ongoing design and construction process for the International Falls LPOE project, with the purpose of sharing responses to previous requests for information and drawing markups.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Transmittal
219 North Second Street - Suite 120, Minneapolis, MN 55401
PROJECT: GSA International Falls LPOE 2023.07
DATE: 8/19/2025
SUBJECT: i fALLS RFI RESPONSES TRANSMITTAL ID: 00086
PURPOSE: For your review and comment VIA: Info Exchange
FROM
NAME COMPANY EMAIL PHONE
Mary Springer 219 North Second Street
- Suite 120 Minneapolis MN 55401 United States
Snow Kreilich Architects, Inc. mary@snowkreilich.com 612.752.0275
TO
NAME COMPANY EMAIL PHONE
Anna Vanko
230 S DEARBORN
STREET
Chicago IL 60604 United States
U.S. General Services Administration anna.vanko@gsa.gov 614.469.2791
Seth LaRocque U.S. General Services Administration Design and Construction Division 985 Michigan Avenue Detroit, MI 48226 United States
GSA seth.larocque@gsa.gov 312.505.6393
REMARKS: Hello Anna and Seth-
Please see attached for our responses to the RFI document and associated attachments. We have also responded to the last substitution request in the shared document. Please let me know if you have any questions.
thank you!
Mary Springer
Transmittal
DATE: 8/19/2025
TRANSMITTAL ID: 00086
DESCRIPTION OF CONTENTS
QTY DATED TITLE NOTES
1 8/18/2025 01 91 13_General Commissioning Requirements.pdf
1 8/18/2025 Existing building CAD files-20241226T212033Z-001.zip
1 8/14/2025 IFALLS LPOE_75% CD DRAWINGS V1_L6-14_RFI
markup.pdf
1 8/14/2025 IFALLS LPOE_75% CD DRAWINGS V1_L7-03_RFI
markup.pdf
1 8/19/2025 International Falls GC Final RFI List.docx
1 8/18/2025 MN0300ZZ LPOE IFalls Asbestos Inspection CCA 2020.pdf
COPIES:
Maryellen Wikoff (Jacobs) Tyson McElvain (Snow Kreilich Architects, Inc.)
Kate Lohrenz (HGA) Theresa Maahs (Stantec) Anne Hicks Harney (Long Green Specs) Emma Froh (TEN X TEN)
File details come from the government source that posted it. Updated .