(I) Bid Form.docx

DOCX document 14 KB Posted

Attached to
Design/Build B562 MAU#1 Replacement
Solicitation number
ACQR6148962
Issued by

About this file

This is a Bid Form for the B533 Cooling Tower Proposal requiring contractors to submit pricing for two line items. The base requirement (CLIN 0001) involves designing, providing, and commissioning new closed circuit evaporative coolers (CCEC), a condenser pump, building circulation pumps, chemical-free condenser water treatment, and bypass valves/piping at each floor loop for Building B533. The optional work (CLIN 0002) includes demolishing two oversized and non-functional CCECs (CCEC-3 and CCEC-4), capping piping and electrical conduits at the platform, and transporting, disposing of, and recycling all waste materials in compliance with applicable regulations.

Award will be made on the combined total of both CLINs, with CLIN 0001 requiring a firm fixed price with no economic price adjustment provisions. The Government reserves the unilateral right to exercise CLIN 0002 within 180 calendar days after contract award, with a contract completion date of 270 calendar days from award if the option is exercised at time of award. If CLIN 0002 is exercised, the contractor must provide additional bonding and obtain surety consent, with the Performance Bond reflecting 100 percent of the combined CLINs amount. Failure to provide prices for either CLIN will result in proposal rejection, and the Government may reject materially unbalanced offers. Evaluation of options will follow FAR 17.206(b) and FAR 52.217-5, though option evaluation will not obligate the Government to exercise them.

View the file

Other files

File Type Posted
562 Metering Graph.jpg JPG image
562 Metering Max Avg.jpg JPG image
BLD 562 100A (SN 70503603)_260401_0925.pdf PDF
Amendment 05.pdf PDF
BLD 562 200A (SN 70503603)_260401_0925.pdf PDF
BLD 562 300A (SN 70503603)_260401_0925.pdf PDF
Amendment 04.pdf PDF
Amendment 03.pdf PDF
C_IMG_20260310_111032976.jpg JPG image
A_IMG_20260310_110720143_HDR.jpg JPG image
C_IMG_20260310_111023551_HDR.jpg JPG image
D_IMG_20260310_111211863_HDR.jpg JPG image
MDP_IMG_20260310_110517249_HDR.jpg JPG image
MDP_IMG_20260310_110533776.jpg JPG image
B_IMG_20260310_110847216_HDR.jpg JPG image
MDP_IMG_20260310_110451510_HDR.jpg JPG image
A_IMG_20260310_110709257_HDR.jpg JPG image
B_IMG_20260310_110835951_HDR.jpg JPG image
D_IMG_20260310_111225555.jpg JPG image
Amendment 02.pdf PDF
Amendment 01.pdf PDF
MACC RFP.pdf PDF
(B) NEPA.pdf PDF
(C) WD CT20260024 01232026.pdf PDF
(J) General Requirements.pdf PDF
(D) 2016-R-0149.pdf PDF
(F) Map to B135.pdf PDF
(A) 1874684 B562 Replace MAU1Final DB RFPsigned.pdf PDF
(E) CERT-141.pdf PDF
(G) Base Map.pdf PDF
(H) RFI Form.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B533 Cooling Tower Proposal Sheet

$_________________ Base Bid (CLIN 0001): Design, provide, and commission new closed circuit evaporative coolers (CCEC), condenser pump, building circulation pumps, chemical-free condenser water treatment and bypass valves/piping at each floor loop for B533.

$_________________ Option (CLIN 0002): Demolish oversized/non-functional closed circuit evaporative coolers CCEC-3 and CCEC-4. Cap piping and electrical conduits at the platform. Transport, dispose of, and recycle all waste materials in accordance with local, state, and federal regulations.

NOTES:

1. Award will be made on the total sum of both CLINs 0001 and 0002.

2. The Government reserves the unilateral right to award CLIN 0002 to the contractor at the proposed price within 180 calendar days after contract award. A firm fixed proposed price is required for CLIN 0001. No provision is made for economic price adjustment. If the option is exercised at time of award, the contract completion date remains 270 calendar days after award of the contract.

3. If CLIN 0002 is exercised, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the combined amount of both CLINs.

4. Failure to enter a price for either of the CLINs will result in the proposal being rejected as unacceptable. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

5. Evaluation of Options (JUL 1990): “Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).”

File details come from the government source that posted it. Updated .